| PDS Piping Designer |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in PDS Piping Designer - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
78233
Last Updated:
Sunday, June 29, 2008 |
Location (Residence): calgary, Canada
Citizenship: India
|
| |
Languages:
Native:
Hindi, Marathi Other:
English |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
Vocational in mechanical draftsman Years of Experience:
16 years
|
Authorized to work in:
India
Present Location:
Canada, Calgary
Relocation:
European Union, UK (in particular), United States, Australia, Hong Kong, Singapore, Thailand, United States |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Design/Software |
PDMS/PDS |
Experienced
|
15 years |
|
Design/Software |
Piping |
Experienced
|
15 years |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
Summary of Experience: 14 years experience of Design & Drafting of Plant Layouts & Piping system for Projects of Well pads, Chemical, Petrochemical, Refinery, Captive Power Plant, Combine Cycle Power Plant and Nuclear Power Plant.
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
Design Engineering: Detailed 3D engineering modeling of Piping & Equipment in Plant Design System (PDS), Stress & Fabrication Isometric Extraction from PDS, Design review of PDS 3D Models in Smart Plant Review (SPR) & NavisWorks, Checking & Extraction of Piping GA using Orthogen, Checking Clash report, Support error report & Segment Data Report. Squad checks of structural & Mechanical drawing. Preparation of Plot Plans, Equipment Layout, Piping General Arrangement, Pipe rack Layouts, Stress critical Isometric for IBR approval, Construction Isometrics, Pipe supports, Nozzle Orientations, Material take off (MTO), As Built Drawings.
Professional Experience:
1 Colt WorleyParsons, Calgary, Canada: from Apr. 2007 to Till Date
Job Responsibilities:
Working as PDS Piping Designer to execute the job. My responsibilities include design & development of piping layout, piping 3D modeling, & PDS Isometric. Worked as a Checker for Debottlenecking project my responsiblities checking Equipment & Piping Isometrics.
Projects Working on:
Nexen, Inc.
Long lake South phase 1 Debottlenecking Project
Long Lake Commercial SAGD, Sustaining Capital (Well Pad 9111) Project
1 Petrofac Engineering India Pvt. Ltd. Mumbai: from Aug. 2005 to Till Date
Job Responsibilities:
Working as design area lead for Sulphur Degassing Pit & Sulphur condenser area. (An area with 1200 Isometrics). I led a team of four designers to execute the job. My responsibilities include design & development of piping layout, piping 3D modeling according to jacketed piping requirement, Equipment modeling Stress & Fabrication Isometric Extraction from PDS, checking Piping GA drawing, Pipe Support, Interface checking. Also worked as area designer for Gas processing unit.
Projects Working on:
AGIP Kazakhstan North Caspian Operating Company
Kashagan Development Experimental Project
Gas Processing Unit Piperack G-01-02, Electrical Substation, AHU (HVAC) unit.
Sulphur Plant Sulphur Degassing Pit & 90% model review preparation & Completion.
1 Fluor Daniel India Pvt. Ltd. New Delhi: from Oct. 2004 to Aug. 2005
Job Responsibilities:
Worked as design area lead for Utilities & Offsite area (An area with 1500 isometrics). I led a team of seven designers to execute the job, also worked as area designer for OrCrude area. My responsibilities include design & development of piping layout, Piping modeling, Equipment modeling, according to modular concept, which includes Pipe rack. Stress & Fabrication Isometric Extraction from PDS & Annotation. Design review of PDS 3D Models in Smart Plant Review (SPR), Pipe Support, Interface checking, Clash report, Support error report, Segment Data Report & Squad checks of structural & Mechanical Vendor drawings. Extraction off Piping GA using Orthogen.
Projects Working on:
Opti Canada, Inc. Long Lake Upgrader Project, Fort McMurray, Alberta, Canada
Main Inter Connecting Pipe rack, ASU pipe rack, Flare Area, Heater Area
1 Technip Abu Dhabi. UAE: from March 2004 to Sep 2004
Job Responsibilities:
Worked as Designer with a team of designers & Engineers carrying out detailed designing of Refinery plant. My activity includes Study Piping, Detailed 3D engineering modeling of Piping & Equipment in Plant Design System (PDS), Stress & Fabrication Isometric Extraction from PDS, Design review of PDS 3D Models in Smart Plant Review (SPR), Pipe Support, Interface checking, Segment Data Report & Inter Discipline check of structural & Mechanical drawings.
Projects Working on:
ADCO, NEB Project, (North East Bab Development Phase I)
Abu Dhabi, UAE
1 Fluor Daniel India Pvt. Ltd. New Delhi: from Dec.2000 to March 2004
Job Responsibilities:
Worked as a Designer with a team of designers & Engineers carrying out detailed designing of Refinery plant. My activity includes Study Piping, Detailed 3D engineering modeling of Piping & Equipment in Plant Design System (PDS), Stress & Fabrication Isometric Extraction from PDS & Annotation, Design review of PDS 3D Models in Smart Plant Review (SPR), Pipe Support, Interface checking, Clash report, Support error report, Segment Data Report & Squad checks of structural & Mechanical Vendor drawings.
