Home  Register  Jobs  CVs  Job Search  Worldwide  Process  Help  Search  Scams  JA  B  C
Oil Offshore Marine Careers in Onshore and Offshore Drilling Energy Industry Oil Offshore Marine: Oil & Gas Jobs & CVs Online recruitment services (job vacancies, resume/cv database search) for Oil Industry, Energy, Offshore, Petroleum, Engineering, Construction, Drilling, Subsea, Marine, Shipbuilding, Shipping, Petrochemical. Have your own FREE account! free cv upload registration on Oil-Offshore-Marine.com recruiter benefits: free job postings and cv search on Oil-Offshore-Marine.com
  Need to find something?
 
 Username:  
 Password:  
Oil Offshore Marine Register
 
  Remember my password?  
 Recruiters - Employers & Agencies
  Advertise / Contact Us
free cv upload for all job seekers, free access to oil and gas jobs
subscribe to oil careers alerts, oil jobs postings, drilling rig jobs, engineering jobs

 

CV EPCM experienced (10 years +) in oil & Gas, IT and Telecomunication

 
EPCM experienced (10 years +) in oil & Gas, IT and Telecomunication

Resume built for oil and gas job opportunities by a jobseeker with experience in EPCM experienced (10 years +) in oil & Gas, IT and Telecomunication - would you like to offer this candidate a job/contract employment?

Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database

CV/Resume ID no.: 78413

Location (Residence): Bekasi - Cibitung, Indonesia
Citizenship: Indonesia
 
Languages:
  Native: Indonesian
  Other: Arabic Saudi Arabia, English United States
 
Education & Experience: Work Authorization & Relocation:
Education:
  Bachelors in Finance Banking

Years of Experience: 20 years
Authorized to work in:
   Indonesia
Present Location:
   Indonesia, Jakarta
Relocation:
   Algeria, Azerbaijan, Bahrain, Iraq, Kazakhstan, Kuwait, Kyrgyzstan, Libyan Arab Jama., Niger, Nigeria, Oman, Qatar, Saudi Arabia, Suriname, Thailand, Tunisia, United Arab Emirates, Vietnam
 
Expertise
Category Subcategory Ability Experience
Engineering Civil Experienced 26 years
Engineering Construction (Topsides) Experienced 26 years
IT/Communications Communications Experienced 26 years
Administration Document Control Expert 28 years
Administration Contracts Expert 28 years
Administration Project Control Expert 26 years
 
CV/Resume Details
 
1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory]

Please, help you analyze my cv document to apply which on the market through/ passing oil-offshore-marine dotcom.

My cv Document on your inbox. So that its easier when you are download my cv data

For can be considered my application this, I render thanks.

2. Work Experience - CV/Resume Part 2 [Mandatory]

Sept 2006 - Present Indonesian Cooperation Professional Engineer
(Koperasi Persatuan Insinyur Professional Indonesia) or KEPIPI


Project Manager EPCM and turn-key ADSL Telkom Internet Dec 28, 2007 - July 5, 2008:

PT Telkom to increase ability of than technology network by utilizing ADSL in each central telecom of at Divre II with the amount 160 central. Where to can to anticipate the usage of TV of cable and TV Conference which interactive till to sales transaction which interactive.

My responsibility

As project manger have to can unite three business clients from Alcatel, Siemens and HU WAEI to can cooperate in finishing this project problem punctually

Active discuses with the giver of fund of Citty-Bank Jakarta defraying this project financing equal to US$ 400 million and have to can give the progress report this project solution

Mobilization of all telecommunications engineer, network engineer, instrumentation engineer to can work the location as much 160 central of telecom.

Compiling schedule work, monitoring project budget, comprehending contract and contract the this project solution

Active discuses with all PT Telkom as Owner and stack holder with the whole entire/all officer of staff Telkom. Have to earn also finish the problem arising out of outside especial work area. Especially problem of is non technical of like wrong central location, bureaucracy of functionary Telkom, and also communicate well with entire/all and whole project coat

Because its packet a lot of so that have to be required by handling in its coordination is complicated enough field

Active discuses with the whole all engineer field from Alcatel, Siemens And HU WAEI of about problem, DSLAM, ATM Switch E1, BRAS 5200-8 G, and RADIUS

Manager of Project of goods Levying for the Asia Petroleum Development, Jan 20,2007 - Feb 20, 2008 :

Preparation and delivery materials pipe:
1. Alloy steel (Cr-Mo) ASTM A182-F22 clad w/alloy 625, Stainless steel (duplex) 22/25 Cr, Manual and actuated Ball valves, Sizes from 1" ~ 14", 1500# rating, reduce/full bore, end connections SW, RF, RTJ total quantity approximately 28 units.

2. Carbon steel ASTM A105, ASTMA 105N, ASTM A216-WCB, ASTM A105N or ASTM A350LF2, Manual and actuated Ball valves, Sizes from 1" ~ 14", 150 - 1500# rating, reduce/full bore, end connections SW, RF, RTJ total quantity approximately 31 units.

3. Casing 7" OD, 26 PPF, L-80/N-80, BTC, R3 SMLS, API 5CT (300 million ton)


Job scope project:
1. Have the character of the goods levying directly and the goods ushered at receiving location in Glagah Kambuna field.

2. The bid have the character of opened and announced in newspaper news.


3. KEPIPI by ASIA Petroleum Development own the relation which very well in facet contract the management of where in payment for the levying of this goods all supplier goods ready to provide the goods directly to KEPIPI and KEPIPI will be given by advantage of equal to 6% from totalizeing goods levying.

Responsibility at this project

1. Asking for support letter fully from factory of pipe of Hyundai Engineering in pipe levying

2. Compiling document bid for the supply of than this bid goods levying

3. Compiling document of letter of travel or bill of lading from factory of pipe steel so that acceptable goods at receiving location Glagah Kambuna

4. Compiling invoice to ASIA Petroleum Development

Manager of Project of goods Levying for the VICO Indonesia, Dec 20,2007 - Jan 20, 2008 :

Goods levying for the Drilling of at VICO Indonesia with the detail :

1. 1500 JT Pipe 6" SEAMLESS/ERW SCH. 80 0.432" WT, BE, API 5L, GR B DRL, Fusion Bonded Epoxy Coating with the heavy amount 2,5 million ton.

2. 2500 JT Pipe 6" SEAMLESS/ERW SCH. 80, 0.432 WT, BE, API 5L, GR, B DRL, 3 Layer Painting with the heavy amount 2,5 million ton

3. Wet cement 125 million ton.

Job scope project:
4. Have the character of the goods levying directly and the goods ushered at receiving location in Kalimantan East in Saliki Doc.

5. The bid have the character of opened and announced [in] newspaper news.


6. KEPIPI by VICO own the relation which very well in facet contract the management of where in payment for the levying of this goods all supplier goods ready to provide the goods directly to KEPIPI and KEPIPI will be given by advantage of equal to 6% from totalizeing goods levying.

Responsibility at this project

5. Asking for support letter fully from factory of pipe of Krakatau Steel and from factory cement the Kujang in pipe levying and cement with the amount which big so

6. Compiling document bid for the supply of than this bid goods levying

7. Compiling document of letter of travel or bill of lading from factory of pipe of Krakatau Steel and factory cement the Kujang of so that acceptable goods at receiving location Kalimantan East

8. Compiling invoice to Vico

Manager of Project EPCM and Turn-key for Central Telkom August 2, 2007 - January 15, 2008

Arranging to repeat the space PCM at Central of Telkom in 160 location area and also provide and install the following equipments.

72 unit Router Cisco 7609-S Chassis and Router Cisco 7609 (for nine Central Telecom for Co-Location rooms)
60 unit Router Cisco 7606-S Chasis and Router Cisco 7606 (for nine Central Telecom for Co-Location rooms)
40 unit Router Cisco 7604 (for nine Central Telecom for Co-Location rooms)
72 unit Cisco Catalyst 6509-LORA (for nine Central Telecom for Co-Location rooms)
72 unit Cisco Catalyst 6504 (for nine Central Telecom for Co-Location rooms)
16 unit Router Cisco 7613 (for support nine hundred sixty Central Telecom for Void)
640 units Cisco Router 3845 (for nine hundred sixty Central Telecom for VoIP)
640 Unit Cisco Universal Gateway (for nine hundred sixty Central Telecom for VoIP)
28 Unit Cisco Catalyst 4510 (for nine hundred sixty Central Telecom for VoIP)
28 Unit Cisco Catalyst 4506 (for nine hundred sixty Central Telecom for VoIP)
28 Unit Cisco Catalyst 4503: (for nine hundred sixty Central Telecom for VoIP)
160 Unit IBM server + External hardisk SAS 9 x 76 GB (for billing server)
48 unit Cisco MDS 9509 Multilayer Director (for support billing server)
48 unit Cisco MDS 9506 Multilayer Director (for support billing server)
80 unit Juniper SSG 320M or 350M (for firewall network)
48 unit Cisco Infinite Band Server 7024 + Cisco SFS 7024D InfiniBand Server Switches (for support billing server)
10 unit Cisco Catalyst 4948 + 10 GE (for support billing server)
Rack cabinet under specification 45U Closed Rack (19" closed rack 45U depth 900mm + glass front door + back metal door, incl: 1 unit Roof Fan Panel 2 Fan, 50 unit Cage Nut + M6 Screw, 1 unit Vertical Power Distribution Panel 12 Outlets)
Responsibility in this project
1. Together Cisco Indonesia and IBM Indonesia where KEPIPI as consultant leader to be able to work along in finishing this project

2. Seeing how the land lies in each; every Central which have in showing by Telkom to place equipments of Cisco Router and also Cisco catalyst together with Cisco Engineer, IBM Engineer and Telkom people

3. Drawing up form contract and budget and administration of is project of this work. We are to consultant showed by Telkom must also earn to look for defrayal of is project of and also look for way out for the permit of defrayal of the credit

4. Calculating the credit analysis actively together with Telkom in Payback Period analysis, NPV and IRR. Where this financing of Telkom have also out for try to pass capital market but less so succeed its fund Hence selected by way of passing money market in its defrayal. Capital composition 25% coming from capital alone and 75% representing defrayal capital from bank credit

5. Searching and for the defrayal of the project of this with Bank Mandiri and Bank of Tokyo as creditor syndication of is project of. This financing amount to American 200 - 275 million dollars with duration during 8 year. And also give good name guarantee than KEPIPI, Cisco Indonesia and IBM Indonesia to be able to can finish problems of is project of this swiftly

6. Together with PT Telkom actively do simulation monetize foreign where the rate have to have value which remain to there may not be any change distortion assess rate. Here to anticipating him/ it must be done hedging

