Home  Register  Jobs  CVs  Job Search  Worldwide  Process  Help  Search  Scams  JA  B  C
Oil Offshore Marine Careers in Onshore and Offshore Drilling Energy Industry Oil Offshore Marine: Oil & Gas Jobs & CVs Online recruitment services (job vacancies, resume/cv database search) for Oil Industry, Energy, Offshore, Petroleum, Engineering, Construction, Drilling, Subsea, Marine, Shipbuilding, Shipping, Petrochemical. Have your own FREE account! free cv upload registration on Oil-Offshore-Marine.com recruiter benefits: free job postings and cv search on Oil-Offshore-Marine.com
  Need to find something?
 
 Username:  
 Password:  
Oil Offshore Marine Register
 
  Remember my password?  
 Recruiters - Employers & Agencies
  Advertise / Contact Us
free cv upload for all job seekers, free access to oil and gas jobs
subscribe to oil careers alerts, oil jobs postings, drilling rig jobs, engineering jobs

 

CV Sr QA QC Engineer Submarine Pipeline Arwana Satu Lay-Barge Colombo Port Expansion Project Sri Lanka

 
Sr QA QC Engineer Submarine Pipeline Arwana Satu Lay-Barge Colombo Port Expansion Project Sri Lanka

Resume built for oil and gas job opportunities by a jobseeker with experience in Sr QA QC Engineer Submarine Pipeline Arwana Satu Lay-Barge Colombo Port Expansion Project Sri Lanka - would you like to offer this candidate a job/contract employment?

Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database

CV/Resume ID no.: 116465

Location (Residence): Tangerang, Indonesia
Citizenship: Indonesia
 
Languages:
  Native: Indonesian
  Other: English
 
Education & Experience: Work Authorization & Relocation:
Education:
  Bachelors in Electric

Years of Experience: 27 years
Authorized to work in:
   Indonesia
Present Location:
   Indonesia, Tangerang
Relocation:
   Anywhere (International)
 
Expertise
Category Subcategory Ability Experience
Quality (QA/QC) Quality Control Expert 33 years
Engineering QA/QC Expert 33 years
Management QA/QC Experienced 16 years
 
CV/Resume Details
 
1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory]

Over twenty six - (26) year’s experience in Petroleum and Chemical Industry, assigned in the world Company and Pertamina of Oil Company in Indonesian Government and associated joint ventures operation, since April 1982. In the field inspection during of the constructions, Fabrications / Erections and Hook-up of piping systems and Structural work for onshore and offshore in Oil Production Platform and Refinery Constructions, Pipeline Installations in onshore and offshore, as N.D.T. Inspector, QA/QC Inspector, Supervision, Coordinators, Third Party of Quality Assurance agency and Management leader for technical review of design, constructions, and inspection including documents/procedures during fabrication and monitor in implementation, safety precaution, qualification and productivity, and maintenance of quality records for dossier.

2. Work Experience - CV/Resume Part 2 [Mandatory]

April 2010 to Present 2010

To assist in the family business (distro) Clothing (factory outlet) in Bandung, West of Java, my main task is the controller of this system is running well, ranging from service in the store, packaging and distribution to consumers and secondly to manage our small farm where in Bogor, West of Java.


Middle of December 2009 to End of March 2010

Carried out as Senior QA / QC Engineer and Vice-QA/QC Manager on site for 36 inches Submarine Pipeline in the Indian Ocean on the Arwana Satu Lay-Barge at Colombo Port Expansion Project at Sri Lanka on behalf of Hyundai Construction and Jeong-Suk Marine Construction Co. Ltd as Korean Companies
On behalf Agency of Blue Marine, Singapore

Since mid-December 2009 until the end of March 2010 has manage in the Quality System Controller

Nature of Work
Quality System monitoring
- Monitoring determine of inspection requirements and resource level as per Ceylon Petroleum Specification, regarding the Quality manual and ITP of main contractor and sub-contractor (Hyundai Engineering Construction Co. Ltd and Jeong-Suk Marine Construction Co. Ltd) in during construction.
- Re-check all document related to fabricate and as built drawing proposed
- Reviews and monitoring ensuring that QC department have access to the latest revision of approved WPS and Related Construction Procedures, Project Quality Plan, Quality Control Manual, and Drawing Revision as built.
- All activity coordination with all departments involved as Engineering, Marine, Production, and Diving to follow the control manual system at QA manual.
- Create the monitoring to all the Welding Procedure Specification, Welder Qualification, and NDT Operators Qualification
- Reviews and monitoring clearance status in form report of Material matched during Fit-up of fabrication drawing, Welding process, NDT treatment process, Equipment installed, and construction installed.
- Control and monitoring system created at all trace abilities records system and assist to sub contractor matched with actual records.


Middle of August 2009 to Last of October 2009

Representative assignment as Client Inspector at during fabrication of Break down Tie-In spool at 6” KRA platform, 10” KG-KF P/L, 6” KG-KG West 1&2, 6” KG-Lukah 1~3, Riser Pipe of 6”, 10” and 14” of I-Tube for KG West-1, KG-Lukah 1X and 82 Pieces of Riser Clamp of various sizes, at Timas Fabricator at Serang West of Java and Utraco Fabricator at Batu Merah Batam.
Project Title: Star Energy of KG Gas Development Project – KAKAP Field
On behalf Agency of Germanischer Lloyd Group

Nature of Work
Quality System monitoring
- Monitoring determine of inspection requirements and resource level as per Star Energy specification, regarding the Quality manual and ITP of main contractor and sub-contractor (Timas-Utraco) in during construction.
- Re-check all the shop drawing work in during fabrication of Riser Clamp, Pipe Riser, Tie-In spools and I-Tube spool as the latest drawing to fabricate and as built drawing proposed
- Reviews and monitoring ensuring that QC inspector have access to the latest revision of approved WPS and Related Construction Procedures, Project Quality Plan, Quality Control Manual, and Drawing Revision as built.
- All activity coordination with the QC department of Dimensional Check, fit-Up, the welding records and NDT inspection
- Monitoring to all the Welding Procedure Specification, Welder Qualification, QC Main contractor Qualification and NDT Operators Qualification
- Reviews and monitoring clearance status in form report of Material matched during Fit-up of fabrication drawing, Welding process, NDT treatment process, Equipment installed, and construction installed.
- Control and monitoring system created at all trace abilities records system and assist to sub contractor matched with actual records.

