| |
| Piping designer Tecnicas Reunidas Spain for Satrop Jubail Export Rafinery Saudi Aramco |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in Piping designer Tecnicas Reunidas Spain for Satrop Jubail Export Rafinery Saudi Aramco - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
125933
Last Updated:
Saturday, September 24, 2011 |
Location (Residence): bucharest, Romania
Citizenship: Romania
|
| |
Languages:
Native:
Romanian Other:
English |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
High School in mechanical Years of Experience:
27 years
|
Authorized to work in:
European Union
Present Location:
pomania, bucharest
Relocation:
United Arab Emirates, Saudi Arabia, UK (in particular), European Union |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Design/Software |
Piping |
Experienced
|
29 years |
|
Engineering |
Piping |
Experienced
|
29 years |
|
Design/Software |
PDMS/PDS |
Experienced
|
4 years |
|
Engineering |
PDMS/PDS |
Experienced
|
4 years |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
Reading and understanding the P&IDs(plant process)
Ability to work under incomplete materials specifications and P&IDs up to their finalization.
Capacity to realize a PDS model without any studies, only with client specifications, P&IDs,
Piping General Layouts
Equipment 3D modelling
3D PDS piping supports
Observing and repairing the PDS model errors
Isometrics extractions
Able to work in Microstation 2D also with reference files,cells, etc
Experience with Drawing Manager
Experience as piping designer mechanical/piping engineer in equipment piping connection design and site erection.
Finding proper solutions to solve clashes in accordance with clients procedures
Using Smart Plant Review
Using of MSOffice(Word,Excel)
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
TECNICAS REUNIDAS - Spain, under contract
CL Arapiles 13, Madrid, Spain
PIPING DESIGNER
October 2009 April 2011
Client: Saudi Amoco
Project: Satrop - Jubail Export Rafinery
-PDS piping designer, equipment modeling, isometric drawing extraction, general arrangements drawing extraction
o equipment modeling :
- heat exchangers, steam drum, temperated water drum, blowdown drum, phosphate injection package, crude booster pumps
- prepared nozzeles orientations drawings for mechanical department
- prepared platform drawings for civil department
o piping :
- all lines in this area :
crude oil, residue, heavy gas oil, light oil, flushing oil, low pressure steam, boiler feed water, hot blowdown, atmospheric steam condensate, phospates, water, etc
- general arrangements drawings extraction in Drawing Manager - isometric drawing extraction
FLUOR - Netherlands, under contract
Bergen Op Zoom, Netherlands
PIPING DESIGNER
January 2009 - March 2009
Client : Shell Moerdijk
-PDS piping designer, equipment modeling, isometric drawing extraction
o equipment modeling :
- platform for safety valves
- pumps
o piping :
- lines for safety valves,
- lines for steam;
- isometric drawing extraction
IV GROEP BV Netherlands, under contract
Noordhoek 37, 3351 LD Papendrecht, Netherlands
PIPING DESIGNER
July 2008 November 2008
Client: Oilexco North Sea LTD / Blue Water Energy Services B.V.
Project: Huntington Field Development
-PDS piping designer, equipment modeling, isometric drawing extraction, general arrangements drawing extraction
o equipment modeling :
- producer water injection pumps, ngl export pumps, ngl Booster pumps, glycol contactor
o piping :
- lines of water injection,
- lines for ngl export ;
- lines to and from separator heaters
- lines producer water degasser
- lines crude oil
- general arrangements drawings extraction in Drawing Manager
- general arrangements drawings using Orthogen
WASHINGTON E&C ROMANIA/BUCHAREST, WASHINGTON GROUP INTERNATIONAL,
9-9a,Dimitrie Pompei Blvd,Building 2,District 2,Bucharest,Romania
PIPING DESIGNER
October 2007 July 2008
Client: QATARGAS OPERATING COMPANY LIMITED (OPCO)
Project:Common Sulfur Project
1 PDS piping design, isometric drawing extraction, general arrangement drawing extraction
o piping :
- sprinkler system at Sulfur Storage Building
- piping support for sprinklers lines at SSB ( Sulfur Storage Building )
- isometric drawing extraction
- general arrangements drawings extraction in Drawing Manager
ABB Lummus Global s.r.o. , - under contract
13, Milady Horαkovι, Brno , Czech Republic
PIPING DESIGNER
January 2007 July 2007
Client: Degussa a.g. Hanau, Germany
Project: Agroferm, Kaba, Hungary
-PDS piping designer, equipment modeling, isometric drawing extraction, general arrangements drawing extraction
o equipment modeling :
- heat exchanger, buffer tanks, feed pump, circulation pumps, ultrafiltration unit, exhaust air cyclon, turboscreen centrifuge, screw conveyor, decanter SC, air choler, dust cyklon, cooling air filter, rotary valve, stairs, platforms,
o piping :
- lines on the racks, steam, condensate,
- connections for steam ,condensate, process air, hot air, process water, cooling water pipes in isolation unit;
- modeling piping sistem after details of photos field
- modifeided existing lines according P&ID
- piping support design, physical support
- resolving clashes
- isometric drawing extraction
WASHINGTON E&C ROMANIA/BUCHAREST, WASHINGTON GROUP INTERNATIONAL,
9-9a,Dimitrie Pompei Blvd,Building 2,District 2,Bucharest,Romania
PIPING DESIGNER
April 2005 January 2007
Client: QATARGAS OPERATING COMPANY LIMITED (OPCO)
Project:Common Sulfur Project
PDS piping design, isometric drawing extraction, general arrangement drawing extraction, equipment modeling
o equipment modeling :
- granulator feed pumps, sulfur storage tanks, expansion tank, process water tank and pumps, air dryer;
o piping :
- most lines on the racks, service water, service air, instrument air, steam, condensate, process water, chemicals, sulfur pipelines;
- all connections for utilities pipelines in sulfur tanks and sulfur pumps area;
- all connections for steam and condensate pipes in sulfur tanks area;
- all utility stations in all areas;
- all lines of the process water system;
- parts of lines of fire water system in underground and above ground solution;
- all lines of tempered water system for tempered water heaters and cooler, pumps and expansion tank;
- parts of lines for deaerator, boiler feed water pumps and electric boilers;
- distribution piping for acidity control system and dust suppression system;
- modeling of spray details of dust suppression and acidity control systems.
