CV Cost and Planning Engineer; Estimating, costing, planning and scheduling
|
|
|
|
|
|
|
| |
| |
| Cost and Planning Engineer; Estimating, costing, planning and scheduling |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in Cost and Planning Engineer; Estimating, costing, planning and scheduling - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
76103
Last Updated:
Thursday, February 28, 2008 |
Location (Residence): Doha, Taiwan, POC
Citizenship: Philippines
|
| |
Languages:
Native:
English Philippines Other:
English United States, English Trinidad |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
Bachelors in civil engineering Years of Experience:
23 years
|
Authorized to work in:
Japan
Present Location:
Qatar, Doha
Relocation:
Anywhere (International) |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Engineering |
Planning/Scheduling |
Expert
|
15 years |
|
Engineering |
Construction |
Experienced
|
3 years |
|
Engineering |
Other |
Experienced
|
3 years |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
Over seventeen (18) years of diversified experience in quantity surveying, planning, scheduling & cost monitoring of major civil, mechanical, electrical & instrumentation projects in the Philippines and in ME countries. Worked in oil & gas refineries, onshore & offshore, industrial gas and petrochemical plant, water injection facilities, gas & oil separator plants and polypropylene plants mostly for Saudi ARAMCO, Qatar Petroleum, Saudi European Petrochemical Co., TOTAL & Occidental Petroleum facilities
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
COMPANY : Doha Petroleum Construction Co (Ltd.) Qatar
POSITION : Cost and Planning Engineer
DURATION : August 2004 to Present
CLIENT : Qatar Petroleum
THE PROJECT BRIEFLY: Contract No. GTC 246/EF/03
EPIC for New Control Building at Halul Island.
Contract Cost – US$ 25 Million
The scope involves the construction of a new four storey control building complete with ICS, TGIM, HVAC, F&G, telecommunications, electrical and instrumentation controls systems of the QP Halul oil & gas facilities. The project also includes construction of an Emergency Generator Building and conversion of existing control room into Local Equipment Room. It also includes the relocation of TOTAL and Occidental Petroleum systems from existing control building to the new control building.
JOB DESCRIPTION :
Development of procedures for planning and cost control for effective and efficient execution and control of the Project and ensure adequacy of reports to the required level of planning and control.
Development of projects master schedule to ensure that the sequence and logic is correct for design, engineering, procurement, construction, commissioning, start up and other activities.
Evaluation of consultants and sub-contractors man-hours, costs, schedules, deliverables and programs in line with project requirements.
Monitoring of sub-contractors’ and consultants’ performance against their baseline program of work and milestones.
Evaluation of sub-contractors and consultants reports to verify progress claims against milestones and invoices submitted.
Preparation of monthly progress reports addressing the contractors’ or consultants’ cost and schedule trends, productivity, earned and actual man-hours spent and actions taken.
Preparation of executive summary reports and presentations for company management review as and when required and initiate corrective action where necessary.
COMPANY : FAFCO (Ltd.) K.S.A
POSITION : Planning & Scheduling Engineer
DURATION : May 2003 to June 2004
CLIENT : Saudi ARAMCO
THE PROJECT BRIEFLY : Contract No. 7844/00
SGP & UGP Sulfur Plants Upgrade at Shedgum Gas Plant & Uthmaniyah Gas Plants, K.S.A.
Contract Cost – US$ 39 Million
The project scope includes the installation of a complete BTX removal system including carbon absorption drums, regeneration separator pumps, pressure vessels, cooling fans, waste water strippers, Piping, Electrical, Controls and Instrumentation works.
JOB DESCRIPTION :
Development of overall planning, scheduling, controlling and forecasting project procedures to ensure critical milestones and project completion are attained.
Preparation of activity oriented CPM network logic diagram in precedence diagram (PDM) format and bar graphs describing all the significant activities to be accomplished.