7. Providing equipments to be Central of Telecom as much 160 unit and also arrange to redo the Central space of Telecom especially space PCM. Where this space PCM represent as place to put the equipments from all client Telkom this one joint the communications channel from customer/ client vendor to a receiving location by way of through two central of proximate telephone

8. Arranging raised floor and air cooler of where so that all equipments can be made cool by in order that the equipments operation ambulatory better

9. Mobilization and arrange all client work from Cisco and IBM to earn the active-together better so that can finish this project punctually

10. Changing computer equipments to be weared by as billing therewith software ORACLE. Installing equipments Firewall from Junipher and also equipments supporting Cisco Infinite of Band Server

11. Router attached have to can anticipate in communications OC3 /STM -1 and also have to can conduct of communicate VoIP usher central

BP Migas Consultants August 2, 2007 – October 5, 2007:

Compiler BP Migas tender consultant to develop; build Data Room IT, CCTV OR SPEEDDOMES and unite entire/all equipments existing CCTV OR SPEEDDOMES in all foreign contractor area of Pertamina ( Oil Company and Gas State Indonesia):

Especial target than this work

1. Compiling TOR of is project of CCTV OR SPEEDDOMES having the character of turn-key and budget its

2. Compiling schedule time management and scenario of is solving of project

3. Requirement equipments any kind of needed by BP Migas to execute the project of this work. Considering at the moment BP Migas represent regulator machine to be is industrial of oil and gas in Indonesia

4. BP Migas wish can control each; every activity of oil and gas in all Indonesia region

Responsibilities:

As Leader Proposal Document must also partake to participate actively in each time configuration plan and discussion each; every existing equipments and also evaluate all equipments of DVR exist in site remote and also locations which is scatter in each; every spread over area angle in all Indonesia

Hold responsible full of also in its participation actively in determining the way communications among site remote with BP MIGAS office in Jakarta where that picture displaying may not have the character of to be broken to break or broken. Here is it true needed by knowledge of IP and VPN which complicated enough and also in each; every bandwidth is even if provided by big enough quota is we have to earn to calculate carefully and requirement of bandwidth which in fact

Chosing correct technologies where from BP Migas user also besides can monitor activity their entire Pertamina contractor also have to earn to conduct meeting. Meeting without having to walk to site remote or head office center delegation of each oil but is enough kept quiet by at their seat of each office and each other via and look in the face fully without loss of time on the way and trapped in traffic jam in this Jakarta town.

BP Migas still ask addition have to earn to communicate by VoIP with area remote by link between two PABX from BP Migas office with office all foreign contractor of Pertamina exist in Jakarta with in area remote have to also can walk better

Design room control IT and the complicated communications process by 2 CAD operator people of is including Diagram line single. This Activity entangling many IT Engineer, System Engineer and Instrument Engineer. From starting to plan room control IT equipments, operator room till location entire/all equipments. Total of document which is released in B3 size measure counted 160 document and page; yard in A0 size measure counted 42 page; yard in the form of plotter printing; mould and letterpress jet propulsion laser. Where will be able to be made as tender document guide reference to compile the specification of labor and equipments and also expense from [all] contractor wanting to got mixed up with this work

Actively participate to accept opinion input from all Nohmi Bosai consultants, Libert, Cisco South-East Asia - Indonesia, Merlin Gerin which can be embraced in the form of specification of the product along with its brochure to be able to wear or utilized as technical elementary reference which is full detail. And when work tender started by they earn as contractor worker or earn also as equipments goods supplier at BP Migas.

Design fully modify software from result of FAP panel output to be able to be made by trigger at alarm panel and also modify print finger base IP software to be can wear flexibility as according to and requirement request of user.. Software in its scheme is weared is Visual Basic And database utilize Microsoft SQL. This Work entangles 2 IT programmers’ people.

Decoder CCTV OR SPEEDDOMES signal Encoder needed by engineer system counted 4 one who ready to in Jakarta where their qualification understand of VLAN Cisco Catalyst, IP TCP / Router IP and server administrator system. And last 4 people is to then duty walk to circle Indonesia to install equipments of AXIS 241 by means of ... assist Laptop computer utilize to conduct IP installation at Axis 241.

Actively and together all engineer control cost compile budget of is project of which reliable in order to project of defrayal of the project when measured from all goods supplier eyeglasses and contractor have equity storey; level able to accounted reply till there is American dollar rate distortion or movement even if. Totalize the project of big scale can swallow expense 9,4 billion US$ . And budget for the spend money of service rent telecommunications at company ] telecommunications equal to 3,7 billion US$ for during three full of year


Team leader and Project Manager Survey Security Safety Systems PT TELKOM INDONESIA DIVRE II (26 Sept 06 – 1 July 07)

Integrate entire/all equipments of CCTV and FAP of exist in Central Telecom as much 20 area to can be controlled in one activity commando all the way equipments and also its coordination.

And responsibility duty at this project.

KEPIPI and all partner work have showed myself directly to me as Team Leader and Project Manager with authority full (of) to finish the problem of the project of Telkom and also compilation of tender price of [is project of when must be done tender with e-auction in its auction. And all defrayal for this work of suffer fully by Partner work KEPIPI.

Work along actively and participations fully also to plunge to see the condition of entire/all DATEL to be made by the project of this work. Recording each; every place done/conducted carefully good in the form of measurement, making picture photo which quite a lot as well as discussing actively also with all the other tender competitor. We this team composition consist of 7 people ( 2 civilian, 2 instrumentation people and electrical, 3 people for the FAP OF, CCTV, Cisco Engineer)

Compiling FAP system configuration, CCTV, DVR-SERVER, Finger Print IP Based to be able to be made to become one unity work by joining DVR Servers relation/link exist in Central equipments of Telecom to be able to be seen in one wide TV Plasma screen monitor in Security DIVRE II head office. Compiling FAP server being based on WEB Based utilizes as data control from the way attached by Panel FAP in each; every DATEL at result of data print-out as voucher for the note of database record. federating of Server FAP and this Finger Print IP Based through concept of [is existence of an IP address. Address IP able to be made by transport data through TCP/IP. Existence of two server database able to be communicated to through ODBC from IP VPN package and computer as its packer the way data at IP

KEPIPI make every effort to get all kinds of information exist in is Central of Telecom. Because basically each; every activity which concerning is Central of Telecom represent work pass by quickly department or pass by quickly sectorally. Authorization holder by Infratel representing Department no. 1 in technological business facet and full of chosen people who in high level qualification for technological handling. And KEPIPI have out for anticipating him/it if communications with Central people of Telecom fail to mean will generate big problem in completion of task of is project of.

System of is tacking on done by work at head office command security and 5 Datel finish in work of civil will be conducted by FAP system installation and CCTV. After tacking on security commando and success Datel in LAN /WAN hence will be conducted the tacking on by 10 is Central of Telecom to be made as is metropolitan of LAN / WAN

Apply IP based list to wear by at attached by equipments at DIVRE II head office. Where IP list to be given later by PT Telkom really will be utilized manifestly and will not be altered by usage of its address by all contractor workers. Delivery of Cisco Catalyst to PT Telkom Divre II to be able to conduct of IP address installation and also arrangement of security at Layer-3 represent as prerogatives rights in PT Telkom

Actively and participate full of together engineer control cost compile material list and equipments and also labor cost for the completion of task of the project of this. Where this work goals will start by early September 06 and end until 27 December 06 have been given [by] the Minutes Of Taking Over of is project of with payment system pass/through bank transfer during 2 workday of is the duration

Making report to PT Telkom work what will be done from all contractor. Evaluating drawing shop and material to wear by all contractor

Evaluating the specification of work than BoQ which has been agreed on between PT Telkom with KEPIPI. Compiling work expense and budget till the solving of project. Compiling work time schedule of is project of civil, electrical and mechanical constructively Microsoft Project

Have to earn communication actively with PT Telkom Divre II by pleasing and presence of mind in a condition any to be able to understand what in fact will; desire than PT Telkom Divre II

Taking care of good communications relation among all contractor with PT Telkom, and solve problems of complicated communications between PT Telkom with all contractor

Efficacy in victory of is project of this

Competitor following this tender from 10 companies becomes to remain 2 companies. Reason of all competitor desist midway in following this tender often all Telkom functionary or personality having the character of arrogant in giving boldness which concerning problem of this project

Difficult of communicate by together all tender participant of is project of with infratel division which in the end often generate to feel circumstantial frustration at all contractor where finally generate story gossip that this project will experience of a big problems and will eating many big invisible cost if communications with conducted difficult infratel is]at all. And all contractors have had execrable image perception where that project of Telkom represent the project of prestigious but full of my inconvenience me with whoever. And sometimes will eat functionary x'self victim handling this project by company when company have experienced of remarkable frustration at cash-flow of is project of and also expense of overhead of is project of

The eliminating of e-auction tender system faucet of participant remains two companies. And all other competitor one for the shake of sending in papers in participation of is project of this formally by generating bad gossip story. Because system auction e-auction always generates big loss at all follower auction tender from price facet of is project of.

Opening of Price done openly where our competitor of Korean company by giving offer of price below 25% from the project value and we also do degradation till 40% from price value of is project of expressed as winner


Project Manager of Building Pertamina (February 05, 07 – June 30, 07):

My responsibility at this project

1. Drawing up all document letters for tender completely along with calculation of is expense of estimation assess project to be able to win this contract. Actively work along with engineer control cost to count the cost arrangement of tender victory to all competitors equal to 1% from value of is project of which we raise

2. Actively communicate to all competitors to be able to compile tender price that tender price they have to above tender price from us with reward that we will assign value equal to 1% from our tender value by proportional. Amount of competitor counted 4 companies

3. Actively together all engineer mechanical and engineer instrumentation and IT engineer collect all document draw Building Pertamina from specially which concerning problem of FAP, "Electrical Driven Jockey Pump" and "Electrical Driven Pump and Diesel Driven Pump" and also hydrant aqueduct and sprinkler

4. Evaluating peculiarly the condition of Mail Pertamina office server and existing Proxy server during the time in order to can be done by the make-up of its ability to be able to be married with WEB Video Conference server from AVAYA by request of Pertamina management. Target of than this request is to can do of each; every meeting of job/activity needn't again have to leave room office work but enough sit from its place each by facing at computer which have been attached WEB Camera IP and speaker

5. Evaluating entire/all equipments of HUB 3COM 10 / 100 Ethernet which quite a lot in a condition 85% out of condition new situation but counted 24 units. The HUB left caused by a work which cannot be finished by an IT contractor in its completion of task. And by Pertamina have to wear by the equipments maximally