November 2008 to July 2009

To assist of our family in (distro) clothing (factory outlet) business in Bandung West of Java, I’m created the control system i.e. management system, marketing system, customer system, packing system and distribution system, right now my wife and my brothers and sister in law to handled our business in well.

December 2007 to October 2008

Representative assignment as QC Engineer and Construction Supervisor for Piping system of Petro Bras, during onshore Fabrication of Construction, Erection the FPSO CIDADE de Sao MATEUS Modules at Global Process Systems Pte Ltd Sekupang and PT. Viking Engineering Pipe Shop Tanjung Uncang of Batam Island
Project Title: FPSO CIDADE de Sao Mateus Modules
On behalf Agency of Global Process System, Singapore

Nature of Work:
Quality System monitoring
- Monitoring determine of inspection requirements and resource level as per Codes & PETROBRAS specification, regarding the Quality manual and ITP of main contractor in during construction.
- Re-check all pipe work in during fabrication shop and erection to modules of piping spools as the latest drawing to fabricate and as built drawing proposed
- Proposed with notes change form if any drawing changed, engineering notes changed or design changed
- Issuing the NCR if any confirming record and take the corrective action distribution
- Reviews and monitoring ensuring that QC inspector have access to the latest revision of approved WPS and Related Construction Procedures, Project Quality Plan, Quality Control Manual, Maintain Repair Procedure, and Drawing Revision as built.
- All that activity and coordination with the QC dept, Dimensional Check (Survey dept) and Construction Engineering Dept, include to sub contractors of department involve.
- Monitoring to all the Welding Procedure Specification, Welder Qualification, QC Main contractor Qualification and NDT Operators Qualification
- Reviews and monitoring created solution and maintain all piping system of welding production and executing test, included held of problem carried out solution.
- Reviews and monitoring clearance status in form report of Material matched during Fit-up of fabrication drawing, Welding process, NDT treatment process, Equipment installed, and construction installed.
- Control and monitoring system created at all trace abilities piping system and assist to sub contractor matched with actual records.
- Including reviews the test package for the hydro testing conducted proposed from Sub-contractor to be application in coordination with our team to release priority line will be tested, and monitoring the execution in during testing as per codes available
- Coordination reported to our Core Leaders, Site Engineer and Site superintendent, advice how to solve problem, manage and maintain of the system.

July 2006 to September 2007

Representative assignment as Construction QC Engineer of Structure and Piping system for Conoco Philips Indonesia, during Fabrication of Construction, Erection the WHP-K Deck, WHP-Jacket and CPP Kerisi Modules and Living Quarter at PT Sembawang Indonesia (SMOE), Kabil Batam Island.
Project Title: WHP-Kerisi Deck / Jacket and CPP Kerisi Modules and Living Quarter
On behalf Agency of PT. GL Nusantara (Germanischer Lloyd Group)

Nature of Work:
Quality System monitoring
- Monitoring determine of inspection requirements and resource level as per Codes & CONOCO Phillips specification, regarding the QA manual and ITP of main contractor in during construction.
- Reviews and monitoring ensuring that QC inspector have access to the latest revision of approved WPS and Related Construction Procedures, Project Quality Plan, Quality Control Manual, Maintain and Repair Procedure, E-11 as additional confirmation required in revision drawing need during construction condition and specification for reference.
- All that activity and coordination with the QC dept, Dimensional Check (Survey dept) and Construction Engineering Dept, include to sub contractors of department involve.
- Monitoring to all the Welding Procedure Specification, Welder Qualification, QC Main contractor Qualification and NDT Operators Qualification
- Reviews and monitoring created solution and maintain all piping system and structural of welding production and executing test, included held of problem carried out solution.
- Reviews and monitoring clearance status in form report of Material matched Fit-up, Welding process, NDT treatment process, Equipment installed, and construction installed.
- Control and monitoring system created at all trace abilities structure and piping system.
- Reviews the test package for the hydro testing conducted proposed from contractor to be application, and monitoring the execution in during testing as per codes available
- Coordination reported to our Core Leaders, Site Engineer and Site superintendent, advice how to solve problem, manage and maintain of the system.

July 2005 to June 2006

Representative assignment as Senior Supervisor for PGN (Perusahaan Gas Negara (Persero), during Spiral Pipe Production of Pipe Mill Inspection of 32” OD x 0.563” and 0.626” Wall Thickness at PT Bumi Kaya Steel Industries, KHI Consortium.
Project Title: South Sumatra – West Java Phase II, Grissik to Pagardewa.
On behalf of PT. GL Nusantara (Germanischer Lloyd Group)
As per: API 5L and PGN Specification

June 2003 to April 2005

Representative assignment for Total E&P Indonesie, during fabricated of Pipeline the Upheaval Buckle Repairs at Tatun field location and Riser Repair Main Campaign at all Total field in Tambora-Tunu (Tatun), Bekapai-Senipah-Peciko (BSP) and CPA and Handil Field,
The job carried out of Inspection application and Reviews in Applicable Procedures in implemented and Clearance of system available, Coordination with all personnel involve, and Relevant Specification or code requisite.

1. As Senior QA/QC Supervisor (SQAC), Leader teams for Total E&P Indonesie,
Project Title: UHB-Repair and Riser Repair Main Campaign, Right of Way (ROW) and River Crossing and Bank (RCB)
At Total E&P field - East Kalimantan
PT. Komaritim as Main Contractor and PT. Meindo
On behalf Agency of PT Prima Langkah Pratama
Period – May 2004 to End of April 2005.

