CV Maintenance Planning Engineer
|
|
|
|
|
|
|
| |
| |
| Maintenance Planning Engineer |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in Maintenance Planning Engineer - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
76322
Last Updated:
Wednesday, October 10, 2007 |
Location (Residence): Gwalior, India
Citizenship: India
|
| |
Languages:
Native:
Hindi Other:
English United Kingdom |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
Bachelors in Mechanical Years of Experience:
8 years
|
Authorized to work in:
India
Present Location:
India, Gwalior
Relocation:
Anywhere (International) |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Engineering |
Maintenance |
Experienced
|
3 years |
|
Engineering |
Planning/Scheduling |
Experienced
|
3 years |
|
Engineering |
Facilities |
Experienced
|
2 years |
|
Plant (Refinery, Gas...) |
Refinery Plant |
Experienced
|
2 years |
|
Operations |
Manufacturing |
Experienced
|
2 years |
|
Administration |
Planning |
Experienced
|
5 years |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
Dear Sir / Madam
With ref: to the vacancy in your company ; I am sending herewith my latest Resume for your kind attention.
I have handled both Oil and gas Operations and Maintenance and EPC project assignments handling end-to-end execution of the project including detailed L1/ L2 /L3 schedule and integrated micro planning to ensure timely execution of the project.
I was responsible for all overhaul planning and scheduling activities related to the maintenance contract for the main Oil pipeline Pumping Stations (6), Production Facilities (2), Metering stations (2), and Marine Loading Terminal (1). I have accomplished both EPC and the Oil and gas Operations and Maintenance project assignments through EAM (Asset Management) Oracle based, MAXIMO 4i; CMMS systems and Primavera (P3) and MS Projects scheduling software.
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
Summary of Skills and Experience:
Last worked as Maintenance Planner with Natco DietsMann, Switzerland for their Operation and Maintenance Contract in Agip Oil; Okpai Power Plant Nigeria.
From 3rd Sep'05 – 05th Jan’07 as Maintenance Planner with Petrofac Facilities Management International Aberdeen U.K., for client Greater Nile Petroleum Operating Company (GNPOC), Khartoum, Sudan responsible for all planning activities related to the maintenance contract for the main Oil pipeline Pumping Stations (6), Production Facilities (2), Metering stations (2), and Marine Loading Terminal (1).
Job profile:
o Planning for 70+ Major Overhauls of Allen Diesel, Wartsila, Rolls Royce Bergen, and Cummins Engine Drivers, along with attached Weir Pumps and ABB Generators.
o Prepares short and long term routine maintenance schedules and monitors completion of the work carried out.
o Participates in long term planning of process and offsites and offshore major maintenance. Participates in the preparation and in the issuing of a 5-year work program.
o Defines with Operations, Maintenance and Engineering departments any shutdown work scope. Ensures that all preventive and maintenance, inspection, recertification, repair, overhaul and modifications’ requirements are included in such scope of works.
o Prepares implementation programs using “PERT” planning techniques. The “PERT” program will show clearly critical paths).
o Defines maintenance activities, defining manpower, spare parts and materials, tools and logistic requirements.
o Checks spare parts and materials availability. Issues materials reservations from stock, and prepares purchase requests as requested. Follows up with warehouse and purchasing sections on materials status and delivery in support of Operations.
o Ensures coordination between various divisions, sections and disciplines during overhaul execution, to ensure that all act in harmony for smooth execution of shutdown.
o Supervises and coordinates follow up and administration of spare parts after shutdown work completion, i.e. returning excess spare parts to Warehouse, arranging for reconditioning of some spare parts, write off and scrap used parts which can not be reconditioned.
o Manage CMMS data input for both upstream and down stream Pump Stations.
o Produce workload look heads and planning from CMMS work orders for both Upstream and down stream Maintainable Assets.
o Generate Preventive maintenance and Corrective maintenance Work orders for Hourly, Daily, Weekly, Monthly & Yearly Maintenance activities through CMMS system. Ensure correct and complete closing out of work orders.
o Produce management reporting data viz. Engine Reliability Reports, Key Performance Indicators (KPIs.), Diesel usage, oil consumption, Engine running hrs, Work orders completed etc. as required.
o Assist in the compilation of PMRs & SPs required to populate additional work in CMMS.
From May'2002 - Aug'05 as Planning Engineer (in Refinery) at Reliance Engineering & Associates Pvt. Ltd. (REAL) Jamnagar- Gujarat
Job profile:
o Successfully handling end-to-end execution of the project including detailed L1/ L2 /L3 schedule and integrated micro planning to ensure timely execution of the project.
o Played a key role in Preparation & monitoring of Schedules & 'S' curves- for Construction, Engineering (Design deliverable Schedule), Procurement, Material constraints etc, generating MIS reports (Weekly & fortnightly) through effective planning and rescheduling.
o Projects handled: VMP (Value Maximization Projects) - PRU (Propylene Recovery Unit, Reverse Osmosis Plant, off sites jobs.
o Involved in start up activities for Engineering Projects with detailed planning & scheduling through application of specialized software viz., Primavera (p3) and MS project to ensure completion of project within the time & budgetary parameters and assessment of the requirements.
o Handled end to end execution of project ensuring completion of project at right time, right cost and right quality including, evaluation & implementation of manufacturing layouts, selection, trial & proof out of new tools & machinery, process planning and commencing production.
o Developing & implementing the work schedule & monitoring the progress of the work through 'S' curves as per the Bechtel manhrs. Norms.
o Analyzing schedule, resource & cost data to perform cross-project analysis for prioritizing resource across project and work out schedules for material planning inventory control as per the contractual terms and scheduled completion dates.
o Monitor project progress and generating project progress reports.
