|
|
CV Mechanical Rotating/Static, Piping & Structural Engineer in EPC Oil & Gas projects
|
|
|
|
|
|
|
| |
| |
| Mechanical Rotating/Static, Piping & Structural Engineer in EPC Oil & Gas projects |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in Mechanical Rotating/Static, Piping & Structural Engineer in EPC Oil & Gas projects - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
101563
Last Updated:
Sunday, October 18, 2009 |
Location (Residence): palembang, Indonesia
Citizenship: Indonesia
|
| |
Languages:
Native:
Indonesian Other:
Malay Malaysia |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
Bachelors in mechanical engineering Years of Experience:
11 years
|
Authorized to work in:
Malaysia, Saudi Arabia
Present Location:
indonesia, palembang
Relocation:
Bahrain, Indonesia, Qatar, Saudi Arabia |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Engineering |
Rotating Equipment |
Experienced
|
15 years |
|
Engineering |
Piping |
Experienced
|
15 years |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
SUMMARY
12 (twelve) years working experience as Mechanical Rotating/Static, Piping & Structural Engineer for several various project;
EPC Oil & Gas
- Gajah Baru CPP Project Premier Oil (Natuna Sea BV)
- Jambi Merang Development Gas Production Facilities (Palembang South Sumatera) JOB (Pertamina Hess)
- North Belut CPP Project (Engineering & Procurement) Conoco Phillips.
EPC Power Plan
- Muara Tawar Project Combine Cycle Power Plan 225 MW
(Engineering, Procurement & Construction)
Pulp Mill Project (Fabrication, Assembly & Installation)
- Recovery Boiler.
- Water Intake & Water Treatment Plan.
- Pulp Dryer.
- Evaporator Plan.
- Waste Water Treatment Plan.
- Re-caustic Plan.
- Digester Plan.
Boiler (Fire Tube/Water Tube) & Pressure Vessel Manufacture
Power Plant Project (Overseas Project/Saudi Arabia) (Fabrication, Assembly & Installation)
- Power Plan Project (Gas Turbine 8 x 50 MW)
- Power Plan Project (Gas Turbine 2 x 85 MW)
- Power Block (Steam Turbine) 3 x 375 MW
Maintenance Works (Fabrication, Assembly & Installation)
- Recovery Boiler (Pulp Mill).
- Wood Handling/Conveyor (Pulp Mill).
- Debarking Drums (Pulp Mill)
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
August, 2009 Present SINGGAR MULIA, PT (Engineering Consultan)
Occupation Fabrication Engineering Coordinator/Superintendent
Project GAJAH BARU CPP Project - Natuna
Project Location Batam - KEPRI
End User PREMIER OIL Natuna Sea BV
Responsibility To manage & deliver Engineering of assigned projects to company and clients
expectation as per schedule, meeting project requirement with an emphasis on value engineering.
To be responsible for:
- Establishing list of Detailed Engineering Deliverables, control and monitor for timely issue of
deliverables and provide progress reports.
- To ensure that deliverables are of requisite quality that meet technical requirement and project
scope.
- To particularly ensure that BOQ/MTO data is accurate, precise and provided at required stage of
project without delay.
- To be responsible for coordination with other departments of project task Force, Subcontractors,
Engineering Companies.
- To track, manage and resolve critical engineering issues with a combination of technical expertise,
tact, discretion., skillful handling and escalation process.
- Responsible for evaluating vendors technical proposals systematically with respect to project
requirements, scope and provide recommendation. Also responsible for review of vendor
documents.
- Responsible for coordinating with Project Management & site construction team for Engineering &
Technical Clarifications.
- Maintenance of preservation records for all equipments at site.
- As built documentation.
July, 2008 July 2009 TRIPATRA Engineers & Constructor (EPC Oil & Gas Company)
Occupation Construction Area Coordinator
Project Jambi Merang Development Gas Production Facilities
End User JOB (Pertamina HESS)
Project Location Bayung Lencir South Sumatera
Responsibility - Supports the construction manager in the definition of the execution strategy.
- Co-ordinates all interdisciplinary field works on a site, supervising the various disciplines/categories
of construction and assembly work.
