|
|
CV Planner / Project Controller Belleli Energy Oman Tecnimont Chile Turner Townsend India
|
|
|
|
|
|
|
| |
| |
| Planner / Project Controller Belleli Energy Oman Tecnimont Chile Turner Townsend India |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in Planner / Project Controller Belleli Energy Oman Tecnimont Chile Turner Townsend India - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
75249
Last Updated:
Thursday, September 30, 2010 |
Location (Residence): MADUKKARAI, PONDY, India
Citizenship: India
|
| |
Languages:
Native:
Tamil Other:
Telugu, Hindi |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
Vocational in MECHANICAL Years of Experience:
13 years
|
Authorized to work in:
India
Present Location:
INDIA, TRICHY
Relocation:
Anywhere (International) |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Engineering |
Planning/Scheduling |
Basic
|
15 years |
|
Administration |
Planning |
Basic
|
15 years |
|
Design/Software |
Primavera (Oracle) |
Basic
|
7 years |
|
Administration |
Project Control |
Trainee
|
9 years |
|
Administration |
Project Control |
Basic
|
1 year |
|
Administration |
Project Control |
Trainee
|
12 years |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
Dear Sir,
I wish to introduce my self as a Planning Engineer / Project Engineer
having more than 20 years of experience in Multinational Companies in
multidiscipline Industrial works. Presently I am working with an *EPC* *Oil
& Gas* Construction outfit *M/s* Belleli Energy SpA in Doha &
executing prestigious project for Qatar Gas /Rasgas, LNG
Terminal in Raslaffan, Qatar under CHIYODA-TECHNIP JV.
My role here involves the complete Budget preparation, Planning & execution
works of multi-million Contracting Works under pressure environment using
advanced planning software like Primavera, MS Project. Apart from normal
teamwork, my distinguish role involves - Project planning, Budget
updation, sub contract finalization, inter face with third parties,
statutory bodies, innovative analytical mitigation; initiating and timely
delivering techno-commercial solutions for multi-interfaces / critical
works; and commercial risk forecasting to Management.
For such outstanding work, I have received a special *"Appreciation
Award"*from Petroleum Development of Oman.
Being a versatile character I have the ability to adopt your desire position
within short time.
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
WORK EXPERIENCE (in descending order)
PRESENT EMPLOYMENT:
1) Duration : 06-06-10 to Till date
Employer’s Name : Camfil Farr India Ltd, (A MNC Company)
Project Description : Global Sourcing of Filters
Designation : Project Controller
Reporting to : Global Sourcing Manager/ DGM-CFPS
Job Description:
Responsible for overall project control at site
PROJECT CONTROL, PLANNING & SCHEDULING FUNCTIONS:
Implementation of Planning, Project control & progress monitoring system
Review & Approval of Level-4 schedule to achieve the contractual date
Monitoring & control of Level-4 schedule
Highlighting the critical areas for attention
COORDINATION FUNCTIONS:
Interface coordination with various vendors, sub contractors
Establishment of QHSE System as per company standard at sub con works.
Vendor Development
Supporting the Global outsourcing team for attaining the international level of sourcing
PREVIOUS EMPLOYMENTS:
2) Duration : 06-12-09 to 03-03-10
Employer’s Name : Turner Townsend India Pvt Ltd, (A MNC Company)
Project Description : Cairn India Rajastan Upstream Project
Designation : Planning Manager
Reporting to : Senior Manager-Planning / Head - Construction
Job Description:
Responsible for overall project control at site
PROJECT CONTROL, PLANNING & SCHEDULING FUNCTIONS:
Preparation of Level-4 schedule to achieve construction completion, precommissioning and Commissioning accomplishment
Monitoring & control of Level-4 schedule
Highlighting the critical areas for attention
COORDINATION FUNCTIONS:
Interface coordination with various Disciplines of civil, mechanical & EI Works
Follow up with GOC Department for accomplishment of Certification completion.
