| |
| Lead Engineer / Project Engineer |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in Lead Engineer / Project Engineer - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
75385
Last Updated:
Sunday, March 23, 2008 |
Location (Residence): Lecheria, Venezuela
Citizenship: Venezuela
|
| |
Languages:
Native:
Spanish Venezuela Other:
English |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
High School in system engineering Years of Experience:
18 years
|
Authorized to work in:
European Union, UK (in particular), United States, Argentina, Aruba, Australia, Brazil, Canada, Costa Rica, Dominican Rep., Germany, Italy, Mexico, New Zealand, Panama, Puerto Rico, Singapore, Spain, Trinidad & Tobago, United Arab Emirates, United Kingdom, United States, Virgin Islands, U.S.
Present Location:
venezuela, puerto la cruz
Relocation:
European Union, UK (in particular), United States, Argentina, Aruba, Australia, Brazil, Canada, Costa Rica, Dominican Rep., Italy, Mexico, New Zealand, Panama, Puerto Rico, Singapore, Spain, Trinidad & Tobago, United Arab Emirates, United Kingdom, United States, Virgin Islands, British, Virgin Islands, U.S. |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Engineering |
Instrumentation |
Expert
|
10 years |
|
Engineering |
Instrumentation |
Expert
|
1 year |
|
Engineering |
Instrumentation |
Expert
|
2 years |
|
Engineering |
Instrumentation |
Expert
|
1 year |
|
Engineering |
Instrumentation |
Expert
|
1 year |
|
Engineering |
Instrumentation |
Expert
|
8 years |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
Leader Engineer and Project Engineer with 18 years of experience Oil & Gas main station upstream and downstream production project, collection and transportation of Oil – Gas.
Coordination and Supervision of conceptual Engineering, Basic, Detail and Construction, precommmissioning, commissioning and start-up in Instrumentation and control, Automatization/Telecommunications and Integration.
• Instrumentation leader, Basic and Detail collection and transportation of pressure low gas, Orimulsion transportation, pumping and storage.
• Supervision and Integration Leader SCADA (Neles S/3), DCS (Honeywell, Provox) and PLC (Modicom, Allend Bradley) System. Detail Engineering.
• Detection and Alarm System of Fire and Heat Detail Engineering
• Site Instruction and Detail Engineering on Phase Operational.
• Speak Spanish, English (Medium).
• Coordination in Instrumentation, Basic Engineering, Detail and Construction.
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
Experience Detail
JANTESA
Instrumentation leader Engineer (Jan. 2007)
SINCOR, Project “Improvement of Opportunities SIOM” Edo. Anzóategui – Venezuela. Basic Engineering Revision, Detail and Construction Engineering.
Instrumentation leader Engineer (Oct. 2005 – Dec. 2006)
PDVSA, Project “Centralized Operations Field Santa Rosa”, Edo. Anzóategui – Venezuela. Basic Engineering Revision, Detail and Construction Engineering.
Instrumentation leader Engineer (Abr. 2005 – Sep. 2005)
PDVSA, Project “Redistribution Circuits D305B y D405B, and Associated Charges to S/E Jusepín I”, Edo. Monagas – Venezuela, Conceptual and Basic Engineering.
Instrumentation leader Engineer (Ago. 2004 _ Mar. 2005)
PDVSA, Project “Secondary Recuperation San Juan 6 / PIGOP”, Edo Monagas – Venezuela. Basic Engineering Revision.
Instrumentation leader Engineer (Jul. 2004)
PDVSA, Project “Development Engineering and Technical Assistance for Management Process and Fractionation Gas”, Edo Anzóategui – Venezuela. Conceptual Engineering.
Instrumentation leader Engineer (Jan. 2004 – Jul. 2004)
PDVSA, Project “Gas Opportunities – Distrito San Tomé”, Collection West Heavy Pressure low Gas – Melones Area, Edo. Anzóategui – Venezuela. Detail Engineering.
Instrumentation leader Engineer (Jun. 2003 – Dec. 2003)
PDVSA, Project “Gas Opportunities – Distrito San Tomé”, Collection Pressure low Gas – Bare – Arecuna/Melones, Edo. Anzóategui – Venezuela. Basic Engineering.