Preparation of time oriented integrated EPC bar charts correlating directly with logic networks.
Preparation of resources requirement forecast in the form of a series of graphic displays depicting manpower by discipline and type and in the aggregate, in man-hours of effort, and equipment requirement.
Preparation of periodic reports for efficiency and performance evaluations.
COMPANY : FAFCO (Ltd.) K.S.A
POSITION : Planning & Scheduling Engineer
DURATION : May 2002 to May 2003
CLIENT : Saudi ARAMCO
THE PROJECT BRIEFLY : Contract No. 74052/00
Safety System Replacement at Rabigh Refinery Rabigh, K.S.A.
Contract Cost – US$ 4 Million
The project involves the replacement of existing PLC safety system with state of the art triple modular redundant DCS safety system and EIV vibration monitoring systems complete with new instruments, cabling and accessories to field equipment.
JOB DESCRIPTION :
Development of overall planning, scheduling, controlling and forecasting procedures suitable to project objectives.
Preparation of periodic accomplishment reports to accurately reflect the actual and forecasted work progress including the impact of change orders and amendments.
Preparation of statistical reports and schedule updates to determine slippage in the performance of work relative to the baseline schedule.
COMPANY : FAFCO (Ltd.) K.S.A
POSITION : Planning & Scheduling Engineer
DURATION : Jul. 2001 to May 2002
CLIENT : Saudi ARAMCO
THE PROJECT BRIEFLY : Contract No. 44591/00
Install DCS & Turbine Control System in WIPS Uthmaniyah and Shedgum, K.S.A.
Contract Cost – US$ 3 Million
The project involves the construction of new DCS & turbine control systems complete with trenching, conduits installation, cable tray installations, instrument installation, marshalling cabinet installation, consoles installation and cabling works for five Water Injection Pumps Systems.
JOB DESCRIPTION :
Responsible for the planning, scheduling and control functions of the project covering identification of construction scope of works, preparation of activities network logic diagrams, man-hour allocations and resource inputs to a man-hour weighted schedule using Primavera Project Planner (P3) software program and monitoring of work execution for scheduled completion analysis.
COMPANY : FAFCO (Ltd.) K.S.A
POSITION : Planning & Scheduling Engineer
DURATION : Aug. 2000 to Jun. 2001
CLIENT : Saudi European Petrochemical Co.
THE PROJECT BRIEFLY : Contract No. 103753/00
Ibn Zahr Polypropylene II Plants (PP-II) Project, Al-Jubail, K.S.A.
Contract Cost – US$ 12 Million
The project involves the installation of all Electrical and Instrumentation works to run the 29 systems that comprise the plant. Areas of work include Purification, Reaction Systems, Resin Degassing and Vent Recovery, Pellet Extraction Unit, Product Handling, Utilities, Offsite and Buildings, Common Facilities and Propylene Feed and Storage.
JOB DESCRIPTION
Direct involvement in the preparation of project budget and cost control. Responsible for the overall planning, scheduling and control of project activities to attain target project milestones including preparation of quantity take-off for construction planning and procurement.
Prepared and monitored progress billing for forecasting deviations in contract revenue versus project expenditure.
Coordinated and confer with site supervisors for the periodic activity look ahead.
COMPANY : FAFCO (Ltd.) K.S.A
POSITION : Planning & Scheduling Engineer
DURATION : May 1999 to Jun. 2000
CLIENT : Saudi ARAMCO
THE PROJECT BRIEFLY : Contract No. 44381
Replace Substations 4, 5 & 6 at Safaniyah GOSP-1, Safaniyah, K.S.A.
Contract Cost – US$ 4 Million
The project involves the installation of new facilities for three substations complete with Power and Lighting Systems; Telecommunication systems; 13.8kV M.V. Switchgears; 480V L.V. Switchgears; Motor Control Centers, Uninterrupted Power Supply Systems; Process Interface Buildings for ESD/DCS Systems, Transformer yards; Duct Banks, DCS Data Highways; Field Power and Control Cables; Building Security System; Demolition of old facilities and site asphalt pavement restoration.