3) Duration : 11-08-08 to 31-10-09
Employer’s Name : Tecnimont Chile Ltda, (A MNC Company)
Project Description : EPC Contract for construction of Power plant
Designation : Lead Planner (Planner Manager)
Reporting to : Site Manager / Corporate Project Control Manager
Job Description:
Responsible for overall project control at site
PROJECT CONTROL, PLANNING & SCHEDULING FUNCTIONS:
Preparation of Progress Measurement system & procedure, planning system & procedure
Preparation of Master Schedule complete cycle for Power Plant using Primavera version 6 including WBS,OBS, Activity codes, Rescource codes/utilization,etc.in server based system.
Updation of Progress weekly and rescheduling every month, review the critical path in P6.
Monitor the Payment Milestone, Obligation, Contractual Milestone, etc in P6
Monitoring the Time of completion for all discipline in P6.
Monitoring of sub contractor schedules and alert notice to sub contractor for the delays.
Preparation & updation of monthly report including schedule analysis, S Curve, Activities report, Claims register, P3 Schedule updation, Payment status register, etc.,
Monitor and review sub contractor progress, productivity and manpower
COORDINATION FUNCTIONS:
Interface coordination with various contractors for civil, mechanical & EI Works
Coordination & Follow up with vendors for progress report & scheduling.
SUBCONTRACT FUNCTIONS:
Subcontract schedule review and highlight the area of concern
Analyzing the Sub contractor claims
Proven Ability: 1. Preparation of Complete cycle of Master Schedule. 2. Implementation of Project control procedures
4) Duration : 09-12-06 to 27-06-08 (1 ½ Years)
Employer’s Name : EXTERRAN BELLELI ENERGY SpA, (A MNC Company)
Project Description : EPC Contract for Qatar Gas /Rasgas / QWEC – Storage Tanks / Desalination plant
Designation : Project coordinator / Project Controller (Project Control Manager)
Reporting to : Site Manager / Senior Project Manager
Job Description:
Responsible for overall project control
PROJECT MANAGEMENT / COST CONTROL:
Monthly progress Payment certificate preparation, certification from client, payment follow up.
Preparation, Updation & control of Budget quantity / value / Manhours with percentage of spent & cost at completion (CTC)
Preparing, analyzing and informing the following Excel database sheets to Head Office. 1. Hiring / Sub contracts Cost Control Report – expected final project completion cost with all anticipated variations and commitments. 2. Change Order Status – listing all Change orders and its payment details. 3.Back-charge & Vendor claim Report – for vendors and contractors
To prepare, submission and negotiation of variation claims to client with back up papers
Advising Management of contractual issues with analytical report and preparing necessary correspondences.
Show initiative and proactively handle commercial issues with minimum supervision from Management.
Establishing cost control code & procedure.
PROJECT CONTROL, PLANNING & SCHEDULING FUNCTIONS:
Preparation of Progress Measurement system & procedure
Preparation of Planning & Scheduling procedure
Preparation of complete cycle of Master Schedule (Engineering, Procurement, Construction & Commissioning) using Primavera version 3.Monitoring of sub contractor schedules.
Preparation & updation of monthly report including delay analysis, S Curve, Activities report, Claims register, P6 Schedule updation, Payment status register, etc.,
Record the reasons for delay for internal review.
Preparation & updation of CPMS (Central Progress Monitoring sheet)
Preparing the Monthly delay analysis report , Earned value analysis for Management review & mitigation measures
Preparation & monitoring of Project Cash flow with respect to updated schedule
COORDINATION FUNCTIONS:
Painting & Scaffolding Sub contractor follow up for progress & interface works.
Rolling & machining sub contractor follow up for progress
Follow up with NDT Agencies, TPI for inspections.
Coordination & Follow up with internal departments for Procurement, Central Stores, etc.
SUBCONTRACT FUNCTIONS:
Subcontract finalization, Progress monitoring, Invoice certification
Hiring & monitoring of Heavy equipments / manpower
Proven Ability: 1. Completed the tank farm (phase-1) construction work with in budgeted hours and time frame.
