CV Project Manager Oil Arabian Industries LLC Oman Worley Parsons PDO – Harweel Camp Facilities project
|
|
|
|
|
|
|
| |
| |
| Project Manager Oil Arabian Industries LLC Oman Worley Parsons PDO – Harweel Camp Facilities project |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in Project Manager Oil Arabian Industries LLC Oman Worley Parsons PDO – Harweel Camp Facilities project - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
106127
Last Updated:
Wednesday, March 3, 2010 |
Location (Residence): PUNE, India
Citizenship: India
|
| |
Languages:
Native:
Tamil, Hindi Other:
Tamil, Hindi, English |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
Bachelors in B.E. MECHANICAL ENGINEERING Years of Experience:
15 years
|
Authorized to work in:
India, Kuwait, Oman, Qatar, United Arab Emirates
Present Location:
INDIA, PUNE
Relocation:
Singapore, Qatar, Oman, Malaysia, Kuwait, India, Bahrain, United Arab Emirates |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Management |
Project Management |
Experienced
|
11 years |
|
Engineering |
Mechanical |
Experienced
|
4 years |
|
Engineering |
Other |
Experienced
|
4 years |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
Graduate Mechanical Engineer from Coimbatore Institute of Technology (1994 passed out). Kindly note I am readily available to takeup immediate job in Project Management in senior position.
I was working with Arabian Industries LLC. Oman as a “Project Manager” since Aug’09 to Dec’09 for PDO-Harweel Camp Facilities project. I have worked on behalf of ADMA-OPCO on their SBIM offshore project thro' M/s. Adyard Abudhabi. LLC. as “Senior Project Engineer” between Sep'06 and Feb'09 & couple of companies in the state of Kuwait between Mar'98 and Sep'06 in various projects with National Oil companies, Refinery and Construction of Power Generation Projects thro’ Universal Erectors. Ahmedabad, Gujarat from May'94 to Mar’98.
I am an approved Engineer & I have handled projects in PDO, ADMA-OPCO, CHEVRON-FRADE-Single Buoy Moorings INC offshores, Kuwait Oil Company(KOC), Kuwait National Petroleum Company (KNPC-Refineries), EQUATE Petrochemical Company, Joint Operations(JO-MPD) in Wafra, Ministry of Electricity & Water(MEW) Projects in Kuwait and Power Plant construction projects in Gujarat-India for ONGC, RIL, GIPCL, GTEC & SEARCH CHEM INDUSTRIES thro' BHEL, DBBD, DCL, EIL & LLOYDS etc.
I am very well versed in the fields of Oil and Gas, Petroleum, Petrochemical, Refinery, Onshore / Offshore project management, Power plants & Storage Tanks Construction / Maintenance.
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
PROFESSIONAL EXPERIENCE: 15 Years + 3 Months (Overseas: 11 years+ & 4 years in INDIA)
I. Organization : ARABIAN INDUSTRIES LLC.
Designation : Project Manager
Period : 5th Aug’ 09 to 29th Dec’ 09
1. Project : For PDO – Harweel Camp Facilities project
thro Worley Parsons – Arabian Industries joint venture.
Job Description :
Harweel Camp Facilities it a semi-permanent camp to accommodate 160 persons of new PDO Harweel plant Commissioning & Operation team.
II. Organization : ADYARD ABUDHABI LLC.
Designation : Senior Project Engineer (Mechanical)
Period : 27th Sep’ 06 to 12th Feb’09
1. Project : For Abudhabi Marine Operating Company (ADMA-OPCO)
SYSTEM BASED INTEGRITY MANAGEMENT(SBIM) - 61523
Job Description :
Service contract to execute proposed remedial repairs for hydrocarbon process piping and supports including process related piping systems on DAS Island & Off shore @ Zakum, Umm Shaif Super Complex.
Responsibilities :
Working on behalf of Abudhabi Marine Operating Company (ADMA-OPCO) as “Senior Project Engineer” for SBIM project execution, includes Engineering co-ordination between ADMA and contactors ADYARD, MASAD, PETRO MIDDLE EAST, METRA, WELLUBE, follow up & monitoring the job.
Reviewing of Engg. documents / drgs. & Planning, Co-ordination between management and other material suppliers.
Raising Material requisition, cost estimation, Contract requisition & Service Order using MAXIMO.
Arrangement of travel request for project materials and other resources.
