Home  Register  Jobs  CVs  Job Search  Worldwide  Process  Help  Search  Scams  JA  B  C
Oil Offshore Marine Careers in Onshore and Offshore Drilling Energy Industry Oil Offshore Marine: Oil & Gas Jobs & CVs Online recruitment services (job vacancies, resume/cv database search) for Oil Industry, Energy, Offshore, Petroleum, Engineering, Construction, Drilling, Subsea, Marine, Shipbuilding, Shipping, Petrochemical. Have your own FREE account! free cv upload registration on Oil-Offshore-Marine.com recruiter benefits: free job postings and cv search on Oil-Offshore-Marine.com
  Need to find something?
 
 Username:  
 Password:  
Oil Offshore Marine Register
 
  Remember my password?  
 Recruiters - Employers & Agencies
  Advertise / Contact Us
free cv upload for all job seekers, free access to oil and gas jobs
subscribe to oil careers alerts, oil jobs postings, drilling rig jobs, engineering jobs

 

CV Senior Process Engineer in Oil and Gas industry 9 years experience for both onshore and offshore

 
Senior Process Engineer in Oil and Gas industry 9 years experience for both onshore and offshore

Resume built for oil and gas job opportunities by a jobseeker with experience in Senior Process Engineer in Oil and Gas industry 9 years experience for both onshore and offshore - would you like to offer this candidate a job/contract employment?

Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database

CV/Resume ID no.: 125835

Location (Residence): Jakarta, Indonesia
Citizenship: Thailand
 
Languages:
  Native: Thai
  Other: English
 
Education & Experience: Work Authorization & Relocation:
Education:
  Bachelors in Chemical and Process Engineering

Years of Experience: 9 years
Authorized to work in:
   Indonesia
Present Location:
   Indonesia, Jakarta
Relocation:
   Anywhere (International)
 
Expertise
Category Subcategory Ability Experience
Engineering Process Experienced 14 years
Engineering Hysys/Pro II Experienced 14 years
 
CV/Resume Details
 
1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory]

A professionally qualified and highly experience Process engineering specialist with extensive knowledge and skills in terminal, chemical plant, compressor station, steam pipeline, and familiar all pipeline standard codes, gained substantial experience in the Oil and Gas/Petrochemical Businesses. Additionally, has carried out start-up and commissioning in combine cycle power plant and terminal.

2. Work Experience - CV/Resume Part 2 [Mandatory]

Year of 2011 – Present
Senior Process Engineer
WorleyParsons, Indonesia
Central Gas Process Plant Project (Senoro Limited) The project is to provide FEED for the gas processing plant; The following works under this project consist of;
• Checking the relieving and blowdown calculation and report.
• Performing the staggered blowdown analysis.
• Modeling the whole HP flare system by FlareNet version V7.1.

Assigned to work in WorleyParsons Thailand for Bibiyana Expansion Project (Chevron Bangladesh Limited) The project is to install the additional liquid recovery system and export compression system to the existing gas plant. The following works under this project consist of;
• Prepared the flare system study.
• Prepared the operating and control philosophy.
• Developed the PFD for BTEX recovery system
• Developed the UFD including P&ID.

Year of 2010– 2011
Senior Process Engineer
WorleyParsons, Indonesia
Suban Fifth Train Development Project (ConocoPhillips Indonesia Limited) The project is to modify and design the onshore gas processing plant to increase the sales gas rates from 700 to 860 MMscfd by installing the additional fifth gas production train and other methods to achieve the new sale gas target. The following works under this project consist of;
• Optimized four existing amine absorption systems which shared two common amine regeneration systems to maximize the acid gas removal with the available capacity of the existing amine system by using ProMax 3.1 (Tsweet).
• Prepared preliminary the major equipment sizing within the fifth amine absorption system consists of the Amine Contactor, Treated Gas Cooler and Treated Gas Separator.
• Checked the adequacy of the existing Rich Amine Flash Drums with the new operating conditions based on the optimization results.
• Prepared the preliminary hydraulic calculation to check the adequacy of the existing Lean Amine Booster and Charge Pump to supply the new Amine Contactor in fifth train.
• Modelled the Ethylene Glycol Regeneration using HYSYS version 7.1 to estimate preliminarily the required heating duty of the Ethylene Glycol Regenerator Reboiler and to use as data for vendor package.
• Rated the existing residue compressor to check the compressor characteristic after increasing the sales gas rates from 700 to 860 MMscfd.

