Home  Register  Jobs  CVs  Job Search  Worldwide  Process  Help  Search  Scams  JA  B  C
Oil Offshore Marine Careers in Onshore and Offshore Drilling Energy Industry Oil Offshore Marine: Oil & Gas Jobs & CVs Online recruitment services (job vacancies, resume/cv database search) for Oil Industry, Energy, Offshore, Petroleum, Engineering, Construction, Drilling, Subsea, Marine, Shipbuilding, Shipping, Petrochemical. Have your own FREE account! free cv upload registration on Oil-Offshore-Marine.com recruiter benefits: free job postings and cv search on Oil-Offshore-Marine.com
  Need to find something?
 
 Username:  
 Password:  
Oil Offshore Marine Register
 
  Remember my password?  
 Recruiters - Employers & Agencies
  Advertise / Contact Us
free cv upload for all job seekers, free access to oil and gas jobs
subscribe to oil careers alerts, oil jobs postings, drilling rig jobs, engineering jobs

 

CV Instrument Engineer Commissioning for CEGELEC oil and gas division, Abu Dhabi UAE

 
Instrument Engineer Commissioning for CEGELEC oil and gas division, Abu Dhabi UAE

Resume built for oil and gas job opportunities by a jobseeker with experience in Instrument Engineer Commissioning for CEGELEC oil and gas division, Abu Dhabi UAE - would you like to offer this candidate a job/contract employment?

Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database

CV/Resume ID no.: 100126

Location (Residence): VELLORE, India
Citizenship: India
 
Languages:
  Native: Tamil
  Other: Hindi, Telugu
 
Education & Experience: Work Authorization & Relocation:
Education:
  Vocational in ELECTRONICS AND COMMUNICATION ENGG

Years of Experience: 12 years
Authorized to work in:
   Oman, Qatar, Saudi Arabia, United Arab Emirates
Present Location:
   UAE, ABUDHABI
Relocation:
   Anywhere (International)
 
Expertise
Category Subcategory Ability Experience
Engineering Instrumentation Experienced 19 years
Engineering Instrumentation Experienced 1 year
Engineering Instrumentation Experienced 11 years
 
CV/Resume Details
 
1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory]

Dear Sir,

I am responding to your ad in website for the post of Instrument Commissioning Engineer.

I have had twelve plus years of experience in an Instrumentation Engineering and Commissioning, and am currently employed as Instrument Engineer Commissioning for CEGELEC oil and gas division, Abu Dhabi.

I have had extensive experience in leading position for Instrument commissioning team, a skill that you asked for in your advertisement. I am now in a position to take on greater responsibilities.

2. Work Experience - CV/Resume Part 2 [Mandatory]

TOTAL EXPERIENCE: (12.2 Years)

GULF (Oil & Gas) Experience: 5 Years

CEGELEC OIL & GAS DIVISION, Abudhabi, UAE
Period: Since August, 2005 to still

DAR AL RIYADH ENGG CONSULTANT, Al Khobar, Saudi Arabia
Period: 07/2004 to 07/2005 - 1 Year

SIEMENS SYSTEM HOUSE AUTOMATION (MICROMAX SYSTEMS), Trichy, India
Period: 05/1997 to 06/2004 - 7.2 Years


• CEGELEC OIL & GAS DIVISION, Abudhabi
Client: ABUDHABI POLYMERS COMPANY LIMITED (BOROUGE)
Contractor: Tecnicas Reunidas, Spain
Period: 05/09 to still
Ruwais, Abudhabi
Project: Utilities, Offsites & External Interconnections for Borouge 2 Project

Position Held: Commissioning Lead Engineer - Instrument

Project Description:
EPCC of Utilities, Offsites and External Interconnections for Borouge 2 project.

Job Involved
 Working as a leader of 3 commissioning instrument teams with total 20 peoples.
 Job assignment, Cold and Hot work permit follow up and daily progress report preparation.
 Prepared Instrument Loop folder and loop commissioning.
 Performing pre commissioning/mechanical completion checks of instrument.
 Getting approval and follow up the completed loop folders and handover to project completion team.

