CV Offshore Pipefitter / Instrument Pipefitter, Wood Group Aberdeen UK
|
|
|
|
|
|
|
| |
| |
| Offshore Pipefitter / Instrument Pipefitter, Wood Group Aberdeen UK |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in Offshore Pipefitter / Instrument Pipefitter, Wood Group Aberdeen UK - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
77927
Last Updated:
Monday, December 15, 2008 |
Location (Residence): MACHEN, United Kingdom
Citizenship: United Kingdom
|
| |
Languages:
Native:
English United Kingdom Other:
None |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
Vocational in Pipefitting Years of Experience:
20 years
|
Authorized to work in:
European Union, UK (in particular), Angola
Present Location:
UK, Caerphilly
Relocation:
Anywhere (International) |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Trades (Skilled) |
Pipefitter |
Expert
|
25 years |
|
Technician Level |
Pipefitting |
Expert
|
25 years |
|
Plant (Refinery, Gas...) |
Refinery Plant |
Expert
|
25 years |
|
Trades (Skilled) |
Welding |
Experienced
|
25 years |
|
Marine (Ship) |
FPSO/FSO/FPU |
Experienced
|
6 years |
|
Marine (Ship) |
Other |
Experienced
|
6 years |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
I am time served, having undergone a four year apprenticeship with Leckwith Engineering Ltd
Can work well as part of a team or on my own
A good Team leader with Supervisory experience
Capable of all aspects of pipe fabrication and installation small and large bore in all metals and plastics, including Mappress, Victaulic, Electofusion, Aquatherm Fusiotherm and many more.
Working from Isometrics & General Arrangement drawings
Experience of working at sea also on petrochem, Power stations, Steel plant and most industrial facilities also expereince on commercial pipework.
Very competent with all aspect of Mechanical Fitting
Capable of Welding to a very high standard and have been coded in the past
Competent Plumber To A high standard in most disiplines
Currently Hold A BOSIET certificate & a current UKOOA Medical Cert for offshore work
Holder of a CCNSG safety Passport
Full UK driver License with no convitions
Full uk Passport
Holder of a current 4 Ton Telehandler license
Holder of a current M E W P license (cherry picker / magic carpet)
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
Offshore Pipefitter / Instrument Pipefitter
Wood Group in Aberdeen (Present employment)
Currently employed by Wood Group, on an ad-hoc basis. Recently onboard BP Lomond during the TAR. My tasks included re-routing of the instrument air lines associated with the control valves on the fuel gas lines due to the renewal and re-routing of the fuel gas lines. I also carried out the destruct and construct of the 6" fuel gas lines. Since I have moved to the Shell Brent Bravo platform.
Offshore Pipefitter
Production Services Network (PSN) in Aberdeen, Scotland UK
April 2008 to June 2008
Employed by Production Services Network (PSN). Since starting back with PSN I have been involved in the CNR Ninian Southern outage. My most recent I was working on the BP Harding TAR. Both these jobs have had tasks involving Graylok, Ring joints and flanged joints, destruct and construct of pipe in various sizes Including instrumentation pipework.
Offshore Instrument Pipefitter / Pipefitter
Caledonian Petroleum Services / Acergy in Congo West Africa
February 2008 to April 2008
I was employed working in the Congo on the FPU Alima. While onboard I was responsible for making up the Instrument pipework to the Umbilicals using Autoclave and Gyroloc fittings and pipe. I found this job very enjoyable and look forward to a simslar challenge soon.
Offshore Inst P/fitter ,Pipeline Process Test Ops
HALLIBURTON (PPS) in Angola (Luanda) (Present employment)
While Offshore in Angola onboard the FPSO MONDO for Halliburton I was involved in a variety of tasks including,manufacture and installation of all instrument piping connections to the umbilical head using 3/8" 1/2" and 1" Autoclave and Swagelok. I was also involed In the fitting of the Pig reciever to the flowlines, also the flooding of the lines and monitoring the lines till the point of recieving the Pig.I was also Involved in the high pressure testing (upto 780 bar),set up of test equipment and monitoring of the umbilical during the test periods as per the procedure. I am at present on board FPSO GREATER PLUTONIO in Block 18 Angola carrying out Instrument piping mods, testing and flushing of the subsea umbilicals.