2. As Senior QA/QC Supervisor (SQAC), Leader teams for Total E&P Indonesie,
Project Title: UHB-Repair and Riser Repair Main Campaign,
At Total E&P field - East Kalimantan
PT. Komaritim as Main Contractor
On behalf Agency of PT Inamco Varia Jasa
Period – June 2003 to April 2004.
Nature of Work:
All the records use reporting form as per ISO 9001 – 2000 Edition Issued (Quality System).
- Reviews and monitoring determining inspection requirements and resource level as per Codes & Total E&P specification (Client Specification).
- Reviews and monitoring verifying inspection equipment requirements as per Codes and Client specification
- Reviews and monitoring ensuring that QC inspector have access to the latest revision of approved WPS and Related Construction Procedures, Project Quality Plan, Quality Control Manual, Maintain and Repair Procedure, and Specification for reference all that activity and coordination with the QC dept, and Construction Engineering Dept.
- Reviews and monitoring the log in form of Welding Procedure Specification, Welder Qualification, Welding Inspector Qualification and NDT Operators Qualification
- Reviews and monitoring created solution and maintain all piping, pipelines or risers and structural of welding production and executing test, included held of problem carried out solution.
- Reviews and monitoring clearance status in form report of Material matched Fit-up, Welding process, NDT treatment process, Equipment installed, and construction installed.
- Reviews and monitoring of document bundle (Dossier) for As-built incorporation purposes compile ensuring records of all the inspection activity data for MIGAS approval and final dossier.
- In Riser Repair Main Campaign, evaluate how best rebuild of subject campaign sources as cathodic protection repair, removal all damage coating and reinforcement repair by composite epoxy coat or painting application.
- Control and monitoring system created at all activities of repair campaign.
- Coordination with other supervisor and advice how to manage and maintain of the system
- Coordination with CSR (Company Site Representative) and Site Engineering how to solve problem as founded in site, and arrange to delegate of supervision.

1. March 2003 to May 2003

Representative assignment as Supervisor for Migas Certifying Authority, during Pipe Line of 28” OD x 0.50” Wall Thickness API 5L 65 for 723 joints or 8.84 km at Tanjung Changal-Tanjung Kubu island and Lumba Besar-Pemping island, Gas Transmission and Distribution from Grisik to Borderline of Singapore, during pipeline installation on ARWANA Lay Barge.
As per: DnV OS-F101 Submarine Pipeline System 2000, and PGN Specification
On behalf of PT. GL Nusantara (Germanischer Lloyd Group)

2. December 2002 to March 2003

Representative assignment as Supervisor for Migas Certifying Authority, during Pipe Line of 28” OD x 0.50” Wall Thickness API 5L 65 for 16,140 joints or 196 km at Kuala Tungkal to Panaran, Gas Transmission and Distribution from Grisik to Borderline of Singapore, during pipeline installation on HD-423 Hyundai Lay Barge.
As per: DnV OS-F101 Submarine Pipeline System 2000, and PGN Specification
On behalf of PT. GL Nusantara (Germanischer Lloyd Group)

3. July 2002 to December 2002

Representative assignment as Supervisor for PGN (Perusahaan Gas Negara (Persero), during Pipe Seamless Production of Pipe Mill Inspection of 28” OD x 0.50” Wall Thickness API 5L 65 at South East Asia Pipe Industries (SEAPI) Bakauheni Lampung selatan, for Kuala Tungkal to Panaran, Gas Transmission and Distribution from Grisik to Borderline of Singapore.
As per: DnV OS-F101 Submarine Pipeline System 2000, and PGN Specification
Representative assignment as Coordinator of Technical Advisor in 28” OD x 0.34” API 5L 65 Spiral Pipe Mill Inspection of Gas Transmission and Distribution from Grisik to Borderline Singapore, (Consortium: KHI Pipe Industries, Bumi Kaya Steel Pipe Industries, Steel Pipe Industry of Indonesia (Spindo) and Indal Steel Pipe)
On behalf of PT. GL Nusantara (Germanischer Lloyd Group)
As per: API 5L and PGN Specification

4. March 2002 to May 2002

Representative assignment as Supervisor for PGN (Perusahaan Gas Negara (Persero), during Spiral Pipe Production of Pipe Mill Inspection of 28” OD x 0.34”, 0.44”, 0.50” and 0.625” Wall Thickness at Hicom Petro-Pipes Sdn. Bhd. Malaysia, Welspun and Anjar plant pipe mill Gujarat India for Sakernan to Kuala Tungkal, Gas Transmission 650 Km and Distribution from Grisik to Borderline Singapore.
On behalf of PT. GL Nusantara (Germanischer Lloyd Group)
As per: API 5L and PGN Specification

5. January 2002 to March 2002

Representative assignment as Supervisor for IOEC (Iran Offshore Engineering Company), during fabrication Pipe of Pipe Mill Inspection of various size and dimension for Balal Project Iran at PT. DSAW Batam Island
On behalf of PT. GL Nusantara (Germanischer Lloyd Group)

Nature of Work:
All the records use reporting form as per ISO 9001 – 2000 Edition Issued (Quality System).
- Attend Pre Inspection Meeting, the regularly progress and weekly meeting.
- Reviews Manufacturing Procedures Specification (MPS) and monitoring determining Inspections Test Plan (ITP) available carried out.
- Witnesses and reviews the result of Manufacturers Production Procedure of Qualification Test.
- Perform Material, chemical verification and perform Handling and Storage procedure.
- Reviews Raw material and Pipe Mill certificate
- Witnesses and reviews Production mechanical testing.
- Witnesses and reviews Production of Visual dimensional inspection and Non Destructive Testing
- Witnesses and reviews the Hydrostatic testing during pipe mill production.
- Witnesses and reviews performed of calibration verification of test gauges, on line and off line by UT flaw detector equipment of pipe mill production.
- Perform Pipe tracking (Pipe History), identification and making the inspection report.
- Perform reviews and verification of manufacturers and constructions QC report.
- Verification and Reviews of Pipe Mill Certificate as Pipe Production and pipe laid installation.
- Perform Manufacturers final pre-commissioning hand over document.
- Witnesses Transportation and Load out loaded to Barge
- Awareness to Procedure Health and safety implemented.
- Reviews all document performed during pipe laying and general surveillance inspection of certifying during pipeline installed.
- Make the Clouse out report (Resume) of factory or contractors performance during pipe mill or construction production to apply all the procedures implemented.

