CV Contract Electrical / Instrumentation Designer Project Coordinator, Expat Engineering Manager UK
|
|
|
|
|
|
|
| |
| |
| Contract Electrical / Instrumentation Designer Project Coordinator, Expat Engineering Manager UK |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in Contract Electrical / Instrumentation Designer Project Coordinator, Expat Engineering Manager UK - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
104557
Last Updated:
Friday, December 18, 2009 |
Location (Residence): Fourways, South Africa
Citizenship: South Africa
|
| |
Languages:
Native:
English South Africa Other:
Afrikaans, Arabic Iraq, Dutch Standard |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
Vocational in Electrical Engineering Years of Experience:
10 years
|
Authorized to work in:
UK (in particular), Afghanistan, Angola, Congo, Dem. Rep., Ghana, Iraq, Jordan, Kuwait, Lesotho, Mozambique, Namibia, Nigeria, Qatar, South Africa, Sudan, Swaziland, Turkey, United Arab Emirates, United Kingdom, Zimbabwe
Present Location:
South Africa, Johannesburg
Relocation:
Anywhere (International) |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Design/Software |
Electrical/Instrument |
Experienced
|
13 years |
|
Engineering |
Electrical |
Experienced
|
10 years |
|
Design/Software |
CAD |
Experienced
|
2 years |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
Good day,
I have been exposed to various types of industry and have the technical ability and tenacity to be an asset to any team that I join.
I hope that you find the following information regarding my work history informative and that it shall encourage you to afford me an opportunity to be part of your team.
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
Engineering Manager
January 2009 – October 2009 Electrical Switchgear Services UK
Request for quotation tender meetings
Client requirement analysis and recommendations
Client relationship development
Detail design of switchgear, LV Distribution Boards / Power Distribution Units
(PDU’s) / Packaged Substations / Small Power and Lighting Distribution Boards /
PLC BMS Systems / Networked Power Metering Systems / Power Management
Analysis and Optimization (Voltage Optimizers / Power Star / Power Perfector Units)
Project Management of awarded tenders, from initial orders to final commissioning.
Project Progress Feedback Meetings with Clients
Project Cost Tracking
Staff Management, 2 clerical / 1 Sales Manager/ 1 Production Manager / 14 Panel Builders.
Company Annual Turnover ±£2,5Mil
Reason for leaving: Company affected by recession and subsequently closed down
Electrical Designer
September 2008 – January 2009 TWP SA
Responsible for Detail Design of Electrical projects for WESIZWE Mine in South Africa.
Concept and Detail Design of LV, HV & EHV Networks (Overhead Line Reticulation,
Substation Sizing and Construction, All LV / HV & EHV Switchgear.
Project Design and Cadding: From Design Concept to Detailing and Project
Execution
Filing and archiving of design documentation.
Compilation of required Scopes of Works, Hazardous Area studies and report
Compilation
Compilation of required Request for Tender Documentation
Supplier QA/QC Meetings and inspections
Progress meetings
Supplier / Manufacturer co-ordination meetings
Reason for leaving: Career advancement
Electrical Designer
June 2007 – September 2008 EHL Consulting Engineers SA
Responsible for Detail Design of Electrical projects for AMPLAT Mines on the
Western Limb, Rustenburg / Amandelbult and Union Mines in South Africa.
Compilation of required Scopes of Works, Hazardous Area studies and report
compilation, Safe Operating Procedure studies and document compilation &
compilation of project execution plan.
Concept and Detail Design of LV, HV & EHV Networks (Overhead Line Reticulation,
Substation Sizing and Construction, All LV / HV & EHV Switchgear, VSD’s,
Softstarters, Instrument Controls, PLC Controls and Comms.
Conducting tender meetings, analyzing submitted tenders and costing.
Project Design and Cadding: From Design Concept to Detailing and Project
Execution.
Filing and archiving of design documentation.
