| |
| Oil & Gas Instrument & Control Engineer DAEWOO Engineering and Construction, Seoul, South Korea |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in Oil & Gas Instrument & Control Engineer DAEWOO Engineering and Construction, Seoul, South Korea - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
117663
Last Updated:
Tuesday, August 14, 2012 |
Location (Residence): Seoul, Korea, (South)
Citizenship: India
|
| |
Languages:
Native:
Urdu Other:
Marathi |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
Bachelors in Electronics Years of Experience:
11 years
|
Authorized to work in:
Present Location:
South Korea, Seoul
Relocation:
United Kingdom, United Arab Emirates, Tuvalu, Singapore, Korea, (South), United States, United States |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Engineering |
Instrumentation |
Experienced
|
14 years |
|
Engineering |
Controls |
Experienced
|
14 years |
|
Design/Software |
Electrical/Instrument |
Experienced
|
14 years |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
Design engineering Instrument and control engineer oil and gas 11 years experience'
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
Current Job:- Instrument & Control Engineer DAEWOO Engineering and Construction, Seoul, South Korea, Nov 2010- Till date
Job Responsibilities:
Design/ Detail Engineering which includes following responsibilities:-
Control Block diagram for Control System,
Material Take Off for Instrumentation
Material Requisition for Instruments etc.
Review Cable tray/ trench Layout Drawings,
Review Instrument/ JB Location Layout Drawings
Instrument Data Sheet & Specifications,
Review of P& IDs & comments to other deptt,
Review of Cause & Effect Matrix,
Logic diagram
Review of Loop Diagram
Review of design as per API, IEC etc. standards,
Cable Schedule, I/O List, Instrumentation Index etc.
Technical Bid Evaluation
Review of Vendor drawing/data
FAT at Auotomation vendor site (Abu Dhabi)
Projects:
1 Inter Refinery Pipeline (IRP-II) EPC-1 package for Ruwais Refinery Expansion Project, Abu Dhabi for
transfer of Hydrocarbon and storage in the tanks.
Duration: Nov2010- Till date
Fifth Job :-Lead Engineer/ Manager- Instrumentation Larsen & Toubro (L&T) Ltd. (Oil & Gas Pipeline Division) , Faridabad, India, Nov 2008- Nov 2010
Job Responsibilities:
PMC Services, Basic Engineering (FEED) & Design/ Detail Engineering which includes following responsibilities:-
System Architecture for Instrumentation & Control System,
Material Take Off for Instrumentation, Bulk Material, Cables, Telecom
Material Requisition for PSV, Panel etc.
Design Basis
Cable tray/ trench Layout Drawings,
Instrument/ JB Location Layout Drawings
Grounding scheme diagram,
Instrument Data Sheet & Specifications,
Review of P& IDs & comments to other deptt,
Review of Cause & Effect Matrix,
Loop Schematics,
Review of Metering Packages,
Project Man Hour estimation for Pre-Bid, FEED, Detailed engineering,
Review of design as per API, IEC etc. standards,
Cable Schedule, I/O List, Instrumentation Index etc.
Review of Quality Document Preparation,
Project cost estimation.
Sizing of Pressure safety valve
Technical Bid Evaluation
Project management
Review of Vendor drawing/data
Following API, ITU, IEC, OISD standards
Following Quality Management System
Projects:
1 Darod- Jafrabad Gas Pipeline Project for Gujrat State Petronet Ltd:- Detailed Engineering for 100 km pipeline
for Instrumentation
Role: Lead Engineer
Duration: April 2009- March 2010
2. Veraval Gas Pipeline Project for Gujrat State Petronet Ltd:- PMC services including FEED for 100 km
pipeline for Instrumentation & Telecom
Role: Lead Engineer
Duration: August 2009- Nov2010
3 Nano Gas Pipeline Project for Gujrat State Petronet Ltd:- Detailed Engineering for 32 km pipeline
for Instrumentation
Role: Lead Engineer
Duration: Feb2010- Nov2010
4.. Salaya Bhogat Pipeline Project for CAIRN India ltd.:- Detailed Engineering for 75 km pipeline
for Instrumentation
Role: Lead Engineer
Duration: May2010- Nov2010
5. Detailed Feasibility Report (DFR ) for HPCL Ltd., India : DFR is prepared for MTO & Estimation cost
including Instrumentation, SCADA/ PLC, Telecommunication for Raman Mandi- Bhatinda, Raman Mandi-
Bahadurgarh Pipeline.
