| Planning / Scheduling / Cost Engineer |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in Planning / Scheduling / Cost Engineer - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
75156
Last Updated:
Thursday, May 8, 2008 |
Location (Residence): Cebu, Philippines
Citizenship: Philippines
|
| |
Languages:
Native:
English Philippines Other:
Arabic Saudi Arabia, Arabic UAE, English United States, English United Kingdom, English Australian, English Canadian, English Caribbean |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
Bachelors in Mechanical Engineering Years of Experience:
7 years
|
Authorized to work in:
United States, Australia, Malaysia, Singapore, United Arab Emirates
Present Location:
Qatar, RLIC
Relocation:
United States, Indonesia, Italy, Japan, Malaysia, Maldives, United Arab Emirates, United States |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Engineering |
Planning/Scheduling |
Expert
|
12 years |
|
Plant (Refinery, Gas...) |
Refinery Plant |
Experienced
|
12 years |
|
Management |
Construction |
Experienced
|
12 years |
|
Plant (Refinery, Gas...) |
Power Plant |
Basic
|
1 year |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
With dedicated work experience in various technical and engineering disciplines. Works involved in LNG Construction Process Area, Mechanical Design, Underground Piping, Chilled Water Piping (CHWP), Fabrication and Installation, Project Planning preparation with the use of Primavera V3.1 & Microsoft Project 2003 in application of SAP System & JD Edwards, then with project execution, developed Designs and Drawings thru AutoCAD R.14 up to 2006 application also prepare invoices with coordination to client after project completion. Previously engaged with multi-national, int’l. organizations or companies in; Oil / Gas, LNG Company and Power Plant, General Shutdown and Maintenance; utilizing the international construction standard references as follows ASTM, ASME 31.1 & 31.3, ASME IX, AWS, ASHRAE, API & ISO 9001:2002 certification
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
Dec. 20, ’06 – Present CTJV- Chiyoda/Technip Joint Venture RGX6
RasGas LNG Onshore Expansion Project Phase 2
P.O.Box : 22740, Ras Laffan Industrial City (RLIC), State of Qatar
Construction Planner – Process
Report to Construction Manager, to ensure planning works of Construction Group for CTJV, Japan's Chiyoda and France's Technip Joint Venture, for the engineering, procurement and construction of the RasGas onshore projects trains 6 and 7. Fact about the Project: Two additional LNG trains, no. 6 and no. 7. This is a new offshore wells, the largest producing wells in the industry. Each train is designed to produce 7.8 million tonnes per year of liquefied natural gas, making them two of the world's largest LNG trains.
Main Task:
- Works involve in Construction Project Planning, extract detailed work activities, and consult on execution scenarios to generate appropriate detail and summary project control schedules for the Project Execution Plan using state of the art tools and techniques with Primavera V.3.1 and MS (Microsoft) Project 2003. Implement project-wide Work Breakdown Structure (WBS) that aligns with the Cost Breakdown Structure (CBS) while working with the Project Cost Engineer and Project Scheduler(s). Conduct Monthly Top Mgt. Joint Review Meeting for Project status thru presentation.
- Prepare and develop the interface schedules, recommend and intervene as warranted to improve performance. Coordinate preparation of the schedule risk analysis and implement the schedule element of the risk management plan. Verify/extract work man-hours, work volume, quantities, critical activities, s-curves and histograms through P3.
- Coordinate with various disciplines like; Civil & Structural Group, Piping Group, E&I and Equipment Group. Coordinate with logistics for the Material and Equipments ETA (Estimated Time Arrival) and ATA (Actual Time Arrived) prior to allocating it to Laydown yard and/or installation.
- Update/submit Weekly Progress Report for all discipline thru S-Curves and Histogram as well as various plans, for Process Access Roads, Equipment Positioning and alignment at Laydown area. Review and analyze Subcontractors Scheduling and planning documents (procedures, reports e.t.c.), monitor progress and control Project activities, verification of Milestones, identify potential delays, analyze and issue proposed corrective actions as required. Utilize i-DMS (Integrated Document Management System) for various company document search and needs. Also utilize and operate SPR (Smart Plan Review) for equipment and construction viewing to check for its virtual location, position and some information.
Dec. 30, ’05 – Nov. 05, ‘06 CAT International Co. Ltd. (CAT Group)
14th Floor ABN AMRO Bank Building, P.O. Box 250 Abu Dhabi, U.A.E.
Planning & Scheduling Engineer/Projects Control
Projects involved:
CONSTRUCTION OF UNDERGROUND CHILLED WATERPIPE NETWORKS AT DUBAI MOTOR CITY (DMC) AREA.
- Client: Emirates District Cooling “EMICOOL”; Dubai, UAE.