- Co-ordinates General and Detail Programs for work carried out directly and works handled
by subcontractors, solving contingent problems on site and optimizing the use of materials,
work teams and available equipment.
- Solves co-ordination, priority and interface problems between the different work categories,
in compliance with the wider interest of whole site.
- Monitor Area Superintendents to ensure their correct supervision of subcontracted works, material orders
and specialist suppliers services in compliance with established program, progress and costs objectives,
as part of a wider objective to optimize manpower.
- Monitors Area Superintendents to ensure the correct implementation of construction activities
in compliance with quality standards and requirements.
- Assists the Site Project Control Engineer with the preparation of periodical reports, and supervises
the correct implementation of procedures designed to collect work performance control data.
- Ensures the observance of security regulations in force on the site.
- Interfaces the Client with regards to technical aspects.
Jan, 2008 June 2008 TECHNIP INDONESIA (EPC Oil & Gas Company)
Occupation Sr. Mechanical Engineer (Rotating Equipment)
Project North Belut CPP
Client Conoco Phillips
Responsibility - Report to lead engineer/Head of Departement for status the assign task.
- Front End Engineering Design.
- Preparation concept detail engineering for rotating equipment as per client requirements.
- Provided documentation rotating equipment data as per client requirements.
- Ensure completeness and full compliance of the deliverables with the contractual specification.
- Reviewing supplier/vendor document as per Supplier Document Register List.
- Interfaces the Client with regards to technical aspects.
Sept, 2007 Dec 2007 ALSTOM Power Asia Pacific Sdn Bhd (EPC Power Plan Company)
Occupation Sr. Construction Engineer
Project Muara Tawar 225 MW Combine Cycle Power Plan Jakarta
Client Perusahaan Listrik Negara (PLN)
Responsibility - Report to Lead Engineer the status of assigned task.
- Provide information to prepare the engineering progress upon request by LE.
- Ensure completeness and full compliance of the deliverables with the contractual specification.
- Analyze client comments and elaborate comprehensive answer.
- Consolidate, prepare and verify materials and transportation bill of quantities (BoQ) for erection
erection subcontract. Continuous monitoring of evolution of quantities and
consequences (resource, schedule, cost).
- Piping prefabrication and supply activity in workshop, support to site for piping prefabrication
if done at site. Continuous monitoring of the evolution of bulk material for piping, hangers and
valves.
- Maintaining, updating a reliable database for tendering and progress calculation.
- Preparation of documentation for erection works and verification of standard documentation
prepared by Participant and partners erection procedure, erection files, inspection and
Test File.
- Preparation of Hydrostatic Test Proposals for Piping Systems.
Jan, 2007 July 2007 PT TRUBA JURONG ENGINEERING Jakarta (J.V company between JURONG ENGINEERING LTD, Singapore and TRI USAHA BAKTI)
Occupation Mechanical Superintendent (Rotating/Static Equipments, Piping & Steel Structural Works)
Job Location Riau Andalan Pulp & Paper Pkl. Kerinci, Riau
Client PEC Tech Indonesia / ANDRITZ
Responsibility - Preparation & maintain updating schedule for fabrication & installation works.
- Reviewing design engineering, technical specification and drawing prior fabrication and installation.
- Monitor Supervisor to ensure their correct supervision of works, material orders
and specialist suppliers services in compliance with established program, progress and costs objectives,
as part of a wider objective to optimize manpower.
- Monitoring progress installation works versus manpower resource & tools.
- Maintaining procedure of installation base on ASME, ASTM, ANSI, API and JIS Standard.
- Maintaining quality management base on ISO 9001-2000, 14001
- Monitoring procedure of safety during construction base on OSHAS 18001
- Involve and solve problem if any technical problem during construction at site.
- Up dating progress report, weekly report & monthly report to Area Manager & Client.
- Arranging requisition materials for fabrication & installation related time schedule & drawing.
July, 2005 Feb, 2006 TRUBA ARABIA (J.V company between JURONG ENGINEERING LTD, Singapore and BEMCO Contracting Co, Saudi Arabia)
Occupation Field Piping Engineer/Superintendent (High Pressure, Medium & Low Pressure Piping Works)
Job Location Shoaiba Power Plant - Saudi Arabia
Client ALSTOM Power Centrals
Responsibility - Preparation & maintain updating schedule for fabrication & installation works.