Offshore Pipefitter
Production Services Network -PSN in Aberdeen
June 2007 to October 2007
Worked Offshore for PSN as a Pipefitter & Instrement Pipefitter onboard the BP Cleeton, BP Andrew, Ensco 92 and the BP West Soul Alpha Rejuvenation project. While on these platforms I have been involved in various tasks including the installation of Swagelok Instumentation pipework through to the larger diameter pipe with bolted flanges, Ring type joints and Grayloks.I was also involved in the Torqueing up joints.
Offshore Pipefitter
Derrick Services Limited in Great Yarmouth
May 2007 to June 2007
fitting of pipework related to Driller upgrade. Also various general fabrication. Aboard the Forties Alpha.
Offshore pipefitter
Amec / Global in Aberdeen
September 2006 to April 2007
Working offshore 2 on 2 off on the Britania Britsats project for Amec fitting a large variety of pipework,including welded and bolted pipework of all sizes.
Offshore Pipefitter
Production Services Network in Aberdeen
July 2006 to September 2006
Involved with the fitting of production water re-injection pipework,various sizes upto 24" Bolted flanges and Graylock joints. On the Tallisman Claymore offshore installation.
Offshore Pipefitter
CDS Oil & Gas Services Ltd in Hull (Present employment)
Currently working on Centricas 43/7 B offshore installation in the Rough field North sea. Carrying out reinstatment / repair of pipe work after a major gas explosion. Working a 2 on 2 off rota.
Offshore Instrument Pipefitter
CLS Offshore LTD in Great Yarmouth
April 2006 to May 2006
Working on Tullow Oils SCHOONER platform in the sothern sector of the north sea. The scope of work included installing the new flow line and all associated tungum instrument pipework to the Xmas tree as a result of a new well being drilled.
Pipefitter / Plumber
MAC Engineering UK LTD in Swindon
January 2006 to March 2006
While working in Swindon on a learning campus project where Laing O'rourke were building 5 schools. I covered all aspects of commercial piping, including Aquatherm Fusionweld and copper amongst others. work scope included heatind pipework and Plant / Boiler rooms.
Pipefitter / Plumber
Crownhouse Technologies (laing o'rourke) in Ascot Racecourse
October 2005 to January 2006
Worked at Ascot Racecourse during the 200 million pound refurbishment. While there Iwas involved in all aspencts of pipe work from copper to Stainless Steel using all disciplines includingMappress, Victaulic, welded, plastic Elecrofusion Etc. I was involved in all areas including Boiler and plant rooms also riser modules between floors.
Pipefitter
Power Units 1953 LTD in Port Talbot , Wales
September 2005 to October 2005
BOS Plant shutdown at CORUS Port Talbot. Main duties included fabrication and fitting of air and nitreogen pipe work using socket weld fittings.I also carried out the welding and fabricated the pipe supports.
Pipefitter
AMEC in Port Talbot
August 2005 to September 2005
Cold Rolling Mill shutdown at CORUS Port Talbot. Main duties Included the renewal of all hydraulic components on various parts of the mill.
Pipefitter
Power Units 1953 LTD in Port Talbot , Wales
July 2005 to August 2005
Hot Mill shutdown and Reheat Furnace rebuild at CORUS Port Talbot. Main duties included work shop and onsite fabrication of pipework for the furnace rebuild.
Mechanical Technican
Pipework Mechanical Construction Ltd in Barry , Wales
June 2005 to August 2005
CELSA Steels Cardiff , shutdown on re heat furnace. Main duties included the Removal, repair and refurbishment of a number of air operated rams and a large amount of small bore instrumentation pipe work.
