CV Construction Manager National Marine Dredging Company United Arab Emirates
|
|
|
|
|
|
|
| |
| |
| Construction Manager National Marine Dredging Company United Arab Emirates |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in Construction Manager National Marine Dredging Company United Arab Emirates - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
127012
Last Updated:
Sunday, December 18, 2011 |
Location (Residence): Baku, Azerbaijan
Citizenship: Azerbaijan
|
| |
Languages:
Native:
Azeri Latin Other:
German Standard, Georgian, English, Basque, Arabic Jordan, Turkish, Russian |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
PhD/MD in Geography and coastal geosciences Years of Experience:
10 years
|
Authorized to work in:
Canada
Present Location:
Canada, Toronto
Relocation:
Canada |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Operations |
Site Supervisor |
Experienced
|
10 years |
|
Management |
Construction |
Experienced
|
3 years |
|
Mining |
Mining Construction |
Experienced
|
10 years |
|
Engineering |
Construction |
Experienced
|
12 years |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
CAREER OBJECTIVE:
To find a challenging position for a long period of cooperation to meet my competencies, capabilities, skills, education and experience. Received Canadian Immigration papers and planning to join in December 2011. Obtained Social Insurance Number
Gender : Male
Race : Caucasian
Nation : Circassian
Citizenship : Azerbaijan, Canadian Immigrant
ACCOMPLISHMENTS:
Active national research studies on coastal protection of Azerbaijan with respect to changing sea level; Conducted trainings for local environmentalists, NGO through funding by BTC;
Fast studying of foreign languages and cultures;Risk assessor for regional environmental simulation project implementation for REC (Regional Caucasian Ecological Organisation)
DRIVING LICENSE:
- United Arab Emirates
- Azerbaijan NAA
- Qatar N
- Georgia NGEO
- Saudi Arabia No
CERTIFICATES:
- TEXACO (Prof. P.R. Vail of Rice University & Dr. Gerald Baum) for the completion of a seminar on seismic stratigraphy & depositional sequence analysis seminar
- 3d grade diploma by AAPG (American Association of Petroleum Geologists) by Mr. Akif Narimanov, for the report on peculiarities of geological structure of Tarsdalar
- COSHH assessments & related activites completion certificate (OTI Centre)
- AGIP (ENI Group) Kazakhstan certificate for environmental symposium for young scientists on the problems of the Caspian Sea (Aktau, Kazakhstan)
- Oil & Chemical Spill Response (Briggsmarine Corporation)
- Sea survival course : Qatar International Safety Centre WLL
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
Work Experience:
03 Jan 2010 Till Date
“National Marine Dredging Company” United Arab Emirates
BNPP Baraka Nuclear Power Plant Project, UAE
17 km of breakwater and revetments, Civil & Earthworks
KEPCO-ENEC Project
Construction Manager (At present)
Gantoot Naval Base Construction (Works Manager for phase I)
- Supervision of 5 heavy duty cutters and 1 beaver dredger
- Supervision of 3 split hopper barges (hired from Boskalis Westminster Middle East)
- Rockworks & Earthworks;
Upper Zakum Project (Construction of 4 islands 50 miles offshore for oil rigs on live oil field)
ADNOC, Zadco
Rock Works Manager, Deputy of Project Manager of JV NMDC-BESIX
Sir Abu Nair Project:
Construction of 2 breakwaters for the sheikh of Abu Dhabi
10 Feb 2009 – 18 July 2009
Assigned as company representative of JDN for rock operations in Mussandam/Oman
Under the same project
09 May 2008 – 03 December 2009
“Jan De Nul Dredging Ltd” SAUDI ARABIA
Manifa Field Causeway Construction Project
Aramco
Head of Rock Quarry & Stockpile area control (Rock Works Department)
- Close supervision of rock supplier La Ala Saudi for the rock delivery to the project
- Control on weighbridge
- Assessment of delivered material & sole person in charge to send it back to the quarry in case of poor quality
- Development of contemporary system for quarry operations in Saudi Arabia for Jan De Nul in Manifa to improve productivity & quality of material
- Improvement of gaps in the contract with regards to the material supply for rock works department
Rock Works Superintendent
Construction of 27 artificial islands for oil rigs and connecting causeway
01 October 2007 – 05 May 2008
“Jan De Nul Dredging Ltd”
Sand Field Operations Superintendent
TDIC/Parsons/JDN
Construction of Saadiyat Island in Abu Dhabi, United Arab Emirates
- Liason with superintendents of the cutter dredger Vesalius, Hopper El Cano, Hopper Gerardus Mercator with regards to corresponding sand fields
- Ensure proper supply of goods on site
- Personnel & machinery arrangements
- Reporting to construction manager on the need for the latter and etc
- Liason with the client on certain issues of the temporary ro-ro jetty construction
- Close interaction with logistics department
- Supervision of all earth works on island development
02 January 2007 – June 2007
“Jan De Nul Dredging Ltd”,Qatar
Offshore Operations Superintendent
Ras Laffan Expansion Project/Phase 2/Shore Approach (Qatar) (2410 m)
- Supervision of all dredging works carried out with backhoe dredger Jerommeke, dredging pontoon DN17
- Pretreatment of hard soil, where required using hydraulic hammer installed on BHD (Krupp 4000)
- Bedding layer installation over excavated rock sections, filling local depressions with selected fine excavated materials
- Pre-trenching, Progress, Pre-pipelay, Post-backfill surveys
- Demobilisation marine spread
Marine Dredging/Non dredging equipment used & supervised:
Responsibilities:
- Managed to claim additional finances from the client for the dredging works of BHD as the scope of hard material in a trench during hammering was exceeding initially expected volume mentioned in the contract.