- Project Contract Duration: 10 October 2006 to 17 August 2007.
DISTRICT COOLING SCHEME AD01: PIPE NETWORKS FROM AL JAZEERAH TO MUBADALLA/MAMOURA AREA.
- Client: TABREED; Abu Dhabi, UAE.
- Project Contract Duration: 01 August 2006 to 31 December 2006.
PHASE 5 TANK FARM EXPANSION DESIGN and CONSTRUCTION OF MECHANICAL, PIPING & CIVIL WORKS.
- Client: VOPAK HORIZON FUJAIRAH LIMITED, (VHFL); Fujairah, U.A.E.
- Project Contract Duration: 20 June 2006 to 19 December 2007.
AD02- AL BATEEN AIR BASE NEW BUILDING PIPING CONNECTIONS
- Client: TABREED; Abu Dhabi, U.A.E.
- Project Contract Duration: 05 March 2006 to 30 June 2006.
TABREED DISTRICT COOLING SCHEMES Tabreed 5 Phase 2- EXTERNAL WORKS & ETS “Energy Transfer Station” Zone EC515A & 521
- Client: TABREED; Abu Dhabi, U.A.E.
- Project Contract Duration: 10 April 2005 to 22 Aug 2006
TABREED DISTRICT COOLING SCHEMES AD04 GHQ - CHW ZONE DISTRIBUTION, ETS, RENOV. OF THE EXISTING AC SYS, AND CONT’N OF THE BLDG. CHW SYS. TO TABREED DIST. COOLING NETWORK.
- Client: TABREED; Abu Dhabi, U.A.E.
- Project Contract Duration: 08 October 2005 to 30 December 2006.
Various Tendering Prepared/Involved such as;
- Emirates District Cooling LLC (EMICOOL) MOTOR CITY - DISTRICT COOLING PROJECT UNDERGROUND CHW PIPE NETWORKS at Dubai Investment Park, Jebel Ali, Dubai, UAE. Tender Planning Package.
- ETS “Energy Transfer Station” Green West Project at Dubai, tender planning package.
- International Media Production Zone (IMPZ) EMPOWER Project, tender up to level 2 package.
- Engineering, Procurement & Construction of PIG LAUNCHERS AND RECEIVERS FOR 13 Nos. Critical Main Oil Lines, tender planning package. For (ADCO “Abu Dhabi Co. for On Shore Oil Operations”).
- AD02- AL BATEEN AIR BASE NEW BUILDING CONNECTIONS.
- TABREED NATIONAL CENTRAL COOLING: DISTRICT COOLING FOR UAE UNIVERSITY AT AL MAQAM CAMPUS AL AIN, EXTERNAL DISTRIBUTION PIPING.
Main Task:
- Develop Planning Package for tender submission to client such as; WBS (Work Breakdown Structure), Weightage Factor, Construction Detail Schedule and other necessary Planning Package attachements.
- Coordinate with Project Manager. Execute document tendering. Preparation of Engineering, Procurement and Construction Project Schedule such as PERT/CPM, quantification, bar chart, progresses S-curve, resources loading histogram, material take off, cost estimate and Monthly Cash Flow.
- Monitor Weekly and Monthly Progress status at level 3 & 4 and procurement status. Gather and compile relevant data as per project requirement. Insure that all target dates as per schedule are properly executed. Conduct site ocular inspection Coordinate project heads.
- Prepare recovery schedule to a certain project for client’s approval if additional quantity and extended schedule or which ever cases may apply. Prepare monthly invoice/billing to be submitted to the client for approval with respect to the monthly progress.
- Utilize Project Planning Software proficiently e.g. Primavera V3.1 and Microsoft Project 2000.
Dec 03,’02 – Oct 12, 2005 Al Suwaidi Industrial Services Co. Ltd.
Supplied to Client: Saudi ARAMCO Testing and Inspection (T&I) Planning and Projects Unit, Maintenance Div. Rabigh Refinery, Kingdom of Saudi Arabia.
T&I, Planning and Projects Mechanical Engineer
Prepare Work Schedule for Tanks and various projects in accordance to SAES (Saudi Aramco Engineering Standards) and SAMS.
Prepares scope of work and letters for review by concern unit such as; Inspection Unit, Operation Maintenance & Engineering with Loss Prevention. As well as, review and give comments on various project design packages in accordance to standards and specifications.
Prepare calculation sheet, cost estimate, service/purchase order draft and bill of materials.
Prepare & responsible on planning & scheduling for tanks, General Refinery Turn Around 2004 w/ various shutdown & projects, utilizing Primavera V.3.1 & Microsoft Project 2000 up to latest version.
Prepares the complete packaged as well as design package and hand-over to the T&I Execution Engineer for implementation or execution.