Pipefitter / Fabricator Welder
Power Units 1953 Ltd in Port Talbot
May 2005 to July 2005
BOS Plant shutdown at CORUS Port Talbot. Main duties included Fabrication of Nitrogen Air and Water Pipe work both welded and screwed.
Pipefitter
Jenkins And Davies in PemBroke Dock
April 2005 to May 2005
Working at the Total oil Refinery at Milford Haven. while working on the turnaround my main duties included carrying out repairs to steam lines and then the Hydrastatic pressure testing once repaired.
Pipefitter Foreman
Aztec Mechanical services Ltd in Cardiff , Wales
January 2005 to April 2005
While with Aztec as a pipefitter Foreman I worked at various sites around the country including sub contracting to TEI on the ESSO Fawley turnaround where I was involved in removing the boiler skin casing and fitting new.
Pipefitter
Vinci Services (Norwest Holst) in Port Talbot
November 2004 to January 2005
While with Vinci I was involved in fabricating new pipe work for the new continuous caster project at CORUS Port Talbot.
Pipefitter foreman
Tema Engineering Ltd in Cardiff , Wales
May 2004 to November 2004
While at Tema I worked on a number of sites including Amersham Int, RF Brookes to name but a few although most of my time was involved with the fitting of a new glass press at NEG Cardiff. At NEG I supervising the Pipe fitters while fabricating all the associated pie on the press. The pipe was Hydraulic, Air, water and instrumentation.
Pipe fitter
LME UK Ltd in Dow Corning , Barry
June 2003 to May 2004
Most of my time with LME was spent at their workshop on Dow Cornings Barry site. While there I was involved in Fabricating a large amount of pipe in both C/S and ST/ST, I was also involved in fitting the pipe during a number of shutdowns.
Chargehand Pipefitter
Leckwith Engineering Ltd in Barry, Wales
February 2002 to December 2001
While at leckwith I worked on Dow Corning Barry But mainly on the Baglan Bay Energy Park fabricating mainly 24" pipe in st/st and c/s.
Process Operator
Cray Valley Ltd (Total) in Machen , Caerphilly
January 2002 to June 2003
AT Cray Valley I decided to make a career change due to the closeness to my home coupled with excellent pay and hours. While there I became an operator and gained the knowledge of how to run the part of plant that I was involved with. This gave me a better insight into manufacturing processes. Unfortunately 18 months later the plant was closed permanently.
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
Bedwas High School in Caerphilly
September 1982 to October 1988
Ystrad Mynach College in Wales
September 1988 to June 1992
Ystrad Mynach College in Wales
October 1988 to June 1992
Diver Center in Carribean
September 1998 to September 1998
Industrial Training Services Ltd in Cardiff Wales
May 2002 to May 2002
Fujikura Training Centre in Westbury , Wilts
February 2003 to March 2003
Barry Training Center in Barry Wales
December 2004 to December 2004
Humberside Offshore Training Association in Hull
September 2005 to September 2005
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
I am very good with all aspects of computing.
