|
|
CV Process Chemical Engineer
|
|
|
|
|
|
|
| |
| |
| Process Chemical Engineer |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in Process Chemical Engineer - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
75228
Last Updated:
Sunday, July 15, 2007 |
Location (Residence): Jamnagar, India
Citizenship: India
|
| |
Languages:
Native:
Marathi Other:
English United Kingdom |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
Masters in Chemical Engineering Years of Experience:
29 years
|
Authorized to work in:
UK (in particular), United States
Present Location:
India, Jamnagar
Relocation:
Anywhere (International) |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Management |
Project Management |
Experienced
|
2 years |
|
Engineering |
Chemical |
Experienced
|
29 years |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
Dear Sir,
I venture to offer my candidature for the post of Chemical Engineer in your esteemed organization. In this context I am submitting my resume for your favourable perusal.
Thanking you
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
Experience Summary :
23 Years of professional experience in chemical process industries and project engineering and management companies as a technical staff. Currently holding General managers position with a leading refinery. Responsibilities have included management of process engineering deliverables for refineries being constructed under EPC contracts, basic and detailed engineering, pre commissioning and commissioning of refinery projects.
Details of experience :
1. Company : Reliance Engineering Associates Private Limited
Reliance Complex, Refinery Division, Moti Khavadi,
Jamnagar
Designation General Manager ( Engineering)
Duration 14th January 2005 ,Onwards
Experience Responsible for Engineering of Sour Water
Stripper/Amine Water Treatment unit, Polypropylene
recovery unit, Saturated and Unsaturated Merox units for
JERP project.
Responsible for engineering of Non process buildings and
Infrastructure development work for SEZ .
2. Company : Larsen & Toubro Limited
Hydrocarbons & Related Projects,
EPC Centre, NH-08, Opp GEB Substation,
Baroda 391740 (Gujarat)
Designation Senior Manager(Project Execution)
Duration 12 Jan 1995 – 12 Jan 2005
Experience
01/2003 – 01/2005 Diesel Hydrotreater & Hydrogen generation Unit project for IOCL Panipat , EPCC-IV Contract
(A) Process Packages from Process Licensor
Managed the following deliverables from Detailed Engineering Contractor.
1. Review of Process Licensors Packages from UOP & IFP for DHDT and Haldor Topsoe for HGU projects respectively.
2. Verification of PFD with stream data, Heat & Mass Balances.
3. Line Size calculation sheets.
4. Pumps & Compressor head calculation sheets.
5. Marked up P&ID updating.
6. Data sheets for Vessels & Drums.
7. Heat Exchanger Data Sheets incorporating Thermal rating.
8. Specifications of Process package units.
9. Equipment, Machinery, Instrumentation Data sheets.
10. Equipment List updating.
11. Utility balances and Requirements.
12. Flare load summary.
13. Utility system engineering Package including P&ID’s.
14. Utility Header Diagrams.
15. Effluent Summary.
16. Product & Raw Material specifications.
17. Flare & Blow down System process engineering package including P&ID’s.
18. Issuance of final P&ID’s for Engineering Package.
19. Operating Manuals.
20. Pre-commissioning / Commissioning report.
(B) Participated in the HAZOP study and 3-D Intergraph Model Review.
(C) Resolution of issues related to Process Packages with process Licensor. Interaction
With process licensor for clarifications during detailed engineering stage.
(D) Managed process deliverables from overseas and local vendors detailed below.
Process Package from Overseas Vendors
1. Review of Basic Engineering packages for the following from vendors.
2. Feed Filter package for Diesel from M/s Filtrex-Italy for Liquid backwash system. Stress calculations for the diesel transfer line to fired heater.
3. Fired Heater for package from M/s Petrochem Development Corporation New York: Stress analysis of Transfer Line for Diesel, FE Analysis for APH Tube sheets. Thermal design of heaters as per API 560, Heater supports, Evaluation of API Data sheet for Heater, Dampers, Fan, APH, Filter Silencers, Fluid Couplings for blower, Refractory specifications, BMS system for Heaters, Soot Blowers, Pigging Requirement, Carried out thermal efficiency calculations for Heater Efficiency as per API.
Process Packages from Local Vendors
Thermal calculations for Naphtha Super heater, API Data sheet checking.
Dosing system for Diesel Hydrotreater & Hydrogen Generation Plants including,
Antifoam, Anticorrosion, Phosphate solution, DMSO, Hydrazine, Amine Water injection skid mounted systems.
Fire Protection system – For DHDT & HGU projects: Vendor ECC Chennai.
Generation of Design Basis document, PFDs, P&ID’s, Process calculations for fire water requirement as per TAC Norms, U/G Layout drawings for F/W system, Design of Fire Alarm system, Specifications of FW system items such as monitors, hydrants, hoses DCPs, Carbon dioxide extinguishers.