- Reviewing design engineering, technical specification and drawing prior fabrication and installation.
- Monitoring progress installation works versus manpower resource & tools.
- Maintaining procedure of installation base on ASME, ASTM, ANSI, API and JIS Standard.
- Maintaining quality management base on ISO 9001-2000, 14001
- Monitoring procedure of safety during construction base on OSHAS 18001
- Involve and solve problem if any technical problem during construction at site.
- Up dating progress report, weekly report & monthly report to Area Manager & Client.
- Arranging requisition materials for fabrication & installation related time schedule & drawing.
March, 2005 July, 2005 TRUBA ARABIA (J.V company between JURONG ENGINEERING LTD, Singapore and BEMCO Contracting Co, Saudi Arabia)
Occupation Mechanical Superintendent (Rotating/Static Equipments, Balance of Plan & Piping Works)
Job Location Riyadh Power Plant # 7 - Saudi Arabia
Client SIEMENS Westing House
Responsibility - Preparation & maintain updating schedule for fabrication & installation works.
- Reviewing design engineering, technical specification and drawing prior fabrication and installation.
- Monitoring progress installation works versus manpower resource & tools.
- Monitor Supervisor to ensure their correct supervision of works, material orders
and specialist suppliers services in compliance with established program, progress and costs objectives,
as part of a wider objective to optimize manpower
- Maintaining procedure of installation base on ASME, ASTM, ANSI, API and JIS Standard.
- Maintaining quality management base on ISO 9001-2000, 14001
- Monitoring procedure of safety during construction base on OSHAS 18001
- Involve and solve problem if any technical problem during construction at site.
- Up dating progress report, weekly report & monthly report to Area Manager & Client.
- Arranging requisition materials for fabrication & installation related time schedule & drawing.
Nov, 2004 March, 2005 TRUBA ARABIA (J.V company between JURONG ENGINEERING LTD, Singapore and BEMCO Contracting Co, Saudi Arabia)
Occupation Estimate Engineer (Mechanical & Piping Works)
Job Location Head Office Truba Jurong Engineering - Jakarta
Responsibility - Estimation of manpower planning, consumables, equipment and budgeting for
project tender purpose.
April, 2004 July, 2004 TRUBA ARABIA (J.V company between JURONG ENGINEERING LTD, Singapore and BEMCO Contracting Co, Saudi Arabia)
Occupation Field Engineer (Mechanical Static/Rotating Equipments, Balance of Plan & Piping Works).
Job Location Riyadh Power Plant # 9 - Saudi Arabia
Client General Electric (GE) - USA
Responsibility - Preparation & maintain updating schedule for installation works.
- Reviewing design engineering, technical specification and drawing prior fabrication and installation.
- Monitoring progress installation works versus manpower resource & tools.
- Maintaining procedure of installation base on ASME, ASTM, ANSI, API and JIS Standard.
- Maintaining quality management base on ISO 9001-2000, 14001
- Monitoring procedure of safety during construction base on OSHAS 18001
- Involve and solve problem if any technical problem during construction at site.
- Up dating progress report, weekly report & monthly report installation to Area Manager & Client.
- Arranging requisition materials for fabrication & installation related time schedule & drawing.
Feb, 2002 Dec, 2003 PT. ATMINDO - Medan (Manufacturing & Engineering) Steam Boiler BABCOCK Gmbh - Germany.
Occupation Quotation & Estimation Engineer (Pressure Parts & Vessels)
Responsibility - Estimation prices for sales/ tender of water tube, fire tube boiler & vessels.
- Making of data specification of water tube, fire tube boiler & vessels.
Aug 2001 Jan 2002 PT. CILEGON FABRICATORS - Cilegon (J.V multi-company between PT. TRUBA ENGINEERING, JURONG ENGINEERING LTD Singapore, and Ishikawajima-Harima Heavy Industries (IHI), Japan.)
Occupation Project Team Leader (PTL)
Responsibility - Preparation production project reports actives such as maintain raw material & updating
progress report to client.
- Detailed production schedules versus actual, budget cost & cost committee and etches.