Update of the following:
1. Testing and Inspection (T&I) daily, weekly report and Tank Data Base.
2. Testing and Inspection (T&I) Overdue tanks and Contracts Tracking.
Prepare Long Form and Short Form Contracts. Hypothetical Quantities and Company “Saudi Aramco” Estimate Cost for Tankage Repair Western Region Shared Contract. Prepare T&I Planning and Projects Unit presentation. Verify & check contractors’ invoice against actual quantity of works completed.
TEST Package, Mid-Year accountability and Operating Plan preparation.
Dec 26, ‘01 – Dec 02’02 Al Suwaidi Industrial Services Co. Ltd.
P.O. Box 269 Rabigh, Kingdom of Saudi Arabia.
Planner Engineer/Quantity Surveyor
Prepare work schedule for tanks and various projects in Primavera V.3.1 and Microsoft Project 2000.
Up date and report work progress daily for “all Project” using Microsoft Excel.
Maintain coordination with the project in-charge.
Monitor Cost for Al Suwaidi Serv. Co. Ltd. Rabigh ARAMCO Maintenance Div.
Prepare project billing and invoice prior for submission to Client and discuss.
Responsible for Weekly report in showing the GVWP, BCWP, ACWP and company asset. Review, interpret and develop isometric Drawings.
Modify drawings in AutoCAD R14 or 2000.
Responsible for Scope of Work preparation.
Oct 2001 – Dec 25, ’01 Al Suwaidi Industrial Services Co. Ltd.
P.O. Box 269 Rabigh, Kingdom of Saudi Arabia.
Mechanical Foreman
Supervise the 1.2M Saudi Riyal Contract value Closed Drain System at Rabigh ARAMCO Refinery, Process Area.
Interpret, review drawings and designs if in accordance to Standards and Specifications.
Responsible in maintaining communication with the Client SAUDI ARAMCO.
Mar 2000 – Apr 2001 SALCON POWER CO.
Poblacion Naga Cebu, Philippines
Cadet Engineer
Assist Mechanical Works.
Prepare reports, in daily, weekly and monthly report for mechanical work shop daily report.
Prepare Plant Integrity Assessment (PIA) report.
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
Cebu Institute of Technology
Bachelor of Science in Mechanical Engineering
Graduated October 14, 2000
N. Bacalso Avenue Cebu City, Philippines
SIENA School of Naga
Graduated March 1996
East Poblacion ,Naga Cebu, Philippines
Received diploma
Naga Central Elementary School
Graduated March, 1992
Poblacion Naga Cebu, Philippines
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
1. Microsoft Office Power Point 2003 9 Years I am using this program to make any presentations on variuos job explanations.
2. Primavera V3.1 6 Years I was able to apply P3 on my Planning and Scheduling also in Cost, Mapower and Equipment tracking on a certain project.
3. Microsoft Office Outlook 2003 6 Years This is a very powerful tool on comunications and made the job execution faster. To deliver the message on time and fast.
4. Microsoft Project 2002 6 Years I am using Microsoft Project for some various Planning and Scheduling, Mapower and Equipment tracking on a certain project as per Clients request.
5. Microstation V7.2 4 Years This drawing and designing tool is an alternative to AutoCAD which I am using in Saudi Aramco for it is their Standard Drawing tools.
6. SAP System 4 Years I am using SAP System for generating a Purchase Order under Planning Module for it is the System used by Saudi Aramco.
7. JD Edwards 3 Years I am utilizing this system for connecting Primavera to JDE, on the cost estimate and budgeting for Al Suwaidi Industrial Service Co. Ltd.
8. Microsoft Office Word 2003 12 Years Microsoft Office Word is a very powerfull tool to communicate through making letters and various applications related to the job.
9. Microsoft Office Excel 2003 11 Years I utilize Microsoft Office Excel on my daily reporting, computations and various application on the work.
10. AutoCAD R 14, 2000, 2002 & 2006 10 years Very proficient on the hands-on/application of Automated Computer Aided Design Program.
11. i-DMS (Integrated Document Management System) 0.2 Years I am using i-DMS for the various company document search and needs.
12. SPR (Smart Plan Review) 0.2 Years I am using SPR for equipment and construction viewing to check for its virtual location, position and some information. To have a virtual view on its location for the purpose of how does a certain equipment will be manuvered at site during installation.
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
Driving
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
To be part with in a dynamic progressive company where I can use and apply my professional work experience. Seeking a position in line w/ engineering works such as; Planning & Scheduling, Estimating, Consultancy/Design, Site Execution or Supervision and Inspection, also can do as Quantity Surveyor, Tank Engineer, Material expediting and Project package preparation. To obtain a position in engineering, construction and maintenance wherein my knowledge and experience will be used to the full extent
|
| |
|