• CEGELEC OIL & GAS DIVISION, Abudhabi
Client: Qatar Petroleum (QP) & Common Seawater Facility (CSF)
Contractor: Dodsal Engineering and Construction Pte ltd
Period: 01/08 to 04/09 (16 Months, Rotation 8W ON /2W OFF)
Raslaffan, Qatar
Project: Raslaffan Common cooling seawater system phase-II (CCWP-PHASE II) for once through consumers

Position Held: Instrument Lead Engineer

Project Description:
EPIC of Raslaffan Common Cooling Seawater System Phase-II for once through consumers (Q-Power, Ras Gas and Qatar Gas)

Job Involved
 Involved system and subsystem separation as per Opercom methodology.
 Prepared Instrument Database in excel and upload in CISCOM to prepare Pre commissioning check, test sheets for each instrument and Commissioning functional test sheet for each basic function (Loop).
 Prepared Pre-Commissioning and commissioning dossier for each subsystem, follow up and getting approval from client.
 Prepared check, test and functional test sheet format and getting approval from client.
 Prepared operational test procedure (OTP) for existing and new Fire and Gas system.
 Involved Pre commissioning and commissioning activities with Dodsal and Commissioned field instruments such as combined check Valve (CCV-Hydraulic operated), MOV, transmitters, etc...
 Instrument engineering document follow up such as P&ID, IO List, loop diagram, cable schedule, Schematic diagram, Cause and effect diagram, interconnection diagram and communication detail diagram for third party equipments.

• CEGELEC OIL & GAS DIVISION, Abudhabi
Client: Abu Dhabi Gas Industries Ltd (GASCO) – NGL Extraction Plant (ASAB & BAB)
Project: Asab and Bab Integrated control System (ABICS)
Period: 12/2005 to 08/2006 & 12/2006 to 11/2007 (20 Months)
Abu Dhabi – UAE

Position Held: Commissioning Team Leader

Project Description:
Revamping – Detailed Engineering, construction and commissioning (Hot Transfer) and GASCO’s requirement to maintain the existing functionality.

Job Involved:
 Involved Site acceptance test (SAT).
 Established Ethernet, Fibre optic and modbus network between Honeywell Experion C200 Series DCS and third party devices such as turbine control system (GE Mark VI, CCC Series 5), vibration monitoring system (Bently Nevada- series 3500) and CCC Antisurge system.
 Preparation of commissioning dossier for each subsystem.
 Study the existing and new logics for preparation of hot changeover transfer procedure.
 Commissioning preparation activities for shutdown and hot transfer.
 Planning and scheduling for each shutdown and hot transfer loops.
 Manpower planning for hot transfer loops.
 Cold and Hot work Permit preparation, follow up and discussion with client for permit.
 Responsible for interlocks cross checking and overriding in DCS/IPS/FGS.
 Hot transfer of all motor sequences/ closed loops to new Honeywell DCS/IPS system
 Commissioning and HOT Changeover loops to DCS, IPS and FGS.
 Conducting process tuning for PID closed loops as per client requirement.
 Commissioning involved with vendor for package system such as TCS, Vibration monitoring system and Antisurge control system.
 Commissioning involved with vendor for High sensitivity smoke detection (HSSD) VESDA System, Energen (Tyco) System, GE Panametric Moisture analyzer system and Fire water system.
 Updating of Process P&ID, Cause & Effect diagram, Alarm management document, Loop diagram, Process and pneumatic hookup drawings.
 Network drawing and final document updating for as built.

• CEGELEC OIL & GAS DIVISION, Abudhabi
Client: Abu Dhabi Marine Operating Company (ADMA-OPCO), Das Island
Project: OIL & GAS: Fire and Gas Up gradation of Existing Fire and Gas System.
Period: 10/2006 to 11/2006 (2 Months)
Abu Dhabi – UAE

Position Held: System Engineer
Project Description:
Up gradation of Existing Fire and Gas system for Process plants at Das Island- Detailed Engineering.

Job Involved:
 Study the existing GE Fanuc PLC 90-30 Program.
 Developed new logics as per client requirement based on new philosophy (1 out of 3).
 Developed Cause and effect diagram for new philosophy.
 Logic diagram preparation to develop PLC Program.