May, 2001 July 2001 PT. TIRTABUMI MEDAN PERKASA Medan (Soft Drink Factory)
Occupation Maintenance & Planning Engineer (Rotating Equipments)
Responsibility - Maintaining schedule of rotating equipments (by weekly, monthly and per 6 month).
- Involve to solve problem if any troubleshooting.
Oct 1999 Jan 2000 PT TRUBA JURONG ENGINEERING Jakarta (J.V company between JURONG ENGINEERING LTD, Singapore and TRI USAHA BAKTI)
Occupation Field Engineer (Mechanical Rotating/Static Equipments, Piping & Steel Structural Works)
Job Location Pk. Baru Riau
Client PEC Tech Indonesia
Responsibility - Preparation & maintain updating schedule for installation works.
- Reviewing design engineering, technical specification and drawing prior fabrication and installation.
- Monitoring progress installation works versus manpower resource & tools.
- Maintaining procedure of installation base on ASME, ASTM, ANSI, API and JIS Standard.
- Maintaining quality management base on ISO 9001-2000 and ISO 14001
- Monitoring procedure of safety during construction base on OSHAS 18001
- Involve and solve problem if any technical problem during construction at site.
- Up dating progress report, weekly report & monthly report installation to Area Manager & Client.
- Arranging requisition materials for fabrication & installation related time schedule & drawing.
May 1998 July 1999 PT TRUBA JURONG ENGINEERING Jakarta (J.V company between JURONG ENGINEERING LTD, Singapore and TRI USAHA BAKTI)
Occupation Field Engineer (Mechanical Rotating/Static Equipments, Piping & Steel Structural Works)
Job Location Palembang South Sumatera
Client KLOCKNER Gmbh - Germany
Responsibility - Preparation & maintain updating schedule for installation works.
- Reviewing design engineering, technical specification and drawing before construction.
- Monitoring progress installation works versus manpower resource & tools.
- Maintaining procedure of installation base on ASME, ASTM, ANSI, API and JIS Standard.
- Maintaining quality management base on ISO 9001-2000 and ISO 14001
- Monitoring procedure of safety during construction base on OSHAS 18001
- Involve and solve problem if any technical problem during construction at site.
- Up dating progress report, weekly report & monthly report installation to Area Manager & Client.
- Arranging requisition materials for fabrication & installation related time schedule & drawing.
Nov 1997 April 1998 PT CANANG INDAH Medan (Medium Density Fiberboard Factory)
Occupation Maintenance Engineer
Job Location Medan North Sumatera
Responsibility - Maintain schedule of maintenance rotating equipments (by weekly, monthly and per 6 month).
April 1995 July 1996 PT. IRAMA DINAMIKA LATEX Tg. Morawa (Latex Concentrate & Glove Factory)
Occupation Technician of Package Boiler
Job Location Medan North Sumatera
Responsibility - Maintain and monitoring operational package boiler.
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
EDUCATION
1997 Years Graduated Bachelor Degree from INSTITUTE TECHNOLOGY MEDAN (ITM),
NORTH SUMATERA- INDONESIA Majoring in Mechanical Engineering
WORKSHOP AND COURSE
2009 Years Fundamental Leadership Course by Dale Carnegie
2009 Years Project Management Course by PMI
2009 Years Public Speaking Course by EXPERD
2008 Years Mechanical Seals Seminar by Eagle Burgmann Mulia Hotel Jakarta (The New Technology for Diamond Faces)
2007 Years SECAD Training by Alstom Power Asia Pacific.
2002 Years Panelist Open Seminar Progress Monitoring & Scheduling Project by Faculty Technology of Industry, Institute Technology of Medan
2001 Years Understanding, Implementing, Documenting & Maintaining ISO 9001 - 2000 by LLYOD Register, for Project Management System.
1999 Years Regionally Seminar, Operational & Maintain of Steam Boiler & Air Conditioning
by Institute Technology of Medan.