May 2001 to October 2001

Representative assignment for Total FinaElf E&P Indonesie, during repair work the Pipeline of Upheaval Buckle Repairs at TUNU field location, the job carried out of Inspections, witnesses and Reviews in applicable procedures in implemented to clarified and Clearance of NDE system, based on Codes of API -1104 in Standard Relative Facilities and API -1111 for Design, Construction Operation, and Maintenance of Offshore Hydrocarbon Pipeline and references to STR-SP-542 of Total Specification and code to ANSI B31.3 References to ASME Sec V
On behalf Agency of PT. Inamco Varia Jasa

1. As QC Supervisor for TotalFinaElf E & P Indonesie,
Project Title: UHB-Repair at UHB# 6 (GTS-L to NMP 24”), UHB# 14 (GTS-B to GTS-C 16”), and UHB# 12 (GTS-D to TMP 18”), included provided with WPS in proved available in material and specification in welding production and Welder performance test at Tunu field - East Kalimantan.
PT. Komaritim as Main Contractor
Period – May to October 2001.
Nature of Work:
All the records use reporting form as per ISO 9001 – 2000 Edition Issued (Quality System).
- Reviews and monitoring determining inspection requirements and resource level as per Codes & TotalFinaElf specification (Client Specification).
- Reviews and monitoring verifying inspection equipment requirements as per Codes and Client specification
- Reviews and monitoring ensuring that QC inspector have access to the latest revision of approved WPS and Related Construction Procedures, Project Quality Plan, Quality Control Manual, Maintain and Repair Procedure, and Specification for reference all that activity and coordination with the QC dept, and Construction Engineering Dept.
- Reviews and monitoring the log in form of Welding Procedure Specification, Welder Qualification, Welding Inspector Qualification and NDT Operators Qualification
- Reviews and monitoring created solution and maintain all piping and structural of welding production and executing test, included held of problem carried out solution.
- Reviews and monitoring clearance status in form report of Material matched Fit-up, Welding process, NDT treatment process, Equipment installed, and construction installed.
- Reviews and monitoring of document bundle (Dossier) for As-built incorporation purposes compile ensuring records of all the inspection activity data for MIGAS approval and final dossier.
As per SP-STR-311 Fabrication of Offshore Steel Structure, SP-STR-211 Materials for Offshore Steel Structures, SP-TCS-611 Welding of Pressure Containing (Piping, Vessels and Equipment’s), SP-COR-181 Painting of Offshore and Onshore Structures and Equipment’s, SP-STR-542 Site Welding of Carbon Steel and others Client Specification


April 2000 to November 2000

Representative assignment for Main Contractor, during fabricated of EPSC 1 and EPSC 2 Offsite Phase 7, the job carried out of Inspections and Reviews in Applicable Procedures implemented and clarification. Clearance of NDE system and Preparation for Hydro test, coordination with Pre-commissioning part dept, based on Standard Codes and Client Specification.
On behalf of PT. Gunanusa Utama Fabricators

As QC Coordinator of Piping and Dossier for PT. Gunanusa Utama Fabricators (Main Contractor)
Project Title: Tunu Field Development Plant of Tunu Central Processing (TCP) and associated facilities Total Indonesie, Tambora East Kalimantan.

Nature of Work:
All the records use reporting form as per ISO 9001 – 1994 Edition Issued (Quality System).
- Determining inspection requirements and resource level as per Codes & Client specification
- Verifying inspection equipment requirements as per Codes and Client specification
- Ensuring that QC inspector have access to the latest revision of approved WPS and Related Construction Procedures, Project Quality Plan, Quality Control Manual, Maintain and Repair Procedure, and Specification for reference all that activity and coordination with the Welding Supervisor, and Construction Engineering Dept.
- Ensuring that QC inspector have access to the latest revision or Modification of approved Construction
- Preparing and maintaining the log in form of Welding Procedure Specification, Welder Qualification, Welding Inspector Qualification and NDT Operators Qualification.
- Created solution of monitoring and maintain all piping and structural of welding production and executing test, included problem carried out solution.
- Clearance status in form report of Material matched Fit-up, Welding process, NDT treatment process, Equipment installed, and Painting.
- Document bundle (Dossier) for As-built incorporation purposes compile ensuring records of all the inspection activity data.
As per SP-STR-311 Fabrication of Offshore Steel Structure, SP-STR-211 Materials for Offshore Steel Structures, SP-TCS-611 Welding of Pressure Containing (Piping, Vessels and Equipment’s), SP-COR-181 Painting of Offshore and Onshore Structures and Equipment’s, SP-STR-542 Site Welding of Carbon Steel and others Client Specification

March 1999 to February 2000

Representative assignment for Main Contractor, during fabricated of pipeline and river crossing, the job carried out of Inspections and Reviews in Applicable Procedures implemented and clarification. Refer to Project Quality Control Plan and Inspection Test Plan, based on Standard Codes and Client Specification.
On behalf of PT. KOMARITIM

1. As QA/QC Coordinator for PT. Komaritim Stolt offshore group (Main Contractor)
Project Title: 20” Trunk line GTS-N to GTS-Q Normal Pipeline 4.4 Km
24” Trunk line GTS-R to GTS-T and GTS-T to GTS-S Normal Pipeline 10 Km
8” Flow line GTS-Q to TN-MK 3, GTS-Q to TN-W9, GTS-S to TN-W4 and GTS-S to TN-20, Normal Pipeline 9.6 Km, at Tunu Field Development Project Phase 6 / EPSC 2, Owned by TOTAL INDONESIE on The ARWANA Lay Barge, and included of hook-up pipe processing to the wellhead East Kalimantan.
Period: – September 1999 to February 2000
2. As QA / QC Coordinator for PT. Komaritim Stolt offshore group (Main Contractor)
Project Title: 16” GTS-D to GTS-E Pipeline Upheaval Buckle Repair, at location Delta Mahakam Owned by TOTAL INDONESIE on the ARWANA Lay Barge, East Kalimantan
Period: – August 1999

3. As QA / QC Coordinator for PT. Komaritim Stolt offshore group (Sub-contractor), from PT. Citra Indonesia (Main Contractor)
Project Title: Peciko Field Development Project Phase 1, EPSC-4, 42” RVX Gas Export Pipeline River crossing, at location Sanga-Sanga, Kutai Lama and Dondang, Owned by TOTAL INDONESIE on The ARWANA Lay Barge, Excess Pipeline to Senipah District Terminal, East Kalimantan
Period: – June 1999 to August 1999