• DAR AL RIYADH ENGINEERING CONSULTANT
Client: SAUDI ARAMCO, Gas and Oil Separation Plant (GOSP)
Project: OIL & GAS: Data Acquisition system for Motor Protection Pack
Period: 01/2005 to 07/2005 (7 Months)
Qatip, Saudi Arabia

Position Held: Commissioning Engineer

Project Description:
Design, Detailed Engineering, construction and commissioning Data Acquisition system for Motor Protection Pack for all motors in plant.

Job Involved:
 Involved Site acceptance test (SAT).
 Established Ethernet, Fibre optic and modbus network between Modicon Quantum PLC System, Plant DCS and Motor protection relay.
 Preparation of commissioning dossier for each subsystem.
 Commissioning preparation activities for hot transfer.
 Cold and Hot work Permit preparation, follow up and discussion with client for permit.
 Commissioning PLC System as per client requirement.
 Updating of Alarm management document.
 Network drawing and final document updating for as built.

• DAR AL RIYADH ENGINEERING CONSULTANT
Client: SAUDI ARAMCO, Ras tanura Refinery Plant
Project: Refinery Data Acquisition and control system for Utilities plant
Period: 08/2004 to 12/2004 (5 Months)
Rastanura, Saudi Arabia
Position Held: Commissioning Engineer

Job Description:
Design, Detailed Engineering construction and commissioning Data Acquisition system for Utility Plant

Job Involved:
 Involved Site acceptance test (SAT).
 Established modbus network between Modicon TSX Micro PLC System and Plant DCS.
 Preparation of commissioning dossier for each subsystem.
 Preparation activities for commissioning
 Cold and Hot work Permit preparation, follow up and discussion with client for permit.
 Developing Cause and effect diagram and logic diagram.
 Commissioning PLC System as per client requirement.
 Updating of Alarm management document.
 Network drawing and final document updating for as built.


• SIEMENS SYSTEM HOUSE AUTOMATION
Client: ISRO-Liquid Population space centre
Project: Data Acquisition and Control System
Period: 09/2003 to 05/2004 (9 Months)
Mahendraheri, India

Position Held: Commissioning Team Leader

Job Description:
Design, Detailed Engineering, construction and commissioning the Siemens PLC S7-400 H (Hardware Redundancy) system with redundant operator consoles for Rocket Engine test control project.

Job Involved:
 Conducting Factory acceptance test (FAT)
 Conducting Site acceptance test (SAT).
 Involved pre commissioning activities.
 Established Ethernet communication network between Siemens S7-400 Hardware Redundancy PLC system and redundant operator and engineering consoles.
 Study the existing logics and implement the new logics.
 Developing PLC ladder logics and PID programming for analog closed loops in PLC System.
 Conducting process tuning for PID closed loops as per client requirement.
 Implementing Graphic screens, trends, alarms configuration and reports in Siemens SCADA system WinCC.
 As built document preparation for System configuration, Network Architecture diagram, Panel layout, Panel wiring diagram, Loop diagram, Cause and effect diagram and logic diagrams.
 Commissioned the project as per client requirement.

• SIEMENS SYSTEM HOUSE AUTOMATION
Client: Bharat Heavy Electricals Ltd (BHEL) –Stainless steel tube Plant
Project: Machine Automation & Data Acquisition System
Period: 02/2003 to 08/2003 (7 Months)
Trichy, India

Position Held: System Commissioning Engineer

Project Description:
Design, Detailed Engineering, construction and commissioning the Hydrostatic SS pipe testing machine and SS Tube Spiral Fin welding machine automation project using Siemens PLC S7-300R (Software Redundancy) system and 4Axis positioning module FM357-2 with operator cum engineering consoles.

Job Involved:
 Involved Factory acceptance test (FAT) and Site acceptance test (SAT).
 Involved pre commissioning activities.
 Established MPI (Multi point interface) communication network between Siemens S7-300 software Redundancy PLC system and operator cum engineering console.
 Study the existing Relay logics and implement the new logics.
 Developing PLC ladder logics and PID programming for analog closed loops in PLC System.
 Conducting process tuning for PID closed loops as per client requirement.
 Implementing Graphic screens, trends, alarms configuration and reports in Siemens SCADA system WinCC.
 As built document preparation for System configuration, Network Architecture diagram, Panel layout, I/O Database, Panel wiring diagram, Loop diagram, Cause and effect diagram and logic diagrams.
 Commissioned the project as per client requirement.