5) Duration : Since 09-01-04 – to Dec-2006
Employer’s Name : ARABIAN INDUSTRIES LLC, (Leading EPC Company in Oman)
PB 51, PC 124, AL RUSAYL,
Sultanate of Oman.
Project Description : USD 60 Million (One million man hours) six streams of Gas Pressure Reduction Terminals in Sohar, for Oman
Gas Company
Completed the Oil tank farm in Marmul for Petroleum Development of Oman
Designation : Senior Planning / Senior Project Engineer (Project Manager)
Reporting to : Contracts Manager
Job Description:
PROJECT MANAGEMENT / COST CONTROL:
Payment Milestone certificate preparation, certification from client, payment follow up.
Preparation, Updation & control of Budget quantity / value / Man hours with percentage of spent & cost at completion (CTC)
Preparing, analyzing and informing the following Excel database sheets to Head Office. 1. Project Cost Control Report – expected final project completion cost with all anticipated variations and commitments. Highlighting the risky / critical new works to the management by doing analytical estimation. 2. Fund Forecasting Report – cash flow forecast for next three months. 3. Change Order Status – listing all Change orders and its payment details. 4.Back-charge & Vendor claim Report – for vendors and contractors 5.Contactors List – listing all contractors with brief job status. Maintaining complete & clear Documentation.
To prepare, submission and negotiation of variation claims to client with back up papers
Management of contractual issues with analytical report and preparing necessary correspondences.
Show initiative and proactively handle commercial issues with minimum supervision from Management.
Authorizing and Verifying the Site petty cash expenses depending up on the criticality.
PLANNING & SCHEDULING FUNCTIONS:
Preparation of Planning and Project control procedures
Preparation & Updation of Master Schedule (Engineering, Procurement, Construction & Commissioning) using Primavera version P3.Monitoring of sub contractor schedules with Risk Analysis.
Review of Engineering consultant schedule with respect to Baseline schedule. Highlight the delays & follow up for recovery. Integration of schedule in to master schedule
Review of Long lead vendor schedules. Integration of schedule in to master schedule
Preparation & updation of monthly report including Schedule analysis, S Curve, Activities report, Claims register, P3 Schedule updation, Payment status register, etc.,
Coordinating with site for construction progress, periodical review of resources & arranging the materials
Monitoring of progress with workshop for piping prefabrication activities.
Preparation & monitoring of Project Cash flow with respect to updated schedule
COORDINATION FUNCTIONS:
Permit application & follow up for pipeline permit for common corridor from owner of plot. Approval from third parties for pipeline crossings
Attending the client, Engineering meetings (for FEED, Design Review, IPF), site progress meeting, review & close out of pending points.
Follow up with NDT Agencies, TPI for inspections.
Preparation & approval from management for productivity related Incentive scheme.
Coordination with vendors, site team for commissioning of vendor supplied items.
Coordination & Follow up with internal departments for Procurement, Central Stores, etc.
Follow up & close out of Punch listed items of client with site team, vendors & Engineering consultant.
SUBCONTRACT FUNCTIONS:
Subcontract finalization, Progress monitoring, Invoice certification
Hiring & monitoring of Heavy equipments / manpower
Proven Ability: 1. Completed the tank farm construction work with in budgeted hours and time frame.
2. Completed the phase-1 of Pressure Reduction Terminal with in budget & time frame by initiating various pro active measures.
3. Internal Auditing for various project sites
6) Duration : 07-12-02 to 31-12-03 (1 Year)
Employer’s Name : Integral Services Co WLL
Abdhabi, UAE.
Project Description : Maintenance of Oil tank farms for ADNOC (Abdudhabi
National Oil company) subsidiary (TAKREER) .
Designation : Planning Engineer
Reporting to : Project Manager
Job Description: Responsible for Planning activities individually
All the below Contractual works done under supervision of Project Manager from Pre-contract to Final Account. Disciplines in includes Mechanical, Electrical, Instrumentation, Painting, Insulation, and partly Civil - in the areas of Process, Utility & Temporary Facilities.