6. In running WEB Video Conference and also FAP server from Building Annex to Building B to Building C may not with "lease line" and or : installing Fiber Optic" only allowed with wireless channel with speed which high enough

7. Evaluating the condition of Panel FAP Nittan brand which during the time still conventional and still in a state of 90% walking better at entire/all building totally 140 panel. The panel it is true shut down by all] officer because often the existence of fire/burning alarm trouble unsettling to work. And all officer handle him/it often also does] not understand handling how to its. No clear SOP and also less so understand in English in manual book also all officers become to shy at. So that taken by short cut is to shut down the equipments

8. Evaluating where its situation of leakage at hydrant sprinkler in which building at the moment exactly "Electrical Driven Jockey Pump" and "Electrical Driven Pump and Diesel Driven Pump" have changed over function from duty which in fact

9. Installing box terminal or black-box an appliance convert from FAP Nittan manual peripheral to be made by FAP panel which is IP Base addressable full. And also change attached by battery at FAP Nittan panel in order to the FAP panel can function to test-drive and ability to detect hot temperature in each detector

10. Changing and installing equipments of FAP supporter old ones where have cannot walk with its his with: Alarm NOHMI Bell, Model: FBM01U-D, Motorized Driven Fire Alarm Bell, Light Indicator alarm: NOHMI, Model: SL24W, Strobe Light, Manual Break glass: NOHMI, Model: FM220, Manual Push Button

11. Installing four new especial FAP panel. MCFA IP Merk base : NOHMI, Model : Integlex, Capacities 1 Zone, Analogous Integrated Flexible [of] Addressable Fire Alarm Control Panel, License Software System Monitoring Fire Alarm for, System Monitoring Program Software CNI016N ( NOHMI BOSAI – JAPAN)

12. Doing new chemicals refilling of Fire Company into fire company tube with observation from office on duty Fire Company

13. Installing four new server of HP ProLiant 8350 5u 4 x 1 GB, HD 4 x 80 GB SCSI II Raid-5 for the peripheral of FAP

14. Doing addition of RAM module at server exchange mail and server proxy maximally to be got by result of optimal to the way WEB Video Conference server

15. Installing wireless 2,4 from Lucent Avaya ORINOCO with frequency 2, 4 GHZ with bandwidth 13 Megabytes per second in each Pertamina office building roof counted 6 antenna; following with Router Outdoor following with permit usage of its frequency to frequency spectrum authority

16. Applying to Pertamina management counted six (6) Pentium-4 computer unit utilize to be made by location of IP wireless network with installing RAM maximally till 8 GB and add two Ethernet card peripheral 10/100 in each; every computer. Utilize can do of IP Address installation among Antenna; Wireless by 3COM HUB. This PC is made also as a means of firewall

17. Requesting to Pertamina management to compile IP address list to wear for the peripheral of FAP, Wireless and also this WEB Video Conference in order not to wear to duplicate by part of their IT OPERATIONAL

18. Changing and installing "Electrical Driven Jockey Pump" and "Electrical Driven Pump and Diesel Driven Pump" to be re-weared as the pump function for the supporter of FAP. And make new hydrant well to be able to wear to get need [of] clean water of building

19. Compiling SOP manual in is bilingual of And Indonesia English concerning procedure usage of equipments and also overcome problems at attached equipments. And give training to all officers to handle the equipments. Training of Model has the character of doing by learning

20. Giving treatment letter and equipments guarantee during 5 year even if the equipments in a state of rent wear. And always place officer able to assist to handle problems counted 6 people


Project Manager GAS HALON LNG Arun Badak Lhok Sukon field (26 Sept 06 – 26 Sept 07)

Responsibility in this work

KEPIPI along with entire/all all subcontractors have passed to myself as project of manager fully in the case of all its. By compiling good enough work team especially really understanding of Gas Halon performance and Gas Energen and also CAD operator understanding about ISOMETRIC in the world of oil and gas

Studying Arun Badak atmosphere which is conducive fully gun bullet series atmosphere among GAM (Rebellion of Aceh Independence) with Governmental Army of RI outside Arun Badak field area. And its profit by all GAM Arun Badak field is not place to be made by war field but made by neutral area

Requesting to be able to be given by support letter document fully and complete and also defrayal guarantee from Bank from all contractor sub of[is including support document letter fully from NOHMI Bosai OSAKA Japan, because here represent condition sine qua non which have been specified by Arun Badak

Actively together controller document collect database draw ISOMETRIC related to Energen gas meter area equal to 40 GB with format “Workstation software" at Intergraph computer which run at RISC processor. As well as hydrant water pipe plumbing data and also position picture domicile machine pump "Electrical Driven Jockey Pump" and "Electrical Driven pump and Diesel Driven pump".

Actively together controller document collect database draw ISOMETRIC being based on ISOCAD software the way this peacemaker gas pipe to each; every expressed by area is fire/burning gristle area which dangerous enough. equal to 160 GB with Sunsparc Workstation format.

Actively together with all engineer control cost calculate the expense of replacement estimation all existing equipments and also Halon gas, and also the expense of changing or edit ISOMETRIC picture in Intergraph WORKSTATION and also ISOCAD into format SunSPARC Workstation

Recruit all CAD operator understanding ISOMETRIC counted 6 people to be placed to work not remain to in Lhok Sukon area to during 6 months with time work during 12 hour per day of is included in red calendar day to remain to work to utilize time which have been determined by this work can be finished on time

Compiling description job among field engineer with controller document along with all CAD operator to equalize perception and data exist in field with below/under observation command Arun Badak field

Compiling data equipments of material accurately and complete as part of supporter from replacement save and Energen gas to Gas Halon. Giving complete picture about solving of the expense of Energen gas meter trade in to Halon gas meter of the size is same gas meter and is same gas pressure content. Following by means of .equipment measure gas pressure which is always attached in each gas meter.

Accepting input that from our consultant Nohmi Bosai OSAKA Japan, that to finish Energen gas that rest of existing gas still in the tube may not be thrown promiscuously because according to world working safety standard, that Energen gas is not friendly gas to environment. For that hence needing of trade in gas meter. And no done by admission filling of Energen gas meter which have empty with Halon gas. And Secondhand Energen gas meter will be brought again to OSAKA Japan

To the solving of Halon gas will be conducted by work directly by Nohmi Bosai OSAKA Japan with engineer assisted by all Indonesia engineer with labor composition 30% Japan and 70% Indonesia ( Total of labor 60 people)

Compiling Halon gas arrival time schedule from Osaka Japan to Indonesia till arrive at Arun Badak field on schedule, As well as compiling arrival time schedule and "Electrical Driven Jockey Pump" installation and "Electrical Driven Pump and Diesel Driven pump" from levying process in Jakarta till to Arun Badak Lhoksumawe field.


Project Manager of Departmental Building of Home Affairs (Departemen Dalam Negeri) (January 10, 2006 – April 30, 2006)

As project of manager levying of goods follow each; every clarification and meeting completely about procedures order levying of goods in Domestic department of Republic Of Indonesia

Studying and also comprehend payment procedures conducted by especial contractor of PT PP to us as supplier. Where one of them there is an way of having to by utilizing LC letter and Bank Mandiri as payer to all supplier contractor

Studying order delivery of goods where to be the goods to be able to be attached as according to time schedule from especial contractor to all supplier. When in supplier have to attend deputized by all engineer which is have competence to know the goods product in course of its installation.

Drawing up company profile document for the work of this service and supplier, including supporter letter document fully from Nohmi Bosai supplier, York, Avaya PABX and Mitsubishi Lift

Work along actively in compiling price which is competitive to be levying [of] the goods can be accepted by reliable by all especial contractor where value than the tender price may not minus 20% from totalizing the project of at the price of 16 billion rupiah. And to be able to win the project tender have to pass auction of is project of openly by e-auction by 10 participant company of the other

Actively by have guerrilla to look for correct estimate owner value at Departemen Dalam Negeri insider from price of is project of this. In this case active emotion communicate which good to braiding relationship in each PP people as especial contractor and Department Dalam Negeri. If needing how to arrange the tender so that price do]not fall below/under estimates owner price but can win price with advantage equal to 30% by arranging all competitor to stand at bay as highest price is but given by compensation equal to 2,5% from tender price value of is project of compiled by us.

Drawing up entire/all SOP technical document for the process of good installation in the form of B3 printing; mould size measure till A0 with amount 1600 sheet by together at]part of controller document all especial contractor.

Giving letter document treatment of equipments guarantee fully during 4 year to starting of the building operational in the form of warranty 3 free year of damage from labor and equipments and bank guarantee statement equal to 2,5% from totalizing value levying of good


Project Manager of Mechanical and Electrical Building Bank Mandiri at Thamrin road no. 5 Jakarta (October 1, 06 – March 15, 07)

Project of Commutation of diesel genset from MWM to HARTECH and DENYO. And also settlement of building air by utilizing YORK at secondhand of building of BDN Thamrin no. 5 which now become the Bank Mandiri

Responsibility in this work Mechanical generator and AC Building

1. As project of manager compile cost estimate of[is expense of together engineer control cost for the commutation of old generator to new generator completely and including expense of installation service for the fee of worker from all engineer mechanical and also engineer electrical and engineer instrumentation to during 4,5 months. From new Bank Mandiri Generator user generator have to be easy is operational or easy to animating of where road; street animate the generator machine have to like as easy as running or animating saloon car by utilizing starter key

2. The wanted by Generator model generator with local production and type silent with amount of counted 30 unit of the size 10 x 180 KVA where 20 first unit utilize HARTCEH brand and ten incoming unit utilize DENYO brand.

3. Participate actively with all controller document and all engineer mechanical, engineer electrical to check entire at generator old ones to be able to be compiled repeated better its life operational document the generator do not functioning the old generator it. Compiling new SOP generator manual into bilingual that is Indonesian and English

4. Together all controller document compile generator electrics current diagrams line single from especial panel of generator to main building panel. This document is compiled by utilizing CAD computer in B3 size measure counted 60 pages; yard and also draw layout location new generator of the size A0 paper counted 25 pages. Including here compilation Especial Panel nicest Generator by utilizing equipments of Merlin Gerin panel control

Evaluating AC building chiller old ones to be conducted its commutation with new chiller and Evaluate less effective AC building outdoor so the way where all building Lodger frequently complain that condition of in less cold building atmosphere so. Freon gas wearied have to utilize Musicool type and at indoor appliance have to contain cluster plasma appliance able to permeate assorted of bacteria atmosphere and virus circulating at air room

Planning maturely the AC building replacement method of door out goodness and also door in from Daikin become York together all engineer control cost and also mechanical to reckon adequate budget to the solving of this project. This work have to earn to be finished parallels with work of solving of installation and levying 30 generator unit of the size 10 x 180 KVA

Evaluating entire/all building ac pipe to look for leakage arising out effect of existence of the tacking on [among/between] leaky pipe and also effect of still to the number of rest of hackneyed Freon gas left behind in the pipe

Actively and participate full of compiling ac pipe diagrams by utilizing ISOMETRIC CAD at three the building and also make ISOMETRIC shop drawing for the commutation of Chiller and AC outdoor machine at three building roof completely amount to 160 page in A0 size measure and B3

Changing Server DCS old ones with Foxboro Perkind at especial control room of AC for the arrangement of the way the AC building.