Submission of P&ID’s to statutory bodies such as Chief Controller of Explosives, Factory Inspector through PMC for Fire Water system. Offered clarifications to queries from CCOE.
HVAC & Pressurization system: For substation 11 A, Vendor Document Review, Including Blower design, Duct Design, Duct Design and Duct layout, Heat Load calculations for HVAC design.
(E) Reformer – PSA interdisciplinary Interface.
Central coordinator for engineering Inputs and Outputs for Reformer Engineering between IOCL (Owner), EIL ( PMC), Vendor ( Haldor Topsoe), DEC ( L&T Powai Unit Systems) , L&T Chiyoda ( DEC ) . Multidisciplinary exposure.
01/ 2000 – 01 / 2002 Diesel Hydrotreater & Solvent Dewaxing projects for IOCL Digboi
Managed the following process deliverables from DEC,
1. Review of the process package.
2. Review of BEDP from project management consultant.
3. Review of PFD, P&ID’s, and Equipment Specifications and data sheets.
4. Equipment List, Raw Material and product specifications.
5. Effluent summary and specifications.
6. Review of Plot Plan.
7. Checking of Stream Data such as process design parameters, heat & mass balance details.
8. Resolution of process related issues during review with PMC and process licensor.
9. Participated in the 3-D Model review and resolution of clashes.
01/1996 – 01 / 2000 Diesel Hydro Desulfurization Project, HPCL Vizag
Managed process deliverables for the off plots & Utility packages for the project.
1. Recirculating Sea Water Cooling Water system.
2. Bearing Cooling water system.
3. Plant & Instrument Air.
4. Instrument Air Drying system.
5. Liquid Nitrogen System.
6. CRW – ETP System.
7. Fired Heater.
As a task force member of the project, commissioned O’s and U’s packages as above.
4. Company: VAM Organic Chemicals Limited, Bhartiagram
Gajroulla 244223, Distt Moradabad, ISO 9002
Duration : 09/1994 – 01/1996
Designation: Manager ( Design ) Technical Services Division
Experience : Responsible for developing basic engineering packages for Continuous Distillation – Fermentation plant for ethanol. Developed Equipment Layout, PFDs, P&ID’s, and Specifications for Bought outs, vessels, columns, tanks, settling tanks, yeast vessels, fermentors. Piping layout, BOQs etc. Operating procedures for the plant. Precommissioning and Commissioning of the plant.
Technical support to the Acetic Acid, Acetic Anhydride, Acetaldehyde, VAM, Pyridine, Picolin plants. Handled MIS for the plants.
5. Company : Praj Industries Limited, Opp HEMRL, Bavdhan, Pune
Duration : 1990 – 1994
Designation : Senior Engineer ( Process Design )
Prepared basic engineering packages for Acetic Acid, Acetic Anhydride, Acetaldehyde plants with ethanol ass starting raw material. Experience of handling Acetic Acid recovery system which involved distillation and extraction columns.
Handled all aspects of Project management including supervision of fabrication of multipurpose rectification column, reboilers, coolers, condensers.
Commercial support to the project team through billing and invoicing. Effected invoice recoveries.
Commissioned IPA-Water system for a large bulk drug manufacturing company.
Commissioned 30 KLPD , Ethanol Recovery column for PJ Margo Pvt Ltd
Prepared a techno commercial offer for a sterile automatic fermentor and materialized an order for the company. Carried out basic and detailed engineering for the project including specifications, procurement, and supervision of fabrication, erection at site, pre and final commissioning of the pilot plant at site. Recovered billed invoices for the project.
6. Company : Deccan Sugar Institute, Manzari , Pune
Duration : 1987-90
Designation : Chemical Engineer
Experience : Process development studies on Treatment & Disposal of Distillery
Spent Wash through Evaporation & Incineration. Development of specifications of
Incinerator boiler. Preparation of process data sheet for the system.
7. Employer : The University of Roorkee, Roorkee 247 267
Duration : 1983-87
Designation : Research Associate
Experience : Developed software for Estimation of output from Steam - NG
Primary Reformer.
8. Employer : National Environmental Engineering Research Institute, Nagpur
Duration : 1980-83
Designation : Senior Research fellow
Experience : Responsible for operation of a pilot plant for Detoxification of Phenol
and Cyanide bearing Coal Chemical Complex waste Water . Work involved design
and operation of pilot plant for the system followed by erection and operation of
plant in the field. Carried out field trials. Assisted Senior Scientist in day to day
work.
