|
|
CV Piping Engineer Murphy Sarawak Oil Co. Ltd. FMC Technologies Wellhead Sdn Bhd Malaysia Brownfield CT
|
|
|
|
|
|
|
| |
| |
| Piping Engineer Murphy Sarawak Oil Co. Ltd. FMC Technologies Wellhead Sdn Bhd Malaysia Brownfield CT |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in Piping Engineer Murphy Sarawak Oil Co. Ltd. FMC Technologies Wellhead Sdn Bhd Malaysia Brownfield CT - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
104503
Last Updated:
Wednesday, December 16, 2009 |
Location (Residence): Ipoh, Malaysia
Citizenship: Malaysia
|
| |
Languages:
Native:
Malay Malaysia Other:
English |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
Bachelors in Mechanical Engineering Years of Experience:
1 year
|
Authorized to work in:
Malaysia, Singapore
Present Location:
Malaysia, Ipoh
Relocation:
Anywhere (International) |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Engineering |
Piping |
Trainee
|
1 year |
|
Engineering |
Piping |
Trainee
|
4 years |
|
Design/Software |
SolidWorks |
Trainee
|
1 year |
|
FEA/FEM |
Abaqus |
Trainee
|
5 years |
|
Technician Level |
Piping |
Trainee
|
5 years |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
Dear Sir/Madam,
I am a Registered Engineer under Board of Engineers Malaysia (BEM) with about 3 years experience in Oil and Gas Industry. I am an enthusiastic team player who can work with different individuals and changing social environment. I am currently working in a well-known Oil and Gas Fabricator which specializes in EPCIC projects. Throughout my service in this company, I have involved in the fabrication of topsides, subsea manifolds and mudmat, structural service platform, vessels and metering skids.
I am keen to further discuss about my qualification and interest in the particular field. I am available for an interview at a mutually convenient time. Thank you for your time and consideration.
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
Piping Engineer
(May’09 – Now)
Project : SK-309/SK-311 Phase 1 Gas Development Project
Client : Murphy Sarawak Oil Co. Ltd.
Scope : Fabrication of Serampang-A (SE-PA) Production Platform Topsides Facilities
Job Description
• Perform material take-off as per Piping and Instrumentation Diagram (P&ID) and PDMS Model.
• Perform Vendor Data Review and Inter-Discipline Check (IDC) in compliance with project specifications. Coordinate with PDMS administrator and designer in incorporating vendor data and project specific requirement into the model.
• Preparation of Purchase Requisitions, Technical Clarifications and Technical Bid Evaluations.
• Perform drawing review, inclusive of Issue For Construction (IFC) drawing, Pipe Support Standard and Detail Drawing and P&ID.
• Raise Site Technical Query (STQ) whenever there is any discrepancy or deviation on specification.
• Work closely with clients and piping administrator to provide professional advice on piping design and assembly drawing.
• Verify site modifications and incorporate all the changes into the PDMS model.
• Preparation of Piping Shiploose List.
Project Engineer
(October’08 – February’09)
Project : Supply of Deepwater Subsea System for Gumusut-Kakap Development Project
Client : FMC Wellhead Sdn Bhd
Scope : Fabrication of 3 x Production Manifolds, 3 x Pigging Loops, 1 x Gas Injection Manifold,
1 x Water Injection Manifold.
Job Description
• Reviewed contract documents inclusive of technical bid clarifications, bid addendum, contract terms and conditions, client's specifications and procedures.
• Chaired weekly progress meeting.
• Responsible in the project scheduling, monitoring & liaison work with client representative.
• Preparation and review of project deliverables: Project Execution Plan, Coating Procedure, Material Control/Monitoring Procedure.
• Review Quality Assurance Plan (QAP) and Project Specific Procedure (PSP) in order to execute the project in line with ISO 9001:2000 and Oil and Gas specification.
• Organize and execute project's front end activities such as kick-off meeting, preparation of project deliverable and organization chart, interface of inter-department.
• Responsible to have techno-com meeting with Sub-Contractors and execute Technical Bid Evaluation based on client's specifications.
Contract Engineer
(February’08 – April’09)
Project : SK-309/SK-311 Phase 1 Gas Development Project
Client : Murphy Sarawak Oil Co. Ltd.
Scope : Fabrication of Offshore Platform Topside Facilities (GOP-A and GOP-B Topside) and
Link Bridge
Job Description
• Performed day to day Project Contract Administration.
• Reviewed contract documents inclusive of technical bid clarifications, bid addendum, contract terms and conditions, client's specifications and procedures.
• Responsible in preparing Change Order Procedure and Invoicing Procedure.
• Responsible in assisting project management in monitoring and controlling of the project by giving accurate reports.
• Responsible in capturing and preparing variation order due to changes of specifications, drawings, site modifications etc.
• Responsible in the close supervision of project commercial by updating variation order and invoice register.