PROPECA INGENIERIA
Instrumentation leader Engineer (Sep. 2002 – Mar. 2003)
PDVSA, Project “BITOR Complementary Installation”. Flow Stations J -20 and O -16, Cerro Negro, Edo. Monagas and Anzóategui – Venezuela. Basic Engineering.
Instrumentation leader Engineer (Feb. 2002 – Sep. 2002)
PDVSA, Project “BITOR Complementary Installation”. Oriducto Bitumen System Transportation, Edo. Monagas – Venezuela. Basic Engineering.
Instrumentation leader Engineer (Feb. 2002 – Sep. 2002)
PDVSA, Project “BITOR Complementary Installation” Orimulsion® Storage Pumping System. Edo. Anzóategui – Venezuela. Basic Engineering.
TIVENCA
Instrumentation leader Engineer (Ago. 2001 – Feb. 2002)
PDVSA, Project “Technical Assistance, Basic and Detail Engineering Improvement Relief System Unity DA-3”, El Chaure Refinery. Edo. Anzóategui – Venezuela. Basic and Detail Engineering.
Project Engineer (Apr. 2001 – Ago. 2001)
PETROZUATA, Project “VEHOP Phase Operational IV (Instrumentation Eng. Main Station Upstream Production Facilities Debottlenecking Project)”, 70 Km to South of Pariaguán and 15 Km to East of population San Diego Cabrutica, Edo. Anzóategui – Venezuela, Site Instruction and Detail Engineering.
Instrumentation leader Engineer (Dec. 2000 – Apr. 2001)
PDVSA, Project “Definition of Gas Plant (Subproject 3 and 4)”. Subproject 3: “Integration from area 500 and 600 Signals (System Honeywell) and Inventory System Entis of Enraf to Main Station (System Provox DCS of Fisher)” and Subproject 4: “Design of Distilled Water for Pressurization of Fire Control System” Fractionation Plant GLP, Bajo Grande – Venezuela.
Project Engineer (Oct. 2000 – Dec. 2000)
PETROZUATA, Project “Phase Operational III (Main Station LP Flare System)”. Detail Engineering: Data Sheet Control Valves, Regulators Valves, Flow Indicator, Pressure Transmitter, Thermal Flow meter. Main Station Laboratory, Detection and Alarm System of Fire and Heat Detail Engineering: Control Panel Specification, Wiring Diagram of the Detection and Alarm System, Data Sheet. Location: 70 Km to South of Pariaguán and 15 Km to East of population San Diego Cabrutica – Venezuela.
Instrumentation leader Engineer (Sep. 2000 – Oct. 2000)
PDVSA, Project “Lineal Thermal Detection and Alarm System in Float Roof Tank”, for Project: Improvement Plant of Combustible Distribution “El Guamache” of the Fire Control System, Municipio Tubores, Margarita Island – Venezuela.
Instrumentation leader Engineer (Feb. 2000 – Sep. 2000)
PDVSA, Project: “Improvement Plant of Combustible Distribution El Guamache of the Fire Control System”, Municipio Tubores, Margarita Island, Edo. Nueva Esparta – Venezuela.
SISTEMAS CIBERNET
Integration leader Engineer (Dec. 1999 – Jan. 2000)
PDVSA, Detail Engineering: Project: Control Center San Joaquin Buster, Anaco, Edo Anzoátegui – Venezuela. Configuration, FAT, SAT, Automation System Scada S/3 Neles.
Integration leader Engineer (Oct. 1999 – Dec. 1999)
PDVSA, Detail Engineering: Project: Control Center San Joaquin Buster, Anaco, Edo Anzoátegui – Venezuela. Programation and Start-Up in Emergency shutdown and Control PLC Allen Bradley.
TECNOCONSULT
Project Engineer (Sep. 1999 – Oct. 1999)
PDVSA, COF (CENTRO OPERATIVO FURRIAL). Edo. Monagas – Venezuela, Basic Engineering Support of PI&D, Conceptual Engineering Revision, Construction Technical Specification.