4. As QA / QC Supervisor for PT. Komaritim Stolt offshore group as Subcontractor
Project Title: Peciko Field Development Project Phase 1, EPSC-2, Shore Approach 24” Line MWP-A and MWP-B Trunk Lines of 8 Km total length of both Pipeline, Owned by TOTAL INDONESIE (PT. Saipem Indonesia as Main Contractor). In The ARWANA Lay Barge, Senipah District Terminal Area East Kalimantan.
Period: – March 1999 to May 1999 -
Nature of Work:
All the records use reporting form as per ISO 9001 – 1994 Edition Issued (Quality System)
- Determining inspection requirements and resource level as per Codes & Client specification
- Verifying inspection equipment requirements as per Codes and Client specification
- Ensuring that QC inspector have access to the latest revision of approved WPS and Related Construction Procedures, Quality Procedures ITP's and Specification for reference and coordination with the Welding Supervisor, and Construction Engineering Dept.
- Preparing and maintaining the Welding Procedure Specification Log, Welder Qualification Log, Welding Inspector Qualification Log and NDT Operators Qualification Log.
- Ensuring that approved and monitoring control of Welding consumables stored and applied of Welding Machines, Welding parameters and Welding process issued for the Production Welding in procedures as per welding procedure specification applied.
- Ensuring the Lay-barge Tally clerks accurately records of the pipe data
- Reviews all of the NDT result, reading and interpreting radiographs
- Carrying out inspection duties in accordance with Pipe-lay QC Plan Procedures and Pipe Installation (Hook-up) on the platform procedures in QC record for inspection activities
- Document bundle (Dossier) for As-built incorporation purposes compile ensuring records of all the inspection activity data.
As per API – 1104 18th Edition, API 1111 2nd Edition, SP-STR-311 Fabrication of Offshore Steel Structure, SP-STR-542 Rev 1 Site Welding of Carbon Steel Pipeline (Client Specification)

November 1998 to December 1998

Representative assignment for PT. Toyo Kanetsu Indonesia, As X-Met 880 Inspector The job carried out during fabricated of LNG Tank No. 24 D-6 Owned by PT. BADAK LNG Co, Bontang East Kalimantan
On Behalf of PT.Asterisk Enam (Subcontractor)

Nature of Work:
The Chemical composition Inspection of Plate and Welding of Inner/Outer shell plate, Bottom Plate, Stiffener Ring of Shell, Supports, Girder, Bolt/Nut and Consumable of Filler Weld.
As per Client specification

July 1998 to September 1998

Representative assignment for JOB PERTAMINA - TALISMAN (Ogan Komering), Ltd. as Inspector of QA / QC, job carried out witnesses of Inspection and Reviews of Files clarification. On behalf of PT. Indospec Asia
Nature of Work:
- The Valve Inspection of Ball Valve, Gate Valve and Check Valve of various size, class and Brand product of Crane, Grove, KTM, Balloon, inspected of visual and hydro test, in PT. Crane Indonesia Cikarang West Java and PT. Valvindo Sunter Jakarta.
- The Pipe Inspection during Fabricated of Line Pipe in size by quantity of 6" x 250 joints in PT. Bakrie Pipe Industries Bekasi West Java.
- The Pressure Vessel Inspection during Fabricated of Flare Knock out Drum 54" x 192" length in PT. Passulindo Segara, Cileungsi West Java.
As per MSS-SP 55, API 598 ref. code, API 6D, API 5L and API 5L 8 RP Ref. Code, ASME sec VIIII Div I

November 1997 to June 1998

Representative assignment As QC Site Engineer and QC Coordinators for PT. Gunanusa Utama Fabricators, during Fabricated and Installation of Fire Water Platform, North Processing Unit (NPU) phase I and Offsite project in TNOR/EPSC I – NPU & Associated Facilities project owned by TOTAL INDONESIE, on behalf of PT. Indospec Asia.
Location Project in Gunanusa Fab Yard Cilegon West Java, Tunu Field East Kalimantan
The job carried out in Welding Process, Structural and Process Piping.

Nature of Work:
- Reviews Client Specification regarding Welding Requirement.
- Reviews and provide applicable of WPS / PQR and summary for specific project.
- Advise if any procedure should be established with Quality Control Standard Manual.
- Reviews NDE / NDT Procedure and Personal Qualification.
- Establish NDE / NDT Plan refer to Client Specification / Codes / Drawing and Interpret / review of all NDT result.
- Weekly Meeting with Client, discuss in progress priority package and take way out of Trouble / Outstanding solution.
- Coordination with Client authorized Inspector, Fab Shop Dept., Engineering Dept involved as per Drawing and Client Specification in actual installation.
- Reviews and monitoring report of all Point Inspections during Material Verification, Cut Profile, Fit Up, Weld Out, Either Shop Fabrication and Erection.
- Organize to finalize and acceptance of Punch List, Non Compliance Report (NCR) and Rejection Report in Structural and Process Piping and keep maintain the traceability Record.
- Organize the Final NDE Clearance and issue the final clearance before Pre-commissioning such as Flushing, Hydro test, and Painting etc.
- Compile all Report and Record as process Piping and Structure to Dossier.

July 1997 to September 1997

Representative assignment for JOB PERTAMINA - TALISMAN (Ogan Komering), Ltd. as Inspector of QA / QC, job carried out witnesses of Inspection and Reviews of Files clarification. On behalf of PT. Indospec Asia

Nature of Work:
- The Valve Inspection of Ball Valve, Gate Valve and Check Valve of various size and class inspected of visual and hydro test, in The Talisman Warehouse Sunter Jakarta.
- The Pipe Inspection during Fabricated of Line Pipe in size by quantity of 3" x 1.230 joints, 4" x 410 joints and 6" x 328 joints in PT. Bumi Kaya Steel Industries Jababeka Industrial Estate, Cikarang West Java.
As per MSS-SP 55, API 598 ref. code, API 5L and API 5L 8 RP Ref. Code

May 1993 to June 1997

Periods and latest position in PT. Budykarya Nastiti as Operation, Appraisal team and Estimator Cost project Jakarta Head Office.

