|
|
CV Electrical Engineer Turbo Generator, Erection and commissioning of 33/11 KV sub-station India
|
|
|
|
|
|
|
| |
| |
| Electrical Engineer Turbo Generator, Erection and commissioning of 33/11 KV sub-station India |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in Electrical Engineer Turbo Generator, Erection and commissioning of 33/11 KV sub-station India - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
111714
Last Updated:
Tuesday, June 8, 2010 |
Location (Residence): angul, India
Citizenship: India
|
| |
Languages:
Native:
Urdu Other:
Tamil |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
Bachelors in Electrical engineering Years of Experience:
4 years
|
Authorized to work in:
Malaysia
Present Location:
India, angul
Relocation:
India |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Engineering |
Electrical |
Basic
|
7 years |
|
Other |
Labourer |
Trainee
|
7 years |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
Seeking assignments in Power Industries & Value Engineering with an organization of repute
Executive Summary
Over 5 years of experience and currently working with Bhushan Steel Ltd.Angul, Orissa as an Assistant Manager, E&I, CPP.project. Designated as a Asst. manager proficient in managing the project, O&M for (150X2), (20+12) MW captive power plants. Such as, Erection, commissioning, testing, operation & maintenance.
A keen planner and strategist with skills in troubleshooting, team building capability and proven abilities in planning and managing resources. Performing the functions of troubleshooting and preventive / breakdown maintenance for reducing equipments downtime to minimum.
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
Over 5 years of experience and currently working with Bhushan Steel Ltd.Angul, Orissa as an Assistant Manager, E&I, CPP project
Job Profile
Notable Contributions
1 Well versed with Turbo Generator, Erection and commissioning of 33/11 KV sub-station. Extensive experience in operation and maintenance of Turbo- generator.
2 Testing of transformer.
Maintenance and Trouble Shooting
4 Conducting regular inspection and tests to ensure the performance capacity of various machines and equipments.
5 Proactively identifying areas of obstruction/breakdowns and take steps to rectify the equipments through application of trouble shooting tools.
6 Responsible for the technological upgrading of the obsolete Machines.
7 Executing cost saving and energy saving techniques/measures and modifications to achieve substantial reduction in O&M Expenditures and work within the budget.
8 Guiding and mentoring teams to bring out their skills.
Operation & Maintenance
1 Switchyard equipment like lightening, CT, PT, power and distribution transformer, isolator etc.
2 Preventive Maintenance of all Electrical equipment like motor, transformer, A C drive (VFD Drive), H.T & L.T motors etc.
3 DG (1010 KVA) operation & its preventive maintenance.
4 11 KV HV switchgear with VCB.
5 132/6.6 KV out door SF6 Breaker.
6 33/ 11 KV Power transformer up to 25 MVA.
7 11 / 6.6 KV Generating Transformer Up to 25 MVA and 15 MVA
8 33/ 11 KV Generating Transformer Up to 10 MVA
9 11 / 0.415 KV Distribution Transformer up to 2.5 MVA.
10 LV Air Circuit breaker up to 4000 A.
11 Expertise in protection systems like SPAM 150C, SPAJ 140C, REM 543.
12 Associated with electrical system with cranes /hoists, MCC Panels etc.
13 Pneumatic Ash Handling system with PLC based.
14 Fuel Handling system with PLC based.
15 Procurement of electrical / electro-mechanical equipment
16 Purchase recommendation for equipment.
17 Maintenance of total electrical systems including Transformer, PCC, MCC Motors, ESP.
Additional supporting activity:-
1. Studying of erection/scheme drawings and obtaining clarification from engineering department as necessary.
2. Planning of work & preparation of Erection schedules.
3. Support Material Management group at site with verification of project material & preparation of shortage report.
4. Identifying short supply material on pro active basis.
5. Supervision of work executed by sub-contractor.
6. Conducting site inspections.
7. Certification of works of sub-contractors.
8. Obtaining owners certification of works.
9. Plant commissioning activities.
10. Support plant O & M activities before hand over to Owner.
11. Provide comments on O & M manuals.
12. Other activities assigned by Project Manager.
Career Features
Present Assignments(A)
Bhushan Steel Ltd.Angul, Orissa Since 10th Oct 2008 to till date
Designation: Assistant Manager Electrical, Project, CPP.
Job Assignment – Erection, commissioning, testing, operation & maintenance of (20+12) MW captive
power plant.
Company Profile:- Bhushan Steel Ltd is a globally renowned one of the leading prominent player in Steel Industry. Backed by more than two decades, of experience in Steel making, Bhushan Steel is now India’s 3rd largest Secondary Steel Producer company with an existing steel production capacity of 10 million tones per annum’s (approx.). It has 442 MW captive power plant , having 2X150MW, (77+33)MW,(20+12) MW. It has boiler capacity of 4X250 TPH CFBC boiler for 2X150 MW each, and 135 TPH AFBC and 7X 75 TPH WHRB boiler for (77+33)MW,3X75 TPH AFBC boiler for (20+12)MW, 3 nos of turbo-blower of rating 8 MW.
Career Features
Previous Assignments(B)
Ramsarup Lohh Udyog Ltd. Since May 2007 to Oct2008
Designation: Manager Electrical (Power Plant).