Project Engineer (Mar. 1998 – Sep. 1999)
PETROZUATA, DOWNSTREAM. CONTRINA, VEHOP (VENEZUELA EXTRA HEAVY OIL PROJECT) Jose, Puerto La Cruz, Edo. Anzoátegui – Venezuela. PETROZUATA (CONOCO ORINOCO INC. and MARAVEN S.A.). Specifications (IDM) and Requisitions in the Instrumentation area. Detail Engineering of Plans (PDS/MicroStation 95). Detail Engineering Support of Analyzers (H2S/SO2, O2/SO2, O2, pH, MW).
INELECTRA.
Project Engineer (Jan. 1997 – Feb. 1998)
PDVSA, Project “Reinstrumentations Projects, ESD Replace and Improve of feasibility CCU”, MARAVEN, Cardón – Venezuela. Detail Engineering: Departures Description of Installation for Instruments and Metric calculations. Instruments Specification and Requisitions in the Instrumentation area, Construction of Specification, Revision of PI&D.
Project Engineer (Nov. 1996 - Jan. 1997)
PDVSA, Project “Ampliación Tren C José” Project. (ATCJ), CORPOVEN, Puerto La Cruz – Venezuela. Detail Engineering: Electrical Plans Engineering, Mechanical and Pneumatic, Instruments Installation Detail, Instruments Installation Details in recipient. Calculation of control valves, Calculation of Relief and Safety Valves. Specification and Requisition, Offer Analysis in Instrumentation, ON-OFF valves, Electrical Materials Balance, Mechanical and Pneumatic, Instrumentation and Control cables Specification, Technical Construction Specification. Manual of Instruments installation and Manual of Tests Calibration, Design Criteria
Project Engineer
TOTAL Project, Jusepin, Maturín – Venezuela. Detail Engineering: Specification and Requisition: ON-OFF valves, Pressure Indicators. Offers Analysis in the Instrumentation area. Instruments Installation Details in Recipient.
Project Engineer (Jun. 1996 – Sep. 1996)
ECOPETROL, Project “Optimization and Modernization of the Technology of the Systems of Control and Instrumentation of the Services of Steam and Electricity Generation” of the Industrial Complex Barrancabermeja, ECOPETROL, Colombia. Study and Feasibility, Basic Engineering and of Detail in the Instrumentation area, Design and Revision of PI&D for Instrumentation and Control.
Project Engineer (Jan. 1996 – May. 1996)
PDVSA, Project “New Pumping Station at ULE-1”, LAGOVEN, Cabimas – Venezuela. Detail Engineering, Programming, Installation and assistance in the start-up on control systems based in programmable logical controllers Allend Bradley.
Project Engineer (Apr. 1995 – Jan. 1996)
PDVSA, Project “Modernization of the Instrumentation System and Control of the plant GLP-ULE”, LAGOVEN, Cabimas – Venezuela. Detail Engineering: Specification and Requisition, Offers Analysis in the Instrumentation area. Revision of PI&D.
Project Engineer (Jan. 1995 – Apr. 1995)
VENCEMOS, Project “Store Improvement Matters Outweigh Windmills Nourishment, Plant II and New Secondary Crusher”, VENCEMOS SACA, Plant Pertigalete, Puerto La Cruz – Venezuela. Detail Engineering: Design in the Electrical Installation Detail, Mechanical and Pneumatic.
Project Engineer (Apr. 1995 - Sep. 1995)
PDVSA, Project “ID Connection in Parallel HITACHI-CADAFE”, PEQUIVEN., Morón – Venezuela. Modification (SOFTWARE) of a System in Redundancy of Programmable Logical Controllers (PLC-5). ALLEN BRADLEY (6200), Synchronization of Turbogenerator.
Project Engineer (Oct. 1995 – Oct. 1995)
INELECTRA, Caracas – Venezuela. Project “Instrumentation Pilot Project”. Detail Engineering. Elaboration of a base project for the Development and Training of the personal in the Instrumentation area.
