|
|
|
|
|
|
| |
| |
| PIPING ENGINEER |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in PIPING ENGINEER - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
75452
Last Updated:
Thursday, June 23, 2011 |
Location (Residence): mulund ( east ) , mumbai, India
Citizenship: India
|
| |
Languages:
Native:
Hindi, Marathi Other:
English |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
Bachelors in chemical engineering Years of Experience:
5 years
|
Authorized to work in:
India
Present Location:
india, mumbai
Relocation:
Anywhere (International) |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Engineering |
Pipe Stress |
Expert
|
8 years |
|
Engineering |
Piping |
Basic
|
8 years |
|
Engineering |
PDMS/PDS |
Trainee
|
6 years |
|
Design/Software |
CAD |
Basic
|
8 years |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
Dear Sir,
SUB: job application
While going through Internet job search I came across your site & found that there are some vacancies within your esteem organization and out of that post for Piping Engineer ( Stress Engineer ) I would like to apply.
I graduated from Mumbai University with bachelor’s degree in chemical engineering in June 2002 with 1st class (60%). Right now I am working in Aker Kvaerner Powegas from Jan 2005 to till date. I working in Piping engineer as Stress & support Engineer. My total job experience is about 5 years.
I would appreciate the opportunity to further discuss my qualification for suitable position in your esteem organization. Looking forward to hear from you. I hope you do the needful & give me a fare chance to work in your esteem organization. Awaiting your favorable reply.
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
Work Experience:
Total experience is about 5 years in industry. Presently working in Aker Kvaerner Power Gas Pvt Ltd in Piping Dept as Stress & Support Engineer since Jan 2005.
Current Job Profile includes:
Sr.
No PLANT
DESCRIPTION SALIENT FEATURES
OF THE PLANT SELF INVOLVEMENT
1
Pure Terephathelic Acid Plant, Hazira (India) Client: Reliance Industries Limited
Review: Aker Kaverner E & C (UK)
Process Licensor :
INVISTA (DU Point)
Capacity : 640,000 TPA
Worked from May 2005 to Jan 2006
Total No of Lines: 4600
Pressure rating up to 1500 # with 350 °C
Stress Critical lines: 950 (Varying from 3” to 60”)
Total Equipment: 450
Plant includes Reactors, Scrubbers, Column, PTA & CTA Dryer, Heat exchanger, Centrifuge, Pumps, and Deaerator.
Types of Piping: High Pressure Slurry, Process lines of titanium, Hastelloy and Duplex Stainless Steel.
Project executed using
3-D PDS system
Worked as Stress Engineer.
Responsibilities included:
Working as a stress engineer for filtration, drying & solvent recovery unit.
• Analysis of High Temp Lines connected to Pumps, Exchanger, reactors, columns using CAESAR-II Rel. 4.4 & 4.5
• Co-ordination with Civil for loading data.
• Making specification for spring hangers & Bellows.
• Checking for support to identify CPS & SPS support. And make drawing of that on Auto-Cad.
• Doing Supporting of Non-Critical lines.
Sr.
No PLANT
DESCRIPTION SALIENT FEATURES
OF THE PLANT SELF INVOLVEMENT
2
Indo Rama, Nagpur (India) Client: IndoRama Industries Limited
Process Licensor :
INVISTA (DU Point)
Worked from Nov 2005 to May 2006
Total No of Lines: 2500
Pressure rating up to
900 # with 350 °C
Stress Critical lines: 700 (Varying from 3” to 32”)
Total Equipment: 450
Plant includes Reactors, Column, Dryer, Heat exchanger, Pumps, and spinning machine
Types of Piping: High Pressure Slurry, Process lines of titanium, Hastelloy and Duplex Stainless Steel.
Project executed using
3-D PDS system Worked as Stress Engineer.
Responsibilities included:
Working as a stress engineer for filtration, drying & solvent recovery unit.
• Analysis of High Temp Lines connected to Pumps, Exchanger, reactors, columns using CAESAR-II Rel. 4.4 & 4.5
• Co-ordination with Civil for loading data.
• Making specification for spring hangers & Bellows.
• Checking for support to identify CPS & SPS support. And make drawing of that on Auto-Cad.
• Supporting of Non-Critical lines.
Sr.