Company Profile: RAMSARUP GROUP founded in 1966, engaged in manufacturing of various grades of steel wires and TMT Bars, is one of the fastest growing groups catering to power and infrastructure sector in India and is aiming to consolidate its position in power and infrastructure sector by initiating steps towards organic and inorganic growth. Aiming to consolidate its position in the power and infrastructure sector, the group is increasing its capacity of steel wire division and TMT (Re-enforcement Bar & Debars) division.
Total Group turnover Rs.1600 Crores (US$390 Millions) 2006-07 which is expected to be over Rs. 2000 Crores (US$ 488 Millions) during 2007-08 with net worth of Rs. 400 Crores (US$ 98 Millions) and Rs. 500 Crores (US $ 122 Millions) respectively.
Job Profile: - Erection, commissioning, testing of 20 MW captive power plant.
Previous Assignments (C)
Shyam Sel Ltd.(Power Division) Since August 2004 - May 2007
Designation: Asst. Engineer
Company Profile: Shyam Group the Leading Steel Producer in the state of West Bengal under Secondary Sector with its Participation in manufacturing activities Sponge Iron & Ferro Alloys. Flat Product, construction Bar, light structures with the most moderate & latest technology with Permutation set up & means.
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
Academia
B.E in Electrical Engg. University of Burdwan,W.B 2004 68.7%
Modules: : Electrical machine, Power System, Power Plant Engineering, Control System
Higher Secondary (10+2) Kanchrapara College 1999 50.5%
Secondary Examination (10th) Mandhari High school, 1996 60.6%
Project
Title : To obtain load flow analysis using Simulation Software (ETAP).
Team Size : 4
Role : Member Duration: 6 months.
Vocational Training
Title : Study of manufacturing of cables of different ratings.
Client : Nicco Corporation Limited (Cable Division) Shyamnagar, (Kolkata)
Duration : 30 days
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
IT Credentials
OS : DOS, Win 98, Win XP
Languages : C
Packages : MS-Offices, Auto CAD, Ps-pice.
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
Seeking assignments in Power Industries & Value Engineering with an organization of repute,
A keen planner and strategist with skills in troubleshooting, team building capability and proven abilities in planning and managing resources. Performing the functions of troubleshooting and preventive / breakdown maintenance for reducing equipments downtime to minimum
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
-
|
| |
|
|
|
|
|
Electrical Engineer Turbo Generator, Erection and commissioning of 33/11 KV sub-station India
CV/Resume ID no.: 111714 |
|
|
|
|
|
|
| Other CVs; view more oil and gas CVs |
| 1. Process / Construction plant Inspection experience |
| 2. NDT Professioanl |
| 3. Planning Engineer |
| 4. BCO, JDPO, Marine Officer, GMDSS, ARPA, HAZMAT |
| 5. Chief mate with master licence, looking for offshore job |
| 6. WORKING WITH MARINE OFFSHORE (EXPERIENCED 7 YEARS) |
| 7. Sr. Electrical Engineer / Project Engineer |
| 8. Software .Net developer |
| 9. Deck Officer, Chief Mate |
| 10. Marine Chief Engineer |
| 11. Document Controller, Logistics with excellent interpersonnal skill |
| 12. Chief Officer 7 years |
| 13. Naval Architect Tribon M3 Structure, Hull, Nesting Modelling Programme |
| 14. Medic seeking work as Safety Officer |
| 15. Marine engineer, MMHE Pasir Gudang dockyard Malaysia, Samsung Heavy Industries, Korea |
| 16. Civil & Structural PDS Designer Fluor Daniels India Gurgaon, Baroda Engineering Consultants |
| 17. Design Engineer GE India Technology Centre General Electric Company Bangalore Oil & Gas Division |
| 18. Graduate instrumentation engineer knowledge of C, C++, microprocesssor 8085, 8086, Microcontroller |
| 19. Marine Engineer Precious Shipping Public Company Ltd, Merchant Marine Training Centre, Samutprakarn |
| 20. Trainee marine engineer onboard MV Maritime Wisdom, MSI Shipping Management Singapore |
| 21. Junior ROV pilot tech with about 100 hours of flying time with navajo and seaeye tiger offshore |
| 22. Junior geologist worked in Fugro Geotech Netherlands / Orissa Manganese & Minerals India |
| 23. Pipeline Engineer with MSc degree, work @ Engineering Consultancy Newcastle upon Tyne United Kingdom |
| 24. Experienced motorman/pumpman on board different vessels of COMANAV PETRAMAR MARPHOCEAN |
| 25. HSE Professional NEBOSH in Oil & Gas, Petrochemical, Chemicals, Construction of large projects |
| 26. Sr Welding Inspector Chesapeake Energy, Quality Assurance, Quality Control, API-510 AWS-CWI API-1104 |
| 27. Engineering Manager / Tooling Manager currently working in China |
| 28. Deckhand Offshore Oil and Gas coxswains, STCW95 and further courses at Fremantle Challenger Tafe |
| 29. Electrical Engineer experienced in the field of Testing and Commissioning of power system products |
| 30. Looking for a new job, currently working in Pakistan |
| |
| |
|
|
|