Year of 2009 – 2010

Process Engineer

Ujung Pangkah Development Offshore Phase II (CPP & AUP EPC) Project (Hess (Indonesia-Pangkah) Limited) The project is to check the adequacy of existing vent system on WHP-A to accommodate the additional PSV relieving and vessel blowdown loads from the Gas Lift Knock-out Vessel which will be relocated from WHP-B to WHP-A. The following tasks under this project consist of;
• Carried out the 6” Gas Lift Subsea Pipeline using pipesys extension within HYSYS version 2006.5 to evaluate the arrival pressure or inlet pressure of the Gas Lift Knock-out Vessel which is expected as vessel operating pressure and initial vessel blowdown pressure.
• Assessed the governing scenario for PSV sizing.
• Evaluated the PSV relieving rate based on the governing case.
• Performed blowdown rate calculation using Hysys Depressuring utilities including minimum temperature study.
• Performed Vent System Hydraulic Calculation using FlareNet version 2006.5 to verify the adequacy of the existing vent system.
• Studied to reduce the vent load due to the PSV fully opens and develops rated flows.

Rawa Facility Optimization Project (ConocoPhillips Indonesia Limited) The project is to reactivate the facility from shutdown condition and install the New LP Compressor during plant inlet pressure declining from 450 psig to 200 psig. The following tasks under this project consist of;
• Optimized the Rawa Facilities to minimize the new Inlet Compression horse power which will be installed during plant inlet pressure declining.
• Carried out process simulation including report to rating the existing Rawa facility with the additional gas and liquid capacity based on the production profiles. The facilities include the Inlet Separation, Compression, and Dehydration.
• Carried out the conceptual selection for condensate stabilization unit.
• Modelled the New LP Compression facilities will be installed between the existing Inlet Separation and Compressor.
• Prepared heat and mass balance for all cases at inlet plant pressure of 450 psig and 200 psig.
• Checked all process equipment data sheets and equipment sizing calculation.

Year of 2008 – 2009

Process Engineer
WorleyParsons, Indonesia
Central Gas Plant Expansion Project (ConocoPhillips Indonesia Limited) The project is to modify and design the onshore gas processing plant to expanse the sale gas rate from 320 to 460 MMSCFD. The following tasks under this project consist of;
• Carried out process simulation for the additional gas production trains for amine gas sweetening plant by using HYSYS version 2006.5 and ProMax 3.0.
• Optimized the Amine Sweetening to slip more CO2 with the existing lean amine design capacity and the existing rich amine regeneration design capacity.

Sumpal Expansion Project (ConocoPhillips Indonesia Limited) The project is to modify and design the onshore gas dehydration plant to install the additional gas production train arranged in parallel with the existing train. The following tasks under this project consist of;
• Carried out process simulation including report for the additional gas production trains of gas & liquid separation and gas dehydration by using HYSYS version 2006.5.
• Validated the PipeSim model against the actual plant performance data and Performed flowlines and gas trunklines hydraulic simulation with the validated model using PipeSim version 2008.
• Prepared heat and mass balance for the additional gas production train.

Dayung Compression Project (ConocoPhillips Indonesia Limited) The project is to modify and design the onshore gas plant to install the Inlet Compression Facilities during well depletion. The following tasks under this project consist of;
• Developed process simulation including report for the Inlet Compression Facilities to supply 220 MMscfd at 1300 psig to Central Gas Plant when the plant inlet pressure declining in ranges of 75 – 810 psig by using HYSYS version 2006.5
• Optimized the compression simulation to minimize driver power consumptions.
• Prepared heat and mass balance for the Inlet Compression Facilities.
• Studied the requirement of the seal gas conditioning for all Inlet Compressors.