• SIEMENS SYSTEM HOUSE AUTOMATION
Client: OFT Heavy Alloy Penetrating plant (HAPP)
Project: Machine Automation & Data Acquisition System
Period: 07/2002 to 01/2003 (7 Months)
Trichy, India.
Position Held: System Commissioning Engineer

Project Description:
Design, Detailed Engineering, construction and commissioning the Wanderer make Stainless steel cone splitting machine automation project using Siemens S7-300R (Software Redundancy) PLC System with simatic operator panel.

Job Involved:
 Performed Factory acceptance test (FAT) and Site acceptance test (SAT).
 Involved pre commissioning activities.
 Established MPI (Multi point interface) communication network between Siemens S7-300 software Redundancy PLC system and Simatic operator panel OP27.
 Study the existing Relay logics and implement the new logics.
 Developing PLC ladder logics in PLC System.
 Implementing Graphic screens, alarms configuration in Siemens Simatic operator panel OP27.
 As built document preparation for System configuration, Network Architecture diagram, Panel layout, I/O Database, Panel wiring diagram, Loop diagram, Cause and effect diagram and logic diagrams.
 Commissioned the project as per client requirement.

• SIEMENS SYSTEM HOUSE AUTOMATION
Client: Indhira Gandhi Centre of Atomic Research (IGCAR)
Project: Atomic Research – Automation of Sodium Heater Plant
Period: 01/2002 to 06/2002 (6 Months)
Kalpakkam, India

Position Held: System Commissioning Engineer

Project Description:
Commissioning the Sodium Heater Plant automation project using Siemens S5-115H (Hardware Redundancy) PLC and SCADA COROS-LSB.

Job Involved:
 Performed Factory acceptance test (FAT) and Site acceptance test (SAT).
 Involved pre commissioning activities.
 Established serial communication (RS 232) link between PLC system and Siemens single loop (DR20) and multi loop controllers (DR 24)
 Developed new logics as per client requirement.
 Developing PLC ladder logics in PLC System.
 As built document preparation for System configuration, Network Architecture diagram, Panel layout, I/O Database, Panel wiring diagram, Loop diagram, Cause and effect diagram and logic diagrams.
 Commissioned the project as per client requirement.

• SIEMENS SYSTEM HOUSE AUTOMATION
Client: Tata Power Company Limited (TPCL)
Project: Power Plant - Automation of BMS for Boiler
Period: 05/2001 to 12/2001 (8 Months)
Wadi, India
Position Held: BMS Commissioning Engineer
Project Description:
Commissioning the Burner Management System (BMS) for 2 x 110TPH (50MW) Boilers using Siemens S7-300R (Software Redundancy) PLC.

Job Involved:
 Performed Factory acceptance test (FAT) and Site acceptance test (SAT).
 Involved pre commissioning activities.
 Developed new logics as per client requirement.
 Developing PLC ladder logics in PLC System.
 As built document preparation for System configuration, Network Architecture diagram, Panel layout, I/O Database, Panel wiring diagram, Loop diagram, Cause and effect diagram and logic diagrams.
 Commissioned the project as per client requirement.

• SIEMENS SYSTEM HOUSE AUTOMATION
Client: Nagarjuna Green power limited (NGPL)
Project: Power Plant – Automation of 10 MW Cogeneration Power Plant
Period: 08/2000 to 04/2001 (9 Months)
Hyderabad, India

Position Held: Commissioning Engineer

Job Involved:
 Performed Factory acceptance test (FAT) and Site acceptance test (SAT).
 Involved pre commissioning activities.
 Commissioned 40 TPH FBC Boiler using Siemens PLC S5-135U with COROS LSB.
 Commissioned steam turbine using Siemens PLC S5-115H with SCADA COROS LSB.
 Established Ethernet communication network between two PLC’s and Redudant operator stations.
 Developed new logics for pumps as per client requirement.
 Developing PLC ladder logics and PID closed loops in PLC System.
 Conducting process tuning for PID closed loops as per client requirement.
 Implementing Graphic screens, trends, alarms configuration and reports in Siemens SCADA system COROS LSB.
 As built document preparation for System configuration, Network Architecture diagram, Panel layout, I/O Database, Panel wiring diagram, Loop diagram, Cause and effect diagram and logic diagrams.
 Commissioned the project as per client requirement.