Preparation of project status reports, close monitoring of progress and submitting.
Attending weekly and monthly meetings. Organizing regular meeting with contractor & follow up.
Adopting approved safety rules & regulation procedures & giving proper guidance to the execution team to achieve the effective progress as per schedule with no loss man-hours during execution.
2. Project : For CHEVRON, FRADE – FPSO, Single Buoy Moorings INC
Job Description :
Fabrication & Installation of Modules for FRADE – FPSO Project thro’ Single Buoy Moorings INC & client CHEVRON.
Responsibilities :
Working as incharge for Piping & Equipments installation on TOP SIDE Module 09 – Water treatment / Utility.
Reviewing of Engg. documents / drgs. & Planning, Co-ordination between management and other sub contractors.
Preparation of project status reports, close monitoring & follow up of progress.
Attending weekly and monthly meetings. Organizing regular meeting with sub contractor & follow up.
Adopting approved safety rules & regulation procedures & giving proper guidance to the execution team to achieve the effective progress as per schedule with no loss man-hours during execution.
III. Organization : Arabi Enertech. KSC. Kuwait.
An ISO 9001 Company.
Project : For JOINT OPERATIONS.
JO/HC14/MP 03 – PMP Water Disposal Facility.
Designation : Mechanical Engineer (Tanks)
Period : 1st Dec’ 04 to 3rd Sep’ 06
Job Description :
1) Construction of Welded Storage Tank TPM-04 (30000 BBL) with following system namely Desludge system, Weir plate, Floating skimmer, semi fixed foam pouring system, gas blanketing system, Flare & P/V relief system, Emergency venting, Bund wall and Cathodic protection systems.
2) Construction of Welded Storage Tank TPM-08 (2000 BBL)
3) Installation of Underground tanks TPM 09 & 10 (100 BBL each) and connected piping / supporting structures etc.
4) Modification of Tank Internals & Installation of additional nozzles for existing tanks TPM 01,TPM 02 & TPM 03. Repair of tank internal Coating
Responsibilities :
Engineer incharge for Site Mobilization activities.
Planning, Organizing, Execution and monitoring of site activities, related to Mechanical, Civil activities of the project.
In charge for the construction, erection, testing & commissioning of API 650 tanks 2 Nos. And maintenance of existing two tanks. Installation of U/G tanks 2 nos and related piping
Reviewing of Engg. documents / drgs. & Co-ordination between management, client (site), Engineering department (M/s. Pyramid) and other suppliers.
Preparing Daily progress reports.
Attending weekly and monthly meetings with client.
Adopting approved safety rules & regulation procedures & giving proper guidance to the workmen to achieve the effective progress as per schedule with no loss man-hours during execution.
Assisting Project Manager for planning & scheduling of construction activities and technical aspects, manpower & resource management.
IV. Organization : GULFSPIC Contracting Co. W.L.L. Kuwait.
1. Project : For Kuwait National Petroleum Company CB 1080 - Revamp of Naphtha Hydrotreater in Unit 17.
Designation : Projects Engineer
Period : Since 3rd Aug’ 02 to 15th March 2004
Job Description :
1) Replacement & construction of new Pump RCC foundation – 6 Nos.
2) Replacement of Pumps & Motors 6 Nos. for Higher Capacity Operation.
3) Fabrication, Erection and Inspection, Testing, Sandblasting & Painting and Insulation of Piping & Process Filters.
4) Installation of new Level Control Valve LV 105 and additional Process feed filters F-17-101A/B and piping & construction of its foundations.
5) Power cables Installation for LT motors 4 nos. (includes Excavation, Backfilling of trenches, paving etc.)
6) Supply, Installation, Testing & Commissioning of 440V MCC of Fuji Electric Co.
7) Modification on 3.3KV feeder switches for HT motors – P-17-102 AM/BM
8) Replacement of Control valves FV 105A, PV 148 & LV118 for higher capacity operation. Conversion of Level control to Flow control-2 Nos.
9) Resizing of Pressure relief valves PSV 136B & PSV 212B.
Responsibilities :
Planning, organizing & Execution of Mechanical, Civil, Electrical & Instrumentation Activities related to the project.
Co-ordination between management, client (site) and other suppliers in getting the information and approved drawings
Preparation of Quality Procedures & technical documents for client approval.
Conducting welders qualification as per the client requirement & specification. Preparing of procurement schedules, control budget statements for different projects and co-ordinate accordingly with the Management.