Project planning and resource scheduling (MS Project)
Contract Management and Cost Tracking
Project Supervision.
Resource Co-ordination
Project Commissioning
Reason for leaving: Chance to be involved in a major project, opportunity to advance
Contracts Manager / Services Co-ordinator
December 2006 – June 2007 Murray & Roberts Construction SA
Bulk Earthworks
Build-ability Studies
Detail Design and Document Control
Co-ordinate all construction support services, Electrical / Water / Sewage / Refuse
Fire protection and Control Systems
Escalator and Elevator Installation and Controls
Chiller Plant Installation and Control
Labor Compound Erection and Infrastructure
Tower Crane Setting Out and Erection
Batch Plant Setting Out and Erection, 1 cube per min unit
Project – Melrose Arch Retail Development ( R 652 Million)
Labor Co-ordination
Plant Equipment Co-ordination, including erection of four five ton tower cranes
Client Liaison
Installation of all Sub-soil Services
All QAQC Aspects
Costing and Budgeting
Sub-contractor Contracts
All Safety Control Measures and Appointments
Reason for leaving: Career advancement to a consulting firm
Foreman - Structures
May 2006 – November 2006 4D² SA / Nigeria
Accommodation unit layout and design
Detail Design and Document Control
Client and Supplier Liaison
QC/QA
Contract Management
Materials quantification and procurement
Co-ordination and logistics of materials
Civils, foundations and De-watering scenarios
Erection of Modular (PAGGIN) accommodation units (1100 of)
Erection of Prefabricated Structures (PREKONS – 5 of)
Erection of Prefabricated Steel Structures, Warehouses. (PREKONS – 10 of)
All Walkways, stairwells and covered area erection.
Project – KBR / Shell Escravos EGTL1 Refinery ($600 Million)
Reason for leaving: Contract completed
Commissioning Engineer
December 2005 – February 2006 ESS Global The State of Qatar
Mobilisation of 5000 man camp, Office Facilities, Power Station, Potable Water Network
and Sewage Network.
Power Generation Plant (5 x 1.6mega watt Cummings Generators, transformed to 6.6kVA for Reticulation Network)
Potable Water Pump Stations (3 x 2100mTanks)
Fire Water Pump Station and Protection
Sewage Management of 4 x 48mLift Stations
Water Waste Treatment Centre
Two Olympic Size Swimming Pools with Filtration Plant
Dining Facility Construction, Management and Maintenance
Industrial Laundry Construction, Management and Maintenance
Long Service Accommodation Construction, Management and Maintenance
Compilation of Maintenance Schedules and Preventative Maintenance System.
Compiled Spares and Parts Lists
Allen Bradley Micro Logix 1200 Programming – Fire and Gas protection Systems.
Potable and Fire Water Distribution Network
DH+ Network Installation
Wireless Network Installation and Setup.
Reason for leaving: Contract completed
Project Manager - Expat
May 2004 – December 2005 4D² Iraq
Responsible for the Design, Erection, Installation, Testing, Commissioning and Handing Over of:
Long service accommodation units:
1. Assembly of COGIM Flat Pack Billets
2. Determination of suitable lay down areas
3. Ground preparation and levelling
4. Ground marking and service servitudes
5. Block and Billet placement and levelling
6. Billet final fitments (Walls and Partitions)
All life support services and utilities
Power generation and fuelling systems
HVAC’s
Industrial kitchen construction and systems
Contract and local labour procurement and management
Client Liaison (all levels)
All on-site safety management and controls.
Reason for leaving: Contract completed
Contracts Maintenance Manager - Expat
September 2003 – May 2004 ESS Global Iraq
Responsible for the Tikrit Operations Project and the Maintenance Team that build /
install / test / commissioning / maintain / repair:
• Three Perkins 2800 Series Diesel Generators (including synchronising panels and change over boards);
• Industrial Diesel Heaters
• various types of industrial cooking appliances (Hobart Ovens and Boilers /Brak Pans /
• Griddle Frier’s / Combi Ovens / Walk In Fridges ect;
• HVAC’s (8 of); Reefer Containers (14 of);
• Single and Three Phase Wiring; Lighting and small power distribution;
• Plumbing and potable water distribution; Grey and Black water tank installation and removal.