December 1994 – April 1997

The round company activities as long as above period’s duties in some project as Operational Manager and adviser, like as

Nature of works:
- The carried out the radiographic testing of Line Pipe Spiral, size diameter 42” and 36” owned by CALTEX in KHI Pipe Industries Cilegon west Java.
- The carried out the radiographic x-rays methods of vessel, diameter by length 96” x 1300” Titanium material 4 units, owned by PT. Polyteline Eka Perkasa at PT. Texmaco Heavy Fabrication Karawang west Java.
- The carried out radiographic testing NGL-B to L-comp pipeline, diameter by length 24” x 36 km, owned by ARCO on behalf on PT. Wira Matra Guna, on Binhai 109 Lay Barge.
- The carried out radiographic testing of Spool process piping L-comp and MMC platform, owned by ARCO, on behalf of Nisconi Balongan fabrication west Java.
- The carried out RT/MT/PT and UT of modification Spool Process piping and structural and repair of corroded pipeline at KNA/MXA/MMC and L-comp, owned by ARCO, on behalf of PT. Cal marine on the CB1 maintenance Barge, sea west of Java.
- The carried out Ultrasonic testing, Thickness gauging, Hardness test for Re-certification of various size diameter of 524 units Pressure Vessels, Scrubber and Pig Launching, owned by ARCO eastern area sea of Java.
- The carried out for Outside project and yard of McDermott Indonesia Batam island. For project:
- PT. Fabrikatama Indonesia carried out project of UT, RT, MT, and PT for Spool process piping and pressure vessel.
- PT. TOYO Kanetsu carried out project of MT, PT, Pressure vessel and Tank.
- PT. Batamas Jala carried out project RT, Vacuum test of Tongkang / Barge and Ship.
- PT. Jaya Ship yard, carried out project RT of Barge / Vessel.
- PT. Nan Indah ship yard, carried out project RT and UT.
- Positive Analyzing Metal Identification tests (PMI), PT. McDermott Indonesia in Foster Wheeler project for Singapore Aromatic Center plant construction.
As per API-1104, ASME Sect. VIII, ANSI-B31.3, and AWS-D1.1

October 1992 – November 1994

The round fabrication activities for Onshore and Offshore project as long as above periods duties in some project and make completed of daily report and record for keeping to dossier bundle of all Inspection implemented data of Welding piping and structure, NDT result, Painting/coating.

Nature of work:
- The job carried out of maintain and regular inspection of conveyor belt, owned by PT. Indocement Cileungsi Bogor west Java.
- The job carried out as Welding Inspector during fabricated of Avtur storage tank, owned by MAXUS in PT. Gerbang Tata Gemilang fabricator, Cileungsi Bogor west Java.
- The job carried out as Welding Inspector, during fabricated and installed of sub sea pipeline, risers and sub sea tie-ins & hook-up of spool piping at Deck platform, owned by TOTAL / UNOCAL and the Jacket and the Deck Platform fabricated and installation offshore, owned by ARCO, in fabrication on Handil Yard, on behalf of PT. KOMARITIM, east Kalimantan.

February 1992 – September 1992

Periods and latest position in PT. Promits Engineering and Construction as Senior Staff in QC Department, as long as above periods duties in EXOR 1 Pertamina project (24” RAW pipeline), as Welding inspector and films reviews of radiographic examination methods in Balongan Indramayu west of Java.
As per API-1104, AWS-D1.1 and ASME sect V. Ref. Code

January 1989 – January 1992

Periods and latest position in PT. SMEIC ENGINEERING INSPECTION, Medan heads office, as Operation Manager in associated activities, Technical adviser in QA-QC and Technician as Welding inspector and NDT Inspector level II.

April 1991 – May 1991

As Surveyor and Welding inspector of job carried out in re-certify Migas authorized of 38 units pressure vessels in Pertamina compressor station and booster station. In Pangkalan Susu, Pangkalan Brandan and Kuala Simpang, north Sumatra
As per ASME sect. VIII div. 1, ASME sect. V ref. Code, and Gronslagen Stoomketels 1952 edition

January 1991 – March 1991

As technical adviser in QA-QC and associated activity as long as periods cleared in severally project, advised procedure specification of code in Boiler, Pressure Vessel, Crane Lifting, NDT and Cathodic Protection.

Nature of work:
- As Corrosion engineer, carried out the Cathodic protection of Galvanic anode system for cathodising of Gas pipeline for size diameter 6” and 8” from Booster and compressor station Pangkalan Brandan district area to Booster and compressor Pangkalan Susu district area, north Sumatra.
- As Welding inspector, carried out installed of fuel pipeline 8” and corroded pipe replacement, owned by PLN fuel storage of Belawan Power station in Medan, north Sumatra.
- As Surveyor a representative witnesses from Indonesian Government third party, carried out international Re-certification of Pressure Vessel and Tube Bottle certified agency by Bureau veritas (France Agency), owned by PT. Schlumberger Geophysics Nusantara Indonesia Training Center, Tanjung Morawa, in Medan north Sumatra.
As per ASME sect. VIII div.1, ASME sect. V Ref. Codes, API –1104, NACE, Gronslagen 1952 edition

July 1989 – December 1989

- Representative assignment in corrosion engineering, carried out in QA services Cathodic Inspection of Loading line pipeline 30 inches, in Impressed Current system, owned by Pertamina Pangkalan Susu district area, north Sumatra.
- As Examiner of Performance Test for welder in gas, Distribution to transmissions pipelines project in tandem, north Sumatra.

November 1988 – May 1989

- As Migas representative assignment in QA services as Welding inspector, the job carried out Rigs inspection, in Pangkalan Brandan, north Sumatra.
- As Welding inspector in welder qualification test and witnesses/inspect welding production as long as 6” x 7-Km gas pipeline onshore project, owned by PGN in Belawan Expansion for distribution gas project, north Sumatra.
As per AWS-D1.1, ASME sect. IX, API -1104, and ASME sect. V Ref. Codes

December 1985 – November 1988

Periods and latest position in PT. Bixindo Utama Jakarta Head’s office as Estimator cost operation project and Supervisor in QA-QC, NDT inspectors level II, and Welding inspector.

August 1988 – October 1988

Representative for Atlantic Richfield Indonesia Inc. (ARCO), as Welding inspector and reviews of NDT inspection services, the job carried in regular maintenance of inspection services during installed for spools piping in Bravo Golf, Fox-trot Alpha, Mike Bravo and Kilo Alpha Platform, sea west of Java.
As per ANSI-B31.3, AWS-D1.1, ASME sect. -VIII div. 1, ASME sect. -IX, and ASME sect. -V Ref. Codes.