Preparing material request and follow up, Evaluating technical offers & negotiation with the suppliers. And Inspection after receipt as per client specification & Applicable Engg. Std.
Preparation of Flushing, Hydro test plan & Procedure and Execution as per the client specification & approval.
Preparation of Final Inspection Documents, As built drawings. & Invoice backup documents.
Preparing Daily & Monthly progress reports.
Attending weekly and monthly meetings with clients Engineers.
Adopting approved safety rules & regulation procedures & giving proper guidance to the workmen to achieve the effective progress as per schedule with no loss man-hours during execution.
Assisting Contract Manager for planning & scheduling of construction activities and technical aspects, manpower & resource management.
2. Project : For Kuwait Oil Company (KOC) Construction of Fuel Pipelines from Refinery to
MKB/NKBV/WKB. Contract No. 17289.
Job Description :
Construction of Fuel Pipelines from Refinery to MKB/NKBV/WKB for Section.2 Works thro’ M/s. Combined Group Co.
Responsibilities :
Incharge for the execution of the entire works for KNPC MAB refinery fencing area to Outside distribution area thro, underground piping & road crossing piping on the existing tunnel.
V Organization : Integral Services Co. W.L.L. (ISCO)
Industrial Maintenance Division – ISO 9002 Co.
1. Project : For Kuwait National Petroleum Company KNPC-MAB (CB 1054) – HYDROGEN UNIT - 18
Modification of Benfield & Sulfinol closed drain systems
Designation : Mechanical Engineer (Site)
Period : From 12th Nov’ 2000 to 18th May 2002
Job Description :
1. Fabrication, Erection and Inspection, Testing, Sandblasting & Painting for Above ground Piping and Wrapping & Coating of U/G Piping.
2. Demolition & New Construction of U/G Concrete Sump Pits –2 nos. for Installation of Sump Pump for Benfield & Sulfinol System
3. Power & Control cables Installation for the Sump Pumps (includes Excavation, Backfilling of trenches, Asphalting, Concrete Duct Banks for Road Crossing.)
4. Supply, Installation, Testing & Commissioning of 440V MCC of Fuji Electric Co.
Responsibilities :
Planning, organizing, monitoring of Mechanical, Civil, Electrical & Instrumentation Activities related to the project.
Co-ordination between management & client (site) in getting the information and approved drawings
Preparation of Quality Procedures & Conducting welders qualification as per the client requirement and specification.
Preparing Daily, Weekly and Monthly progress reports.
Preparing control budget statements for different projects and co-ordinate accordingly with the Management.
Attending weekly and monthly meetings with clients Engineers.
Assisting Project Manager for planning & scheduling of construction activities and technical aspects, manpower & resource management.
2. Project : For Kuwait National Petroleum Company
GRTA 2001-Shutdown works in Unit 06 & 07
Job Description :
Replacement of SS 304 Piping by SS 321 in Unit 07 & Replacement of Piping, Fittings and Mitres in Unit 06 during GRTA 2001. KNPC-Shuaiba.
Responsibilities :
Co-ordination between management & client (site) in getting the information and approved drawings
Preparation of Quality Procedures & Conducting Welders Qualification Test as per the client requirement and specification.
Preparing daily, Weekly and Monthly progress reports.
Assisting Project Manager for planning & scheduling of construction activities and technical aspects, manpower & resource management.
3. Project : For Equate Petrochemical Company
Job Description :
1. Tie-in for SBH Injection System
2. Fabrication & Installation 1.5” DM Water Line for Utility
3. Add Third Trap in Parallel with existing Steam Piping–8”,4”&2” Ø
4. Installation of NPS 6” Check Valve in LS Line to C 6305
5. Tie-in on RSFT Piping.
Responsibilities :
Execution of the Jobs as per client Specification & Approved Drawings.
Co-ordination & follow up between management & client (site) in getting the information and approved drawings. And arrangement of Manpower & Resources.
Preparation of Quality Procedures & Conducting Welders Qualification Test as per the client requirement and specification.
Preparing material request and follow up, Evaluating Technical offers from suppliers. And Inspection after receipt as per client specification & Applicable Engg. Std.
Preparation of Final Inspection Documents, As built drawings. & Invoice backup documents.