1995 Years One-Day Seminar Conservation of Energy by PT. PLN Medan.
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
COMPUTER SKILLS
MS Office, MS Project, AUTO CAD Release 2007, Primavera 3.1, AUTO Pipe 6.1
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
Manufacturing and Maintenance Engineer
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
-
|
| |
|
|
|
|
|
Mechanical Rotating/Static, Piping & Structural Engineer in EPC Oil & Gas projects
CV/Resume ID no.: 101563 |
|
|
|
|
|
|
| Relevant CVs; view more oil and gas CVs |
| 1. Piping Design Engineer |
| 2. PDMS Piping for Oil & Gas Engineering (Offshore, Onshore, EPC Power etc) |
| 3. Piping Superintendent/supervisor/engineer |
| 4. Senior Piping Designer, I aim to be involved in new challenging projects. |
| 5. PDS Piping Designer / Piping Senior Draughtsman |
| 6. PDS Piping Designer |
| 7. Mechanical Engineer with expertise in Piping & Pressure vessel Design |
| 8. PIPING ENGINEER |
| 9. Pipe, Piping, Caesar, Stress Piping |
| 10. Project Manager - Commercial Operations Manager |
| 11. Pipe, Piping, Lead Piping, Coating, Insulation |
| 12. Piping design engineer, PDS/PDMS |
| 13. PDS Piping Designer |
| 14. PDS/PDMS/AutoPlant piping designer |
| 15. PIPING ENGINEER |
| 16. Construction Supervisor / Engineer |
| 17. Oil & Gas Operations and Maintenance Staff in Gail India, in Indrprastha Gas |
| 18. Field Piping Designer |
| 19. Lead Piping Engineer, Piping Stress, Plant Layout,Caesar, Routing, Support |
| 20. Mech./Piping Designer, with 14.5 years experience in Oil & Gas exploration. |
| |
| |
| Other CVs; view more oil and gas CVs |
| 1. Electrical QC Inspector / Supervisor Construction and Maintenance Projects India Middle East |
| 2. QC Inspector, surveyor for ship buildings |
| 3. 28 years of project construction management |
| 4. ETO (13+) in all kind of vessels (LNG, LPG, CNT, FPSO, Supply) |
| 5. A/B Tugboats |
| 6. Emergency Response Coordinator, Combat Medic in Mauritania, Libya, Kabul Afghanistan, British Army |
| 7. Catering, chef, seafood cooking |
| 8. Deck foreman, helicopter landing officer, service team leader, (offshore) |
| 9. PDS PDMS CIVIL STRUCTURAL DESIGNER |
| 10. CNC programmer |
| 11. RIG MECHANIC CHIEF/TUG BOAT & SPEED MECHANIC CHIEF/ CRANE MECHANIC |
| 12. General practioner with 15 yrs experience |
| 13. Junior welding inspector |
| 14. Personal assistant, Office-Manager, translator |
| 15. Trainee ndt engineer |
| 16. IT Engineer MS-Office, Internet Application, Outlook Express, LAN / WAN, wireless Network |
| 17. Experienced roughneck, can work derrick, pump room,rgit,medical,banksman slinger,forklift,coshh |
| 18. Trainee SAP ABAP and BASIS staff, experience in PT Cheil Jedang Indonesia |
| 19. Reservoir Engineer, Modeling Engineer, ECLIPSE (Geoquest Reservoir Simulator) |
| 20. Field Geophysicist Australia, Surtron Technologies, Senior Geophysicist & Field Group Leader |
| 21. Iraq based Site Manager, Prime Projects International, experience in warehousing/logistics/transport |
| 22. Offshore Crane Operator, Mechanic Murchison & Ninian North Sea Platform SMS Offshore Aberdeen UK |
| 23. Young Trainee Pakistani worker with no experience in work |
| 24. Junior I & C Technician working in PLC SCADA systems, Fatek PLC Programming |
| 25. Coordinating Arrival / Departures of all vessels with the appropriate authorities (CBP, Pilots, Tug) |
| 26. Piping Designer GA Drawings Pipe Material Selection, Thickness Calculation, Pipe Rack Planning |
| 27. Basic scaffolder with 6 years experience both on shore and offshore Alpha and Bravo gas platforms |
| 28. Expat Supervisor Corrosion Control, Painting, Blasting, worked on various offshore installations |
| 29. Firefighter working in India Mumbai fire brigade since 2006 |
| 30. Process Design Engineer DuPont Engineering Centre Hyderabad, UOP Honeywell Company Gurgaon India |
| |
| |
|
|
|