All spares ordering, costing, inventory and logistics.
IT network installation, setup, commissioning and troubleshooting;
Compilation of Audit reports, SOW’s and SOP’s.
The Dining Facility supplies approximately 7000 meals per day.
Responsibilities also included the management of the dining facility kitchen with a staff of a hundred and four (which includes kitchen hygiene and safety; food handling and storage; food preparation, presentation and hospitality, logistics, menu preparation, staff HR needs, staff medical advice and services, staff safety and safety measures, staff counseling and mediation, disciplinary actions, enforcing company policies and procedures ect.)
Expat and Staff accommodation unit Construction / Installation / Maintenance and Repair (All Disciplines).
Reason for leaving: Contract completed
Contract Electrical / Instrumentation Designer – Project Co-ordinator
January 2002 – September 2003 Smart Plan (BHP Billiton) SA
Responsible for Detail Design of Electrical / Instrumentation projects for eight Project Specialists located at Hillside Aluminium BHP Billiton.
Compilation of required Scopes of Works. Cadding, Filling and archiving of design documentation.
Contracts Management
SAP Proficient as user
Project Design and Cadding: From Design Concept to Detailing and Project Execution
HAZOP study and Report Compilation.
Project management and supervision.
Project Commissioning and Resource Co-ordination.
Conducting tender meetings, analyzing submitted tenders and costing.
Design / Installation / Testing and Commissioning of: MV switchgears, LV MCC, switchgears and Power Panels, Protection Relay Testing, AC and DC UPS's, Lighting Systems, MV Oil-Filled Power transformers, LV Dry Type, Distribution transformers, Induction Motors.
Fully aware of NEMA, ANSI and IEEE standards.
Preparation of Electrical System Commissioning Strategy and Plan.
Preparation of Electrical Commissioning Dossiers.
Determine manpower requirements.
Organize and control vendor representative’s site visits.
Preparation of commissioning spare part list.
Preparation of test equipment requirements.
Supervising the site works.
Monitoring electrical commissioning activities.
Issue As-commissioned electrical drawings.
Reason for leaving: Overseas opportunity
Senior Artisan / Planner
January 1990 – December 2001 Mondi Kraft SA
Motor Control Centre Maintenance and Repair
Motor Control Gear Maintenance and Repair (DOL / Star Delta / Drives / Soft Starters)
Testing, Repairing and Maintenance of HV / LV Electrical Equipment.
Responsible for the maintenance of two high-speed paper machines.
Planning of weekly and annual shutdowns.
Co-ordination of manpower.
ABB DC Drive repair, maintenance and fault finding
Allen Bradley PLC and Drive programming, maintenance, fault finding and repair.
Siemens PLC programming, maintenance, fault finding and repair.
MODSOFT PLC programming, maintenance, fault finding and repair.
ASEA DC Thyristor Drive maintenance, faultfinding and repair.
Utilization repair and fault finding of control systems such as DCS, Pisys and SCADA.
Specialized electrical installations such as explosive areas, Oxygen Plant and Chemical plants, SO4 / Caustic / Chlorine / Methanol ECT.