Preparing, updation and analyzing of master schedules including Histogram, resources.
Issue & follow up for site related material purchase request with vendors / Head office
Attending, preparation & follow up for close out of client review meeting.
Monthly invoicing based on the actual progress (Excel Data sheet)
Quantity certification from client for completed works
Daily manpower allocation area wise with respect to schedule
Review of resources with respect to updated schedule and timely reminder to management.
Variation claims & back up paper preparation & finalization with client
Fixing the targets & review of productivity after discussing with management, Supervisors.
Monitoring the productivity on daily basis
Proven Ability: Completed the shut down work with in time and cost.
7) Duration : 01-01-02 to 31-12-02 (1 Year)
Employer’s Name : IMC Limited,
Chennai, India
Project Description : Construction of Oil tank terminal for captive purpose.
Designation : Lead Project Engineer
Reporting to : Project Manager
Job Description & Responsibilities:
Finalization of Third party for preparing Feasibility report based on marketing feed back.
Finalization of Third party for preparing Environment Impact statement. Submission & follow up with various government bodies for obtaining the clearance for project.
Finalization & follow up of long lead delivery items for mechanical and E & I Package
Resolving Subcontractor’s all Commercial problems during execution by coordinating with Construction and Engineering teams. Giving proper techno-commercial explanation to the Subcontractors as per existing Contract - Articles, Addenda, Terms & Conditions, Scope of Supply / Works, Specifications & Drawings.
Negotiation with the subcontractors for the disputed, new and site modified items deviating from Contractors original Contract Scope.
Preparation & submission of Management Information Report (MIR)
Verifying the multiple-construction Subcontractors Progress by considering the interfaces to avoid double payment. Checking progress as per Contract method of measurement, Scope of Supply / Works, drawings, Contract specifications. Preparing and sending invoice along with Site Manager Payment Request Sheet for payment to Management.
Analyzing & preparing the following excel database: Cost Review report, DRN Evaluation List (Site modified works assessment) report every month.
Proven Ability: Completed the project with in Budgeted cost.
8) Duration : 01-06-01 to 31-12-01 (6 Months)
Employer’s Name : EMAS Engineers & Cntractors Pvt. Ltd.
Chennai, India
Project Description : Vertical Expansion of Multi storey building for Standard Chartered
& Grindlays Bank. Located in busy office area underneath.
Designation : Planning Engineer
Reporting to : Contracts Manager
Job Description & Responsibilities:
Preparing and distributing the daily manpower allocation list with respect to schedule.
Resource loading in the schedule & periodical updation for verifying the resource requirement.
Preparation & Updation of schedule, weekly report.
Productivity monitoring activity wise / area wise.
Equipment Utilization program
Optimizing the utilization of resources
Liaising with client, consultant for daily programs
Liaising with client consultant for invoice certifications
Document control & distribution
Proven Ability: Completed the project with out any hindrance to client by close coordination with internal staffs, suppliers & sub contractors.
9) Duration : 18-04-99 to 31-05-01 (2-Years)
Employer’s Name : ANSALDO ENERGIA S.p.A,
16152 Genova-Via N. Lorenzi, 8, Italy
Project Description : International MNC constructed 250 Million USD turnkey
2 X 210 MW Coal Based Thermal Power Plant for
Neyveli Lignite Corporation at Neyveli.
Designation : Project Planner
Reporting to : Site Manager (Italian)
Job Description & Responsibilities:
Updation of Level-3 Schedule. Preparation & Review of Level-4 schedule with sub contractor.
Monitoring the progress of works with respect to Schedule and discussion with sub contractor during the weekly meeting.
Monitoring of structural fabrication (approximately 5500MT) item wise and prioritizing based on erection sequence.
Spool wise follow up with piping prefabricator for supply of materials in line with erection sequence
Analyzing & preparing the following excel database: Daily quantification with resources, productivity monitoring. Sending such excel data sheet to Head Office Italy through Site Manager.