Letang Tengah Rawa Optimization Project (ConocoPhillips Indonesia Limited) The project is to study preliminary concepts to optimize two phase flowline and sales gas trunkline. The following tasks under this project consist of;
• Performed well characteristic by using PVT model with HYSYS simulation to evaluate the well stream compositions based on the dry gas and condensate separated compositions from laboratory test.
• Carried out a steady state hydraulic simulation using HYSYS pipesys extension version 2006.5 for flowline and trunkline including report.
• Carried out the conceptual selection for condensate stabilization unit.
• Studied to propose an option to meet the target arrival pressure at the designation such as increase inlet trunkline pressure, internal trunkline coating or looping the trunkline to reduce the pressure drop.

Suban Phase-3 Project (ConocoPhillips Indonesia Limited) The project is to study preliminary concepts to increase the sales gas production rate of onshore gas plant from 700 to 850 MMSCFD. The following tasks under this project consist of;
• Developed process simulation models for the additional gas production train comprises Inlet Separations, Amine Gas Sweetening, HC dewpoint, Produced Water System and Residue Compressors for sales gas exports by using HYSYS Version 2006.5.
• Studied to install new residue compressor or introduce new pipeline looping for sales gas export pipeline based on a conservative results from Hysys extension pipesys or PipeSim.
• Rated the existing gas production trains whether they can accommodate the additional gas production rate of 150 MMscfd.
• Studied the feasible options to modify the existing gas production trains to meet the new sale gas target or install the new gas production train on the available currently plant space.
• Rated the existing gas production trains whether they can accommodate the additional gas rate of 150 MMSCFD.
• Studied the feasible options to modify the existing gas production trains to meet the new sale gas target including new gas production train installation on the available currently plant space.
• Checked the existing Flare system to accommodate the additional relieving and blowdown load from the new and modified facilities by using FlareNet Version 2006.5.

Kerisi Crude Oil Splitting Project (ConocoPhillips Indonesia Limited). The project is to study the possible splitting two crude oils into two parallel separation trains. The following tasks under this project consist of; consist of;
• Modeled process by using HYSYS Version 20006.5 is checking the feasible existing crude separator and vapor recovery unit whether it can be operated after splitting two crude oils into two parallel separation trains.
• Prepared preliminary PFD and P&ID are based on the feasible process model obtained by HYSYS.

Process Engineer
WorleyParsons, Thailand
Bibiyana Expansion Compression Project (Chevron Bangladesh Production and Exploration Limited). The project is to perform the conceptual design for compressor station. The following tasks under this project consist of; following tasks under this project consist of;
• Developed process design basis and operating and control philosophy for conceptual study of Musai compression station.
• Developed simulation by using HYSYS Version 2006.5.
• Prepared heat and mass balance by using HMB generator which extracted data from HYSYS simulation.
• Developed preliminary UFD/PFD.
• Selected fuel gas design configuration which give high reliability and operation for gas turbine driven centrifugal compressor.
• Sized preliminarily major equipments and process lines within gas compressor station.
• Prepared the preliminary equipment lists.

C1 Catalyst Plant Prject (Polyolefins Company Limited). Assigned to work in WorleyParson Thailand Sriracha Branch Office. The works which performed the details design for Catalyst plant consist of;
• Incorporated HAZOP action from FEED stage item into P&ID.
• Attended HAZOP review during detailed design.
• Verified adequately safety protection system as PSV on equipments as HAZOP action requirement.
• Reviewed P&ID.
• Reviewed line and pump sizing calculation.
• Rated the shell and tube exchanger by using HTRI 5.0.

Year of 2006 – 2007
Process Engineer
WorleyParsons, Thailand

Platong Flare Study Project (Chevron Thailand Production and Exploration Limited). The project is to perform the modification study after increasing gas production rate on CPP from 150 to 210 MMSCFD. The following tasks under this project consist of;
• Reviewed the integrated flare system of PLCPP, PLOCPP and PLOCPP II generated by using FlareNet Simulation.
• Reviewed required the addition PSV on Inlet Separator after increasing gas production capacity.
• Reviewed and checked the effecting of whole flare system after upgrading compression train on PLOCPP II is to increase gas flow capacity from 150 to 210 MMSCFD.