Reason for leaving: Career advancement
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
1989 – 1999 Richtek College SA
National Diplomas N1 through to N5 Industrial Electrical / Electronics
Trade Tested Electrician- 1993. (Red Seal)
Wireman’s License and Code of practice
Autocad Draughting Diploma
Architectural Draughting Diploma
Intermediate Courses
Microsoft Office (Excel / Word / Outlook / Access / Power Point / Visio / Project)
Adobe PDF Writer
Photoshop
Ami8or
SAP (BHP Biliton)
Auma Actuators
ABB Drives
Hydraulics
Pneumatics
44 ton Overhead Cranes
Accident and Incident Investigation
Occupational Health and Safety
Hazardous Chemicals and Areas
Management and Supervision
Lockout / Tag out Procedures
Network Installation and Setup. LAN / Wireless
Radio Handling and Etiquette
Basic Navigation, Chart Reading and Course Plotting
Automation Concepts and Design
PLC Programming
CCS (Construction Computer Software)
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
Microsoft Office (Excel / Word / Outlook / Access / Power Point / Visio / Project)
Adobe PDF Writer
Photoshop
Ami8or
SAP (BHP Biliton)
Auma Actuators
Autocad Draughting Diploma
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
None
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
None
|
| |
|
|
|
|
|
Contract Electrical / Instrumentation Designer Project Coordinator, Expat Engineering Manager UK
CV/Resume ID no.: 104557 |
|
|
|
|
|
|
| Other CVs; view more oil and gas CVs |
| 1. Mechanical Engineer having more than 16 years experience in the field of Construction, Drilling, Ere |
| 2. SAFETY OFFICER / HSE OFFICER |
| 3. Contract Management, Contract Administration and Procurement |
| 4. QA/QC in Onshore & Offshore oil & Gas Industry |
| 5. Roustabout |
| 6. Catering Manager experienced (15 years +) |
| 7. Electrical & Instrumentation Designer, Network Administrator |
| 8. Electrical Inspector, testing, risk assessment |
| 9. CHEF DE PARTIE OVER 20 YEARS INTERNATIONAL EXPERIENCE |
| 10. Plant operator / production operator - petroleum development oman |
| 11. Army Combat Engineer / Supply Clerk, Bamberg, Germany |
| 12. Senior Commercial Manager, FCMA, MBA, Finance, Negotiations, UK, Europe, North America and Brazil |
| 13. Technical Superintendent / Technical Manager, Chief Engineer, Lilly Maritime (UAE) |
| 14. Graduate Petroleum Engineer, Balouchistan University of Information Technology Engineering |
| 15. Service & Sales Technician, Hydraulic Technician, Fitter, Supertechnical Group Dubai UAE |
| 16. Stupid indian worker seeking jobs offshore as seaman |
| 17. Field service engineer gas turbines gas turbines GE MS3002, MS 5001, MS 5002, MS 9001, PGT10 |
| 18. Graduate with MSc Master degree in Geology and Master of Technology in Petroleum Exploration |
| 19. Driller MB Petroleum Oman, Derrickman worked with Schlumberger Pakistan, Delma Energy Saudi Arabia |
| 20. Mechanical Technician working in Qatar Petroleum, Offshore, Oil & Gas and Petrochemical Plants |
| 21. Graduate M.Sc Applied Geology, M.Tech in Petroleum Exploration |
| 22. Licensed Journeyman Electrician Residential, Commercial and Industrial work environments experience |
| 23. Trainee Graduate Engineer B.TECH In Electronics and communication Engineering India |
| 24. Diving Supervisor IMCA HSE Part I and Lloyds NDT and TWI CSWIP 3.1 U inspection diver 18 years exp. |
| 25. Sr Geophysicist IEOC ENI Group Subsidiary Egypt Western Desert East Delta Deep Marine Offshore |
| 26. HVAC Mechanical Engineer ETA Engineering Saudi Oger Ltd Saudi Arabia, Suvidha Engineers India |
| 27. Welding Inspector in field of Welding & Refractory in industries like LNG plant and Steel plants |
| 28. Research Scholar ONGC Sponsored R&D Collaborative Research Project Delta Studies Institute India |
| 29. MFL Data Analyst Baker Hughes Calgary, AB, Canada, EMAT Data Analyst GE Oil & Gas Pipeline Solutions |
| 30. Widely experienced tecnichan, operation, management, security and administation South Africa |
| |
| |
|
|
|