• Perform evaluation and approval of subcontractor work/invoices.
• Supervises the preparation of all invoices and milestone payment requests to client.
• Review of contractual documents of sub-contractors and suppliers.
Project Engineer
(January 2009)
Project : Load out of 5 units 50MT each piperacks to Princess Mary Vessel
Client : Bumi Armada.
Scope : Transportation and load out of 5 unit 50MT piperacks by using a multi axle trailer and
2 point lifting vessel.
Job Description
• Responsible in the preparation of the Transportation Procedure and Load Out Procedure, which including the load out sequence, JSA and road survey.
• Responsible gathering information such as bollard capacity, berth area water depth, tide table, fenders condition, vessel draft information for berthing and lifting purpose.
• Finalized Lifting Procedure by having discussion with stevedores and master.
Project Engineer
(December’07 – February’08)
Project : Reliance KG-D6 Project
Client : Aker Kvaerner Malaysia
Scope : Fabrication of 8 Subsea Templates and 11 Suction Anchors
Job Description
• Assisted Project Manager in manpower loading arrangement in the project.
• Responsible in highlighting additional/modification work to client and inter-departments. Capture change order details with reference to contract documents.
• Preparation of project deliverables: Project Execution Plan, Coating Procedure, FAT Procedure.
• Review Quality Assurance Plan (QAP) and Project Specific Procedure (PSP) in order to execute the project in line with ISO 9001:2000 and Oil and Gas specification.
• General exposure to subsea equipment installation such as SCM, MQC, PTT Sensors etc.
• Performed calculation of torque and bolt tensioning for different bolt sizes.
• Assisted T&C Engineer in performing Factory Acceptance Test (FAT).
• Assisted client in performing Site Integration Test (SIT).
Project Engineer
(November'07 - February'08)
Project : ENI Woollybutt South 1 unit Subsea Manifold
Client : FMC Technologies
Scope : Fabrication of 4 UTA Foundation and 1 Subsea Manifold
Job Description
• Reviewed contract documents inclusive of technical bid clarifications, bid addendum, contract terms and conditions, client's specifications and procedures.
• Responsible in the project scheduling, monitoring & liaison work with client representative.
• Preparation of project deliverables: Project Execution Plan, Coating Procedure, Bolt Tensioning Procedure, Electrical Continuity Procedure.
• Review Quality Assurance Plan (QAP) and Project Specific Procedure (PSP) in order to execute the project in line with ISO 9001:2000 and Oil and Gas specification.
• Assisted Project Manager in manpower loading arrangement in the project.
• Responsible in capturing additional scope of work for Change Order Proposal preparation.
• Involved in the fabrication of hydraulic tubing joints by orbital welding. Attended short courses conducted by vendor in operating an orbital welding machine.
• Experienced in monitoring the welding of dissimilar joints of hydraulic tubing, from Inconel 625 to DSS.
• Performed earthing cable laying and performed electrical continuity check as per project requirement.
• Assisted T&C Engineer in performing Factory Acceptance Test (FAT).
• Assisted in the preparation of hydrotest and flushing. Examined the pipe cleanliness by using boroscope.
• Assisted client in performing Site Integration Test (SIT).
Project Engineer
(August'07 - December'07)
Project : ASME U-Stamp Vessel
Client : Kencana HL Lumut Yard
Scope : Fabrication of a mock-up air receiver for yard ASME U, U2 Stamp renewal, audited by Authorized Inspector.
Job Description
• Review vendor’s materials such as 2:1 ellipsoidal head, flanges and fittings as per design specifications.
• Site supervision of air receiver fabrication and NDT works.
• Review design calculation of air receiver which was performed by PV-Elite.
Project Engineer
(August’07 – October’07)
Project : Brownfield CTOC Project
Client : Kencana Bestwide
Job Description
• Planned and monitored spool fabrication progress.
• Site supervision of ship loose piping fabrication, which involves overlay welding using Duplex filler metal ER2209.
• Site coordination of PWHT, NDT inclusive of UT-ABI scan, UT-TOFD (Time of Flight Diffraction), RT and Blasting & Painting works.
Project Engineer
(June’07 – September’07)
Project : MLNG 2 Debottlenecking Project
Client : Kencana Infrastructure Sdn Bhd
Scope : Pre-fabrication of inter-cooler service platform structural beams.
Job Description
• Involved in the prefabrication and blasting & painting of inter-cooler service platform structural beams.
• Preparation of project deliverables: Project Execution Plan, Coating Procedure, Material Traceability and Handling Procedure.
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
Educational Background
Bachelor's Degree
Field of Study : Engineering (Mechanical)
Institute/University : Universiti Teknologi Malaysia
Grade : 2nd Class Upper Hons.
