CV Piping Stress Engineer Aker Solutions, Caesar Triflex PDMS Microstation Chevron Pembroke Refinery UK
|
|
|
|
|
|
|
| |
| |
| Piping Stress Engineer Aker Solutions, Caesar Triflex PDMS Microstation Chevron Pembroke Refinery UK |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in Piping Stress Engineer Aker Solutions, Caesar Triflex PDMS Microstation Chevron Pembroke Refinery UK - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
75493
Last Updated:
Tuesday, May 19, 2009 |
Location (Residence): Istanbul, Turkey
Citizenship: Turkey
|
| |
Languages:
Native:
Turkish Other:
English, Italian Standard |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
Bachelors in Physics Years of Experience:
15 years
|
Authorized to work in:
Turkey
Present Location:
Turkey, Istanbul
Relocation:
Anywhere (International) |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Engineering |
Pipe Stress |
Experienced
|
19 years |
|
Engineering |
Piping |
Experienced
|
19 years |
|
Engineering |
Caesar/Triflex |
Experienced
|
13 years |
|
Engineering |
Stress |
Experienced
|
18 years |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
Piping/Pipe Stress Engineer with wide range of experience in industries Petroleum Processing, Power, Chemicals and Petrochemicals Polymers. Able to work on own initiative and as part of a team. Proven leadership skills involving managing, developing and motivating teams to achieve their objectives. First-class analytical, design and problem solving skills. Dedicated to maintaining high quality standards.
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
Senior Piping/Stress Engineer
Nov. ‘07- Senior Piping / Pipe Stress Engineer
Company: Aker Solutions
Client : Chevron Pembroke Refinery-UK
Projects:
VBU Slope Project- Piping Engineer
Continious Emmission Monitoring Project- Piping Engineer
Alky ESD Replacement – Pipe Stress Engineer
CDHDS Bottoms to Diesel Pool- Project Engineer
Biodiesel Blending Project- Pipe Stress Engineer / Project Engineer
Berth 1 Loading Arms Replacement- Piping Engineer
Berth 6 Access Platform- Piping Engineer
Berth 6 Revamping -Piping Engineer
Jetty Welfare Facility-Piping Engineer
Line Lists Update-Stress analysis (Caesar II - 5.1), flexibility check and support design- Assessment of piping loads on equipment (nozzle loads/stress on vessels using WRC107/297 capability of Caesar II), structure and foundations-Piping Design-Support Design-Integrity Design–Fitness for Service Assessment –Design Review- Expediting- Estimation- Project Planning – Answering Technical Queries
June ‘07- Nov. ‘07 Senior Pipe Stress/Piping Engineer
Company: BGM Engineering Ltd.
-Report to engineering manager -Piping design -Pipe stress and flexibility analysis (Triflex) -Pipe support design and drafting- Supervision at site – Site survey-
Oct ‘06 –June ‘07 Quality System Manager
Project: Diesel–Kerosene Hydro processing and CCR Reformer Project
Client:Tupras Refinery –Izmit Turkey
Company: Alarko - Afken Joint Venture
-Report to project manager on progress, including any problems, technical or otherwise, particularly with regard to costs, man-hours, program milestones and resources –Coordinate NDT activities (Radiographic Test, PMI-Positive Material Identification, Hardness Test, Liquid Penetration Test, Ultrasonic Test, Material thickness check, Holiday test) -Coordinate Preheat and PWHT -Coordinate Welding repairs - Material control (visual, dimensional) –Material handling – Local Procurement
Oct. ‘05 – July ‘06 Piping Works Site Manager
Project: North Marmara and Degirmenkoy Underground NG Storage Plant Surface Facilities
Client:Turkish Petroleum Corporation (TPAO), Silivri-Istanbul-Turkey
Company: Fernas Inc. (MG Engineering Lurgi)
There are 3 fields location in the project.
1-Shared Facility: NG is processed here to store in Kuzey Marmara and Degirmenkoy .
2-Kuzey Marmara which is an old NG field with 6 well heads.
3-Degirmenkoy which is an old NG field with 10 well heads.
2nd and 3rd fields are connected to Shared Facility by 20” and 16” pipelines.
-Report to construction manager -Ensure that construction is carried out in accordance with procedures and contractual requirements to the agreed budget and schedule -Continuously monitor the performance of workers in terms of man-hours, and costs against the project’s program and budget -Advice the construction manager of man power requirements to meet the work schedule within the project time and man-hour budget and monthly progress figures -Keep up-to-date and complete project files/drawings -Ensuring the proper documentation is in use for construction at site -Solving technical problems with the client and partner -AG/UG piping fabrication and installation -UG piping; coordination of holiday test and backfilling -Piping design -Pipe support design –Pipe /pipe support material quantities and requisitions -Piping revisions and as-built -Planning the heat treatment activities -Relocation of Pig Trap and Pig Receiver -Material handling-Lifting Studies and planning of equipment erection -Precommisioning –Hydro test loops -Hydro test /service test coordination -Acid Cleaning
March ‘05 –Sept. ‘05 Mechanical Works Site Manager
Project: 4th Slab Reheating Furnace
Client: Erdemir Steel Manufacturing Corp.-K. Ereglisi-Zonguldak-Turkey
Company: Mimag-Samko Energy Technologies Inc.