Project Engineer (Nov. 1995 – Dec 1995)
PDVSA, Project “Terminal Deep Waters TAP”, LAGOVEN. Conceptual Engineering, Eastern Division, Caripito-Güiria – Venezuela.
Project Engineer (Jun. 1994 – Oct. 1995)
PDVSA, Project “Eastern Cryogenic Expansion, ACCRO PHASE II”, CORPOVEN, Puerto La Cruz – Venezuela. Detail Engineering of Furnace, Calculations of Control Valves. Specification and Requisition, Offers Analysis: Control Valves, ON-OFF Valves, Self-regulating Valves, Motorized Valves, and Restriction Orifice. Coordination and Construction Supervision in loop Tests in the Instrumentation area.
Project Engineer (Dec. 1993 – May. 1994)
PDVSA, Project “Eastern Cryogenic Expansion, ACCRO PHASE I”, CORPOVEN, Puerto La Cruz – Venezuela. Detail Engineering, Calculation of Control Valves, Orifice Plates. Plans Engineering, Electrical Installation Details, Mechanical and Pneumatic. Specification and Requisition of Instrumentation area. Detail Engineering in Compressor of Refrigeration, Revision of the Documentation Supplied by the Manufacturer NUOVOPIGNONE.
Project Engineer (Jul. 1992 – Sep. 1993)
PDVSA, Project “N. 92070 NEW FUEL OIL DISTRIBUTION PUMPS AT NASS”. Project and N. 92300 “REPLACING NASS TANK 2018”. Basic Engineering and of Detail Specifications and Requisitions in the Instrumentation area, Manual of Installation and Implementation in Instrumentation, Refinery ISLA, Curazao.
Project Engineer (Jan. 1991 – Jul. 1992)
PDVSA, Remodeling Project of “THE CATALYTIC UNITS AND GASOLINE TREATMENT 2/3, GAS PLANT II, MARAVEN, Cardón – Venezuela. Revision PI&D, Calculation of Control Valves, Calculation of Relief and Security Valves, Calculation of Orifice Plates, Specifications and Requisitions, Offers Analysis in the Instrumentation area. Coordination in the Construction in Instrumentation and Control.
TECNO-CONTROLES
Project Engineer (Apr. 1990 – Dec. 1990)
PDVSA, Projects Engineering “OLEFINAS II”, CVA, Maracaibo – Venezuela. Configuration and Development of the Software of the System, Design and Installation of a System in Redundancy of Programmable Logical Controllers (MODICOM).
Project Engineer (Mar. 1990 – Apr. 1990)
PDVSA – Venezuela, “Elaboration and Offer Development of a System in Redundancy based on Controlling Programmable Logical of the Project”.
Project Engineer (Dec. 1989 – Mar. 1990)
Engineer of Applications System of PLC´S GOULD-MODICOM.
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
• System Engineer 1989, “Luis Caballero Mejías” University, Venezuela.
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
Microsoft Windows.
Microsoft Excel, Power Point, Access, Autocad
Program for sizing of Control valves.
Program for sizing of plates Orifice.
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
Norms PDVSA, API, ISA, NEMA
Elaboration of P&ids and of documentation of engineering.
Criteria for selection of instrumentation in referential measurement and control for guard transference.
Criteria for selection of PLC' s and other controllers.
Calipers of 4-20 mA and shaping HART.
Calibration of flow transmitters, pressure, level and temperature.
Calibration of control valves and ON/OFF.
Calibration of capacitívos Transmitters of level.
Thermocouples K type, J, and RTD `s.
Instrumentation for thermal Oxidadores systems (Thermal Oxidizers) and gas chromatographs.
Cards of I/O and Controller of flame.
Gas monitors
Compressing of gas and monitors of Vibration, Temperature and indicators of alarm.
Installation and conexionados of PLC´s and Tableros of control.
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
REALIZED COURSES
Basic Instrumentation, Industrial Instrumentation
Architectonic Technical Drawing
DBase IIIPLUS
Basic Autocad
Classification and Installation in Hazardous areas
Course of Industrial security
|
| |
|