Training and Seminars Attended
1. Understanding on ISO 9001:2000 Quality Management System (QMS)
2. ISO 9001 Process Based Internal Auditing
3. NIOSH - OSFAM Safety Passport
4. Coating, Product Stewardship Seminar
5. Familiarization of 2007 ASME Section IX
6. Familiarization of AWS D1.1
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
1. AutoCad
2. SolidWorks
3. Matlab
4. Abaqus
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
1. Good interpersonal and coordination skills
2. Fast learner and independent
3. Problem solver
4. Team player
5. Creative
6. Good adaptability and versatility
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
Languages (Spoken and Written)
1. English
2. Bahasa Malaysia
3. Mandarin
|
| |
|
|
|
|
|
Piping Engineer Murphy Sarawak Oil Co. Ltd. FMC Technologies Wellhead Sdn Bhd Malaysia Brownfield CT
CV/Resume ID no.: 104503 |
|
|
|
|
|
|
| Relevant CVs; view more oil and gas CVs |
| 1. Piping Design Engineer |
| 2. PDMS Piping for Oil & Gas Engineering (Offshore, Onshore, EPC Power etc) |
| 3. Piping Superintendent/supervisor/engineer |
| 4. Senior Piping Designer, I aim to be involved in new challenging projects. |
| 5. PDS Piping Designer / Piping Senior Draughtsman |
| 6. PDS Piping Designer |
| 7. Mechanical Engineer with expertise in Piping & Pressure vessel Design |
| 8. PIPING ENGINEER |
| 9. Pipe, Piping, Caesar, Stress Piping |
| 10. Pipe, Piping, Lead Piping, Coating, Insulation |
| 11. Piping design engineer, PDS/PDMS |
| 12. PDS Piping Designer |
| 13. PDS/PDMS/AutoPlant piping designer |
| 14. PIPING ENGINEER |
| 15. Construction Supervisor / Engineer |
| 16. Field Piping Designer |
| 17. Lead Piping Engineer, Piping Stress, Plant Layout,Caesar, Routing, Support |
| 18. Mech./Piping Designer, with 14.5 years experience in Oil & Gas exploration. |
| 19. PDMS PIPING DESIGNER |
| 20. Pipe Stress Analysis |
| |
| |
| Other CVs; view more oil and gas CVs |
| 1. MARINE MANAGER |
| 2. MASTER - EXPERIENCED TUGS, BARGES, FLOATING CRANES MASTER |
| 3. Junior DPO / Widely experienced OOW / 2nd OFFICER, Maersk UK company |
| 4. Control Systems Expert |
| 5. Coating/Painting Inspector |
| 6. Widely exprienced in teaching and bpo industry as semi tech support |
| 7. C.A., L.L.B and C.S. Audit and Finance |
| 8. Advanced Care Paramedic, working Australia and Greenland |
| 9. Executive 25 Years experience in wholesale and retail petroleum sales and marketing |
| 10. Sr Mechanical Engineer with MWD/LWD and Directional Drilling experience |
| 11. Mechanical, Piping and Structural Steel Superintendent |
| 12. Electrical Supervisor, BHP mine sites in Northwest shelf Pilbara. Yandi Minesite |
| 13. IT Analyst Programmer, Computer science graduate with 11 years of experience |
| 14. Young radio officer, GMDSS, GOC, port operations |
| 15. Welding Inpector (AWS), CWI Holder, Welding Supervisor |
| 16. Maintenance Engineer, Fault finding, PCB inspection and replacement, servicing and repair |
| 17. Production Operator OMV Pakistan Well Head Operation and Well Testing, Separation, Oil Stabilization |
| 18. Masters Graduate seeking Graduate recruitment jobs |
| 19. Field Operator Petroleum Industry Reliance Industries Limited & Qatar Gas Chennai Petroleum Corporat |
| 20. Sr Electrical Technician KBR BRITISH PETROLEUM / GUPCO GULF SUEZ PETROLEUM CO., EGYPT |
| 21. Tool room staff engineer in manufacture automotive company as casting & machining engineer |
| 22. Commissioning & Startup Production Engineer Yanbu National Petrochemical Co (Yansab) SABIC Affiliate |
| 23. Scaffolder, 18 months experience - returned from living in Australia |
| 24. Quality Control / Quality Assurance NDT Technician Sainest Tubes Pvt. Ltd India |
| 25. Junior Telecom Engineer / BSS Engineer working in Pakistan |
| 26. Planning Engineer LNG plants, shutdowns/turnarounds/refurbishments, offshore hook-ups, FPSO design |
| 27. 3.2U DMT ALST Saturation/Air Diver with 8 years experience, worked in Africa Singapore and Indonesia |
| 28. Experience in welding, attended Austin Community College |
| 29. Offshore maintenance planning engineer Tunisia, CMMS software Maximo 4, MS Project, Primavera 3. |
| 30. Storekeeper 4 years experience in store keeping in Arabtec Construction L.L.C Dubai UAE |
| |
| |
|
|
|