- Suggested and successfully implemented technique for installation of the bedding layer, which does not leave small piles of material on the starboard side of the trench
- Regular control of the survey works over the trench, timely survey requests & analysis & planning for future operations of the backhoe dredger
- Thorough knowledge of port regulations of the Ras Laffan area.
Ras Laffan Joint Venture
“Boskalis – Jan De Nul Dredging Ltd” (Qatar)
Ras Laffan Expansion Project
Offshore Operations Superintendent
March 2007 – 01 October 2007
Scope of works:
- Construction of SBK (South Break Water, MBK) & reclamation island
- Widening of existing port entrance channel by present 120 to 400 metres
- Contract implies dredging of 20 million m3 of limestone, reclamation of 25 million m3 of offshore sand, quarry and placing of 18 million tons of stone & construction and placing of 1 million m3 of concrete blocks for the construction of breakwaters that will protect new harbour
Responsibilities:
- Supervised 6 non-propelled split barges (Split 1,2,26, Pena 1, Split 21, Seine), along with 3 assisting tug boats
- Arrangement of dumping locations, various approaches to carry out dumping
- Liason with technical department with regards to technical conditions of the vessels
- Port clearance papers for the new arrived vessels
- DOS 90, pre-mobilisation certificates
- Liaison with vessel owners
- Construction of container jetties, removal of high spots, core & reclamation works of the breakwaters, side casting material, container berth basin construction.
26 March – December 2007
“Eni Group” “Saipem” Middle East Triton Pipes, Dubai, Taweelah, UAE
Dolphin Energy Limited
Project Environmental Coordinator, Assistant to construction supervisor for
Ras Laffan – Taweelah 48’ gas pipeline. Project involved large number of near shore dredging operations and offshore pipe lay barge operations
Responsibilities:
- Modeling possible discharge options with regards to the increased distance of the point of release of the residual pre-commissioning chemicals & sea water intake of the power plant complex. Model included dispersion of oxygen scavenger & biocide in the marine waters. An alternative more environmentally friendly proposal was developed to the client to use alkaline controller (lime) to ensure no growth of bacteria occurs in the pipe leading to the final result of non toxic discharge water.
- Reviewing dewatering & hydro test procedures
- Regular liaison with EAD (Environmental Agency Abu Dhabi)
- Monitoring & auditing marine operations on CASTORO SEI support vessel.
- Daily TBTs.
- Conducted joint risk analysis with subcontractors with respect to the risks associated with construction damage to the environment
- Ensuring all project streams are correctly treated, segregated & disposed of in accordance with regulations and project policy, training of workforce in hse awareness.
- Stand in for HSE during leave periods & weekends on a rotation basis
- Thorough knowledge of UAE & Qatar’s environmental legislation
July 2004 – March 2006
“McDermott Incorporated” SPS, Baku, Azerbaijan
Environmental Advisor for West Azery, CA, EA & DUQ platform projects. Four well head platforms, 2 production platforms, subsea pipelines connecting wellhead to production platforms. Fabrication, Assembly, hook up and commissioning of integrated topside decks.
August 2003 – May 2004
Consolidated Contractors Company (CCC) Baku Tbilisi Ceyhan Pipeline
(Azerbaijan/Georgia/Turkey)
River Crossing Environmental Engineer/Assistant to river crossings superintendent
Responsibilities: Managing environmental issues on 10 rivers with river slopes/banks stabilization & erosion protection
September 2002 – May 2003
DODSAL PRIVATE LTD (Dubai, United Arab Emirates)
42’ gas pipeline from Ruwais to Jebel Dhana
Project environmental Engineer
July 2001 – December 2001 (part time)
Mineralogical Laboratory of the Institute of Geology in Kiel, Germany
Laboratory Technician (HIWI)
1999 – 2000 (part time)
Institute of Geology of Azerbaijan, Petroleum Geology Laboratory
Geo technician
November – December 1998 (part time)
Wintershall Oil Co (BASF Group, Baku office)
Practice in digitizing
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
Education Background:
2003-2007
PhD in Geography & Environmental Science, Institute of Geography.