-Report to site manager - AG piping fabrication and installation -Piping revisions and as-built - Hydro test /service test coordination -Dismantling of existing steel structure -Steel structure fabrication and installation -65m Stack erection-Equipment erection-Refractory lining -Material handling -Procurement - Coordination of subcontractors’ activities
March ‘03 – Feb. ‘05 Senior Piping Engineer
Project: Afsin-Elbistan 4 x 360 MW Thermal Power Plant Unit B
Client: E.U.A.S. Kahramanmaras-Turkey
Company: Babcock Kraftwerstechnik GmbH
-Report to site manager -Approval of all technical decisions made by subcontractors -Identify and manage design changes -Prepare extra work order -Ensuring construction meets acceptable criteria and technical accuracy of all calculations and drawings produced -P&ID revision -Piping re-designs -Supervision of pipe and pipe support fabrication and installation -Piping revision and as built drawing.-Supervision of all piping fabrication and installation activities, hydro tests, service tests , pickling, flushing, blow-out -Design of steam tracing and condensate piping-Revision of mechanical and piping drawings and as-built-Piping flexibility analysis- Pipe support design -Pipe support material quantities and requisitions -Material handling -Attending conformity walk-down
Dec. ‘95 –Feb. ‘03 Senior Pipe Stress Engineer
Company: Foster Wheeler Bimas,Turkey / Foster Wheeler Milano, Italy
-Report to project manager -Approval of all technical decisions made by engineers allocated in my team for a the project -Ensure that engineering is carried out in accordance with procedures and contractual requirements to the agreed budget and schedule -Identify and manage design changes -Continuously monitor the performance of my team in terms of man-hours, and costs against the project’s program and budget -Ensure that all members of the group reporting to them liaise and co-operate with all members of project team -Ensure all my team members comply with the design guidelines laid down for the project -Advice the project manager man power requirements to meet the work schedule within the project time and man-hour budget and monthly progress figures -Ensuring design meets acceptable criteria and technical accuracy of all calculations and drawings produced -Ensuring the proper documentation of all such calculations and data -Piping design -Pipe stress and flexibility analysis (Caesar II) -Calculation of pipe branch connection, pipe wall thicknesses and pipe supports (acc. to ASME B31.1/B31.3) -Pipe support design and drafting -Pipe support material quantities and requisitions -Assessment of piping loads on equipment (nozzle loads/stress on vessels using WRC107/297 capability of Caesar II) structure and foundations -Piping analysis of compressor lines prior to acoustic studies -Provide Lead Piping Engineer with pipe support, drawing indices -Keep up-to-date and complete project files, including calculations, calculation indexes -At the completion of the engineering project to arrange for archive of all necessary documentation in accordance with company procedures -Supervision of pipe and pipe support fabrication and installation -Procurement, expediting, traffic -Piping revision and as built drawing.
Projects:
- Chemopetrol PP Plant, Czech Republic.
- TRC 2000- Tamoil SA- Colombey, Switzerland
- CCR and Isomerization Units-Tupras Refinery, Izmir- Turkey
- Amoc Lube Oil Expansion Project, El-Mex-Alexandria – Egypt
- 33 MW Combined Cycle Project – Bilenerji, Ankara–Turkey
- Gasco Western Desert Gas Complex, Egypt
- Bosen Combined Cycle Project, Bursa – Turkey
- Hoecsa Industrial Yarn and Tire Cord Factory, Izmit – Turkey
- Enerjisa Cogeneration Project, Izmit – Turkey
- Kromsan Chrome and Chromic Compounds Plant, Mersin - Turkey
- NCHD Debottlenecking to 24 TBD Project- Atas Refinery,Mersin – Turkey
- Storage and Loading Plant-Petrol Ofisi, Antalya – Turkey
- Manufacturing Plant – Roche, Gebze – Turkey
- Benzene Hearcut Project-Sarpom SPA, Italy
- Trecate Desulfurization Unit - Sarpom SPA, Milan –Italy
- Vado-Genesis Project –Exxon, Ligure- Italy
- Isab & Erg -Solvent Deasphalting Project, Italy
- Equate - Ethylene Glycol Plant, Kuwait
Sept.‘94-Dec.‘95 Project Engineer
Project: Radiant Heating Project,
Client: Sise Cam A.S. Gebze - Istanbul – Turkey
Company: Rama Inc. , Istanbul- Turkey
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
B.Sc. Physics at the University of Bosporus (1994), Turkey
TRAINING COURSES
- Piping Design
- Piping Engineering
- Plant Design
- Management Training
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
Caesar II (pipe stress analysis ), Triflex (pipe stress analysis ), PDMS, Microstation Draft, CMMS (Procurement, expediting),
MS Office (Excel, Word, Power Point, Project)
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
Good knowledge of ASME, ANSI , DIN Standards
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
References upon request.
