| |
| AIRCEL Resident Engineer telecom/isp (rf/wimax/bts/microwave) - a stupid lazy moron from India |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in AIRCEL Resident Engineer telecom/isp (rf/wimax/bts/microwave) - a stupid lazy moron from India - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
100971
Last Updated:
Tuesday, October 6, 2009 |
Location (Residence): kolkata, India
Citizenship: India
|
| |
Languages:
Native:
Hindi Other:
English |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
Bachelors in electronics and instrumentation Years of Experience:
2 years
|
Authorized to work in:
India
Present Location:
india, kolkata
Relocation:
UK (in particular), United States, Bahrain, France, Germany, Greenland, Hong Kong, Iran, Islamic Rep. of, Italy, Jamaica, Japan, Kuwait, Malaysia, Mauritius, Netherlands, New Zealand, Nigeria, Oman, Philippines, Qatar, Saudi Arabia, Singapore, South Africa, Spain, Swaziland, Sweden, Switzerland, Taiwan, POC, Thailand, Turkey, United Arab Emirates, United Kingdom, United States |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Technician Level |
Installation |
Trainee
|
6 years |
|
IT/Communications |
Telecom |
Trainee
|
6 years |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
To work with a great spirit and lead by example with passion, integrity and creativity to meet the challenges of the new millennium and to hold a responsible and challenging position in an organization having good working environment and provide best of me, both at technical and personal level to the organization.
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
1. Till I Am working in Leading Telecom operator AIRCEL ABS( AIRCEL BUSINESS SOLUTION) TEAM AS a AIRCEL RESIDENT ENGINEER (RF/WI-MAX/BSS) the pay roll of spin telecomm Delhi FOR Patna and Bhuwaneswar. From july 2009
projects
PROJECTS: AIRCEL (DISNET WIRELESS LTD) FOR LINK INSTALLATION OF WIMAX 3G BROADBAND SERVICES IN ALL OVER INDIA, and coordination the project in kolkata panta and bhubwaneswar with our team and vendor team. Team size 110.
MAJOR JOB ASSIGNMENTS DONE IN ORGANISATION
Project coordination with vendor management in telecomm & infra
Project coordination, manpower handling. full customer satisfaction.
Take responsibility of the project.
Wimax backhole installation
L1&L2 Feasibility Survey
Installation & Maintenance of Rad win / Alvarian Wi-MAX Equipment
PTP/PTMP RF Link Survey & Installation & RF Planning
Router Configuration
CPE Installation And configuration
Customer Complaint Handling And Customer Support 24*7
Visibility check
IP CONFIGURATION OF router and switch
VPN connection, configuration for wimax.
E1 THROUGH AND PATCHING
OPTICAL FIBRE PATCHING
BSS Operation, Maintenance & Administration of KOLKATA.
Base Station maintenance & also Customr site problem short out.
QUALITY CHECK,ALARM MONITOR, E1 CONVERTER
TECHNICAL EXPOSURE:-
RF test and Network
RF coverage and quality of Network
Generation of Network performance
New site survey
Networking Connectivity & Resolution / Trouble Shooting
2. I was working in MODERN INFRA kolkata as a project engineer and coordinator Infrastructure project and PDH link installation for SHYAM TELECOMM (MTS) team size 35
HUAWEI:-
TATA CDMA SECTOR UPGRADATION
TATA GSM INSTALATION BTS INDOOR & OUT DOOR
SITE RFI & VSWR.
MTS BTS INSTALATION INDOOR & OUTDOOR
MICROWAVE HUAWEI
0.3,/0.6/1.2/1.8 DIAMETER MICRO OF HUAWEI OPERATOR SHYAM.
SOFTWARE USED IN MICROWAVE START WEB LCT T2000
COMMISIONING.
LINK SET UP & ALLINGMENT.
E1 THROUGH.
PDH & SDH LINK.
3. I was working in a leading Telecom Company LINKQUEST TELECOMMUNICATION PVT. LTD AS A PROJECT ENGINEER(RF/WIMAX) & PROJECT CO-ORDINATOR team size 20 from oct 2007
MAJOR JOB ASSIGNMENTS DONE IN ORGANISATION
Project: RELIANCE CDMA PROJECT KOLKATA AND WEST BENGAL AS PROJECT ENGINEER
ALCATEL:
TRE & COMBINEER SWAPPING
BTS INSTALATION & COMMISIONING
SOFTWARE :- B9 OR B10
BTS SWAPPING MOTOROLA TO ALCATEL
ACCEPTANCE TEST & VSWR
PROJECT : RELIANCE COMMUNICATION WIMAX PROJECT FOR TELSIMA COMMUNICATION AS A PROJECT ENGINEER
WIMAX AND RF TELSIMA :
Wimax installation & commissioning, BASE STATION INSTALLATION,LINK SET UP
RF SERVEY,ALLIGNMENT,
PROJECT COORDINATION
ROUTER COMMISIONING
PTP/PTMP RF Link Survey & Installation
PROJECT: AIRTEL RADWIN PROJECT
RAD WIN :
AIRTEL RAD WIN INSTALLATION
LINK SET UP AND COMMISSIONING
Router configure, Solving any Hardware & Software Problem.
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
Qualification /Degree Institution Year Percentage
B-Tech (EIE) BUIE, Bankura 2007 74.96 %
Higher Secondary Bankura Goenka Vidyayatan, WB 2003 65.1 %
Madhyamik Bankura Goenka Vidyayatan, WB 2001 73.758%
Training :
Nature of Training Duration Place of Training
At Bankura B.S.N.L under the control of SDE (Internal), SDE (Transmission), DE (OFC) & A.O. (TR) BANKURA (WEST BENGAL).
28/06/2005 to 27/07/2005 Bankura B.S.N.L
Training on the basis of TEMPARATURE ON/OFF CONTROLLER USING MICROCONTROLLER 8051
26/06/2006 to 22/07/2006 MICRO PRO
75C PARK STREET
KOLKATA
Additional Courses :
Name/Address of Institute Course Duration
Techno Lab ( Gariahat Branch)
Kolkata.
FOUNDATION CERTIFICATE IN
NETWORKING ESSENTIALS
(FCNE) At Techno Lab nature of training is basic of networking FCNE with LAN,WAN, Troubleshooting, Connection implementation Setup TCP/ IP, DNS,SUBNET,UDP,CSMA,OSI MODEL, Administrator,Win98/Win xp
1 Month
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
C -with data structure, Core-java, computer & Networking, HTML
Software packages: MS-Office, open office, circuit maker, MATLAB, BTS SW, TERA TERM PRO. COLA PING.
Operating Systems: Windows-98 / XP. Windows Vista
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
MOBILE COMMUNICATION (GSM/CDMA), RF. WIMAX, RADWIN, BTS, MICROWAVE, PROJECT COORDINATION
SWITCH,VPN,VOIP,PROTOCOL,CSMA/CD,CSMA/CA,HDLC,VLAN,ETHERNET,CDMA,GSM, TDMA,ALLOAHA,WIRELESS,LAYERS,PROTOCOLS, NETWORK COMMUNICATION. TCP/IP
IP CONFIGARATION. TAPI PROTOCOL, HYBREX TAPI PROTOCOL,PBX,ISDN,ASTERISK,GNU BAYONNE,FREE SWITCH,OPEN PBX
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
Smart worker and good Team Player.
Good communication and interpersonal skills.
Committed and devoted towards work
Committed and devoted towards work & Zeal to succeed.
|
| |
|