All this modeling has been performed without piping studies & layouts or detailed engineering, directly in PDS,based on P&IDs only.
- piping support design
- resolving clashes
- RDB Update
- isometric drawing extraction
- preparing isometrics in Microstation 2D, also with reference files for the client
- capability of repairing isometrics
- general arrangements drawings extraction in Drawing Manager
January 2005 April 2005
Client: Nuovo Pignone Florence, Italy
Project: Kashagan Gas Reinjection Barge Kazachstan
PDS piping design, isometric drawing extraction, general arrangement drawing extraction, equipment modeling
- equipment modeling: pumps, tanks, racks
- piping modeling: pipes in the utility station, modeling fire water station & connections with fire water protection system pipelines, service waterlines, service air, instrument air, steam, condensate lines.
- solving the clashes after design review.
ISPE BUCHAREST (Institute Of Power Studies And Design)
1-3,Lacul Tei Blvd,District 2,Bucharest,Romania
- MECHANICAL DESIGNER AND PIPING DESIGNER
September 1984 - December 2004
Client: TPP Brasov, TPP Drobeta Turnu Severin; TPP Craiova II, TPP Iasi; TPP Suceava
- parts of feasibility studies, piping studies & layout, piping connections
- design isometric drawings for pipes connections
- pipe supports,
- isometric checking, material take-off,
- vendor dwg. squad checking,
- site survey and technical assistance [equipment location & erection, pipe routing ],
- supports, instruments location, tie-in location, P&IDs mark-ups, material take-off, inputs to Civil Discipline (for platforms, stairs, concrete supports, beams, columns), access
- as-built documentations
- MECHANICAL DESIGNER
September 1981 - September 1984
Client: NPP Cernavoda, TPP Rovinari, TPP Doicesti; TPP Craiova; TPP Timisoara; TPP Arad; TPP Oradea; TPP Govora; TPP Govora; TPP Pitesti; TPP Drobeta Turnu Severin; TPP Iasi; TPP Suceava
- discipline leader for all design phases of equipment repair workshops
- discipline leader for radioactive waste depot
- discipline leader for electrical equipment authorisation in explosive environment
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
Dimitrie Cantemir High school - graduated
2008 Training for using Orthogen
2005
INSEMEX (Romanian National Institute for Mine Safety and Explosion Proof Protection) Certificate (Authorization for design and construction for equipment located in hazardous areas)
2005
Microstation for PDS (2D & 3D)
Creating Models with PDS
Equipment Models
Piping Models
Extracting Isometrics Drawings with PDS
Extracting ORTHO Drawings with PDS
PELICAN FORGE Support Modelling
Smart Plant Review
Training by Intergraph Poland
1992
1991 Improving Technical Skills about piping and mechanical engineering IPB Bucharest
Improving Technical Skills about piping and mechanical engineering IPB Bucharest
1986
1985 Improving Technical Skills ISPE, Bucharest
Improving Technical Skills ISPE, Bucharest
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
2008 Training for using Orthogen
2005
Microstation for PDS (2D & 3D)
Creating Models with PDS
Equipment Models
Piping Models
Extracting Isometrics Drawings with PDS
Extracting ORTHO Drawings with PDS
PELICAN FORGE Support Modelling
Smart Plant Review
Training by Intergraph Poland
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
2005
INSEMEX (Romanian National Institute for Mine Safety and Explosion Proof Protection) Certificate (Authorization for design and construction for equipment located in hazardous areas)
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
driving license
|
| |
|