|
| |
|
|
|
|
|
Piping Stress Engineer Aker Solutions, Caesar Triflex PDMS Microstation Chevron Pembroke Refinery UK
CV/Resume ID no.: 75493 |
|
|
|
|
|
|
| Relevant CVs; view more oil and gas CVs |
| 1. Piping Design Engineer |
| 2. Piping Designer |
| 3. PDMS Piping for Oil & Gas Engineering (Offshore, Onshore, EPC Power etc) |
| 4. Piping Superintendent/supervisor/engineer |
| 5. Piping Stress Analysis on CAESAR with 4 years of experience. |
| 6. Senior Piping Designer, I aim to be involved in new challenging projects. |
| 7. PDS Piping Designer / Piping Senior Draughtsman |
| 8. PDS Piping Designer |
| 9. Mechanical Engineer with expertise in Piping & Pressure vessel Design |
| 10. PIPING ENGINEER |
| 11. Pipe, Piping, Caesar, Stress Piping |
| 12. Pipe Stress Engineer |
| 13. Pipe, Piping, Lead Piping, Coating, Insulation |
| 14. Piping design engineer, PDS/PDMS |
| 15. PDS Piping Designer |
| 16. PDS/PDMS/AutoPlant piping designer |
| 17. PIPING ENGINEER |
| 18. Construction Supervisor / Engineer |
| 19. Field Piping Designer |
| 20. Lead Piping Engineer, Piping Stress, Plant Layout,Caesar, Routing, Support |
| |
| |
| Other CVs; view more oil and gas CVs |
| 1. widlely experienceed in repair and Maintenance |
| 2. Senior Operations Coordination / Supervisor KBR |
| 3. Master, Ship manager, Training officer/manager, Navigation Officer |
| 4. Able Seaman on multi purpose stand by ships for 16 years |
| 5. Production Operator / Control Room Operator / Lead Operator |
| 6. Photographer, PhotoGallery Manager, Designer & Photo Lab Operator |
| 7. Project Electrical Engineer Basic (FEED) & detail design, inspection, site supervision |
| 8. Sr. Petrophysicist in Wintershall Noordzee, Techlog (Techsia), GeoFrame: ELANPlus (Schlumberger) |
| 9. Recruitment and Resourcing Personnel Services (Consultant) |
| 10. VAT / Indirect Taxes Senior Consultant, PwC UAE |
| 11. Lazy Indian - SAP ABAP Consultant, accept 3 pkr/month |
| 12. Skilled and motivated experienced mechanic |
| 13. Offshore/Onshore Electrician, North Sea, Universal BOSIET AGIT, RGIT |
| 14. Camp Boss, Catering Manager, Sodexho for Technip –Ayang II Barge Hotel, Nigeria, Angola |
| 15. Marine electronics and Electrical technician, Excellent technical and interpers |
| 16. Painting and Insulation Engineer |
| 17. Pipe line fitter - little experience |
| 18. Piping Stress Analysis Engineer for FPSO, FPU, LNG, M/s Technip Geoproduction Sdn Bhd, Malaysia |
| 19. Junior roustabout wants to work on a semi-sub oil rig offsore |
| 20. Senior Cost controller, Engineer Cost estimator, Total Austral SA |
| 21. Junior radio operator offshore hook-up barge Sea Patriot Mashal Shipping Agency |
| 22. Trainee junior worker with no relevant work experience |
| 23. SmartPlant 3D implementation and software client servicing engineer working in Rolta India Ltd. |
| 24. Trainee Instrumentation Engineer working in Paris Glass, Dabhasa India |
| 25. Facility Management / Technician Service HVAC, M/s Persistent Systems Ltd., Pune, India |
| 26. Piping Supervisor hands on exposure Refinery & Petrochemicals projects Olayan Descon KSA IGS Sicim |
| 27. Pipe Stress Design Engineer Filipino - Mitsubishi Heavy Industries Technical Services Makati City |
| 28. QA Manager / Auditor, Bonatti SpA in Saudi Arabia Saudi Aramco, Reliance Petroleum Refinery in India |
| 29. Captain / MATE DPO Unrestricted OOW, 3,000 ton Chief Mate, 500 ton Master HT in Canada |
| 30. Instrument Process Control Engineer / Technician Zimbabwe Power Company Hwange Thermal Power Station |
| |
| |
|
|
|