January 1988 – July 1988

Representative for PLLP assignment in Chiyoda Corporation Ltd As Welding Inspector and NDT of Radiograph interpretation and documents reporting’s reviews as Dye Penetrant testing, Magnetic Particle testing, Ultrasonic Flaw Detector testing and Leak Pneumatic test of Gas piping system and Tank Storage of Gas (LNG), under supervision by PLLP Pertamina (Mr. Amos Clark, NDT level III) and Chiyoda Corporation Ltd. as Main contractors.
Responsible at during fabrication and modification or expanded gas product, from Train D refinery LNG Production and new fabrication Train E of piles structural, in Bontang east Kalimantan
As per ANSI-B31.3, AWS-D1.1, ASME sect. VIII div. 1, ASME sect. IX and ASME sect. V Ref. Codes

October 1987 – December 1987

Representative for ARII in PT. Sanggar Sarana Baja Fabricator Jakarta, as Welding inspector and Film reviews of radiograph testing, the job carried during fabricated and repaired of Pressure Vessel recycle liquid dehydrator s/n 01-V-201 A/B and Two Phase HP Discharge Scrubber 24” OD x 10 feet’s S/S for LPG media services.
As per ASME sect. VIII div.1, ASME sect. I, ASME sect. IX and ASME sect. V Ref. Codes

October 1986 – December 1986

As Supervisor in Offshore project, the carried out radiographic examination, during modification and Hook-up piping system and Piles of Jacket, on the Toba Work Barge, PT. Adiguna contractor at Arjuna Field location, owned by ARII
As per ANSI-B31.3, AWS-D1.1

December 1985 – July 1986

As assistant of Supervisor in Onshore project at PT. McDermott Indonesia Fabricator yard in Batam Island, the job carried out of radiographic examination during installed and fabricated of Jacket, Deck, Vessel processing and piping system, owned by ARII, ONGC, CPC, HUDBAY.
As per ANSI-B31.3, AWS-D1.1, ASME sect. VIII div. I and ASME sect. V Ref. Codes

October 1985 – December 1985

As assistant of Supervisor in Offshore project on the IOC-2000 Work Barge, PT. Satmarindo, the job carried out of Hook-up installed of piping system, Jacket, and deck fabrication, owned by ARII.
As per ANSI-B31.3, AWS-D1.1


June 1985 – October 1985

- As assistant of Radiographer for PGN Jakarta, the carried out onshore project of Gas Distribution Pipeline 6” OD in the Jakarta Industrial Estate Pulogadung Jakarta (JIEP).
- As assistant of Radiographer for Adiguna Ship yard, the carried out fabricated of Deck Platform, owned by ARII.
- As assistant of Supervisor in Onshore project PT. Guna Nusa Utama Fabrication Yard (GUF), the job carried out of Radiograph, Magnetic Particle, Dye Penetrant, Ultrasonic flaw Detector examination of Junction satellite, Deck Platform and Flare Tower Jacket, Pressure Vessel, owned by Kodeco Energy Co. Ltd. in Grenyang west of Java.
As per API-1104, ANSI-B31.3, ASME sect. VIII div. AWS-D1.1, ASME sec., and V Ref. Codes

January 1985 – April 1985

- As assistant of Inspector in Onshore project, the carried out Hydrostatic Test of 24” OD of Avtur Fuel pipeline from Compressor station yard shore connected to Mooring Buoy station in Offshore, owned by Pertamina for The Jakarta International Airport (Sukarno Hata Airport).
- As Inspector for Adiguna Shipyard Fabricator, the job carried out of Magnetic Particle Examination (MT), during fabricated of Kitty-3 Deck platform, owned by IIAPCO.
As per AWS-D1.1, ANSI-B31.3 and ASME sect. V Ref. Codes

November 1984 – January 1985

As Representative NDT Controller and Activities Clerk, reporting to client during fabricated in Offshore project for IIAPCO Pipeline and installed Deck Platform of Wanda and Shinta production Platform on the Brown and Root 264 Lay Barge, the job carried out of Radiograph, Magnetic Particle, Dye Penetrant, and Ultrasonic flaw Detector examination.
As per API-1104, AWS-D1.1, ANSI-B31.3, ASME sect. V Ref. Codes.

July 1984 – August 1984

As Inspector in Onshore project for Toa Harbor Work Co. Ltd., the job carried out Dye Penetrant examination (PT), during fabricated of Jetty Piling for LPG Supply, owned by Pertamina Tanjung Uban, Riau Island.
As per AWS-D1.1, ASME sect. V Ref. Codes

July 1984 – December 1985

Periods and latest position in PT. Asterisk Enam Jakarta Head office, as NDT Inspector


April 1982 – March 1983

Periods and latest position in PT. Baja Indonesia Utama (BIU), Steel Fabricator in Cirebon State, west of Java, as Section Head of Electrical

March 1978 – March 1982

As assistant assignment in Theoretical and Laboratory training, work of Electrical Circuit and Electronics in Academy of Technology Mandala (ATM), Bandung west of Java.


3. Education & Training - CV/Resume Part 3 [Mandatory]

1977 - High Electrical current course at Pusat Latihan Kerja Bandung, with certificate.
1982 - Bachelor of Electrical Engineer from Academi Technology of Mandala Bandung.
1983 - The P4 further education at the central BP7 Jakarta, for appointed as national of P4 teaching assignment with certificate.
1986 - The Welding Inspector course conducted by B4T Bandung of Migas programmed with certificate.
1987 - Attended of corromaint seminar held by N.A.C.E at the Borobudur Hotel for two days regarding corrosion maintenance.
1994 - Attended of advantage a Nuclear Technology in Industries and Supervision aspect for two days at the Kartika Chandra Hotel, regarding Batan and Oil Services Company.
1995 - The operator training course of X-Met 880, Positive Analyzing Metal Identification methods (PAMI), conducted by YSI Limited Clandon in Batam island with certificate.
1997 - Attended in house training of ISO 9001-1994 Edition, Introduction and Implementation the ISO 9001 system at Oil and Gas manufacture construction for Onshore and Offshore for PT. Gunanusa Utama Fabricators conducted by QA department
1999 - Attended in house training of the ISO 9001-1994 Edition of quality system in advance subject for PT Komaritim affiliate of Stolt Offshore Group at Balikpapan East Kalimantan, conducted by Stolt Offshore Group Company
2003 - Safety Induction and Survival Training held for two days in Hyundai Heavy Industries Co. Ltd in Batam Island, with Certificate
2003 - Work Permit training by TotalFinaElf E&P Indonesie, CPU East Kalimantan
2005 - Re-certified in-house training ASNT-TC-1A for level II of Radiographic Testing (RT) conducted by Mr. Sugianto NDT Level III # 83327 with certificate.
2005 - Helicopter Underwater Escape Training (HUET) Conducted by Industrialindo Konsultrain Services (IKS) Jakarta, the Membership of British Safety Council, with certificate.
2006 - And 2007, Inhouse training and Induction refreshing act of STOP programe, Ethic programe and Safety programe conducted by Conoco Phillips Indonesia
2007 - Helicopter Underwater Escape Training (HUET) and Basic Sea Survival Training Conducted by MSTS Asia SDN BHD, Landing Craft Jetty Johor Port Pasir Gudang Johor Malaysia, the Member of Falck Nutec, with certificate.