4. Project : For Shuaiba Power Station (SPS) – Annual Maintenance Works (2001-2006)
Job Description :
Annual Maintenance works for Mechanical Equipments in Power Station & Distillation Plant - Shuaiba Power Station (Cont.# MEW/MC/2507-2001/2002.)
Responsibilities :
Approved as a Maintenance Engineer for Distillation Plant. Involved in the mobilization activity.
Preparing material request and follow up, Evaluating Technical offers from suppliers. And Inspection after receipt as per client specification & Applicable Engg. Std.
5. Project : For Az-Zour South Power & Water Production
Station – Annual Maintenance of Distillers & Boilers Works
Designation : Maintenance Engineer
Job Description :
Annual Maintenance of Distillers & Boilers works for Az-Zour South Power & Water Production Station. (Cont.# MEW/M/1791-97/98)
Responsibilities :
Worked as a Maintenance Engineer for Distillation Plant (Leave Replacement)
Responsible for Overhauling of horizontal & Vertical Pumps and Pneumatic/Motor operated Valves viz. Gate, Globe, Ball, Butterfly and Check valve of sizes up to 1350mm in Desalination units.
As incharge for Hydro blasting & Tube cleaning activities of Brine Heater, Stage condenser etc. And also Maintenance of Flash chambers, Water boxes, Demisters cleaning activities & Replacement of Anodes.
Responsible to achieve the Progress as per the schedule of client.
VI Organization : Kuwait Shipbuilding and Repairyard Co. (KSRC)
(Industrial Contracts Division) – ISO 9001 Co.
a) Project : Shuaiba Power Station (SPS)
Annual Maintenance Works
Designation : Engineer (Maintenance Project co-ordination)
Period : From 25th March ’98 to 31st May’98
Job Description :
Annual Maintenance works for Mechanical Equipments in Power Station & Distillation Plant - Shuaiba Power Station
Responsibilities :
Planning, organizing, monitoring of Distillation Plant shutdown activities
Co-ordination & follow up between management & client (site) and arrangement for Manpower and Resources.
Responsible for Maintenance of Flash chamber, Brine Heater, Stage condenser, Water Boxes, Demisters & Valves of different types.
Responsible for Hydro blasting & Tube cleaning activities of Brine Heater, Stage condenser, Heat Exchangers, Condenser etc.
Also responsible to arrange proper resources for Surface Preparation, & Painting Activities.
b) Project : Kuwait Oil Company (KOC)
Production Facilities Expansion New Gathering
Centers 27, 28 and Transit Lines – West Kuwait
Designation : Engineer (Projects/Co-ordination)
Period : From 1st June ’98 to July’2000
Job Description :
Fabrication, Erection and Testing of API 650 Tanks 24 Nos. for Kuwait Oil Company (KOC) through China Petroleum Engineering Construction Company (CPECC)
Responsibilities :
Planning, organizing, monitoring of Fabrication and Erection of Storage Tanks. Co-ordination between client and site managers in getting the information, and approved drawings. Follow up & monitoring the progress as per client’s approved schedule.
Preparing material request and follow up, Evaluating Technical offers from the suppliers, Inspection after receipt of the materials as per clients specification & approvals
Preparing weekly / monthly progress reports and monthly running bills & follow up.
Attending weekly and monthly meetings with clients. (CPECC/KOC)
Assisting Project Manager for planning and scheduling of construction activities and technical aspects and also manpower and resource management.
Preparation of as built mark ups, final technical documents & QC dossiers.
Preparation of variation orders and backup documents for clients submission.
VII. Designation : Site Engineer (Mechanical)
Period : From 25th Jan’95 to 24th March ’98.
Organization : Universal Erectors, Ahmedabad
Power Plant Engineers and Contractors
a] Project : 45MW Captive Power Plant
For Relience Industries Ltd. (Vimal)
GIDC, Naroda, Ahmedabad, Gujarat.
Responsibility :
Overall responsible for HRSG (Heat Recovery Steam Generator) Piping (i.e. Both IBR and Non-IBR) Fabrication, Erection activities.
Erection of Equipments Viz. Boiler Feed Water Pumps & Accessories, HP, LP Steam drums, Blow down & Condensate Tanks.
Also Involved in the Erection of Flue gas & Boiler feed water sample analyzer Installation & Tubing
Preparation, Maintaining documents like Non Destructive Testing reports, Pre & Post weld heat treatment and weld maps of external & integral piping on behalf of M/s. Deutsche Babcock Blacke Durr Ltd., Madras.