Project Manager of Amphibious for Tank PT-76 and BTR for Indonesian Marine 6 January 2007 - 6 June 2007:

Responsibility in this project:
Compiling budget and contract this administration project till finish.

Compiling schedule import the machine truck accurately from Singapore and Taiwan of so that the machine can be attached and done by a test-drive accurately at workshop assembly. And do not forget to draw up also expense import the machine truck from foreign country with the import tariff going into effect

Actively together past master from Marinir Indonesia for the fox of dome arm the cannon PT - 76 to glider rocket the Bofors 120 mm by utilizing aid of simulation Autocad completely and check. And this work represents the work mechanical

Re-Arranging cabin Tank for the PT-76 OF and BTR fallen to pieces to be made by comfortable possible if done in encounter operation of at accelerating motor tank.

Modification domicile the machine to can be attached mechanically truck Nissan and Mitsubishi. And conducted by a painting repeat at entire/all body tank with the color matching with military requirement

Compiling and giving drawing shop to Marinir Indonesia of where to be each; every work started to can be agreed and also earn the start project develop; build to repeat the strength of Marinir Indonesia

Project of Departmental Manager of Defence in study analysis 1 Sept 2006 - 6 January 2007:

Analysis Election of plane combat F-15C vs. SU-27 and MIG-31 vs. SU-37 as Indonesia parachute protector a period to come

Analysis Election of U209 vs. KILO submarine to take care of region go out to sea Indonesia and as strength of regional sea of South-East Asia and also to assist in Archipelagos formula and ZEE

My responsibility at this project
Collecting all literature study materials from various source of about F-15C, Su-27, MIG-31 And SU-37 and also U209 submarine and Class KILO

Giving input to Departmental R&D of Defence that any equipments bought from seller state may not conduct boycott action arm or embargo arm or equipments of access with reason of the problem of Human right or wish to have a hand in overseas nor domestic politics

Purchasing arm this nor may there is bearing among activity of NGO which unpleased with Government Indonesia

Weapon bought later have to earn to be produced in country entirely or in the form of part of component from the equipments to in exporting return to the weapon maker old country

Giving correct amount input which is always adapted for by state budget in the field of security and defence but this payment have to earn is also conducted by system barter with result of shoe production, textile, Indonesia handicraft, sawit coconut, cooking oil and chocolate, coffee

Giving input to Departmental R&D of Defence that Indonesia enough can and rich once its experience will in human resource at military where to develop idea knowledge and ability of management, tactics and strategy sending many all heroic to America and even a lot is financed by USAID and IMET. While for the purchasing of equipments always come from Russia. This Matter have been proved in the year 1960 - 1965


Project Leader Bureau Ministry Transportation (1 Sept 2006 - 6 January 2007)
The project name: Report ANTARA

The report ANTARA representing the project of study analysis from which Department Communication in the form of defrayal budget and also statistical for the development of port of sea, port and airport of is transportation of river and lake. The data have the including with requirement operating expenses plan in activity operate for the port

KEPIPI here act as contractor than PT LUHUNG. Where in finishing the project of the study analysis is we take data example at ten (10) towns and ten (10) provinces in Indonesia

In finishing the project of Report ANTARA this obliged to wear the basis for Dynamic Theory and Regression Correlation. And Appliance assist to the solving of this project is Powersim Studio 2005 for dynamic theory and SPSS version 14 for the regret ion and correlation.

Responsibilities
1. Consultant analysis and study for development port ten (10) provinces in Indonesia with solution theory dynamics model.

2. enquire the reply of about problem of development of port and air-port with all the form of its problems

3. Collecting and process the data statistically to get the definitive certainty in this quantitative study analysis

4. Searching the basis for theory in dynamic model to be weared by as this problem billows

Consultant COST CONTROL ENGINEER for China National Offshore Oil Corporation (CNOOC) (4600 hours) (Oct 5, 2002 - May 2, 2004)
My responsibilities:

Assumes responsibility for all aspects of contracts management and follow-up in the Maintenance Department. Includes controlling expenditure, reviewing invoices and back-up documents and clearing them for payment, maintaining financial commitment records for contracts, and highlighting to management any vacancies or additional claims with suggestions for corrective action.

Maintain adequate control over the Maintenance Department budgets through continued monitoring of expenses to ensure that they stay within budget limits. Review the monthly variance reports, highlighting to Supervisor those variations requiring particular attention. Clarifies with concerned personnel any abnormalities in the positing the cost.

Prepares various cost performance and other management information reports with cost performance analysis to keep management advised of cost trends and implications. Includes highlighting actual expenses against approved budgets, computing performance indices and comparing them with internationally accepted standards, and providing recommendations for improvement.

Provides assistance to Planning Engineers and planners regarding planning and preparation work of specific modular or major turnaround maintenance activities. Including follow-up with Operations personnel for coordination of maintenance works prior to scheduling and for the preparation of additional resources to keep backlog within acceptable limits. Follows up on work progress of scheduled maintenance activities.

Reviews work orders required to be contracted out. Prepares detailed technical workshop document. Provides technical clarifications on work scope to bidders and contracts Engineer at PSD. Reviews proposed bidders for the job based on performance. Participates in technical bid evaluation. Attends any clarification / negotiation meetings with bidders and PSD representative.

Participates in progress review meetings with contractors for monitoring periodically the performance, and suggests corrective steps in case of deviation from agreed schedules. Provides clarifications or interpretation of contractual terms / clauses to engineers responsible for field execution of work. Initiates Provisional and Final Acceptance Certificates.

Prepares detailed technical work scope for modular and major turnarounds in consultation with Planning Engineers / Area Engineers. Liaises with concerned personnel in Maintenance Department to prepare detailed specifications and workshop of activities required to be contracted out. Includes review and analysis of historical work records, discussion of manpower utilization statistics and investigation of work methods.

Participates in all tender preparation activities, site visit of the bidders and bid evaluation up to the stage of contract agreement. Participates in progress monitoring of contract execution to ensure conformity to specified terms and conditions and in progress monitoring during shutdown. Assists supervisor in preparation of detailed post shutdown report.

Review annual requirements for labor, special requirement, and manpower hire and contracts for specific maintenance jobs and any plant emergencies. Analyses own manpower, equipment and those from other Operating Centers and CNOOC group of Companies to determine additional needs. Initiates necessary documents for obtaining management approval and, subsequently, prepares fax of intent and short term agreements for labor / equipment / services hire.

Participates in the preparation of annual budget proposals for Maintenance Department. Includes collecting data from various maintenance sections, coordinating such data to identify requirements for man-hour, materials and services, and preparing detailed justifications for proposed expenditure.

Reviews materials consumption reports prepared by subordinates to keep track of prevailing pattern, highlights abnormal trends and examines implications, providing recommendations as appropriate. Checks that purchase requisitions are issued in time for replenishment. Ensure the maintenance and updating of necessary records.

Assists in preparing training programmed for National employees undergoing on the job training by identifying specific training needs. Provides essential training and guidance to trainees, developers and other subordinates with a clear objective of career development.

Performs other similar or related duties as assigned. Includes maintaining and updating contractor performance data, cost data and plant assets register for future references; initiating timely action for revalidation / implementation of body shop contract; liaising as necessary to ensure safety orientation of contractor personnel prior to work; and complying with mandatory safety regulations.

Ensures that all procedures for commitment of high value PR & Contacts are adhere to.

Prepare detailed un-priced bid evaluation report with necessary presentation handouts to PSC for commitments exceeding US$. 3.0 Millions.

Assist in the preparation of all documents for WSO Contract Committee submissions.

Prepare necessary justification to management in case of variation noted in contracts.

Consultant China National Offshore Oil Corporation (CNOOC) Senior Buyer (2000 hours) (July 1, 2004 - March 8, 2005)
Roles and Responsibilities
Understand and supports the policies, goals, efforts, and programs of company’s HSE (Health, Safety and Environmental) Management System. Ensure HSE issues are given primary consideration in all activities undertaken within area of responsibility.

Mentors and offers assistance and technical/commercial advice and direction to buyers in carrying out their work activities.

Receives approved requisitions from project engineers, drilling, operational sections and other Company functions, for a variety of materials and equipment and places orders with services and equipment vendors and manufacturers locally and abroad.

Maximizes value and optimizes saving by coordinating alternate sourcing of material, product evaluation, lifecycle costing, competitive bidding and price negotiations with vendors. The individual ensures the uninterrupted supply of materials, equipment and services to operations and drilling in coordination with offshore logistics personnel.

Ensures the timely delivery of materials and services through forward planning, knowledge of lead times, market conditions and by expediting materials. Ensures quality requirements are met by adherence to Company specifications and internationally recognized engineering codes and standards.

Resolves disputes arising with suppliers concerning quality, price or delivery and handles claims and counter claims as they arise. Conducts all commercial transactions on the highest ethical standards and in accordance with good business practice and knowledge of commercial law.

Arranges repairs, fabrication and make up of well completion sub assemble as recommended by various operational support team members. Also coordinates company equipment and rental/lease equipment arrangements with appropriate vendors.

Monitors and carries out inventory control functions, including maintaining sufficient quantities of critical materials, controlling additions and recoveries to stock, analyzing idle inventory, excess stock and identifying surplus stock. Also reviews catalog descriptions for possible duplication, preparing inventory investment forecast and variance analysis, and replenishing and reusing equipment where repair is economical.

Works with the Finance personnel in resolving audit queries, ensuring cost avoidance and cost savings are reported regularly, manages consignment stock by ordering, transferring and notifying payment due date to vendors at the end of the consignment period, and reporting consignment stock transfers to finance regularly to arrange cash calls.

Prepares and updates sourcing strategy by customer to ensure knowledge of and preparation for upcoming projects and activities to maximize impact on front end loading process.

Negotiates and concludes various special assignments with vendors such as price agreement, consignment and convergence alliance agreements in the most timely, cost effective and ethical manner.