JOB DESCRIPTION
Development of planning, scheduling and control functions of the project to ensure coverage of the entire scope of works.
Preparation of man-hours allocations and resource loadings as inputs to the preparations of the project construction schedule using Primavera (P3) software program.
Monitoring project objectives and preparation of periodical progress reports including progress billing.
COMPANY : Asian Construction and Development Corporation Philippines
POSITION : Control (Planning & Scheduling) Engineer
DURATION : Apr. 1997 to Feb. 1999
CLIENT : Bechtel Overseas Corporation
THE PROJECT BRIEFLY:Quezon Power Plants Project , Mauban, Quezon, Philippines
Contract Cost – US$ 23 Million
The project involves the construction of 98 structures for a 440-Megawatt coal-fired power plant to supply electricity to Manila Electric Company. The work package includes 34,000 cubic meters of concrete, 6 steel-framed structures, 14,000 linear meters of mechanical piping, 26,000 linear meters of electrical raceway, 3,000 linear meters of cathodic protection and several thousand square meters of site development.
JOB DESCRIPTION
Development of construction schedule, network logic diagrams, work activities sequencing and resource allocations for the project.
Monitoring periodic progress and evaluation of performance for the overall project management functions.
COMPANY : Al-Owaidah Group, Riyadh-K.S.A.
POSITION : Quantity Surveyor / Estimator
DURATION : Apr. 1994 to Apr. 1997
THE PROJECT BRIEFLY : Al-Owaidah Roads and Buildings Project Al-Waha Palaces and Manfouha Commercial and Residential Buildings.
Contract Cost – US$ 34 Million
The project involved the construction of a five-story commercial complex with gross floor area of 33,000 sq. m.
JOB DESCRIPTION
Responsible for the development of project progress tracking sheets including identification of activities in scope, quantification of various activities for material requisition, resources requirements for time & cost management. Responsible for the preparation of various formats for project reporting including daily, weekly and monthly reports and project quantified progress summary report. Responsible for the monitoring and reporting of cash flows for use in evaluation of accomplishment with respect to time and cost.
COMPANY : GEO-Transport & Construction, Philippines
POSITION : Site Engineer
DURATION : July 1988 to May 1993
CLIENT : Metropolitan Cebu Waterworks System, Inc.
THE PROJECT BRIEFLY: Consolacion Reservoir Project Cebu, Philippines
Contract Cost – US$ 18 Million
The project involves the construction of two 5000 cubic meter water reservoirs and distribution system including 32 pumping stations, 48,000 linear meters of distribution pipes, control buildings, access roads and site development.
JOB DESCRIPTION
Supervision of the construction of pumping stations, concreting and incidental works on a 5000 cum water reservoir including quantity take-off, preparation of construction method statements, material requisitions, daily construction and manpower reports.
Coordination with head office on subcontractor billing and reconcile with client representative on billing quantities
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
B.S. in Civil Engineering (License No. 66746)
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
Computer Programming Application Course
Primavera, MS Project, AutoCAD,
WINDOWS and MS Office (EXCEL,
WORD, ACCESS & POWER POINT)
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
electrician
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
Presently working here in Doha Petroluem Company as a Sr. Planning Engineer.