Timely reminders to HO for delivery of drawings, materials, long lead items, sub contractors based on project priorities
Identification of critical list & discussing with management for timely actions
INTERFACE HANDING OVER PROGRAM for Civil, mechanical, E & I and Commissioning disciplines for them to start the activity.
Identifying the critical resources and timely action
Three month look ahead and action plan for construction activities.
Earned Value analysis report for various construction activities at site.
Verifying the multiple-construction Subcontractors Progress by considering the interfaces. Checking progress as per Contract method of measurement, Scope of Supply / Works, drawings, Contract specifications & Site People Instructions.
Liaising with Client, Consultant & Subcontractors for Client Lump sum Payment. Coordinating with Planning department to get the inputs for Progress Preparation (WBS). Drafting Letters to Client, Consultant, and Subcontractors for commercial matters.
Proven Ability: Completed the structural fabrication & erection work with in time frame even though there was delay in initial phase of project.
10) Duration : 16-05-95 TO 15-02-99 (3-Years 9 months)
Employer’s Details : Fenner India Ltd (EPC Company for material handling
: system and pollution control system
Clients Handled : Dharani Sugars Ltd
EID Parry India Ltd
Kudremukh Iron & Steel Company
Designation : Junior Manager (Projects)
(Reporting to Chief Project Manager)
Job Description & Responsibilities:
Preparing the Master Schedule. Follow up with Engineering Department for release of AFC Drawings.
Coordination with client /Consultant for approval of drawings
Correspondence with client on contractual issues
Material / BOQ takeoff from all drawings. Estimating the cost for new anticipated works as per the existing rates of Labour, Materials and Equipments at site.
Finalization & follow up with Purchase / vendors for delivery of materials
Verifying the Contractor progress BOQ as per Site verification, Drawings & Specifications. Confirming with all Discipline Managers before processing the Progress. Preparing and submitting the checked invoice along with payment request for payment.
Negotiating prices/rates with Contractors for new development works. Estimating the quantity of Manpower, Materials and Machinery to guide Planning department.
Coordinating with Consultant and Contractors for all Commercial / Contracts matter.
Preparing Budget Report to Accounts department for Fund allocation. Verifying and assuring the Contractors Tax Paid status for the invoiced amount.
Coordination with site team for progress, schedule.
11) Duration : 10-02-90 TO 10-05-95 (5-Years 3 Months)
Employer’s Details : Fluid Air India Ltd. Bombay
Job Details : Executed projects with various reputed clients
1. Citurgia Bio chemicals Ltd., 2. Hindustan Zinc Ltd
3. Rashtriya Chemical Fertilizers
4. SAIL – Durgapur
5. National Thermal Power corp – Ramagundam
6. Float Glass India Ltd
Designation : Site Engineer
(Reporting to Project Manager)
Job Description & Responsibilities:
Daily manpower allocation with sub contractor
Follow for the delivery of raw materials in sub contractor workshop and coordinating for delivery of materials to site.
Quantity certification of Sub contractor invoice
Supervision & Inspection of fabrication and erection of super structures, equipments, rotary parts.
Releasing drawings to Subcontractors after crosschecking.
Commissioning & handing over of conveying equipments, pollution control systems, Pneumatic handling system
Client Payment follow up
Preparing the level-4 schedule at site.