Role: Lead Engineer
Duration: Nov 2008- March 2009
6. Estimation & Quantification Engineering for :-
Petrofac, Sharjah, Qatar Petroleum- AGR Project, Qatar, ADCO-ASAB Lean gas, ADCO- BAB, HPCL, KOC
Etc.
Role: Lead Engineer
Duration: Nov 2008- Nov2010
Recognition at L&T:- Awarded as ICON for Manhour saving
Fourth Job :-Lead Engineer/ Executive- Engineering, YOKOGAWA India Ltd, Bangalore, India, Aug 2006- Oct 2008
Job Responsibilities:
Project Design/ Detail Engineering for Oil & Gas projects which includes following deliverables:-
Study of EPC project philosophy & other Docs,
Preparation of System Configuration,
Grounding scheme diagram,
System & Marshalling Cabinet Layout Drawing,
Termination Diagram ,
Preparation of BOM,
Preparation of Technical Data sheet (Pressure Transmitter, Flame& Gas Detector, Power Supply Unit, Relays, Solenoid Valve, Barrier etc.)
Procurement with Techno-Commercial discussion & follow up with vendor as per BOM,
Extracting/ Editing in INTOOLS Database,
Power Consumption Calculations,
Preparation of Typical Loop Diagrams,
IO Assignment & Nest loading,
Matching P& ID tags with IO List,
Reviewing Instrument Data Sheet,
PLC Programming & modifications,
Integration with DCS CS3000,
Checking PLC logics with DCS graphics & field instrument (Gas detector etc.),
Preparation of Functional Design Specification,
Conducting Pre-FAT and FAT & making reports,
Giving Suggestion to EPC for change in Junction Box Wiring,
Reporting to PM & coordination, follow up with Team member & panel deptt.
Follow up with vendors for procurement & Technical issues, FAT at vendors premises.
Attending Review meetings in India & Abroad for Technical clarification
Project Scheduling, Invoicing as per BOM & Follow up
Exposure of International Codes & Standards (IEC, EN, NFPA etc.).
Projects:
1. Rajasthan North Area Development Project, Rajasthan, India: This is Grassroot project from Cairn India for Upstream, Midstream & Telecom sector & exporting oil & gas through 600 KM pipeline.
Role: Lead Engineer
Duration: April 2008- October 2008
2. ONGC C2/C3/C4 Extraction Unit, Dahej, Gujrat, India: In this project, the gas is taken form LNG Dahej Plant then C2, C3, C4 was extracted & Scrap returned to LNG unit.
Role: Lead Engineer
Duration: Dec 2007- May 2008
2. Green Dome Petrochemical (Ammonia Div), Sharjah, UAE: This is the grass root project for production of ammonia.
Role: Lead Engineer
Duration: July 2007- Dec 2007
3. Rabigh Refinery & Petrochemical Project, Saudi Arabia: This is the grassroot project & handled the Petrochemical section for EPPE, LLDPE, HDPE & BUTENE. All the Design Engineering & testing was carried out in SINGAPORE.
Role: Lead Engineer
Duration: October 2006- July 2007
Third Job :-Lead Engineer/ Executive Instrumentation, ACE Glass Containers Ltd, Rishikesh, India, Feb 2003- July 2006
Job Responsibilities:
Maintenance of the instruments (Temp Controller, Solenoid Valve, Motorized Actuator etc.) & UPS ( 10 KVA, 5KVA)
Working in the shift & Handling Breakdown.
Handling DCS (Yokogawa)/SCADA (SIEMENS) operations for controlling Gas firing, Oil flow, Furnace pressure, VFD control etc.
Supervision, Planning & completion of work of contractor personnel.
Hand on experience on AC drives.
Making Technical Datasheet for faulty instruments.
Procurement for instruments by preparing Technical datasheet.