|
| |
|
|
|
|
|
Cost and Planning Engineer; Estimating, costing, planning and scheduling
CV/Resume ID no.: 76103 |
|
|
|
|
|
|
| Relevant CVs; view more oil and gas CVs |
| 1. PDMS Piping for Oil & Gas Engineering (Offshore, Onshore, EPC Power etc) |
| 2. MATERIAL LOGISTIC ENGINEER |
| 3. Snr Drilling Engineer/Op |
| 4. Sr Pipeline Engineer in oil and Gas field with 13 years Experience |
| 5. Senior Civil Engineer |
| 6. Oil & Gas, Petrochemical, Steel Plants |
| 7. Designing, Planning, Estimation |
| 8. Planner / Project Controller Belleli Energy Oman Tecnimont Chile Turner Townsend India |
| 9. Mechanical, Construction, Maintenanace |
| 10. Fire & Gas Detection System engg. |
| 11. MARINE ENGINEER |
| 12. civil engineer |
| 13. Manager - Construction |
| 14. Project Manager |
| 15. Electrical and instrumentation, Project Engineering, maintenance |
| 16. PLANNING ENGINEER (MECHANICAL) PRIMAVEERA ENTERPRISES, SAP (R3) |
| 17. Project Manager, Site/Construction Manager, Operations Manager, Mechanical Inspector |
| 18. QA/QC Engineer in Oil & Gas sector Onshore, worked in PDO sites executing Pipeline work |
| 19. Planning Engineer in Oil and Gas Field onshore and offshore |
| 20. Chemical Engineer with 5 languages knowledge |
| |
| |
| Other CVs; view more oil and gas CVs |
| 1. Electrician - Rig Electrician |
| 2. HSE Officer |
| 3. QC Engineer |
| 4. Sr PDS Piping Designer, Smartplant Review, Rebis |
| 5. Maintenance fitter with Seaman |
| 6. Master Mariner, Superintendent, currently with Shell LNG |
| 7. BOSIET Advanced Scaffolder (20 years), Offshore Certificated, worker/foreman/supervisor/manager |
| 8. Marine civil engineer / marine work |
| 9. Assistant Export Manager - Exploration, Drilling, Production, Trainee, Entry level |
| 10. Company man, night drilling supervisor, directional driller, HUET – OPITO Cold Water, IWCF Sub-Sea |
| 11. Design Engineer experienced 2 yrs in Machine building automation field |
| 12. Resident Medical Officer, MBBS doctor |
| 13. CNC programmer cum machinist (wire cut edm) |
| 14. HSE Manager, Chevron/Technip Engineering, Lagos Nigeria, Undertake HAZOP studies/reviews |
| 15. Junior PDMS Engineer, ADMIN, DESIGN, PARAGON, SPECON, DRAFT AND ISODRAFT |
| 16. Senior process operator / plant operator |
| 17. IT Administrator with 5+ Years of exp with Customer Service Skills and OnSite Experience |
| 18. Trainee CAD Mechanical Engineer graduate of University of Mumbai India |
| 19. Safety Trainer (Senior Faculty) Retired Junior Warrant Officer of Indian Air Force (Cryptographer) |
| 20. Sr. Learning & Development position, 20 yrs international experience developing & leading training. |
| 21. Electrical & Instrumentation Engineer Oil & Gas Versa Tech Automation Middle East Jebel Ali DubaiUAE |
| 22. Mechanical Technician, Wortex UK Limited Libya, welder looking for work in the oil and gas industry |
| 23. 10 years of India experience in both IT and not IT recruitment, good at Staffing and Outsourcing |
| 24. Plant operator experience of commissioning, precommissioning, start up and shutdown of plant |
| 25. Experienced Member of Administration having +4 years of experience in construction companies |
| 26. Logistics and Supply Chain Officer Oil and Gas India Shiv-vani Oil & Gas Baker Hughes, Schlumberger |
| 27. Second Mate experienced many international merchant vessels handling mainly the bulk / general cargo |
| 28. Heavy equipment mechanic diesel engines, in Horizon Offshore Services Mumbai India |
| 29. Mud Logger APACHE, PETROBEL, ZEITCO in Egypt, AGOCO, WAHA, HAROUGH, OIL INDIA in Libya |
| 30. M.B.A. Graduate from Kurmanchal Institute of Degree India K.I.D.E. Nanital/PTU |
| |
| |
|
|
|