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
DME
INTERNAL AUDITOR COURSE
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
PRIMAVERA, MS PROJECTS, MS OFFICE
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
PROJECT MANAGEMENT, COST CONTROL, PROJECT COORDINATION
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
STRONG DRIVING SKILLS TO MEET THE CONTRACTUAL SCHEDULE & BUDGET
INNOVATIVE THINKING
|
| |
|
|
|
|
|
Planner / Project Controller Belleli Energy Oman Tecnimont Chile Turner Townsend India
CV/Resume ID no.: 75249 |
|
|
|
|
|
|
| Relevant CVs; view more oil and gas CVs |
| 1. MATERIAL LOGISTIC ENGINEER |
| 2. Snr Drilling Engineer/Op |
| 3. Planning / Scheduling / Cost Engineer |
| 4. Designing, Planning, Estimation |
| 5. Planner / Project Controller Belleli Energy Oman Tecnimont Chile Turner Townsend India |
| 6. PROCUREMENT, BUYER, SALES MANAGER |
| 7. MARINE ENGINEER |
| 8. Administrative Manager |
| 9. Project Manager |
| 10. Camp Boss |
| 11. Project Manager |
| 12. business analyst, senior cost controller; interest to evaluate opportunities in challenging projects |
| 13. Planning Engineer in Oil and Gas Field onshore and offshore |
| 14. Chemical Engineer with 5 languages knowledge |
| 15. Right Man for the Job. You will be able to sleep at night knowing that I am on the job site. |
| 16. I look for a offshore job - safety and organisation are my keywords |
| 17. 17 Years Experienced in On/Offshore,LNG,Oil & gas Industry Maintenance,Pre-Comm,Comm & Strart up. |
| 18. plc. electrician , maintenance electrician , rig electrician , experienced electrician , |
| 19. Experienced (7 years +) in civil/structural, enthuasiast to switch to offshore line. |
| 20. Planning/scheduling job profile with over 20 years experience |
| |
| |
| Other CVs; view more oil and gas CVs |
| 1. Instrumentation Engineer |
| 2. DPO, SDPO, Master, Marine Superintendent, Marine advisor, Ship inspector/surveyor, Training Master |
| 3. Static Equipment Engineer |
| 4. Drilling Fluids Supervisor, Technical Rep, Manager(30 years) |
| 5. TRAINEE QA NDT Level 2 |
| 6. X-STEEL (TEKLA) LEAD-DESIGNER (OFFSHORE OIL AND GAS) |
| 7. Instrumentation / Planning Engineer |
| 8. HSE INSPECTIONS, HSE MANAGEMENT, HSE CONSULTANT |
| 9. MECHANICAL ENGINEER (FRESHER) WILLING TO WORK IN OIL AND GAS FIELDS |
| 10. Administrative / Brand Co-ordinator |
| 11. AUDITING, ACCOUNTING AND ADMINISTRATIVE PERSONNEL |
| 12. Naval Architect and Marine Engineer, Shipbuilding, Bentley Microstation, Sikob |
| 13. Instrumentation engineer - oil&gas |
| 14. Crane Operator - drilling semis jack ups |
| 15. Welding Inspector, QC Engineer, Radiographic film Interpretation |
| 16. M.Sc. Geologist, mineral resources engineer, geologist |
| 17. QC Inspector Germannischer Lloyd, Oil & Gas Industry |
| 18. Skilled Industrial Painter aiming to be a Coatings Inspector |
| 19. Plant Operator DCS MOL Pakistan Oil & Gas Company B.V |
| 20. A very highly regarded engineer, Health, Safety, off shore, instrumentation, production, electrical |
| 21. Trainee Layput Engineer with PDMS, AUTOCAD experiance Bulk Plant Upgrade, Rabigh K.S.A. |
| 22. Petroleum Engineer, Artificial lift methods, Oil surface facilities, Reliability process design |
| 23. FAT Instrument Engineer / DCS Engineer Factory Acceptance Test (FAT) of Distributed Control Systems |
| 24. Trainee safety and fire engineer (btech, nebosh, iosh) with 1 year experience |
| 25. Network Operations Administrator Network Consultant Northrop Grumman Corporation through TEK Systems |
| 26. Offshore Structural Designer / X-Steel Detailer, Neptune Marine Oil and Gas Singapore Priserve India |
| 27. Dive system project manager and maintenance system upgrades and certification with Lloyds and DNV |
| 28. PRO II Process Engineer working in CTCI Taipei Taiwan Deepak Fertilizers & Petrochemicals Ltd India |
| 29. Petrochemical Senior Staff working as expatriate in Arabian Gulf Equate Petrochemical Company Kuwait |
| 30. Senior NDT technician Suez Channel Bridge NKK company Egypt |
| |
| |
|
|
|