• SIEMENS SYSTEM HOUSE AUTOMATION
Projects Handled in Paper Industry:

Tamilnadu Newsprint and Paper Limited, Karur, Tamilnadu
Period: 12/1999 to 07/2000 (8 Months)
Field and Commissioning Engineer
Design, Detailed Engineering, construction and Commissioning for Reel wrapping machine using Siemens S7-300 R PLC

Tamilnadu Newsprint and Paper Limited, Karur, Tamilnadu
Period: 06/1999 to 11/1999 (6 Months)
Field and Commissioning Engineer
Design, Detailed Engineering, construction and Commissioning for A4 Cutter and packing machine using Siemens S7-300 R PLC

West Coast paper mills Limited, Dandelli, Karnataka
Period: 09/1998 to 05/1999 (9 Months)
Commissioning Engineer
Design, Detailed Engineering, construction and Commissioning for Automation of Stock preparation plant using Siemens S7-400R PLC

Sun paper mills Limited, Tirunelveli, Tamilnadu
Period: 03/1998 to 08/1998 (6 Months)
Field and Commissioning Engineer
Design, Detailed Engineering, construction and Commissioning for 45 TPH Boiler plant automation using Siemens S7-300R PLC

Madhya Bharath paper mills Limited, Champa, Madhyapradesh
Period: 09/1997 to 02/1998 (6 Months)
Site Engineer
Design, Detailed Engineering, construction and Commissioning for total Turnkey C & I Project for 7 MW Plant automation using Siemens S7-300R PLC and S7-200.


3. Education & Training - CV/Resume Part 3 [Mandatory]

EDUCATIONAL QUALIFICATION:

Electronics & Communication Engineering Diploma (3 Years)
First Class with honours (88%)
Year 1994 - 1997

TRAINING ATTENDED

 Siemens total range of PLC hardware, software, basic programming & Networking.
 Siemens PLC hardware & software redundancy programming & Networking.
 Process Automation & Instrumentation control.
 Opercom (Operation & Commissioning), CISCOM & ICAPS Methodology.
 Commissioning - Subsystem selection Overview.


4. Computer Skills - CV/Resume Part 4 [Mandatory]
OPERATING SYSTEM : MS WINDOWS.
MS OFFICE.
5. Other Skills - CV/Resume Part 5 [Optional]
FIELDS OF COMPETENCE

Design, Engineering, Programming & Commissioning - Programmable Logic Controller (PLC),Distributed Control System (DCS),Human machine Interface (HMI), Supervisory control and data acquisition system (SCADA) and Field Instruments.
Preparation of System Configuration, I/O Database, Cause & Effect Chart, Logic Diagram, PID Control Loop, Ladder Logic and Mimic Screen Developing ,FAT & SAT.
6. Additional Information - CV/Resume Part 6 [Optional]
-


 

Questions about this candidate? Contact us for an immediate answer. To find similar people [or more experienced] - active jobseekers, please login OR create, FREE of charge, your own company account.

In order to view this candidate's contact information, you must a) be registered with Oil Offshore Marine - Worldwide Oil & Gas Jobs, and b) have already purchased a subscription.

Login Register Pricing Information
Instrument Engineer Commissioning for CEGELEC oil and gas division, Abu Dhabi UAE
CV/Resume ID no.: 100126

Relevant CVs; view more oil and gas CVs
1. Instrument and Control Engineer
2. ELECTRONICS AND INSTRUMENTATION ENGINEER
3. CONTROL, AUTOMATION AND INSTRUMENTATION ENGINEER
4. INSTRUMENT TECHNICIAN
5. Senior Instrumentation Engineer
6. Instrumentation & DCS Enginner
7. Marine Instrumentation Engineer
8. INSTRUMENTATION DESIGN AND DETAIL ENGINEER
9. electronic and instrument engineer
10. Instrument Engineerer - Oil & Gas
11. Project Manager, Planning Specialist
12. Fire & Gas Detection System engg.
13. Manager - Construction
14. Lead Engineer / Project Engineer
15. Instrument Engineer
16. Maintenance Supervisor 3 Years Experience in water plant
17. 6 years experienced Instrument Technician
18. PLC programming, Instrumentation controlling with 1.4 Yrs experience
19. Marine Service Engineer/mechanical/Instrumentation
20. Installation/ Erection/ Commissioning/Projects/ Operations & Maintenace
 