Banyu Urip FEED Updated Project (Mobil Cepu Limited) Assigned to work in WorleyParsons Indonesia. The works which were FEED update on oil and gas processing plant consist of;
• Updated PFD and P&ID to incorporate ExxonMobil’s comments.
• Updated heat and mass balance table from ExxonMobil’s Pre-Feed.
• Prepared the functional specification for nitrogen, UA/IA system.
• Prepared equipment sizing calculation within process and utility area.

Platong Gas II Development Project (Chevron Thailand Exploration and Production Limited) The project is to perform FEED for Live Quarter of new gas CPP. The following tasks under this project consist of;
• Prepared UFD and P&ID for utilities system.
• Checked line and equipment lists for utilities system.
• Performed line sizing and hydraulic calculation for interconnecting lines between existing and new CPP.

Year of 2005 - 2006

Process Engineer
WorleyParsons, Thailand
GFI Bualuang Field Development Wellhead Platform (GFI Greenfields Interanational Oil & Gas Corperation). The project is to perform FEED for oil wellhead platform. The following tasks under this project consist of;
• Performed pipeline hydraulic simulation by using Pipesys.
Funan Produced Water Injection Platform Project (Chevron Thailand Exploration and Production Limited) The project is to perform details design of produced water injection platform. The following tasks under this project consist of;
• Performed and updated PFD and P&ID.
• Performed sizing calculation for single phase Safety Valve on Degasser, Water Injection Pump Suction & Discharge Line, Water Injection Pig Launcher & Receiver, Inlet Lines of Turbine Fuel Heater and Pressure Regulator Downstream Line of Fuel Gas Supply to Turbine.
• Performed sizing calculation for single phase Control Valve on Water Injection Discharge Line and Blanking and breathing out line of degasser.
• Checked the preliminary sizing of Booster and Water Injection Pump by performing hydraulic calculation based on actual platform layout.

CBD MWC Hub Platform Project (Chevron Offshore Thailand Limited) The project is to perform the detail design for hub platform. The following tasks under this project consist of;
• Performed sizing calculation for single and two phases Safety Valve on Production Header, HP&LP Separators and Utilities & Instrument Gas Scrubbers.
• Performed inlet and outlet line sizing for above Safety Valves by using FlareNet V.2004.
• Performed sizing calculation for single and two phases Control Valves on inlet line of Utilities & Instrument Gas Scrubbers.
• Checked the preliminary sizing of HP&IP separator from FEED stage during detailed design whether it can handle fluid flow from Production Header.
• Sized ROs on drain line of HP&IP Separators.
• Checked the preliminary sizing of the following lines: Gas Compression Suction&Discharge Header, Test Header, Production Header, HP and IP Inlet Manifold by using Hysys V.2004.

Third Transmission Pipeline Project (PTT Public Company Limited) The project is to perform details design for gas transmission pipeline. The following tasks under this project consist of;
• Updated Heat & Mass Balance for condensate stabilizer divided into two cases are 2006 OPERATION and 2014 UPSET COMPOSITION.
• Updated hydraulic calculation for condensate stabilizer system and associated utility.
• Performed heat exchanger rating based on actual size from Vendor by using Hysys V.2004.

GAS 2 Feasibility Study – Brown Field Modification on PLOCPP2 (Chevron Thailand Exploration and Production Limited) The project is to perform the feasibility study for modification on gas CPP. The following tasks under this project consist of;
• Prepared red line marked up PFD & P&ID for limiting the suitable tie-in location of a new line linked between PLOCPP2 and GAS 2 CPP.
• Performed preliminary line sizing calculation for Three (3) Fluid, Liquid Spill Over and Gas Spill Over which run across between PLOCPP2 and GAS 2 CPP.
• Checked and verified capacity of existing compressor whether it is required to debottleneck in case of increasing flowrate from 110 to 160 MMSCFD.