4. Computer Skills - CV/Resume Part 4 [Mandatory]
Microsoft Office
5. Other Skills - CV/Resume Part 5 [Optional]
None
6. Additional Information - CV/Resume Part 6 [Optional]
None


 

Questions about this candidate? Contact us for an immediate answer. To find similar people [or more experienced] - active jobseekers, please login OR create, FREE of charge, your own company account.

In order to view this candidate's contact information, you must a) be registered with Oil Offshore Marine - Worldwide Oil & Gas Jobs, and b) have already purchased a subscription.

Login Register Pricing Information
Sr QA QC Engineer Submarine Pipeline Arwana Satu Lay-Barge Colombo Port Expansion Project Sri Lanka
CV/Resume ID no.: 116465

Relevant CVs; view more oil and gas CVs
1. Piping Superintendent/supervisor/engineer
2. Qa/Qc, NDT, Welding Inspection, Integrity
3. CSWIP-AUT Phased Array/SENIOR WELDING/ASNT NDT LEVEL III/LEAD QA/QC INSPECTOR
4. ELECTRONICS AND INSTRUMENTATION ENGINEER
5. QA/QC, WELDING INSPECTOR
6. Offshore, Pipeline, Topside, Coating
7. QA/QC, welding inspector, NDE engineer, NDE, pipeline
8. QC Inspector (Welding)
9. QUALITY MANAGER
10. Electrical Engineer
11. SENIOR WELDING INSPECTOR
12. Lead - Inspection & QC / QA Metallurgy Engineer
13. Pipe, Piping, Lead Piping, Coating, Insulation
14. QA QC
15. Electrical and instrumentation, Project Engineering, maintenance
16. Civil Engineer - Projects
17. Instrument Supervisor
18. Laboratory Technician / Chemist
19. QA/QC Engineer
20. Manager / Sr. Engineering - Projects [electrical]
 
 
Other CVs; view more oil and gas CVs
1. Sr. Piping Designer
2. Welding inspection, NDT, Radiography interpretation
3. Experienced Chef, Food Production Manager
4. Logistics, Warehousing, supply chain, Dispatcher
5. Instrument Technician with BOSIET, HUET, H2S training
6. Graduate Mechanical Engineer
7. H2S Safety Engineer
8. Rig mechanic in drilling land rig saudi arabia
9. Procurement, Buyer, Supply Chain - Seadrill Limited, Aberdeen
10. Mechanic / floorman
11. Chief engineer on chemical / oil tankers
12. Pipefitter Guerohrtec GMBH Leverkusen
13. Floorman, Derrickman & Trainee Assistant Driller in Arabian Drilling Company KSA
14. QA/QC Painting & Coating Inspector, Saudi Aramco Client
15. Technical Instructor Singapore Training Centre, Aker Solutions (Aker MH Singapore Pte Ltd)
16. PDMS piping layout designer, isometric dwg, general dwg preparation in PDMS & Auto Cad
17. Drilling Supervisor, Rig Manager, Toolpusher, Drilling Superintendent, Petrom GSP Constanta Romania
18. Entry-level driller or roughneck, interested in entry-level employment offshore
19. Inspection Engineer in oil and gas and heavy manufacturing field, Refinery, Oil & Gas other industry
20. Procurement / Logistics Coordinator INMA Gulf development and Construction LLC in Dubai, UAE
21. Trainee PR Coordinator, Lamprell Energy Ltd. Jebel Ali Free Zone
22. General Sales Manager – GOScH Auto Group Hemet, Ca
23. Oil and Gas Shift Operator Qatar Chemical (Q-Chem) JV of Chevron Phillips & Qatar Petroleum
24. Senior electrician experienced in high voltage in commercial, industrial, and residential projects
25. Offshore Crane Operator Noble Homer Ferrington, Transocean c/o Offshore Marine Services
26. Professional with experience in the field of retail sales, customer care and document control
27. Administration Officer Cedar Link Libya TEREX, no experience in oil and gas companies
28. Sr QA QC Engineer Submarine Pipeline Arwana Satu Lay-Barge Colombo Port Expansion Project Sri Lanka
29. Electrician / Qualified Artisan working in Bethan South Africa
30. IT Technology Clerk, Sales IT Product, Technical Services, Stock Check in Malaysia
 
 

Press Ctrl+D to Bookmark - Tell a Friend - Job Archives - Jobs - Oil and Gas CVs Resumes - Subscribe to Job Alerts - Site Map - Events - Legal - Privacy - Contact

oil offshore marine's website design

Official Blog - International Maritime Signal Flags - Glossary of Oil & Gas Jobs Definitions - Abbreviations & Acronyms from the Oil, Offshore, Marine, and Shipping Industries - Engineering Oil Jobs - Top 100 Energy Sites - Marine Jobs - Offshore Jobs - Oil Careers - Maritime Jobs - PDS/PDMS Oil & Gas Jobs - Oil Industry Jobs - Oil Field Jobs - Oil and Gas Careers - Petroleum Jobs - Oil Rig Jobs - Offshore Oil Rig Jobs - Drilling Jobs - Oil Industry - Official Sitemap - Jobs Feed - Login to your Oil-Offshore-Marine.com account

www.Oil-Offshore-Marine.com - Your Oil & Gas, Offshore, Construction, Shipping, Petrochemical, and Marine Engineering Recruitment Center.

© Oil Offshore Marine - Oil & Gas Jobs - All Rights Reserved.
This website is designed for international users, and its use is governed by Oil Offshore Marine - Oil & Gas Jobs Legal provisions. By browsing on any page of this website, you are deemed to have accepted all Oil Offshore Marine - Worldwide Center of Oil & Gas Jobs legal terms. If you do not agree with Oil Offshore Marine's legal provisions, you must stop using this website and its services.


find oil and gas jobs

  Looking for something?