| |
| Instrument Engineer KOC Kuwait Oil Company, Gulf Spic Ethyl Benzene Styrene Monomer Project |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in Instrument Engineer KOC Kuwait Oil Company, Gulf Spic Ethyl Benzene Styrene Monomer Project - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
108199
Last Updated:
Saturday, March 6, 2010 |
Location (Residence): jiangyin, China
Citizenship: China
|
| |
Languages:
Native:
Chinese PRC Other:
English |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
Bachelors in electrical engineering and automation control Years of Experience:
2 years
|
Authorized to work in:
European Union, UK (in particular), United States, Argentina, Australia, Austria, Bahrain, Belgium, Belize, Brazil, Canada, China, Cook Islands, Cyprus, France, French Guiana, French Polynesia, Germany, Greece, Greenland, Hong Kong, Ireland, Israel, Italy, Japan, Korea, Dem. Rep., Korea, (South), Kuwait, Kyrgyzstan, Macao, Malaysia, Mexico, Netherlands, New Zealand, Philippines, Qatar, South Africa, Spain, Sweden, Switzerland, Taiwan, POC, United Arab Emirates, United Kingdom, United States
Present Location:
china, jiangyin
Relocation:
Anywhere (International) |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Engineering |
Instrumentation |
Basic
|
5 years |
|
Engineering |
Instrumentation |
Basic
|
1 year |
|
Engineering |
Instrumentation |
Basic
|
1 year |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
Instrument Engineer KOC Kuwait Oil Company
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
Work Experience
2009/05~2010/01
Employer: KOC -Kuwait Oil Company, KOC project
Position held: Instrument Engineer
1. Carry out loop checks , commissioning of loops of main plant and utilities like boilers, compressors.
2. Carry out day to day jobs in accordance with safety rules.
3. Responsible for fault finding during start up problems.
4. To maintain history record of each instrument and special records for critical ones.
5. From time to time checks for the spares available and if found shortage generates immediately request a purchase. Also checks if often requires are available in the department in order to save time during emergency.
6. During the shift start go through the log and then visit control room for any inst problems and then as per the corrective jobs distribute them among the foremen.
7. Executed the overall troubleshooting for the DCS and Electronics used in the plant as instructed by the manager.
8. Responsible for planning and coordinating the technical design and engineering implementation of the project work.
MAJOR FIELD INSTRUMENT HANDLED:
Control Valves : Fisher (UK), ILL, Masonelian, Auma & Rappold (Motor operated Valves), Hytork and ABB.
Flow Meters : Mass flow (Rosemount and Forbes Marshall), Vortex (Yokogawa), Magnetic meter (Yokogawa and Forbes Marshall)
Transmitters : Rosemount (Smart), ABB-KENT taylor, Fuji, Foxboro intelligent Transmitter, Honeywell.
Level Instrument: Radar, level troll, Enraff, ultrasonic, DP.
2008/06~2009/03
Employer: Gulf Spic -Ethyl Benzene Styrene Monomer Project, OL2K., Shuaiba ,Kuwait
Position held: Jr. E&I Engineer and Jr. Project Control
1. Prepare electrical and instrument drawings and specifications.
2. Manage project schedules and budgets, and obtain permits for operations.
3. Make engineering calculations in connection with field and office assignments.
4. Investigate problems and recommend solutions.
5. Ensure compliance with safety requirements and standards procedures.
5. Make Material Take Off of electrical and instrument and material coordinate job.
6. Make sketch for instrument secondary cable tray route, instrument air manifold .
7. Supervise instrument primary and secondary cable tray installation and cable pulling.
8. Arrange cable laying in RIE (route instrument enclosure) room.
9. Do leaking test of instrument tubing.
10. Make RFI and finish Punch list from client side.
11. Make monthly invoice, monthly report, weekly report, daily report .
12. Prepare the report to PM for meeting with client and head office. Such as project progress, system wise progress and contract revision.
2007/11~2008/06
Employer: Alghanim Sepam - Main Sea Water Cooling Tower Project, OL2K, Shuaiba,Kuwait
Position held: Document controller and Quality Surveyor
1. Quality Survey of the inst tubing , conduit and multi electrical material installed on site.
2. Prepare Quality Control Procedure.
3. Prepare system turn over package of mechanical piping.
4. Coordinate with Mushlif QC engineer and prepare any document as required.
5. Prepare As-built drawing of electrical drawings and list instrument additional cables.
6. Update cable length in Cable Schedule for project control requirement.
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
2003/09--2007/07:Nanjing Normal University
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
Auto CAD, office 2007 ,primavera
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
Chinese language , English , basic Arabic
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
none
|
| |
|