Bongkot Field Development Phase 3F Project (Unocal Thailand) The project is to perform conceptual design for wellhead platform. The following tasks under this project consist of;
• Prepared operating and control philosophy.
• Prepared PFD and P&ID.
• Prepared equipment and line lists.

Year of 2004 – 2005

Process Engineer
Pro-En Technologies, Ltd.
Provision Pipeline Standard for Thailand Project (Energy of Ministry) The project is to prepare the standard pipeline design code for Thailand. The following tasks under this project consist of;
• Studied and collected the standards such as AS, ASME, BS, DIN, ANSI and JIS in order to prepare the suitable standard of liquid hydrocarbon pipeline in THAILAND.
Modification Work for Steam Supply Pipeline GLOW SPP1 TO SPP3 Project (Glow Public Company Limited) The project is to perform details design for steam pipeline. The following tasks under this project consist of;
• Studied the possibility of using existing steam line for supplying the higher pressure steam flowing backward from SPP1 to SPP3.
• Verified system hydraulic for the existing steam supply line from SPP3 to SPP1 by using PlantFlow Plus 6.10.
• Conducted hydraulic analysis for the new steam flowing from SPP1 to SPP3 using the PlantFlow Plus 6.10.
• Evaluated existing equipment, instrument and its relevant accessories can be utilized under the new design conditions. The study was carried out in both operational and design aspect.
Second Bangkok International Airport (SBIA) Aviation Fuel Depot Project (Bangkok Aviation Fuel Service Public Company Limited) The project is to perform details design and commission for JET A1 depot.
• Prepared and reviewed process concerned area for pre-commissioning and commissioning schedule of depot and facilities.
• Prepared pre-commissioning and commissioning procedure including checklists.
• Performed pre-commissioning & commissioning work such as water flushing, Oil flushing, Pipe & Storage Tank Sterilizing, Nitrogen pack line and System Test.
• Reviewed and commented P&IDs, line schedule, equipment list, and equipment data sheets.
• Performed Hydraulic calculation for all system in depot plant such as Jet A-1 system, Fire Water system, Potable Water system and Oily Water Separation system by PlantFlow Plus 6.10.
• Specified set point of pressure switch for prevents hydrant pumps from cavitations.
• Specified set point of pressure switch for firewater pumps and jockey pump in according to NFPA 20.
New Steam Supply Pipeline from GLOW SPP3 to SMPC3 Project (Glow Public Company Limited) The project is to perform details design for steam pipeline. The following tasks under this project consist of;
• Calculated the maximum and minimum steam flow rate and pipe sizing including material selection.
• Generated a heat and mass balance for Deareator and Desuperheater using ChemCad 5.12.
• Performed 3D hydraulic calculation steam pipeline by using PlantFlow Plus 6.10.
40 bar Steam Supply from Tuntex to BPE Project (Tuntex Utility Public Company Limited) The project is to perform details design for steam pipeline. The following tasks under this project consist of;
• Performed mass balance and heat balance around Deareator as well as De-superheater.
• Prepared data sheet for Deaerator.
• Reviewed and updated on P&IDs and instrument data sheet such as pressure transmitter, control valve, safety valve, temperature transmitter, De-superheater and flow meter.
• Performed 3D hydraulic calculation steam pipeline by using PlanFlow Plus 6.10.
• Prepared datasheet of piping special parts, for example bucket strainer and thermal dynamic type steam traps.
• Calculated steam consumption and time required to warm up the steam pipeline to operating condition.

Year of 2003 – 2004

Process Engineer
Toyo Thai Corporation, Ltd.
Thai MMA Debottlenecking Project (Thai MMA Company Limited) The project is to perform detail design for modifying work on Chemical Plant. The following tasks under this project consist of;
• Prepared P&IDs for expansion phase of reactor unit.
• Prepared equipment list and line schedule shall be revamped and modified.
• Reviewed data sheet such as reactor, demister, drum vessel and isokinetic sampling nozzle.