No PLANT
DESCRIPTION SALIENT FEATURES
OF THE PLANT SELF INVOLVEMENT
3
Jamalco unit 3 – aluminum Extraction Client: ALCOA
Process Licensor :
ALOCA
Worked from May 2006 to Nov 2006
Total No of Lines: 1000
Stress Critical lines: 700 (Varying from 3” to 32”)
Total Equipment: 450
Plant includes Reactors, Column. Heat exchanger, Pumps, Flash Tank etc.
Types of Piping: High Temp Slurry, Steam Line
Project executed using
3-D PDS system Worked as Area Stress Engineer.
Responsibilities include:
Working as a stress engineer for Evaporation area , heat generation area
• Analysis of High Temp Lines connected to Pumps, Exchanger, reactors, Flash Tank using CAESAR-II Rel. 4.4 & 4.5
• Co-ordination with Civil for loading data.
• Making specification for spring hangers.
• Checking for support to identify CPS & SPS support. And make drawing of that on Auto-Cad.
• Supporting of Critical & non critical lines.
• Stress Analysis of Pipe rack lines.
Sr.
No PLANT
DESCRIPTION SALIENT FEATURES
OF THE PLANT SELF INVOLVEMENT
4
Talisman Wellhead – Malaysia ( Oil & gas ) Client: Talisman / PTSC
Worked from Dec 2006 to till date
Total No of Lines: 1500
Stress Critical lines: 575 (Varying from 3” to 32”)
Equipment includes: Heat exchanger, Pumps, Test Separator, Launchers, Receivers etc.
Project executed using
3-D PDMS system version 11.3 Worked as Stress & support Coordinator.
Responsibilities include:
Working as a stress engineer for
• Analysis of High Temp Lines connected to Pumps, Exchanger, using CAESAR-II Rel. 4.4 & 4.5
• Bridge Lines , Receiver & launcher connected lines
• Co-ordination with Civil for loading data.
• Preparation of specification for spring hangers.
• Checking for support to identify CPS & SPS support. And make drawing of that on Auto-Cad.
• Supporting of Critical & non critical lines.
Sr.
No PLANT
DESCRIPTION SALIENT FEATURES
OF THE PLANT SELF INVOLVEMENT
5
Pipeline Replacement Project- Phase III Client : Larsen & Toubro
Process Licensor : ONGC
Modification of 56 Platforms' Topside facilities.
Worked from Jan 2007 to Jun 2007
Modification of Topside facilities for Unmanned Well head platforms as well as Process complex for Hook up of Sub-Sea pipeline for various services.
Well Fluid, Lift Gas and Water Injection Launcher and Receiver. Worked as Stress & support Engineer.
Responsibilities include:
Working as a stress engineer for
• Analysis of High Temp Lines connected to Pumps, Exchanger, using CAESAR-II Rel. 4.4 & 4.5
• Receiver & launcher connected lines
• Co-ordination with Civil for loading data.
• Checking for support to identify CPS & SPS support.
• Preparation of CPS & SPS sketches.
Sr.
No PLANT
DESCRIPTION SALIENT FEATURES
OF THE PLANT SELF INVOLVEMENT
6 Konkola Copper Mines, Zambia Client: Konkola Copper Mines.
Process :- Outo Kumpu Technology
Capacity :- 3 Lac TPA
Worked from Mar 2007 to till date
No. of Equipments : 300
No. of Lines : Approx. 1200 Worked as Stress & support Coordinator
Responsibilities include:
• Analysis of High Temp Lines using CAESAR-II Rel. 4.4 & 4.5
• Co-ordination with Civil for loading data.
• Preparation of specification for spring hangers.
• Checking for support to identify CPS & SPS support. And make drawing of that on Auto-Cad.
Previous Experience:
• Worked in ALKYL AMINES CHEMICALS LTD in Technical Services Dept from Jan 2004 to Jan 2005.
Job Responsibilities:
• Check ISO and issued for fabrication.
• Prepare isometric suit at site
• Draw Isometrics as per piping layout.
• Keep support MTO record properly.
• Supporting of Non-Critical Lines.
• Worked in CINCH CHEMICALS PVT LTD as Production Engineer from Oct 2002 to Jan 2004.
Job responsibilities:
• Taking production of Styrene Oxide in Styrene Unit.
• Doing Lab analysis of Product to check for its purity.
• Planning of Styrene Oxide production to meet monthly targets and review of planning for next six months and get it approved from Manager.
