| |
| Mechanical Engineer Nam Theun 2 power company Laos, Electricity De France major share holder |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in Mechanical Engineer Nam Theun 2 power company Laos, Electricity De France major share holder - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
116157
Last Updated:
Friday, October 22, 2010 |
Location (Residence): Vientiane, Lao, Dem. Rep.
Citizenship: India
|
| |
Languages:
Native:
Hindi Other:
Thai, Latvian, French Standard, English |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
Bachelors in Mechanical Engineering Years of Experience:
7 years
|
Authorized to work in:
European Union, American Samoa, Andorra, Angola, Australia, Austria, Bahrain, Bangladesh, Barbados, Belarus, Belgium, Benin, Bermuda, Bhutan, Bolivia, Brazil, Burkina Faso, Burundi, Cambodia, Cameroon, Canada, Cayman Islands, Central African Rep., Chile, China, Christmas Island, Colombia, Comoros, Congo, Congo, Dem. Rep., Cook Islands, Costa Rica, Cote D'ivoire, Czech Rep., Denmark, Egypt, Finland, France, French Guiana, French Polynesia, Gambia, Georgia, Germany, Ghana, Haiti, Honduras, Hong Kong, Hungary, Iceland, India, Indonesia, Ireland, Italy, Kenya, Kiribati, Korea, Dem. Rep., Korea, (South), Kuwait, Kyrgyzstan, Lao, Dem. Rep., Latvia, Lebanon, Lesotho, Liberia, Macao, Macedonia, FYR, Madagascar, Malawi, Malaysia, Maldives, Mali, Malta, Mayotte, Micronesia, Monaco, Morocco, Mozambique, Namibia, Nauru, Nepal, Netherlands, New Zealand, Nicaragua, Niger, Nigeria, Niue, Norfolk Island, Norway, Palau, Panama, Papua New Guinea, Paraguay, Peru, Philippines, Pitcairn, Reunion, Romania, Russian Federation, Rwanda, Samoa, Senegal, Serbia & Montenegro, Seychelles, Sierra Leone, Singapore, Slovakia
Present Location:
Laos PDR, Vientiane
Relocation:
Anywhere (International) |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Engineering |
Maintenance |
Trainee
|
10 years |
|
Technician Level |
Commissioning |
Trainee
|
6 years |
|
Technician Level |
Maintenance |
Trainee
|
4 years |
|
Engineering |
Commissioning (+ Pre-) |
Trainee
|
6 years |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
Dear Sir/ Madam,
I am sending my resume for appropriate post.
I have 7 years 2 months experience in Erection & Commissioning of 4X250 MW power plant ,Mechanical Maintenance of Hydro Power plant.
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
Presently working with Nam Theun 2 power company, Laos (Electricity De France major share holder) w.e.f 20/10/09.
Involved in erection and commissioning of 4X250 MW Karcham Wangto Hydro Power Plant of JAI PRAKASH Group (Annual Turnover Rs 7000 crores) w.e.f Aug 07 to Oct 09..
Four year in Operation & Maintenance of 330 mw power plant of JAI PRAKASH group awarded gold shield for 2007-2008 by ministry of power.
Involved in Dimensional & profile Inspection of Fabricated Assemblies, Machined components etc
such as DRAFT TUBE LINER,SPIRAL CASING AND GUIDE VANES.
I have completed one week training programme on Advanced Welding Technology and Non Destructive Test conducted by Welding Research Institute, Bharat Heavy Electricals Limited, Tiruchirapalli.
Two month complete runner weld repairing and Robotic HVOF coating (in technical collaboration with Techno lab) work at HEAVY ENGINEERING WORKSHOP, REWA, M.P.All these activities were held under my supervision
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
DIPLOMA IN MECHANICAL ENGINEERING
FINAL YEAR 2003
First division (76.9%)
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
MS OFFICE, AUTO CAD2000, ERP, CMMS (GP Mate)
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
Nam Theun 2 Power Company, Laos (Electricity De France major share holder) 1080 MW
Preparation of Master Maintenance Plan including all the maintenance activities for
each & every equipments of Power House, Dam site, Substation and Regulating Dam.
Maintenance planning and scheduling for shutdown.
Supervision of maintenance activities during outage.
Preparation of annual maintenance plan using CMMS (Computerized Maintenance Management System).
Daily T&C activity planning and monitoring of Nam Theun 2 Power Company.
Preparation of punch list for various equipments of Power House, Dam site, Substation and Regulating Dam.
Karcham Wangtoo Hydro Electric Project 4X250 MW (Aug 07 to Oct 09.)
Involved in erection and commissioning of 4X250 MW Karcham Wangtoo Power Plant of JAI PRAKASH Group.
Timely and safe execution of erection & commissioning activities as per given erection schedule.
Looking after safety of man and material at site.
Safe handling, lifting and proper storage of site material.
Preparation of daily work record, problem faced, important and pending activities.
Preparing day by day activity plan of erection and commissioning.
Planning for man power requirement as per given erection and commissioning schedule.
Preparing daily report of erection, commissioning and operational events as specified in the work instructions.
Adopting the erection and commissioning procedure as given in supplier’s technical manual.
Erection of 4X250MW Francis Turbine (Andritz make)
Erection of 275 ton, 210 ton, 180 ton E.O.T. crane. (Unique make)
BASPA II 3X100 MW (Aug 04 Aug 07)
Maintenance, replacement and reparation of Pelton wheel turbine, runner (Vertical Shaft Pelton wheel) (VA TECH make) using TIG welding and NDT Test such as Dye Penetrant Test and Magnetic Particle Test.
Preparation of welding procedure specification for weld repair.
Maintenance and installation of 400 kv gas insulated switchyard ALSTOM make
Maintenance of 111 MVA synchronous generator make SIEMENS.
Maintenance and installation of guide bearing pad, roller bearing and ball bearing.
Maintenance of Pelton turbine runner.
a. Gearboxes..
Fault & Trip analysis.
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
-
|
| |
|