Yala Green Power Project (Gulf Yala Green Company Limited) The project is to perform detail design for power plant. The following tasks under this project consist of;
• Prepared and clarified the final bid tabulation (Only technical part) for Deareator package with other manufacturing from American’s Deareator, Korea’s Deareator and Japan’s Deareator.

KAO T-Project (Thai KAO Corporation Company Limited) The project is to perform detail design for chemical plant. The following tasks under this project consist of;
• Reviewed P&IDs and equipment lists.
• Reviewed pump and line sizing calculation.
• Prepared instrument data sheet for on-off valves and pressure regulators.

Year of 2002 – 2003

Process Engineer
Toyo Thai Corporation, Ltd.
TIGER Project (Thai Silicone GE Toshiba Limited) The project is to perform detail design for Chemical Plant. The following tasks under this project consist of;
• Updated P&ID from licenser.
• Prepared instrument process data sheet for on-off valves, pressure gauge, pressure and flow transmitter.
• Prepared equipment list and line schedule.
• Prepared bid tabulation (Only technical part) for Vent Scrubber Package from various Vendors.

TLP Project (TLP Cogeneration Company Limited) The project is to perform detail design and commissioning for Power Plant. The following tasks under this project consist of;
• Performed hydraulic calculation for steam supplying line from HRSGs to Steam Turbine.
• Assisted to work the pre-commissioning and commission for balance of plant and power block such as water flushing, air flushing steam blowing and chemical cleaning.
• Completed performance acceptance test for auxiliary steam generator, cooling tower and heat recovery steam generator (HRSG) as well as writing technical report.


3. Education & Training - CV/Resume Part 3 [Mandatory]

Bachelor of Engineering in Chemical Engineering, King Mongkut’s Institute of Technology North Bangkok (2002).

Certificate in Clean Technology from The National Science and Technology Development Agency.


4. Computer Skills - CV/Resume Part 4 [Mandatory]
• Proficient in Solidworks 2000 created 3D model of equipment.
• Effective in 3D modelling Hydraulic Analysis by using PlantFlow.
• Familiar with simulation program HYSYS, FlareNet , PipeSim, HTRI, ProMax and BP Cirrus radiation.
• All Microsoft package.
5. Other Skills - CV/Resume Part 5 [Optional]
Familiar with Special program for gas plant such as ProMax or Tsweet
6. Additional Information - CV/Resume Part 6 [Optional]
Have experience in chemical and power plant.


 

Questions about this candidate? Contact us for an immediate answer. To find similar people [or more experienced] - active jobseekers, please login OR create, FREE of charge, your own company account.

In order to view this candidate's contact information, you must a) be registered with Oil Offshore Marine - Worldwide Oil & Gas Jobs, and b) have already purchased a subscription.

Login Register Pricing Information
Senior Process Engineer in Oil and Gas industry 9 years experience for both onshore and offshore
CV/Resume ID no.: 125835

Relevant CVs; view more oil and gas CVs
1. Process Engineer
2. Process Engineer, Project Management
3. Engineering - Process, extensive experience in onshore LNG and NGL industries
4. Process Engineer Oil Gas Offshore Upstream Onshore Hysys Pipesim
5. chemical engineer looking for a new challenge
6. PROCESS ENGINEER
7. Chemical Engineer / Project Engineer
8. Process Engineer
9. PROCESS ENGINEER, EXPERIENCED IN OIL AND GAS PLANT DESIGN ENGINEERING FIRMS.
10. Process Engineer
11. Process Engineer
12. Production / Project Planning Engineer
13. Chemical Engineer, Process, Production & Operations
14. engineer, engeneering, chemical, metallurgical, piping, projects.
15. Instrument technician in offshore and onshore
16. Process Engineer
17. DCS and Instrumentation Engineer
18. Drawing P&ID (in Visio2003 version) for planned equipment as per process requirement
19. Process Engineer, PFD, P&ID, Simulation
20. Process Engineer
 