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
Educational Qualification:
• Done Post-Graduate Diploma in “ PIPING DESIGN “ from Suvidya Institute of Technology in 2005
• Passed B.E. (Chemical Engg) in 2002 from Mumbai University with 1st Class.
• Passed H.S.C. in 1998 from Vaze college with Distinction. ( 72 % )
• Passed S.S.C. in 1996 from Maharashtra State with distinction ( 81 % )
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
Professional Skills:
Software Proficiency:
1. Caesar II – 4.4 , 4.5, 5.0
2. Smart Plant Review
3. Navis Work
4. Auto Cad
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
Worked as Stress Engineer.
Responsibilities included:
Working as a stress engineer for filtration, drying & solvent recovery unit.
• Analysis of High Temp Lines connected to Pumps, Exchanger, reactors, columns using CAESAR-II Rel. 4.4 & 4.5
• Co-ordination with Civil for loading data.
• Making specification for spring hangers & Bellows.
• Checking for support to identify CPS & SPS support. And make drawing of that on Auto-Cad.
• Doing Supporting of Non-Critical lines.
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
Extra Curricular Activities:
• Captain of winning team of Inter College Cricket Tournament in 2001.
• Captain of winning team of Inter School Cricket Tournament in 1994 & 1995.
• Won Inter School Quiz Competition held in school competition.
• Done Hiking Exhibition from “CHAKRAM HIKING CLUB”
• Took Part & done well in “ HOMI BHABHA SCIENCE EXAM”
• Done well in Math’s & Language Exam.
|
| |
|
|
|
|
|
PIPING ENGINEER
CV/Resume ID no.: 75452 |
|
|
|
|
|
|
| Other CVs; view more oil and gas CVs |
| 1. INSTRUMENT & CONTROL |
| 2. Electrician - Rig Electrician |
| 3. YOUNG STAAD STRUCTURAL DESIGNER |
| 4. Electrcal technician in industrial and ship building |
| 5. HVAC Engineer |
| 6. Senior SDS structural detailer |
| 7. Communication field HF vhf uhf data communication in hf |
| 8. Construction Supervisor, corrosion control of gas and oil pipelines |
| 9. Process Engineer HYSYS, HTFS, ASPEN ICRAUS, Flare net |
| 10. Welder in naval and industry, electrode and co2 expert |
| 11. Roustabout / HVAC Technician / Labourer |
| 12. Rig Electrician Saudi Arabian Saipem Ltd |
| 13. Tender Projects, Cost Analysis & Controller, KPI in shipping, Vessels' OPEX, Crewing Operations |
| 14. Sr Directional Driller / Drilling Consultant with international experience |
| 15. Deck Officer, Indonesia MT. PUNGUT PT. PERTAMINA C/O TANKER |
| 16. Piping Designer, J. Ray McDermott Asia Pacific Pte Ltd., Derrick Services (S) Pte Ltd |
| 17. BE Mechanical Engineer from Pune University |
| 18. GIS / CAD Engineer ADCC Infocad Pvt. Ltd., (Meghe Group) Nagpur, Maharashtra |
| 19. Graduate with some skills in HVAC and Autocad |
| 20. Pipeliner with 5 years of pipelaying experience |
| 21. Mechanical fitter experience offshore and shore based, South Arican Navy, served on submarines |
| 22. Quantity Surveyor/Estimator FIDIC contracts, Bujagali Hydro Power Project Jinja Uganda, Africa |
| 23. Graduate of information technology and majoring database management Ara Open University Egypt |
| 24. Deck Cadet on M/V Morning Lucy Car Carrier South Korea looking for offshore jobs |
| 25. Engineer Project Management Team for construction, fabrication onshore and offshore structures |
| 26. Production Supervisor Total Qatar Al Khaleej Offshore field, DNO Yemen AS, Occidental Oman |
| 27. PDS Frameworks Plus Designer in Galfar Engineering & Contracting W.L.L. Emirates Abu Dhabi UAE |
| 28. Offshore FPSO DCS Technician, I/0 Selection Controller Configuration Controller Load Sharing |
| 29. Materialman Petra Resources Malaysia Shell Sabah Petroleum Comp. & Sarawak Shell Berhad |
| 30. Maintenance Engineer in charge of Oil & Gas drilling equipment fro National Drilling Company UAE |
| |
| |
|
|
|