| |
| DCS / Scada Engineer, Oil & Gas Automation Engineer Punj Lloyd Qatar Petroleum Doha Shell Trading US |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in DCS / Scada Engineer, Oil & Gas Automation Engineer Punj Lloyd Qatar Petroleum Doha Shell Trading US - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
104866
Last Updated:
Friday, December 25, 2009 |
Location (Residence): Bhuvanagiri, India
Citizenship: India
|
| |
Languages:
Native:
Urdu Other:
Kannada |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
Bachelors in Electrical And Electronics Engg Years of Experience:
8 years
|
Authorized to work in:
United States, India
Present Location:
India, Chidambaram
Relocation:
Anywhere (International) |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Engineering |
Instrumentation |
Basic
|
12 years |
|
Engineering |
Controls |
Basic
|
9 years |
|
Plant (Refinery, Gas...) |
Gas Plant |
Trainee
|
4 years |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
SALARY WANTED
450 Pakistani Rupees per day (450 PKR/day)
TECHNICAL SKILLS
Core Specialization: Supervisory Control and Data Acquisition (SCADA) end-to-end, Remote monitoring and control systems for Electrical, Oil, Gas and Fiber Optical application. Microcontroller based Remote Terminal Unit (RTU) Products
EXPERIENCE SUMMARY
9 years of experience in Analysis, Design, Implementation of various Electrical, Oil, Gas and Industrial Networks.
Involved in design and development of SCADA with Various software Products and Innovative global portals using Visual Studio2005, VB6, C, C++, .Net Frameworks, SQL, Oracle, MS SQL Server 2000 and Ms Access.
Involved in Telvent (OASYS) SCADA 6.2 NT, CYGNET SCADA, ABB Spider SCADA System, Wonderware SCADA, OSI PI Soft, AREVA e-terra EMS System and IFIX SCADA.
Contribute to developing of system-wide SCADA standards for electrical transmission distribution , Gas Pipeline systems and substation applications and also for Industrial Networks.
Involved with integration of 3rd party vendor tools like H2S Sensors Panels, Chromatography panels MOVs Panels and Fire & Gas panels to the SCADA system.
Involved with RTU configuration through patching panel from the Master station telecom panel to Slave stations.
Maintained and installed RTU and PLC Allen Bradley SLC 500 circuits, Modicon, Beckoff Twin Cat PLC and wiring assemblies for various clients. Analyzed client communication/technology needs, made system recommendations and metered/monitored SCADA and Telemetry systems.
Involved in Network design/support, Routers, switches, firewalls, IDS, network and radio services are managed supported and maintained.
Enhanced and maintained SCADA control systems. Set up SCADA Equipment & telemetry for 13KV, 33KV, 66KV & 132KV power systems
Designed electrical schematics using AUTOCAD: including panel schedules, load calculations, wiring diagrams, plan and detail drawings for the power, lighting, communication, fire alarm, security, grounding, lightning protection, building automation, exposed conduit and underground conduit systems.
Performed various tasks necessary to install, overhaul, test, troubleshoot, and complete final operational check-out of electrical motors and equipment, electrical harnesses, junction box assemblies, panel assemblies, relays, and electrical systems.
Tested power equipment and systems, industrial process control systems, telecommunication, broadcast, recording and audiovisual systems, micro-electronic systems and circuits, computer systems and networks. Worked on low voltage signal system / Implementing & maintaining test automation project ,Gas Pipeline project and HVAC systems.
Good experience in component development using C#, VB.NET, ADO.NET to implement middle tier implement business logic.
Experience with configuring, deploying, supporting and administering: Cisco 2600, Cisco 2800
Involved with RTU testing and troubleshooting of RTU communications issues..
Has extensively used ASP.Net, Win Forms, HTML, JavaScript XML, XSLT, XHTML, JavaScript, VBScript and IIS for web application development.
Experience developing component oriented loosely coupled highly cohesive software
Experience with 4-wire telephone, microwave, fiber, direct wire, and MAS radio system communication
Excellent interpersonal skills and teamwork. Enthusiastic and quick to learn new applications and tools and willing to take individual responsibilities.
Provide support for project installation, commissioning, checkout and troubleshooting
Developed Reports using Reporting Services SSRS2005
Adding Various tags , changing Schedules in the existing system
Merging all Servers to the SCADA System
Provide in 24X7 on call Support
Good at Analytical, Communication, Programming and Problem solving skills
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
PROFESSIONAL EXPERIENCE
Project Title: SCADA FOR DOHA URBAN PIPELINE RELOCATION PROJECT
Company / Client: Punj LLOYD / QATAR PETROLEUM , DOHA , QATAR.