Consultant Maximo - Jakarta for Offshore Solutions Analyst China National Offshore Oil Corporation (CNOOC) (450 hours) (April 10, 2006 - June 5, 2006)
Provide overall Maximo and Application support to both offshore locations. Be a primary point of contact for the offshore Maximo and Application users.
Roles and Responsibilities
Provides first line support to current offshore users of the Maximo System and other applications. Includes ensuring user documentation is prepared, that offshore users are provided with training and that appropriate security codes and authorizations are in place. Initiates and leads workshops to address cross-functional issues and processes that need to be resolved. Provides ongoing advice to offshore users and key users, responding to their requests for problem resolution, system training and improvements. Refers some requests on to the Business Information Services team members or to the relevant IS Group, and liaises with them for the resolution of offshore user problems. Assists offshore users with the day-to-day use of Maximo and other applications.

Monitors ongoing usage of Maximo, identifying issues/opportunities for system improvement. Works with offshore users, key users in developing changes within the existing system. Coordinates any work to be done by external consultants or internal resources with the Business Information Services Team, reviewing their inputs and liaising with users.

Assists in the training of offshore users, prepares any related systems and application documentation. Works with WEB solutions to update training material on the DP Intranet. Follows up in initial stages to support offshore users, answering their enquiries and liaising with onshore Business Information Services

Solutions Analysts or internal resources on unresolved issues. Assist with the set up access and authorization codes for the offshore user area.

Carries out an ongoing audit of Maximo, identifying any offshore user problems for resolution and providing the Director and Solutions Analysts with a periodic report on each application.

Assists the business in reviewing business processes to determine which Maximo functionality should be implemented to streamline the process and achieve maximum benefits.

Keeps colleagues in other areas of Business Information Services team and IS advised of all Maximo offshore operations and developments, involving them in systems integration activities.

Carries out other similar and/or related duties including:

1. working with other areas of Finance and the Company's auditors, assist with developing and implementing an appropriate systems audit program.

2. monitoring and following up on user training requirements, including providing Maximo training on new functionalities.

3. monitoring Maximo use and opportunities in the search for continuous improvement.

4. keeping up to date with Maximo developments either through direct contact with Maximo, other members of the Business Information Services team, or through own networks with other Maximo users locally or internationally.


Gulf Resources : April 2, 2001 – October 5, 2002:
Assignment Consultant Gulf Resources for Engineering Department location work project Jakarta Office, Jambi Province Sumatra, Riau Province Sumatra.. Position Cost Control Engineer and Senior Buyer

Developed EPCM and turnkey project Rig Onshore for area filed gases Gelam -1 until Gelam-4 and Corridor gasses block

Developed EPCM and turn-key project piping gasses from area gasses Gelam-1 until Gelam-4 to Grissik gases station which include gasses transport satellites

Developed EPCM and turn-key project piping gasses from Grissik gasses station to Caltex (Chevron) Rumbai and Minas field for consumption production steamflood model technology.


As Senior Buyer Project my job description:

Under direct supervision is responsible to process requisitions for goods and services; determines best vendor; performs necessary buying and ordering tasks; checks product, vendor and price details; determines optimal accounting information into the on-line purchasing system to commit funds and to generate purchase orders; places the resulting orders.

CHARACTERISTIC JOB TASKS AND RESPONSIBILITIES
May include any and/or all of the following:
1. Analyzes purchase requisitions; verifies and/or provides necessary buying information; makes necessary changes; enters ordering/buying information into the on-line purchasing system which generates a budget encumbrance; provides ordering details for invoice matching in accounts payable, and creates the purchase order.

2. Places original, confirming, and standing orders by mail or telephone; inputs and retrieves data on computer terminal.

3. Communicates with departments to provide order information, answer questions, explain policies, and resolve problems.

4. Communicates with suppliers about product availability, pricing or other order issues, and coordinates resolution of problems; processes emergency purchase order requests.
5. Performs other duties as assigned.

As Cost Control Engineer :

Responsible for providing a complete Cost Engineering service to projects and corporate management for all projects of the Company.

1. Coordinate and fulfill all project based cost requirements and management requirements with regards to scope of services, organization, and job specific procedures and cost reporting.

2. Formulates manpower and man hour estimates, material consumption rates, and staff expenses for ongoing projects and tender proposals.

3. Provide an accurate, comprehensive and compatible estimating, cost control and cost reporting service to each Project.

4. Accurate forecasting and early recognition methodology of potential overruns

5. To ensure all relevant costs are recorded and coded correctly.

6. To ensure correct authorization for expenditure.

7. To continuously monitor current expenditure against budget and to forecast future costs in respect of all General Contracting activities.

8. To manage changes in cost arising out of changes in work scopes.

9. To operate systems in accordance with Company procedures for the accurate measurement, recording and forecasting of costs.

10. Prepare, record and analyze manpower rate build -ups and material consumption rates in accordance with scope of service as per each specific project.

11. Prepare cost reports to projects and management regularly and on specified reporting dates.

COPAREX Energy June 6, 1998 – Feb 1, 2000
Consultant Cost Control Engineer and Document Controller for support Seismic Area model 2D or 3D and Drilling, area Muriah - Juwana Java Island, North Geragai Jambi, and Merauke Coast Papua .

My Responsibility:
1. Braiding good communications relation with all contractor of so that each; every problem of arising out can be overcome better without having to there is jam in different communications perception with all contractor.

2. Because from all Owner very difficult once if conversing in English, their cause have accustomed if conversing in French or Indonesia. While all contractor at most moving in Seismic effort and Drilling come from America (Schlumberger OMNES, GeoQuest, Prakla, Anadril, Landmark, Hughes Baker Atlas, Halliburton, Baroid, Patra Camp, Indosat, etc)

3. Active discuses with the Manager Exploration in the event of something danger menacing the happening of big problem, like Well Kick, conflagration, burst the explosive superbly or security trouble.

4. Evaluation and analysis document contract from Pertamina for liaison business and exploration

5. Evaluate and analysis cost and prepare budget estimate costs for Seismic activity and Drilling with stacke holder with including all CAPEX

6. Evaluate and analyst document contract including SLA for IT Equipment and Communications from Remote Site to Jakarta Office and Jakarta Office to Headquarter Paris.

7. Mobilization and demobilization about personnel and materials for Seismic and Drilling,

8. Managing and supervise all activities remote site with together Manager Exploration, and Superintendent Remote Site

9. Managing and supervise all IT and Communication Equipment for area Accounting and general Office and Exploration Dept


Nov 1995 – Apr 1998 Saga Petroleum Indonesia AS
Position: Computer Operation Supervisor and Mechanical Data Analysis
Project : Jambi Merang (Corridor gas block) and South Natuna (Operator Enterprise Oil)

Responsibilities
1. Build the communication network with VSAT between Jakarta – Jambi Merang Site, Jakarta – Natuna Site 64 Kbps each and Jakarta – OSLO with Frame Relay using bandwidth cloud network for 128 Kbps CIR 64 Kbps
2. Mechanical Data Analyst
Mechanical Data Analyst:
The main purpose of the job to collect input and maintain data for a wide variety of major and minor mechanical equipment installed in company facilities, offshore and onshore and produces user manuals and updates in Livelink to facilitate proper maintenance of the equipment. Support and comply with the policies, goals, efforts, and programs of the Company's Health, Safety and Environmental (HSE) Management System. Ensure HSE issues are given primary consideration in all activities undertaken within area of responsibility. Unsafe acts and/or conditions, no matter in what area of responsibility, are to be reported so corrective actions can be taken.
Roles and Responsibilities
Collects vendor data for a wide variety of mechanical equipment from drawings, specifications, maintenance bulletins, data sheets and from as-built and modifications completed by in-house sections. Inputs data into Maximo system and manipulates data in the required categories and formats to produce maintenance manuals. Also use scanning software and hardware including electronic storage and maintenance of data.

Produces user data manuals for major and minor mechanical equipment, including generators, compressors, pumps, electric motors, cranes, and a wide variety of other equipment. Uses Maximo and the Microsoft office suite of software to produce manuals and includes necessary drawings, specifications etc. as deemed necessary or useful.

Provides manuals to the other company functions and acts as the advisor on all aspects of the data/information provided. Receives a variety of regular inquiries and answers questions by telephone, e-mail and memoranda. Also provides data to the Data Maintainer section in formats they can readily use.

In some cases, physically inspects equipment to ensure the correct item or to determine if it is inferior. May use calipers, micrometers or other devices during these inspections.

Ensures the proper physical maintenance of manuals, drawings, specifications etc. in the workshop library and that all items are properly tagged for convenient retrieval. Also maintains electronic inventory lists as required.

Continually updates manuals based on vendor service bulletins and immediately notifies maintenance/operations sections concerned, if prompt action is recommended. Also inputs data for new equipment purchased by the company.

Advises and provides technical support to warehouse and sourcing personnel on any technical queries that are raised from purchase orders that have been placed. Also, assists in correcting or updating material descriptions and part numbers in Maximo as appropriate.

Research and solve technical information problems that may arise on any equipment/spare parts within the DP operations by using the manuals or direct contact with manufacturers/vendors.

Assists the data maintainers in preparing or massaging data for incorporation into ORACLE Finance.

Assists the Data Maintainer Group in performing spot quality reviews of data in ORACLE Finance.

Adheres to the Document Records Management system for both physical and electronic records.

Work Contacts:
Frequent contacts with operations and warehouse staff, data maintainers and vendors to answer queries and provide data.

Independence of Operation:
Works according to established procedures and technical standards. Completed work is observed during the normal work cycle.

Physical Effort:
15% of the time is spent walking and standing.
85% of the time is spent in an office environment.

Work Environment:
10% of the time is spent outdoors exposed to heat and humidity.

SOFRESID SUPRACO INDONESIA, Sept. 26, 1994 - November 5, 1995.

Sofresid Supraco Indonesia is an engineering company from France which was last affiliated to JOHN BROWN and Trafalgar House in London. Its main duty is the making of the oil and gas piping project for TOTAL INDONESIE in East Kalimantan and RIG for field project HANDIL which is often referred to as HANDIL EOR.

The Buyer Project Engineering, responsibilities:
Oversees the execution of complex and routine commodities purchases to include Request for Proposal (RFP), Invitations to Bid (ITB), Requests for Information (RFI) and all related documentation. Supervises the commodities section composed of a team of commodities buyers.

POSITION KEY ACCOUNTABILITIES:
1. Formulates procurement strategy in alignment with agency policies, and objectives.

2. Directs the administration of complex capital equipment purchases.

3. Organizes and leads purchasing project teams pursuant to a specific agency need.
4. Reviews and approves/executes RFPs, ITBs, RFIs and contracts.