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
GCSE CDT: DESIGN AND REALISATION B
GCSE MATHS C
GCSE GEOGRAPHY C
GCSE BUSSINESS STUDIES C
GCSE CDT: DESICN AND COMMUNICATION D
GCSE ENGLISH D
GCSE BIOLOGY E
City & Guilds Oxy Acetylene Welding Credit
City & Guilds Mechanised Welding Credit
City & Guilds Fabrication Welding Inspection and Quality Control Pass
City & Guilds Basic Fabrication and Welding Technology Credit
City & Guilds Manual Metal Arc Welding Credit
City & Guilds Metal Arc Gas Shielded Welding Credit
City & Guilds Welding Technology Distinction
City & Guilds Tungsten Arc Gas Shielded Welding Distinction
City & Guilds Resistance Welding Distinction
City & Guilds General Fabrication and Welding Technology Pass
City & Guilds Basic Engineering Technology Pass
City & Guilds Basic Mechanical Production Technology Pass*
City & Guilds Welding Practical Qualifying Tasks Pass*
PADI Advanced Open Water Diver Pass
RTITB Counter Balance Fork Truck Operator License Pass
City & Guilds Single Mode Fibre Written Distinction
City & Guilds Copper Communication Cable Written Distinction
City & Guilds Multimode Fibre Written Distinction
City & Guilds Multimode Fibre Practcal Pass*
Fujikura Active Equipment Design & Installation Pass*
Fujikura Copper Fibre Design Installation & Testing Pass*
Fujikura OTDR Test & Measurment Pass*
City & Guilds Copper Comunication Cable Practical Pass*
City & Guilds Single Mode Fibre Practical Pass*
CCNSG Safety Passport Pass
BOSIET Basic Offshore Safety Induction Emergency Training Pass
BOSIET EBS Training (Rebreather) Pass
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
Date of Birth:
23rdOctober 1971
Status
Married
|
| |
|
|
|
|
|
Offshore Pipefitter / Instrument Pipefitter, Wood Group Aberdeen UK
CV/Resume ID no.: 77927 |
|
|
|
|
|
|
| Other CVs; view more oil and gas CVs |
| 1. RIGGER/ROUSTABOUT (OFFSHORE) |
| 2. hardware and system operator |
| 3. Supervisor Instrument Specialist |
| 4. Financial Advisor @ JPMorgan Chase Investment Services |
| 5. Senior Purchase, Buyer, Cost Controller, Cost Analysis (11 years +) in Oil & Gas |
| 6. Entry Level Employee |
| 7. Superintendent Instrumentation and Calibration |
| 8. Marian PDS Administrator / PDS spec writer / PDS coordinator |
| 9. USCG Master Oceans Unlimited |
| 10. HSE ADVISOR STATOILHYDRO COMPANY |
| 11. Multi-coded Welder |
| 12. CRANE OPERATOR - NEW CENTURY FAB |
| 13. Medic / Chef / Gourmet Cook / Nurse / Trainer/Secretary/Logistics co-ordinator |
| 14. Construction Crane (Liebherr) / Fork lift/Loader |
| 15. Seeking job on offshore oil rig in Norway |
| 16. Sales Assistant Aberdeen, Scotland UK |
| 17. Health, Safety and Environmental Officer, Consolidated Contractors Company Oman Onshore & Offshore |
| 18. QA/QC Inspector Insulation, RasGas & CTJV certification |
| 19. Junior Seismic Navigator, Schlumberger-WesternGeco, Production Officer in Philips India |
| 20. Materials Controller / Material Coordinator / Warehouseman |
| 21. Piping and Layout Design Engineer, Aker Solutions AS at Bergen in Norway |
| 22. Experienced scaffolder fully trained with tube and fitting, kwik stage, haki, layher, cup lock |
| 23. Oil entry engineer with internship in Pakistan Attock Oil Refinery Morgah, Rawalpindi |
| 24. PDMS Navisworks piping designer, experience in projects Power Plants, Oil & Gas and Chemical Plants |
| 25. Hydrographic Surveyor, Inspector, Project Management, Construction Oversight, Consultant, Diver, ROV |
| 26. Senior I & C Engineer, Nuclear Reactors and Nuclear Power Plants instrumentation experience |
| 27. Seaman with CDC (seaman book) onboard Container Ship with Turkish Company Furtrans |
| 28. Piping design engineer Samsung Engineering Al Khobar Saudi Arabia DURR India ASE Design Soft Ltd |
| 29. Graduate Electronics Engineer Pakistan Air Force Karachi Institute of Economics |
| 30. Network Administrator / IT Systems Engineer Analyst in Saudi Aramco Al-Khobar Saudi Arabia |
| |
| |
|
|
|