 
Other CVs; view more oil and gas CVs
1. Sr. Instrument Technician
2. Technician
3. QA/QC Manager
4. Mud Engineer, expert
5. Installation of electronics & instrumentation
6. Experienced Master Mariner, Master/ Chief Officer
7. Electronics Technician CDC Istiglal & Dada Gorgud MODU
8. MBA graduate having 3 years of experience
9. Instrumentation / process instrumentation, installation, commissioning, testing, troubleshooting
10. Medic National Institute Occupational Safety and Health (NIOSH)
11. Helicopter Landing Officer
12. Piping Engineer in Pipe & Heater fabrication, Erection Division
13. Radio operator / telecommunications engineer
14. Chief Officer Oil Tankers, TEMASEK RIVER Singapore Afra Max, Panama VLCC ULCC
15. Fitter / welder 3e, mig, tig, current forklift and ewp, crane and dogmans
16. Piping Engineer, Aker Kvaerner Powergas, Hungary MOL Hungarian Oil and Gas Plc, Autocad, PDMS
17. HSE Advisor, Pennecon Energy Ltd, Safety Officer, Pyramid Construction Limited
18. Shift plant operator Pakistan refinery limited
19. Piping designer PDMS user Citec Engineering India Pvt. Ltd., Navi Mumbai Larsen and Toubro Ltd
20. Sr Drilling Consultant / Wellsite Supervisor, HTHP under balance drilling, mud cap technology, HTHP
21. Piping engineer piping P&ID’s piping isometrics piping layout development piping general drawings
22. NACE Level 3 Certified Coatings Inspector with Offshore Certification / Technical Sales Consultant
23. Admin Clerk, currently studying for Diploma in Petroleum Engineering University of Trinidad & Tobago
24. Radio Operator / Administrator production platform off Den Helder Heerema SSCV Hermod Noble NTVL
25. Emergency Physician Lilongwe Malawi via UNDP, UNV unit, Lankien South Sudan, Bangalore India
26. Graduate OTC Mechanical and Production Engineering at the Technical University of Bordeaux I, France
27. Mechanical Inspection Engineer, City Engineer’s Office Bayawan City Negros Oriental Philippines
28. Graduate with BE Degree in India V.R.S. College of Engineering & Technology in 2010
29. Drilling Supervisor Saudi Aramco IWCF Well Cap H2S Certificate Algeria Libya Oman Arabian Gulf
30. Oil & Gas QA/QC Welding &Painting Inspector Inspection Engineer Gas Plant, Refinery, Water desalinat
 
 

Press Ctrl+D to Bookmark - Tell a Friend - Job Archives - Jobs - Oil and Gas CVs Resumes - Subscribe to Job Alerts - Site Map - Events - Legal - Privacy - Contact

oil offshore marine's website design

Official Blog - International Maritime Signal Flags - Glossary of Oil & Gas Jobs Definitions - Abbreviations & Acronyms from the Oil, Offshore, Marine, and Shipping Industries - Engineering Oil Jobs - Top 100 Energy Sites - Marine Jobs - Offshore Jobs - Oil Careers - Maritime Jobs - PDS/PDMS Oil & Gas Jobs - Oil Industry Jobs - Oil Field Jobs - Oil and Gas Careers - Petroleum Jobs - Oil Rig Jobs - Offshore Oil Rig Jobs - Drilling Jobs - Oil Industry - Official Sitemap - Jobs Feed - Login to your Oil-Offshore-Marine.com account

www.Oil-Offshore-Marine.com - Your Oil & Gas, Offshore, Construction, Shipping, Petrochemical, and Marine Engineering Recruitment Center.

© Oil Offshore Marine - Oil & Gas Jobs - All Rights Reserved.
This website is designed for international users, and its use is governed by Oil Offshore Marine - Oil & Gas Jobs Legal provisions. By browsing on any page of this website, you are deemed to have accepted all Oil Offshore Marine - Worldwide Center of Oil & Gas Jobs legal terms. If you do not agree with Oil Offshore Marine's legal provisions, you must stop using this website and its services.


find oil and gas jobs

  Looking for something?