Topic: “Management of Azerbaijani Coastal zone in different levels of the Caspian Sea”
(5 written & published scientific articles)
2000-2002
MSc in Coastal Geosciences & Engineering, University of Kiel (Germany)
1996-2000
BSc in Petroleum Geology, Azerbaijan State Oil Academy
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
COMPUTER SKILLS:
ADIOS; GNOME; IDRISI 32; Delft3D; Chemwatch, Sypol COSHH software, MS Office.
COURSES:
Task Risk Assessment, Port Security Course, Incident Investigation, Spill Response, ISO14001
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
LANGUAGES:
German (Good); English (Very Good); Azery (excellent); Turkish (excellent); Russian (excellent); Circassian (Native Speaker); Arabic (Intermediate speaker)
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
-
|
| |
|
|
|
|
|
Construction Manager National Marine Dredging Company United Arab Emirates
CV/Resume ID no.: 127012 |
|
|
|
|
|
|
| Relevant CVs; view more oil and gas CVs |
| 1. PDMS Piping for Oil & Gas Engineering (Offshore, Onshore, EPC Power etc) |
| 2. Plater with more than eleven years experiance currently seeking offshore employment |
| 3. Sr Pipeline Engineer in oil and Gas field with 13 years Experience |
| 4. Planning / Scheduling / Cost Engineer |
| 5. Pipe Stress Engineer, CAESAR II |
| 6. Senior Civil Engineer |
| 7. Oil & Gas, Petrochemical, Steel Plants |
| 8. Mechanical, Construction, Maintenanace |
| 9. civil engineer |
| 10. Manager - Construction |
| 11. Project Manager |
| 12. Electrical and instrumentation, Project Engineering, maintenance |
| 13. PLANNING ENGINEER (MECHANICAL) PRIMAVEERA ENTERPRISES, SAP (R3) |
| 14. Project Manager, Site/Construction Manager, Operations Manager, Mechanical Inspector |
| 15. Civil Engineer - Projects |
| 16. QA/QC Engineer in Oil & Gas sector Onshore, worked in PDO sites executing Pipeline work |
| 17. Construction Manager |
| 18. PROJECT ENGINEER |
| 19. 8 years of Construction experience, Specially on PRECAST FACTORY (PRODUCTION) |
| 20. Senior Project Mechanical Engineer for Oil/Gas Fields (Onshore & Offshore) |
| |
| |
| Other CVs; view more oil and gas CVs |
| 1. Electrical Foreman |
| 2. AHTS and Bulk Carrier experienced |
| 3. xsteel and connection design engineer with 2 yrs experience |
| 4. widely experienced (30 years) in financial accounts and admn. |
| 5. Technician - Instrument and Electronic; ROV Technician; PLC or DCS Programmer |
| 6. DP Operator + Second Mate |
| 7. Civil Engineer (Project Management) |
| 8. Material Coordinator with Experiance in Refineries |
| 9. BSC nursing with 2.4 yrs experiance in emergency unit and general icu |
| 10. Control Room Operator |
| 11. INSTRUMENTATION GRADUATE ENGINEER |
| 12. IT Project Manager - worked in many countries |
| 13. Electrical Engineer in Distribution of HT lines |
| 14. Top up diver + construction and welding, padi scuba diving instructor |
| 15. Process Technician |
| 16. Welder / offshore plater Amec oil and gas, Aberdeen, Britannia Satellites Project |
| 17. Technical Support Executive, Electronics Technician |
| 18. Senior process operator / plant operator |
| 19. Environmental Engineer in Halcrow Pakistan (Pvt.) Ltd |
| 20. Design Engineer Intools, Instrucalc, Navisworks Oil & Gas Petrofac Engg India Pvt Ltd, Mumbai |
| 21. Offshore Personnel Officer / HR Officer / Barge Administrator Saipem S.p.A ACG BP Project |
| 22. Safety Supervisor Civil Construction Company, Project of Balloki 225 MW CCPP in Phool Nagar Pakistan |
| 23. Trainee Indian IT Project Manager/Team Leader/Project Leader |
| 24. Welding & Painting Inspector NDT experience, Pressure Vessels, Heat Exchangers, Air Coolers, Storage |
| 25. Trainee Planning and Project Control Engineer Azerbaijan Methanol Company Engineering & Construction |
| 26. Office administrator dealing with Expats Sicim S.p.A Kazakhstan oil & gas projects (Italian company) |
| 27. Marine Consultant, Project Solutions St Rose, LA Friede Goldman Offshore Pascagoula, Miss MODU rigs |
| 28. Structural Engineer experienced in offshore fixed platform design using SACS software |
| 29. IT Manager / CAD Support Manager WS Atkins & Partners Overseas Dubai UAE, and India |
| 30. Professional Waiter 10 years in cruise ship industry experience |
| |
| |
|
|
|