DCS/SCADA ENGINEER , June 2009 to Till Date
Project Description
The objective of developing this innovative portal is to inter-connect 8 stations of Gas Pipeline system. The stations are T1,T2,B,S,W1,W2,F,Offshore station. The Station T1,B,W1,S,Offshore station are Control Stations and Station T2,W2 are slave stations. The Station W1 is Distribution Station the Station T1 has 3 stages
1. Pig Launcher -1 Send / Receive to Station B & T2
2. Gas Filter , Pressure Reducer
3. Pig Launcher -2 to Station S
And also to replace the old system and Movs to new System.
Project Title: SCADA FOR Water and Sewer Plant
Company / Client: DCWASA, Washington DC , USA.
Sr.SCADA Analyst, August 2008 to May 2009
Project Description
The objective of developing this innovative portal is to inter-connect various stages of integrating a Water and Sewer Plants. The objective was to synchronize both water and sewer plants in a single Zone to view, also to replace the old system to new System.
Project Title: SCADA FOR New Process Equipment (Industrial SCADA)
Company / Client: CORNING INC, Wilmington, NC , USA.
Sr.SCADA Analyst, August 2007 to August 2008
Project Description
The objective of developing this innovative portal is to inter-connect various stages of process for a newly developed process and machinery. The objective was to process the glass blank in a new way for the plant, achieving a more cost effective and flexible way of processing ware within and between fiber making plants.
Project Title: SCADA for New Pumping Station
Company / Client: Shell Trading (US) Company (STUSCO), TX, USA .
SCADA Analyst, Jan 2007 to July 2007
Project Description
The objective of developing this innovative portal is to inter-connect 1 pumping station, 8 block valves, and Telvent liquid management (LMS) applications such as
Inventory management.
Daily balance of GAS movement at every site.
Custody transfer measurement and ticketing.
SCADA measurement audit trail.
And One press reduction station, which included a remote operation workstation (ROW) connected to the local net (LAN) and accessing the SCADA system through the communications network.
Project Title: Supervisory Control and Data Acquisition
Company / Client: Eastern Overseas LLC, OMAN
SCADA/EMS Analyst, Jan 2006 to Dec 2006
Project Description
The objective of developing this innovative portal is to inter-connect various Power Generating stations and major substations throughout the country. The important factors are
Connectivity, which offers the interconnection of various computing resources in local area or wide area network structures.
Interoperability, which provides for a harmonization of functions, i.e. software applications, into one user system.
Scalability, involves all aspects for expanding and developing the information system using the package Visual studio, C++ and creating new databases using Ms SQL Server2000.
Portability in software offers a multiple hardware supply possibility and easy migration to future hardware technologies.
Project Title: Designing and Modeling Generators
Company / Client: Mitas Generators Pvt. Ltd. Paphos, Cyprus, Europe.
Design Engineer, Aug. 2004 to Dec.2005
Project Description
The objective of developing this innovative portal is to be a catalyst between the Manufactures and Consumers. This portal would Design the parts of generators and also provide a platform between the manufactures and consumers on their requirements.
Project Tile: "Load Flow Study
Company / Client: Neyveli Lignite Corporation, Neyveli, INDIA (Thermal Station s-I & Ts-II)
Team Member, May 2001 to July 2003
Project Description:
Load flow study in Power systems is conducted in order to find out the steady state solution of the given power system network. By conducting load flow study (or) the power flow study the following informations are obtained.
The magnitude and phase angles of the load bus Voltage
The real and reactive powers flowing in each line
The transmission line los
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
EDUCATIONAL QUALIFICATION
Bachelor of Electrical and Electronics Engineering
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
Programming Language: VB.Net, C#.Net, VB6, C++, C#,C, SQL
Tools: ASP.NET, HTML, Java Script, I.E 5.0, IIS 6.0. XML,XSL, VB Script ,ASP
IDE / Tools / Utilities: .NET Framework 1.1 & 2.0, Visual Studio .NET 2000, MS Visio
Databases: MS Access, MS SQL Server 2000, Oracle9i
Operating Systems: Windows XP/98/95
HMI: Wonderware, Intouch Application Package, RSView
Protocols: OPC, Modbus RTU, Modbus TCP, ControlNet, Ethernet, TCP/IP, Devicenet.
Documentation and Project management Tools: MS Project 2000, MS Office 2000, Auto-Cad2000, 2005, R14
Hardware: ISDN, RTUs, HMI, CO switches, Sqlserver 2000, Windows Server 2003 and HP Servers
Product: Telvent (OASYS) SCADA 6.2 NT, CYGNET SCADA, ABB Spider SCADA System,
Wonderware SCADA, IFIX SCADA
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
-
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
To expand my experience in Electrical and control Engineering and to achieve the highest level of performance possible while working along with the company to meet its objectives
|
| |
|