 
Other CVs; view more oil and gas CVs
1. Driller assistant
2. MSCE and CCNA Holder with strong networking knowledge and system admin ability
3. Piping Engineer with 6 years experience
4. Master, Chief Officer, 16 years in oil / cargo operation experience
5. Drilling, directional drilling, completion Consultant 25 years experience
6. Piping draftsman with 2 years of experience in the field of piping
7. Logging/Perforation engineering
8. Project Manager, Planning/Scheduling Engineer, Project Manager in a PMU
9. Control System engineer, System Engineer
10. Widely experienced (30 years+) in Oil & Gas construction work at home and abroad
11. Mud Engineer / Drilling Fluids Engineer
12. Experience in marine electrician works
13. Operation & Maintenance Manager Offshore and Onshore
14. Medic - private dental practice
15. Principal E & I Engineer, Instrument engineer on oil and gas, chemical, water treatment
16. Chief Electrical Engineer 1st Class, Wallem Ship Management Limited
17. Health Safety & Environment Engineer Oil & Gas projects, Plants and Civil works
18. Trainee Remote Sensing & Geographic Information System Engineer
19. Experienced in Fire Safety, Fire Fighting, Security Operations
20. ASNT AWS-CWI Welding Inspector, QA QC LNG & Oil Storage Tanks, Pipe Lines /Pressure Vessels
21. O & M ENGINEER OIL & GAS SAP I-DEAS8, AUTO CAD 2004 Dr. Babasaheb Ambedkar Marathwada University
22. Engineering Trainee Visvesvaraya Technological University, H.K.B.K.College of Engineering
23. SENIOR MECHANICAL ROTATING EQUIPMENT TECHNICIAN, GAS TURBINE TECHNICIAN
24. Safety Instructor, Fire Safety Engineering College, Seeb Oman, Sultanate of Oman, Duetac Drilling Co
25. British Army Specialist Signaller/Gunner/Driver on Operations overseas
26. Mechanical Technician, Polytechnic Kuching Sarawak, Malaysia, internship in Sealink Engineering
27. Petroleum Production Engineer Canadian Nexen Yemen operating oil/gas and water injection wells
28. +12 years experienced scaffolder with many certificates looking for offshore work
29. Offshore structural engineer, API, ISO, DNV, NORSOK, CAP, EN, BS, DOE, SOLAS standards
30. Contracts Administrator Topaz Marine Dubai UAE Caspian Sea and Middle East/Arabian Gulf regions
 
 

Press Ctrl+D to Bookmark - Tell a Friend - Job Archives - Jobs - Oil and Gas CVs Resumes - Subscribe to Job Alerts - Site Map - Events - Legal - Privacy - Contact

oil offshore marine's website design

Official Blog - International Maritime Signal Flags - Glossary of Oil & Gas Jobs Definitions - Abbreviations & Acronyms from the Oil, Offshore, Marine, and Shipping Industries - Engineering Oil Jobs - Top 100 Energy Sites - Marine Jobs - Offshore Jobs - Oil Careers - Maritime Jobs - PDS/PDMS Oil & Gas Jobs - Oil Industry Jobs - Oil Field Jobs - Oil and Gas Careers - Petroleum Jobs - Oil Rig Jobs - Offshore Oil Rig Jobs - Drilling Jobs - Oil Industry - Official Sitemap - Jobs Feed - Login to your Oil-Offshore-Marine.com account

www.Oil-Offshore-Marine.com - Your Oil & Gas, Offshore, Construction, Shipping, Petrochemical, and Marine Engineering Recruitment Center.

© Oil Offshore Marine - Oil & Gas Jobs - All Rights Reserved.
This website is designed for international users, and its use is governed by Oil Offshore Marine - Oil & Gas Jobs Legal provisions. By browsing on any page of this website, you are deemed to have accepted all Oil Offshore Marine - Worldwide Center of Oil & Gas Jobs legal terms. If you do not agree with Oil Offshore Marine's legal provisions, you must stop using this website and its services.


find oil and gas jobs

  Looking for something?