And also involved in the commissioning activity of the boilers.
b] Project : 100 MW Captive Power Plant
For Search Chem Industries Ltd. (UPL Group)
GIDC, Jhagadia, Bharuch Dt., Gujarat.
Responsibility :
Planning, Organizing, Executing & Monitoring of Fuel Oil SS Piping fabrication & erection activities from Storage Tanks to forwarding skid, forwarding skid to Gas Turbine auxiliary skids through pipe rack
Involved in Equipments Erection & Unit Piping (DM Plant, Air Compressor Unit 4 Nos. and Main as well as auxiliary cooling water piping system)
Co-ordination with client design department for the complete re-routing of SS piping for the DM Plant & Compressor House as per the site condition.
Preparation Hydrotest plan & Procedure and Execution.
Also Involved in the Pre-commissioning activity during start up.
c] Project : 655 MW Combined Cycle Power Plants
For Gujarat Torrent Energy Corporation Ltd.
(GTEC) Paguthan, Bharuch, Gujarat.
Responsibility :
Planning, Organizing, Executing, Monitoring of STEEL STACK Fabrication and Erection of 5.5 Mtr. ID & 70 Mtr. Height 3 Units on behalf of M/s. Deutsche Babcock Blacke Durr Ltd., Madras.
Over all incharge for fabrication & erection of Steel Stack, which involves co-ordination with the design department, preparation of cutting layout, preparation of inspection reports, online inspection both in fabrication & erection, preparation of protocol for the civil foundation, Preparation of Erection Plan & Procedures using higher capacity cranes.
Fabrication & Erection of temporary & permanent supporting structures in consultation with client engineers as per standard.
Preparation, Maintaining documents like Non Destructive Testing reports, weld maps & Sandblasting & Painting activity.
VIII. Designation : Assistant Engineer (Piping)
Period : From 9th May ’94 to 23rd Jan’95.
Organization : Aicam Hightech Pvt. Ltd., Madras.
Project : Oil and Natural Gas Commission Ltd. (ONGC)
Gandhar Oil Field, Central Processing Facility (CPF) Phase – II, Western Region, Gujarat.
Responsibility :
Planning, organizing, Execution & monitoring of Fabrication & Erection of Above Ground Piping (includes Fuel Oil System from unloading & loading pumping area to Tank, Tanks to process. Fire fighting system, Cooling water supply & return piping and Main Flare Line rack piping of 42” diameter)
Fabrication & Erection of Unit Piping – Crude Stabilization Unit (CSU) on behalf of M/s. Lloyd Steel Industries Ltd. (LSIL) and M/s. Bharat Heavy Plates and Vessels Ltd. (BHPV).
Co-ordination between Head Office and client in getting the information, drawing, schedules & Materials status etc.
Preparation, Maintaining documents like Fit up, Welding, Non Destructive Testing reports, weld maps & Sandblasting & Painting activity.
Preparation of Flushing, Hydro test plan & Procedure and Execution as per the client specification & approval.
Preparation of as built drawing & Material reconciliation reports.
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
Degree : Bachelor of Engineering (Mechanical)
Institute / University : Coimbatore Institute of Technology (Autonomous)
Bharathiar University, Coimbatore.
Year of Passing / % : April 1994 (1990 - 1994) & Scored 67.67%
Additional Qualification: Diploma in Industrial Safety
Institute : Indian School of Labour Education, Madras.
Management Training Course participated:
Project Management Professional(PMP) training organized by PMI Global registered education provider – PMAC consulting Pvt. Ltd. Noida. India.
Action Centered Leadership(ACL) training organized by TOPAZ Energy & Marine Ltd. Presented by Dr. Sunil Gupta from IDEAS management consultant. OMAN.
Safety Training Courses:
Offshore Survival courses attended & trained from Emirates Technical & Safety Development Centre.(ETSDC) Abudhabi.
1. Sea Survival, 2. Helicopter underwater Escape & 3. Health, Safety & Environment induction programme organized by ADMA-OPCO.
4. PDO-HSE Induction training and 5. H2S training course attended & which was organized by Safety Technical Services Co. Ltd. Oman.
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
Computer Proficiency: Good knowledge in Windows, MS. Office, MS. Project. Primavera Project Planner (P3) & MAXIMO Application.