5. Plans and conducts negotiations to achieve agency pricing objectives.

6. Trains and mentors junior purchasing personnel in purchasing procedures and techniques.

7. Provides work direction and guidance to personnel within department. Provides input for: recruiting and selection, hiring and termination, training, professional development, mentoring, counseling, performance evaluations, and salary planning. Directs the work of Buyers.


ADARO Coal Mining October 10, 1993 - September 28, 1994
My responsibilities:

Ensure that the cost control, change management and reporting procedures are thoroughly defined and that all members of the team (both EPCM and Owner's team) are adhering to the procedures. Ensure the procedures and processes confirm to quality assurance requirements.

Manage the EPCM contractor in the execution of its cost control services. Identify any deficiencies in the EPCM cost control organizational structure and staffing plan. Provide independent assessment of the EPCM contractor's performance, schedule risk and cost exposure to the Owner's management team

Ensure that key project indicators are established and that each indicator has a solid baseline, and clear and transparent measurement basis.

Ensure that a rigorous change management procedure is implemented and assist with the review and recommendation of trends and changes.

Ensure that the month end forecast process is rigorous, comprehensive, transparent and accurate and facilitates the reporting of all cost deviations at the earliest practical date.

Develop and maintain an understanding of escalation, foreign exchange and contingency and risk variables, and ensure that they are appropriately managed and reported.

Audit change control and forecast processes on an on-going basis.

Ensure that the cash flow and cash management reporting requirements are accurate and provided on timely basis.

Ensure clear process for invoice payment recommendations submitted to the Owner and that the work flow support on time payment of invoices.

Coordinate and compile the Owner's monthly project report.

As Cost Control Engineer, my responsibilities:
Ensure that the cost control, change management and reporting procedures are thoroughly defined and that all members of the team (both EPCM and Owner's team) are adhering to the procedures.

Ensure the procedures and processes confirm to quality assurance requirements.

Manage the EPCM contractor in the execution of its cost control services. Identify any deficiencies in the


3. Education & Training - CV/Resume Part 3 [Mandatory]

Arthur Andersen Consulting, Jakarta 1997 Business Process Data warehousing, Inventories and HR System in house training and some tertiary coursework completed

Schlumberger OMNES and COMPAQ Indonesia 1997 Windows NT Network Administration on the job training. COMPAQ ProLiant 5500r 7u. Some tertiary coursework completed

J.D. Edward, Singapore 1997 Business Process JD Edwards : Asset Management, Procurement, Supply Chain Management, in house training and some tertiary coursework completed

MindComp, Australia 1997 Technical Foundation (JDE) in house training and some tertiary coursework completed

SAP/R3, Singapore 1997 Business Process SAP/R3: Human Resources Systems in house training and some tertiary coursework completed

Datacraft, Singapore 2000 Cisco Academy Semester 1 – 4 foundation study network. In house training and some tertiary coursework completed

Lucent ORiNOCO, Jakarta 2000 Technical Foundation Radio transmission via the airwaves. Various communications techniques are used to provide wireless transmission including infrared line of sight, cellular, microwave, satellite. packet radio and spread spectrum. In house training and some tertiary coursework completed

Lucent ORiNOCO Agere WaveLan 2000 Technical Foundation a local area network that transmits over the air typically in an unlicensed frequency such as the 2.4GHz band. In house training and some tertiary coursework completed

Infrared Communication Systems, Singapore 2001 Free Space Optical Wireless Broadband communication systems: Cablefree 1250MBPS Gigabit Ethernet Series. The user's network switch, router or hub simply connects via a multi mode or single mode fiber optic cable to the optical interface located in the transceiver. The link is transparent to the network and adds zero latency. In house training

Infrared Communication Systems, Singapore 2001 Free Space Optical Wireless Broadband communication systems: Cablefree 155 MBPS OC-3/ATM Series. The user's network switch, router or hub simply connects via a multi mode or single mode fiber optic cable to the optical interface located in the transceiver. The link is transparent to the network and adds zero latency. In house training and some tertiary coursework completed

Agilent, Singapore 2001 Technical course foundation: HIGH SPEED 10BaseT 8.5Ghz Wireless Networking Equipment. In house training and some tertiary coursework completed

Datacraft, Singapore 2001 Cisco Internetworking Design. In house training and some tertiary coursework completed

Notel Networks, Singapore 2001 Nortel LAN METRO, In house training and some tertiary coursework completed.


4. Computer Skills - CV/Resume Part 4 [Mandatory]
Router for Central Telecom supported for runninng third party in co-location module rooms:
Cisco 7609 Chassis

1. CISCO 7600 SERIES 8-PORT OC-12C/STM-4 POS/SDH ENHANCED OPTICAL SERVICES MODULE
* High-Density, OC-3c/STM-1 Connectivity for Consolidated Service Provider POPs with Service Delivery over IP or MPLS Core Networks

* OSM-8OC3-POS-SI+; 8-port OC-3/STM-1 SONET/SDH enhanced OSM, single-mode intermediate-reach with 4 GE; M-OSM-512M; 512 MB ECC memory for OSMs (three unit)

2. Cisco 7600 Series Supervisor Engine 720
* WS-SUP32-10GE-3B Cisco Catalyst 6500 Series/Cisco 7600 Series Supervisor Engine 32 with 2 ports 10 Gigabit Ethernet, PFC3B, and MSFC2A (two unit)

3. CISCO 7600 SERIES SPA INTERFACE PROCESSOR-600
* Cisco 7600 SIP 600 with 10-Port Gigabit Ethernet SPA; Cisco 7600 Series SPA Interface Processor-600 7600-SIP-600 (one unit)

4. Cisco 7600 Series SPA Interface Processor-200
* 7600-SIP-200; Cisco 7600 Series SPA Interface Processor-200 and MEM-SIP-200-1G; 1 GB memory for Cisco 7600 SIP-200 (one unit)

5. Cisco 10-Port Gigabit Ethernet Shared Port Adapters, Version 2
* Cisco 10-Port Gigabit Ethernet Shared Port Adapter; SPA-10X1 GE-V2 (two unit)

6. Cisco 8-Port 10BASE-T/100BASE-TX Fast Ethernet Shared Port Adapter, Version 2
* Cisco 8-Port 1 0BASE-T/100BASE-TX Fast Ethernet Shared Port Adapter; SPA-8X1 FE-TX-V2 (four unit)

Cisco 7609-S Chassis

1. FlexWAN Module for the Catalyst 6500 and Cisco 7600 Series ( three unit)

2. Cisco 7600 Series Route Switch Processor 720
* RSP720-3C-GE(=); RSP 720 with PFC-3C includes: ; Two Gigabit Ethernet ports (port 1 supports 1-Gbps Small Form-Factor Pluggable (SFP)module; port 2 is configurable for either SFP or 10/100/1 000BASE-TX through a RJ-45 connector Integrated 720-Gbps switch fabric PFC-3C and MSFC4 Route processor: 1- to 4-GB DRAM (1-GB default) ; Service processor: 1- to 2-GB DRAM (1-GB default). Two external Compact Flash Type II slots 2-MB nonvolatile RAM (NVRAM) 512-MB internal boot memory (Compact Flash) (two unit)
* MEM-RSP720-4G ; RSP 720 4-GB memory upgrade (two unit)
* MEM-RS720-CFL1G; 1-GB Compact Flash memory (two unit)


3. CISCO 7600 SERIES SPA INTERFACE PROCESSOR-600
* Cisco 7600 SIP 600 with 10-Port Gigabit Ethernet SPA; Cisco 7600 Series SPA Interface Processor-600 7600-SIP-600 (one unit)

4. Cisco 7600 Series – Ethernet Services 20G Line Cards for Carrier Ethernet
* Cisco 7600 Series Ethernet Services 20G Line Card, 2-port 10 GE XFP and DFC-3C; 7600-ES20-10G3C ; Cisco 7600 Series Ethernet Services 20G Advance License; 76-ES20-ADVIP-LIC (one unit)


5. Cisco 7600 Series – Ethernet Services 20G Line Cards for Carrier Ethernet
* Cisco 7600 Series Ethernet Services 20G Line Card, 20-port GE SFP and DFC-3C; 7600-ES20-GE3C; Cisco 7600 Series Ethernet Services 20G Advance License; 76-ES20-ADVIP-LIC (one unit)
Cisco 7604

1. CISCO 7600 SERIES 8-PORT OC-12C/STM-4 POS/SDH ENHANCED OPTICAL SERVICES MODULE
* High-Density, OC-3c/STM-1 Connectivity for Consolidated Service Provider POPs with Service Delivery over IP or MPLS Core Networks

* OSM-8OC3-POS-SI+; 8-port OC-3/STM-1 SONET/SDH enhanced OSM, single-mode intermediate-reach with 4 GE; M-OSM-512M; 512 MB ECC memory for OSMs (one unit)

2. Cisco 7600 Series Supervisor Engine 720. WS-SUP32-GE-3B Cisco Catalyst 6500 Series/Cisco 7600 Series Supervisor Engine 32 with 8 ports Gigabit Ethernet, PFC3B, and MSFC2A (one unit)

3. CISCO 7600 SERIES SPA INTERFACE PROCESSOR-600. Cisco 7600 SIP 600 with 10-Port Gigabit Ethernet SPA; Cisco 7600 Series SPA Interface Processor-600 7600-SIP-600 (one unit)

4. Cisco 7600 Series SPA Interface Processor-200. 7600-SIP-200; Cisco 7600 Series SPA Interface Processor-200 and MEM-SIP-200-1G; 1 GB memory for Cisco 7600 SIP-200 (one unit)

Cisco 7606-S Chassis
1. Cisco 7600 Series Route Switch Processor 720
* RSP720-3C-GE(=); RSP 720 with PFC-3C includes: ; Two Gigabit Ethernet ports (port 1 supports 1-Gbps Small Form-Factor Pluggable (SFP)module; port 2 is configurable for either SFP or 10/100/1 000BASE-TX through a RJ-45 connector Integrated 720-Gbps switch fabric PFC-3C and MSFC4 Route processor: 1- to 4-GB DRAM (1-GB default) ; Service processor: 1- to 2-GB DRAM (1-GB default). Two external Compact Flash Type II slots 2-MB nonvolatile RAM (NVRAM) 512-MB internal boot memory (Compact Flash) (two unit)
* MEM-RSP720-4G ; RSP 720 4-GB memory upgrade (two unit)
* MEM-RS720-CFL1G; 1-GB Compact Flash memory (two unit)


2. CISCO 7600 SERIES SPA INTERFACE PROCESSOR-600
* Cisco 7600 SIP 600 with 10-Port Gigabit Ethernet SPA; Cisco 7600 Series SPA Interface Processor-600 7600-SIP-600 (one unit)