From Dec 1999 to April 2002 as Production Planning Engineer- at
Emco Ltd, Thane (Distribution & Special Transformers Manuf. Company).
Job profile:
o Preparation of Production Plan, Delivery status, resource planning, & Coordination with other depts. in Customer's inspection, ISO & other activities.
o All responsibilities of Tanking, assembly, Drying, Vacuum oil filling & Final fitting before despatch. Active part drying in Hot air oven for the required drying time as per the Kv ratings.
o Tanking assembly: Active part tanking, Assembly of HV/LV Bushings, Top lid preparation, oil level gauge, PRV, Thermometer pocket, Drain valve, tap changer fixing, earthing etc. Vacuum Oil filling of complete transformer & offering for testing. All Final fittings viz. Rating plate, Lightening arrestor brackets, stenciling (HV & LV side), Earthing side, Rollers assembly etc. are added & transformer is offered for inspection before despatch.
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
Education:
B.E (Mechanical) from Barkatullah University, Bhopal (M.P.), India in 1999
Professional Training :
Undergone “Power user level training” on EAM Management (Oracle based) and MAXIMO 4i CMMS systems.
Undergone Project Management training program at REAL Jamnagar.
Undergone ISO- 9001:2000 training program at Emco ltd. Thane.
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
Familiar with IBM compatible systems and Microsoft support software,
SAP PM, Primavera (p3) and MS Project, Auto cad-2000 & Windows
applications viz. MS Excel, MSWord and MS PowerPoint.
Sound knowledge of Technical Integrity, CMMS Systems, EDMS Systems, Data Loader, Engineering, Maintenance Strategies. Procedures, Practices and Techniques and hands-on approach to CBM.
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
Competencies/Dimensions:
Adaptability – Maintaining effectiveness when experiencing major changes in work tasks or the work environment
Effectiveness with Others – Establishing rapport and a positive working relationship with individuals within or outside the workgroup.
Managing Priorities – Effectively managing time and resources to ensure that work is completed efficiently.
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
Job Objective:
To accomplish the Oil and gas Operations and Maintenance and EPC project assignments through EAM (Asset Management), MP2; Oracle based, MAXIMO4i, CMMS and Primavera (p3) and MS Project control systems.
|
| |
|
|
|
|
|
Maintenance Planning Engineer
CV/Resume ID no.: 76322 |
|
|
|
|
|
|
| Other CVs; view more oil and gas CVs |
| 1. Safety &Fire Specialist 35 years experience |
| 2. RIGGER / ERECTOR / ANCHOR HANDLER / COXSWAIN |
| 3. Electrical technician |
| 4. Customer Service Executive |
| 5. Roustabout, Rigger, Pipefitter |
| 6. Instrument Technician |
| 7. IT Networking, IT administration, Electronic technichian |
| 8. QC Supervisor (Instrumentation) |
| 9. Drilling Supervisor, Workover Sueprvisor |
| 10. Marine Staff Captain, Relief Master - Safety, Security, Accident Investigation, Training |
| 11. Completion Drilling Engineer / Manager |
| 12. Material Management / Procurement / Inspection / Vendor Development |
| 13. Rig Doctor BOSIET, HUET, AGM and ACLS courses |
| 14. Canadian Interprovincial Welder looking for work |
| 15. Marine Chief Engineer |
| 16. Roustabout seeking offshore work |
| 17. Project Controls Manager |
| 18. CompEx Electrician with 9 years experience including Oil & Gas and off-shore |
| 19. Junior mechanical engineer |
| 20. Camp Manager, Accommodation Manager, Warehouse Coordinator |
| 21. Expert driller BOSIET, Certificate in Drilling I, MARCSTA, Senior First Aid and Cert IV |
| 22. Marine Crewing Officer (Marine Crewing Administrator) |
| 23. Marine Engineer, Indian Navy, Naval Maritime Academy |
| 24. HR Professional, Recruitment Specialist for EPC, Engineering consulting & management firm |
| 25. Directional Drilling Supervisor, Baker Hughes INTEQ, MWD / LWD Field Engineer Sperry Sun |
| 26. Mechanical Engineer Engines, Boiler and IGG Automation and control systems, Purifiers, Compressors |
| 27. AWS QC1-CWI, QUALITY CONTROL ENGINEER POWER BOILER & PRESSURE VESSELS |
| 28. Security Mission Controller, British Army Training Instructor, Section Commander |
| 29. HSE process controller experience in health, safety and environment field |
| 30. MBA Human Resources & Administration Executive working in India |
| |
| |
|
|
|