9. Company : DCM Chemical Works, Najafgarh Road, New Delhi 110011
Duration : 10/1978 – 10/1980
Designation : Graduate Engineer Trainee (Projects Division)
Experience : Training in the projects division. Training on various aspects of
Caustic Soda revamping project in particular to Double Effect evaporation system
for Caustic Lye. Designed venture jet ejector system for absorption of Chlorine
Leakages from cell house.
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
M.Tech.(Chem Engg) ,1978-79 , IIT Kanpur
• B.Tech ( Chem Engg) , 1976 , Nagpur University
• H.S.S.C. , 1971 , MS Board , Nagpur
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
Functional expert in SAP MM module.
Windows, Primavera, MS Projects
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
Expediting procurement activities.
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
I have perseverance skills. I am also adaptibility and flexible.
|
| |
|
|
|
|
|
Process Chemical Engineer
CV/Resume ID no.: 75228 |
|
|
|
|
|
|
| Relevant CVs; view more oil and gas CVs |
| 1. Procurement Manager / Procurement Specialist |
| 2. Process Engineer in Aurobindo Pharma limited,3.6years, expexcellent technical and interpersonal |
| 3. Cost analysis, cost controller, MARKETING , SALES ADMINISTRATION, GREAT INTERPERSONAL SKILLS |
| 4. Mechanical Engineer with expertise in Piping & Pressure vessel Design |
| 5. Project Management |
| 6. Process Engineer |
| 7. Process Chemical Engineer |
| 8. Engineerinf, project manager, program manager |
| 9. Chemical Engineer |
| 10. Project Manager, Planning Specialist |
| 11. SR. PROJECT ENGINEER |
| 12. Telecom System's Project |
| 13. Process Engineer, Project Management |
| 14. Chemical Engineer |
| 15. Project Manager |
| 16. Geosciences, GIS and Remote sensing |
| 17. chemical engineer looking for a new challenge |
| 18. Project Manager - technical lead - 25 years worldwide experience |
| 19. MBA (IB/MKTG) PIPING ENGG/SUPPLY CHAIN MANAGEMENT |
| 20. Chemical Engineer / Project Engineer |
| |
| |
| Other CVs; view more oil and gas CVs |
| 1. Electrical and instrumentation, Project Engineering, maintenance |
| 2. Experienced Motorman (20 years of which 3+ offshore), hardworking, excellent technical skills |
| 3. HSE in the Oil & Gas Construction/Operation site |
| 4. Structural PDMS/CADD Designer |
| 5. Deckhand, Roustabout, Assistant, Entry Level |
| 6. Experienced in pipelines |
| 7. Technician rotating equipment |
| 8. Diesel & Gas Generator Mechanic I Total 8 year Experince |
| 9. Safety Officer / Marine Radio Officer |
| 10. HSE INSPECTIONS, HSE MANAGEMENT, HSE CONSULTANT |
| 11. Oilfields doing mechanical, craftsman and safety work |
| 12. Rigger - Lifting with heavy cranes vessels and colums, oil and gas field |
| 13. Quick learner, Flexible, Hard & smart worker |
| 14. Procurement / Buyer / Supply Chain Specialist |
| 15. HSE and deck operations senior advisor/field supervisor |
| 16. Pipefitter / Rigger / Banksman / Slinger |
| 17. Wide experience in rotating equipment and static machinery. Trainer, Mentor and Instructor. |
| 18. Site construction engineer, Kling Consult GmbH / Design and Civil Engineering / Dubai |
| 19. SUBSEA ENGINEER TECHNIP, DEEPLINES, BENDING, STRUCTURE, STIFFNESS, LIFE, SLPM, MOLDI |
| 20. Network administrator, have worked on the site for Addax Petroleum |
| 21. Widely Experienced Welder (15 years) with TWIC Card, Quality Plus Services Tallahassee, FL |
| 22. Cruise Ship Computer System Hardware Technician, I Have 7 Years Experience in IT Hardware Sector |
| 23. Sr. Document Controller, PPMS International Ltd. / PPMS SARL Paris 75008, France, Abu Dhabi, U.A.E. |
| 24. Junior Cad Draughtsman in Emrald Rims Pvt. Ltd |
| 25. Young graduate, no experience whatsoever, a stupid lazy Indian |
| 26. Expert British Pipefitter, thirty years experience in oil and gas industry in UK & overseas projects |
| 27. Logistics Manager Air and Sea department of leading worldwide Danish transport company Latvia branch |
| 28. R&D CFD PhD Engineer Two-phase flow, software skills in ANSYS, Fluent, CFD, OpenFoam, Fortran |
| 29. Able Seaman with AHTS working as a Tug and supply vessel and General cargo experience |
| 30. Experienced procurement and logistics industry Uganda, Makerere University in Uganda graduate |
| |
| |
|
|
|