3. Cisco 7600 Series SPA Interface Processor-200.
* 7600-SIP-200; Cisco 7600 Series SPA Interface Processor-200 and MEM-SIP-200-1G; 1 GB memory for Cisco 7600 SIP-200 (one unit)

4. Cisco 7600 Series – Ethernet Services 20G Line Cards for Carrier Ethernet
* Cisco 7600 Series Ethernet Services 20G Line Card, 2-port 10 GE XFP and DFC-3C; 7600-ES20-10G3C ; Cisco 7600 Series Ethernet Services 20G Advance License; 76-ES20-ADVIP-LIC (one unit)


5. Cisco 7600 Series – Ethernet Services 20G Line Cards for Carrier Ethernet
6. Cisco 7600 Series SPA Interface Processor-200. 7600-SIP-200; Cisco 7600 Series SPA Interface Processor-200 and MEM-SIP-200-1G; 1 GB memory for Cisco 7600 SIP-200 (one unit)
* Cisco 7600 Series Ethernet Services 20G Line Card, 20-port GE SFP and DFC-3C; 7600-ES20-GE3C; Cisco 7600 Series Ethernet Services 20G Advance License; 76-ES20-ADVIP-LIC (one unit)

Cisco Catalyst 4500, 4506, 4507 and 4510 Series for Central Telecom for support Transmission Room:

Cisco Catalyst 4503, content module:
1. Supervisor Engine Cisco Catalyst 4500 Series Supervisor Engine V-10GE; WS-X4516-10GE/2; Cisco Catalyst 4500 Redundant Supervisor Engine V-10GE, (2x1 0GE (X2) or 4x1 GE (SFP), Console RJ-45 (one unit)

2. Ethernet Module: WS-X4548-GB-RJ45V; 10/100/1000 (RJ-45); Cisco IOS Software Release 12.2(18)EW or later; IEEE 802.3af and Cisco prestandard PoE, IEEE 802.3x flow control; Bandwidth is allocated across six 8-port groups, providing 1 Gbps per port-group; Enterprise and commercial: designed to power IP phones, wireless base stations, video cameras, and other IEEE-compliant powered devices (one unit)

3. Gigabit Ethernet over Copper: WS-X4448-GB-SFP; 48 ports; 1000BASE-X (SFP); Cisco IOS Software Release 12.2(20)EW or later; IEEE 802.3x flow control; Bandwidth is allocated across six 8-port groups, providing 1 Gbps per port-group; Enterprise and commercial: designed for server farms and switch-to-switch applications; Metro Ethernet: designed for service providers to run point-to-point Gigabit Ethernet over single-mode fiber (one unit)

Cisco Catalyst 4506 content module:
1. Supervisor Engine Cisco Catalyst 4500 Series Supervisor Engine V-10GE; WS-X4516-10GE/2; Cisco Catalyst 4500 Redundant Supervisor Engine V-10GE, (2x1 0GE (X2) or 4x1 GE (SFP), Console RJ-45 (one unit)

2. Fast Ethernet over Copper WS-X41 48-RJ; 48 ports 10/100BASE-T module (RJ-45); Cisco IOS Software Release 12. 1(8a)EW or later; IEEE 802.3; Enterprise and commercial: high-port-density solution for desktop connectivity (two nit)

3. Fast Ethernet over Copper WS-X4148-RJ21; 48 ports Telco 10/100BASE-T module (4 x RJ-21); Cisco IOS Software Release 12. 1(8a)EW or later; IEEE 802.3; Enterprise and commercial: high-port-density solution with improved cable management RJ-21 connectors for desktop connectivity (one unit)

4. Gigabit Ethernet (GBIC or SFP) WS-X4448-GB-SFP; 48 ports 1000BASE-X (SFP); Cisco IOS Software Release 12.2(20)EW or later; IEEE 802.3x flow control; Bandwidth is allocated across six 8-port groups, providing 1 Gbps per port-group; Enterprise and commercial: designed for server farms and switch-to-switch applications; Metro Ethernet: designed for service providers to run point-to-point Gigabit Ethernet over single-mode fiber (two unit)

5. Gigabit Ethernet (GBIC or SFP) WS-X4424-GB-RJ45; 24 ports 10/100/1000 module (RJ-45); Cisco IOS Software Release 12. 1(8a)EW or later; IEEE 802.3x flow control; Bandwidth is allocated across six 4-port groups, providing 1 Gbps per port group; Enterprise and commercial: designed for Gigabit-to-the-desktop and server-farm applications ( one unit)

Cisco Catalyst 4507 module:
1. Supervisor Engine Cisco Catalyst 4500 Series Supervisor Engine V-10GE; WS-X4516-10GE/2; Cisco Catalyst 4500 Redundant Supervisor Engine V-10GE, (2x1 0GE (X2) or 4x1 GE (SFP), Console RJ-45 (two unit)

2. Fast Ethernet Power over Ethernet WS-X41 48-RJ45V; 48 ports Cisco prestandard 10/100 (RJ-45); Cisco IOS Software Release 12. 1(8a)EW minimum for data, Cisco IOS Software Release 12.1(1 1b)EW minimum for power Not IEEE 802.3af compliant (Cisco prestandard only); PoE provides –48 VDC power over standard Category 5 cable; Enterprise and commercial: designed for desktop connectivity and to power IP phones, wireless access points, or any other Cisco prestandard PoE device (one unit)

3. Fast Ethernet Power over Ethernet WS-X4248-RJ2 1V; 48 ports 10/100 (RJ-21); Cisco IOS Software Release 12.2(18)EW or later; IEEE 802.3af PoE and Cisco prestandard; Enterprise and commercial: designed to power IP phones, wireless base stations, video cameras, and other IEEE-compliant powered devices with improved cable management RJ-21 connectors (one unit)

4. Gigabit Ethernet (GBIC or SFP) WS-X4448-GB-LX; 48 ports 1000BASE-LX (SFP); Cisco IOS Software Release 12. 1(8a)EW or later; IEEE 802.3, IEEE 802.3x flow control; Includes 48 1000BASE-LX SFP optics preloaded at the factory; Bandwidth is allocated across six 8-port groups, providing 1 Gbps per port group; Enterprise and commercial: designed for fiber to the desktop; Metro Ethernet: optimized for service aggregation and business customer connectivity, designed for service providers to run point-to-point Gigabit Ethernet over single-mode fiber (one unit)

5. Gigabit Ethernet (GBIC or SFP) WS-X4448-GB-SFP; 48 ports 1000BASE-X (SFP); Cisco IOS Software Release 12.2(20)EW or later; IEEE 802.3x flow control; Bandwidth is allocated across six 8-port groups, providing 1 Gbps per port-group; Enterprise and commercial: designed for server farms and switch-to-switch applications; Metro Ethernet: designed for service providers to run point-to-point Gigabit Ethernet over single-mode fiber (one unit)

6. Gigabit Ethernet (GBIC or SFP) WS-X4506-GB-T; 6-port 10/100/1000 and 6-port SFP (any combination of up to 6 ports can be active at one time); 10/100/1000 RJ-45 PoE and 1000BASE-X (SFP); Cisco IOS Software Release 12.2(20)EWA; PoE IEEE 802.3af and Cisco prestandard (RJ-45 only); Provides full line-rate Gigabit switching on all ports L2-4 Jumbo Frame Support (up to 9216 bytes); Designed to give customers the choice of RJ-45 with or without PoE and SFP without incurring extra costs; Enterprise and commercial: high-performance desktop connectivity and server farms; designed to power IP phones, wireless base stations, video cameras, and other IEEE-compliant appliances; Metro Ethernet: designed for service providers to run point-to-point Gigabit Ethernet over single-mode fiber (one unit)


Cisco Catalyst 4510 content module:
1. Supervisor Engine Cisco Catalyst 4500 Series Supervisor Engine V-10GE; WS-X4516-10GE/2; Cisco Catalyst 4500 Redundant Supervisor Engine V-10GE, (2x1 0GE (X2) or 4x1 GE (SFP), Console RJ-45 (two unit)

2. Fast Ethernet Power over Ethernet WS-X41 48-RJ45V; 48 ports Cisco prestandard 10/100 (RJ-45); Cisco IOS Software Release 12. 1(8a)EW minimum for data, Cisco IOS Software Release 12.1(1 1b)EW minimum for power Not IEEE 802.3af compliant (Cisco prestandard only); PoE provides –48 VDC power over standard Category 5 cable; Enterprise and commercial: designed for desktop connectivity and to power IP phones, wireless access points, or any other Cisco prestandard PoE device (three unit)

3. Gigabit Ethernet over Copper WS-X4448-GB-RJ45; 48 ports 10/100/1000 module (RJ-45); Cisco IOS Software Release 12. 1(8a)EW or later; IEEE 802.3x flow control; Bandwidth is allocated across six 8-port groups, providing 1 Gbps per port group; Enterprise and commercial: designed for Gigabit-to-the-desktop applications (one unit)

4. Gigabit Ethernet (GBIC or SFP) WS-X4448-GB-LX; 48 ports 1000BASE-LX (SFP); Cisco IOS Software Release 12. 1(8a)EW or later; IEEE 802.3, IEEE 802.3x flow control; Includes 48 1000BASE-LX SFP optics preloaded at the factory; Bandwidth is allocated across six 8-port groups, providing 1 Gbps per port group; Enterprise and commercial: designed for fiber to the desktop; Metro Ethernet: optimized for service aggregation and business customer connectivity, designed for service providers to run point-to-point Gigabit Ethernet over single-mode fiber (two unit)

5. Gigabit Ethernet (GBIC or SFP) WS-X4448-GB-SFP; 48 ports 1000BASE-X (SFP); Cisco IOS Software Release 12.2(20)EW or later; IEEE 802.3x flow control; Bandwidth is allocated across six 8-port groups, providing 1 Gbps per port-group; Enterprise and commercial: designed for server farms and switch-to-switch applications; Metro Ethernet: designed for service providers to run point-to-point Gigabit Ethernet over single-mode fiber (two unit)

Cisco Catalyst 6503, 6504, 6506 and 6509 Series for Central Telecom for support Transmission Room:

Cisco Catalyst 6503 content module:
1. Supervisor Engine Supervisor Engine 2, WS-X6816-GBIC or Supervisor Engine Supervisor Engine 720; WS-X6748-SFP, WS X6724-SFP (one unit)

2. WS-X6148X2-45AF; Cisco Catalyst 6500 Series 96-Port 10/100 RJ-45 Classic Interface Module with 802.3af PoE daughter card (that is, includes daughter card [part number WS-F6K-FE48X2-AF=]) (one unit)