Projects Working on:
Sunoco, Inc. Low Sulfur Gasoline Project,
Marcus Hook, Philadelphia, Toledo, US.
Scanfining Reactor, Effluent Exchangers.
Sasol Chemical Industries, SCI Project
Sasol one Conversion to Natural Gas. Sasolburg, South Africa
Deputed to Fluor South Africa for Design work on SCI project.
Centrifugal Compressor, Second stage gas Preheater & steam Superheater
Sinclair Oil Corp, Clean Fuel Project, Tulsa, Oklahoma
Reactor Feed Furnace System (Vertical Cylinder Fired Heater), Recycle Gas Compressor System (Centrifugal Compressor).
Exxon Mobil, Low Sulfur Mogas Project, Bayton, US.
Splitter Reboiler System (Cabin Fired Heater), Stabilizer Reboiler system (Vertical Cylinder Fired Heater), Recycle Gas Compressor System & Sour Gas Compressor System (Centrifugal Compressor).
Syncrude, UE-1 Project, Fort McMurray, Alberta, Canada
Pipe Rack
Fichtner Consulting Engineers (I) Pvt. Ltd. (Navi Mumbai): March 1997 to
Dec.2000
Job Responsibilities:
Worked as a Sr. Draftsperson with a team of Draftsman & Engineers carrying out detailed designing & Drafting of Power Plants. My activity includes preparing of Piping GA, Stress Analysis Isometric for IBR Approval, Construction Isometric, As Built Drawings, Material Take Off, and Support Drawings.
Projects Worked on:
Meghana Energy, Bangladesh (11 MW Gas based Power Plant)
Work share project with Rolce Royce Power Ventura, (RRPV), Singapore
Konark Met Coke India Ltd. (MECON India) Orisa, India
(56 MW Combine Cycle Co-Gen. Plant)
Cabot India Ltd. Thane Belapur Plant, India
(Debottelnecking of Carcass Unit.)
Arvind Mills Ltd. (Combine Cycle Co-Gen. Plant)
(Naroda 2 x 28 MW & Santej 2 x 30 MW), India
Work share with EPC contractor Thermax Ltd., Pune
1 Development Consultants Ltd. Vashi (Navi Mumbai): From May 1994 to March 1997
Job Responsibilities:
Worked as a Draftsman with a team of Draftsman & Engineers carrying out detailed designing & Drafting of Power Plants. My activity includes preparing of Piping GA, Stress Analysis Isometric for IBR Approval, Construction Isometric, Material Take Off, and Support Drawings.
Projects Worked on:
Gujrat Alkalies & Chemicals Ltd. (GACL) Dahej, India
(90 MW Captive Combine Cycle Co-Gen. Steam & Power Plant)
Jain Irrigation Ltd. Jalgaon, India
Jain Chiquta Foods Pvt. Ltd. (Fruit Processing Plant)
Nuclear Power Corporation of India
(Rajasthan Atomic Power Project 2x235 MW)
(Kaiga Atomic Power Project 2 x 235 MW)
1 Satguru Enterprises, Dombivali: from Oct. 1993 to May 1994
(Satguru Enterprises is Contractor Company of Kvaerner Power Gas India Ltd.)
Job Responsibilities:
Worked as a Draftsman with a team of Draftsman carrying out detailed designing & Drafting of Chemical, Petrochemical & Refinery Plants. My activity includes preparing of Stress Analysis Isometric for IBR Approval, Construction Isometric, Nozzle Orientation, Material Take Off, and Support Drawings.
Projects Worked on:
Manglore Refinery & Petrochemicals Ltd. Manglore, India
National Peroxide Ltd. Mohane Thane, India
(Hydrogen generation Plant)
1 National Organic & Chemical Industries Ltd. Thane: From Sep 1992 to Sep 1993
Job Responsibilities:
Worked as a Trainee Draftsman. My work activity were to draft Construction Isometrics, As Built of Fire Fighting system, In NOCIL I had gone through extensive training & hard worked in different Plants e.g. Plant Machine Shop, Maintenance Dept. & Drawing Office.
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
1 Education Qualification :
1) Passed S.S.C. exam. Held in March 1990, by securing 61% marks (1st Class).
1 Professional Qualification :
Passed I.T.I. Mechanical Draftsman Diploma exam. Held in Aug. 1992, by securing 70% marks (1st Class).
Passed NCVT’s Mechanical Draftsman Diploma exam. Held in Dec. 1993, by securing 69% marks (1st Class).
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
: Computer Knowledge :
PDS (Plant Design System version 07.01.00.10)
SPR (Smart Plant Review version 04.02.01.14), NavisWorks
Microstation SE & J
Auto CAD Release 14 & 2000
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
n/a
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
no
|
| |
|