Maintaining inventories for all Instruments.
Calibration of instruments((Temp Controller(Honeywell, Masibus), Pressure Transmitter (Rosemount & Bell Controls), I to P Converter(Rosemount & Bell Controls), Pneumatic Positioner, Conflow Valve (Honeywell) etc.)& documentation for ISO.
During Projects, working as Team Leader for Testing, installation & commissioning.
Coordination with Electrical, Utilities, Production, Q.C., & Furnace deptt.
Attending breakdown in the plant.
Designing Small projects & implementation.
Handling Siemens EPABX System.
Project:
1. Completed SAT for commissioning of SIEMENS SCADA System which includes loop checking of Furnace Pressure, Furnace Air, Furnace Fuel (oil) flow, Glass level, Temperature closed loops(gas rig) & other open loops, maintenance in batching system for Furnace Rebuild Project.
2. Commissioning of Centac Compressor having IngersollRand Control System.
3. Cable tray laying & cable scheduling.
4. Supervision of installation of Siemens EPABX System.
Second Job :-Project Engineer, Factory Automation India Ltd (OMRON), New Delhi,India June 2001- Feb 2003
Job Responsibilities for project engineering:
Preparation of System Configuration,
Grounding scheme diagram,
System & Marshalling Cabinet Layout Drawing,
Termination Diagram ,
Preparation of BOM,
Techno-commercial discussion with customers for OMRON (PLC, Drives, Servo Motors, Sensors, Relays, Timers, Counters etc.) Products,
OMRON PLC Programming.
Maintenance at Customer site.
Projects:
a. Oil Dispensing Unit, Noida, India : This is Grassroot project in Automobile Sector for Oil Dipensing unit for DENSO India
Role: Project Engineer
Duration: June 2001- Feb 2002
b. Wire Brushing Unit, Faridabad, India : This is Grassroot project in Automobile Sector for Wire Brushing Unit for SUBROS India
Role: Project Engineer
Duration: March 2002- Jan 2003
First Job:- Project Engineer, HUM Engineers & Consultants (Messung, Mitsubishi) Ghaziabad,India Aug 1999- May 2001
Job Responsibilities for project engineering:
Preparation of System Configuration,
Grounding scheme diagram,
System & Marshalling Cabinet Layout Drawing,
Termination Diagram ,
Preparation of BOM,
Panel Engineering
Messung, Mitsubishi PLC Programming,
Maintenance at Customer site.
Projects:
1. Descaling Unit, Ghaziabad, India: This is Grassroot project in Automobile Sector for Descaling unit for SUBROS India.
Role: Project Engineer
Duration: Sept 1999- March 2000
2. Bulging Eight Station Unit, Ghaziabad, India : This is Grassroot project in Automobile Sector for Bulging Eight Station Unit for SUBROS India
Role: Project Engineer
Duration: May 2000- April 2001
PROFESSIONAL HISTORY:
2008- Till date L&T Ltd. (Pipeline Division)
2006-2008 YOKOGAWA INDIA LTD.
2003-2006 ACE GLASS CONTAINERS LTD.
2001-2003 Factory Automation Pvt. Ltd. (OMRON)
1999-2001 HUM Engineers & Consultants (Messung, Mitsubishi)
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
Examination Year of Passing Name of Institution Board/University Percentage
B.E.(Electronics) July 1999 Walchand Institute of Technology, Solapur Shivaji University, Kolhapur 1st Class with Distinction
PROFESSIONAL TRAINING UNDERGONE:
1. On the job training in YOKOGAWA INDIA Ltd.
I. DCS CS3000 System which includes P& ID Graphics, Logic Design etc.
II. Project Engineering & Management.
III. PRIMTOOL Training.
IV. PROSAFE-RS PLC Training.
V. Personality Development Training.
VI. Functional Safety Management Training.
2. PLC Training from Government Institute.
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
SOFTWARE CAPABILITY:
Languages Known : C, C++, Java, D2k, Visual Basic
RDBMS : Oracle 8i, MS Access
Operating System : M.S. Office, Windows 95, Windows 98, Windows 2000,
Windows NT, Windows XP
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
none
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
none
|
| |
|