Professional Membership: Kuwait Society of Engineers & ASME. Membership
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
Achievements:
1. Execution of the awarded 20 days Shutdown Project in 9 days by saving 11 days, with out any loss of Man-hours to the management & Client KNPC-MAB.
2. ADMA-OPCO - Major Oil Shutdown’07 @ USSC executed in a professional manner by saving 4 days, with out any loss of Man-hours.
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
Other Particulars:
1. Driving License: Own valid Indian, Kuwait, UAE & Oman Licenses.,
|
| |
|
|
|
|
|
Project Manager Oil Arabian Industries LLC Oman Worley Parsons PDO – Harweel Camp Facilities project
CV/Resume ID no.: 106127 |
|
|
|
|
|
|
| Relevant CVs; view more oil and gas CVs |
| 1. Procurement Manager / Procurement Specialist |
| 2. Marine Engineer, tanker VLCC experienced, I aim to be involved in FPSO projects, DP or offshore. |
| 3. Cost analysis, cost controller, MARKETING , SALES ADMINISTRATION, GREAT INTERPERSONAL SKILLS |
| 4. Mechanical Engineer with expertise in Piping & Pressure vessel Design |
| 5. Project Management |
| 6. Oil & Gas, Petrochemical, Steel Plants |
| 7. Process Chemical Engineer |
| 8. Engineerinf, project manager, program manager |
| 9. Mechanical - Pressure vessel, Heat Exchanger |
| 10. Project Manager, Planning Specialist |
| 11. Fire & Gas Detection System engg. |
| 12. SR. PROJECT ENGINEER |
| 13. MARINE ENGINEER |
| 14. Telecom System's Project |
| 15. Occupational Health and Safety Engineer |
| 16. piping engineer |
| 17. PDS Piping Designer |
| 18. Process Engineer, Project Management |
| 19. CAD Experience - oil & gas industry |
| 20. Project Manager |
| |
| |
| Other CVs; view more oil and gas CVs |
| 1. PLANNING ENGINEER (MECHANICAL) PRIMAVEERA ENTERPRISES, SAP (R3) |
| 2. Software Developer, Database Developer, Suport Engineer (Application & Networking) |
| 3. HVAC technician |
| 4. Pipeline Engineer |
| 5. HSE Officer, Roustabout |
| 6. DPO 2nd Mate, Kongsberg KPOS-2, Simrad, SDP-21; DSV, Drill-Ship, Cable Layer, PSV, ROV, Survey |
| 7. Instrument Supervisor, Technician |
| 8. Master Mariner, Officer, experienced in tanker cargo operations |
| 9. Roustabout |
| 10. Control Room Operator |
| 11. Roustabout Entry level, off-shore, willing to relocate |
| 12. Maritime Seaman, Marine Crew |
| 13. Consultant, Export Development Department |
| 14. Roustabout, roughneck, floorhand, derrickhand, motorman, floorman. |
| 15. Plumber / pipefitter |
| 16. Export Manager, Export Area Manager, Business Development Manager |
| 17. Health Center Physician Holder of Seaman's Book ( Seaman's Registration Certificate) |
| 18. Drilling Engineer, Electrical Engineer |
| 19. Technical Instructor Singapore Training Centre, Aker Solutions (Aker MH Singapore Pte Ltd) |
| 20. NAVAL ARCHITECT / PROJECT CO-ORDINATOR PROSAFE PRODUCTION PTE LTD SINGAPORE |
| 21. Experienced accountant in Luminiaire trading co LLC |
| 22. Looking for a challenging job opportunity in Welding Inspection, Quality Assurance & Quality Control |
| 23. MBA Graduate - AXA Business Services a financial service company |
| 24. Telecom Engineer ngHLR Engineer Huawei Technologies Telenor Core Network Project-PAKISTAN |
| 25. Trainee Project Assistant with Indian Institute of Science (IISc), Bangalore India |
| 26. Manufacturing production technician - Leading Floor Tile manufacturing Company in India |
| 27. Instrument Technician, ladder logic and relay logic, DCS and PLC knowledge |
| 28. Piping Designer Rolta India Pvt Ltd exp. SP3D / PDS / Microstation / Piping Material Specifications |
| 29. 30 years experience as a welder, foreman, supervisor, inspector, QC, and welding superintendent |
| 30. Safety Observer on contract basis with DCD Dorbyl Ltd, Table Bay Harbour Cape Town South Africa |
| |
| |
|
|
|