* WS-F6K-FE48X2-AF=; Cisco Catalyst 6500 Series 802.3af PoE Daughter Card for WS-X6148X2-RJ-45) module (one unit)

* WS-X6148-45AF-UG=; Cisco Catalyst 6500 Series 802.3af PoE Advanced Upgrade for (part number WS-X6 148 RJ45 or WS-X6148-RJ45V) (one unit)

3. WS-X6748-SFP, 48 port High Performance Mixed Media Gigabit Ethernet interface module, Requires SFP; CEF720 (one unit)

Cisco Catalyst 6504 content module:
1. Supervisor Engine Supervisor Engine 2, WS-X6816-GBIC or Supervisor Engine Supervisor Engine 720; WS-X6748-SFP, WS X6724-SFP (one unit)

2. WS-X6148X2-45AF; Cisco Catalyst 6500 Series 96-Port 10/100 RJ-45 Classic Interface Module with 802.3af PoE daughter card (that is, includes daughter card [part number WS-F6K-FE48X2-AF=]) (two unit)

* WS-F6K-FE48X2-AF=; Cisco Catalyst 6500 Series 802.3af PoE Daughter Card for WS-X6148X2-RJ-45) module (two unit)

* WS-X6148-45AF-UG=; Cisco Catalyst 6500 Series 802.3af PoE Advanced Upgrade for (part number WS-X6 148 RJ45 or WS-X6148-RJ45V) (two unit)

3. WS-X6748-SFP, 48 port High Performance Mixed Media Gigabit Ethernet interface module, Requires SFP; CEF720 (one unit)

Cisco Catalyst 6506 content module:

1. Supervisor Engine Supervisor Engine 2, WS-X6816-GBIC or Supervisor Engine Supervisor Engine 720; WS-X6748-SFP, WS X6724-SFP (one unit)

2. WS-X6148X2-45AF; Cisco Catalyst 6500 Series 96-Port 10/100 RJ-45 Classic Interface Module with 802.3af PoE daughter card (that is, includes daughter card [part number WS-F6K-FE48X2-AF=]) (two unit)

* WS-F6K-FE48X2-AF=; Cisco Catalyst 6500 Series 802.3af PoE Daughter Card for WS-X6148X2-RJ-45) module (two unit)

* WS-X6148-45AF-UG=; Cisco Catalyst 6500 Series 802.3af PoE Advanced Upgrade for (part number WS-X6 148 RJ45 or WS-X6148-RJ45V) (two unit)

3. WS-X6196-RJ-21; Cisco Catalyst 6500 Series 48-Port 10/100 RJ-21 Classic Interface Module; field upgradable to support 802.3af PoE daughter card (part number WS-F6K-FE48X2-AF=) (one unit)

* WS-X6148-21AF-UG=; Cisco Catalyst 6500 Series 802.3af PoE Advanced Upgrade for (part number WS-X6148 RJ21 or WS-X6148-RJ21V) (one unit)

4. WS-X6148A-GE-TX; Cisco Catalyst 6500 Series 48-Port 10/100/1000 RJ-45 Classic Interface Module; field upgradable to support 802.3af PoE daughter card (part number WS-F6K-GE48-AF=) (one unit)

5. WS-X6748-SFP; Small Form-factor Pluggable (SFP); 48 port; 1000BASE-SX LX/LH, -ZX, -T; 1000BASE-CWDM; LC connecter 240 ports (410 GbE max)/6513; 384 ports (386 GbE max)/6509; Up to 9216 bytes/frame (one Unit)


Cisco Catalyst 6509 content module:

1. Supervisor Engine Supervisor Engine 2, WS-X6816-GBIC or Supervisor Engine Supervisor Engine 720; WS-X6748-SFP, WS X6724-SFP (two unit)

2. WS-X6148X2-45AF; Cisco Catalyst 6500 Series 96-Port 10/100 RJ-45 Classic Interface Module with 802.3af PoE daughter card (that is, includes daughter card [part number WS-F6K-FE48X2-AF=]) (two unit)

* WS-F6K-FE48X2-AF=; Cisco Catalyst 6500 Series 802.3af PoE Daughter Card for WS-X6148X2-RJ-45) module (two unit)

* WS-X6148-45AF-UG=; Cisco Catalyst 6500 Series 802.3af PoE Advanced Upgrade for (part number WS-X6 148 RJ45 or WS-X6148-RJ45V) (two unit)

3. WS-X6196-RJ-21; Cisco Catalyst 6500 Series 48-Port 10/100 RJ-21 Classic Interface Module; field upgradable to support 802.3af PoE daughter card (part number WS-F6K-FE48X2-AF=) (one unit)

* WS-X6148-21AF-UG=; Cisco Catalyst 6500 Series 802.3af PoE Advanced Upgrade for (part number WS-X6148 RJ21 or WS-X6148-RJ21V) (one unit)

4. WS-X6148A-GE-TX; Cisco Catalyst 6500 Series 48-Port 10/100/1000 RJ-45 Classic Interface Module; field upgradable to support 802.3af PoE daughter card (part number WS-F6K-GE48-AF=) (one unit)

5. WS-X6748-SFP; Small Form-factor Pluggable (SFP); 48 port; 1000BASE-SX LX/LH, -ZX, -T; 1000BASE-CWDM; LC connecter 240 ports (410 GbE max)/6513; 384 ports (386 GbE max)/6509; Up to 9216 bytes/frame (three Unit)

The Bigest VoIP for Central Telecom:

Cisco 7613 (for head quarter Central Telecom , 10unit):
CISCO 7600 SERIES 8-PORT OC-12C/STM-4 POS/SDH ENHANCED OPTICAL SERVICES MODULE
High-Density, OC-3c/STM-1 Connectivity for Consolidated Service Provider POPs with Service Delivery over IP or MPLS Core Networks

OSM-8OC3-POS-SI+; 8-port OC-3/STM-1 SONET/SDH enhanced OSM, single-mode intermediate-reach with 4 GE; M-OSM-512M; 512 MB ECC memory for OSMs (five unit)

Cisco 7600 Series Supervisor Engine 720
WS-SUP32-10GE-3B Cisco Catalyst 6500 Series/Cisco 7600 Series Supervisor Engine 32 with 2 ports 10 Gigabit Ethernet, PFC3B, and MSFC2A (two unit)

ENHANCED GIGABIT ETHERNET OPTICAL SERVICES MODULE FOR THE CISCO 7600 SERIES INTERNET ROUTER

High-Performance IP Services Delivery over Gigabit Ethernet for Service Provider Applications

OSM-2+4GE-WAN+ 2+4-port Enhanced Gigabit Ethernet Optical Services Module
MEM-OSM-512M 512-MB ECC Memory for Optical Services Modules

Maximum Station-to-Station Cabling Distance
• 1000BASE-SX: 62.5 um multimode fiber: up to 275 m
• 1000BASE-SX: 50 um multimode fiber: up to 550 m
• 1000BASE-LX: 62.5 um multimode fiber: up to 550 m
• 1000BASE-LX: 50 um multimode fiber: up to 550 m
• 1000BASE-LX: 9/10 um single-mode fiber: up to 5 km
• 1000BASE-LH: 62.5 um multimode fiber: up to 550 m
• 1000BASE-LH: 50 um multimode fiber: up to 550 m
• 1000BASE-LH: 9/10 um single-mode fiber: up to 10 km
• 1000BASE-ZX: 9/10 um single-mode fiber: up to 70 km
• 1000BASE-ZX: dispersion-shifted fiber: up to 100 km
Cisco Service and Application Module for IP
1. WS-SVC-SAMI-BB-K9, Cisco Service and Application Module for IP

2. WS-SVC-SAMI-BB-K9=, Cisco Service and Application Module for IP (spare)

3. Six PowerPC SC8548 at 1.25 GHz (5 for traffic classification)

4. 1 GB double data rate 2 (DDR2) synchronous dynamic RAM (SDRAM) per PowerPC at 250 MHz; upgradeable to one 2-GB dual in-line memory module (DIMM) each

5. Daughter card data path – 32-bit FIFO at 125 MHz DDR (8 Gbps)

6. PowerPC data path – 16-bit FIFO at 125 MHz single data rate (SDR) (2 Gbps)


CISCO 7600 SERIES SPA INTERFACE PROCESSOR-600
* Cisco 7600 SIP 600 with 10-Port Gigabit Ethernet SPA; Cisco 7600 Series SPA Interface Processor-600 7600-SIP-600 (one unit)

Cisco 7600 Series SPA Interface Processor-200.
* 7600-SIP-200; Cisco 7600 Series SPA Interface Processor-200 and MEM-SIP-200-1G; 1 GB memory for Cisco 7600 SIP-200 (one unit)

Cisco 10-Port Gigabit Ethernet Shared Port Adapters, Version 2

1. Cisco 10-Port Gigabit Ethernet Shared Port Adapter, SPA-10X1 GE-V2
2. 1000BASE-SX SFP (DOM), SFP-GE-S
3. 1000BASE-LX/LH SFP (DOM), SFP-GE-L
4. 1000BASE-ZX SFP (DOM), SFP-GE-Z
5. 1000BASE-T SFP, SFP-GE-T


Gigabit Ethernet SFP Optics, Maximum Distance
1. Short wavelength (SX) SFP multimode optics, 1804 ft (550m)
2. Long wavelength/long haul (LX/LH) SFP single-mode optics, 6.2 mi (10 km)
3. Extended distance (ZX) SFP single-mode optics, 43.5 mi (70 km)
4. Copper (RJ-45) SFP optics, 328 ft (100m)

Cisco 1-Port 10 Gigabit Ethernet Shared Port Adapter, Version 2

1. Cisco 1-Port 10 Gigabit Ethernet Shared Port Adapter, SPA-1X10GE-L-V2
2. Cisco 10 Gigabit Ethernet LR (10 km) Optics, XFP-10GLR-OC192SR
3. Cisco 10 Gigabit Ethernet ER (40 km) Optics, XFP-10GER-OC192IR
4. Cisco 10 Gigabit Ethernet ZR (80 km) Optics, XFP-10GZR-OC192LR

Gigabit Ethernet XFP Optics, Maximum Distance
1. 10 Gigabit Ethernet long-reach (LR) optics (single-mode fiber), 6.2 mi (10 km)
2. 10 Gigabit Ethernet extended-reach (ER) optics (single-mode fiber), 25 mi (40 km)
3. 10 Gigabit Ethernet long-haul (ZR) optics (single-mode fiber), 50 mi (80 km)

Cisco 3800 Series Integrated Services Routers and CISCO IP COMMUNICATIONS VOICE/FAX NETWORK MODULE (4 unit every Central Telecom)( Total Central, 160 unit)

CISCO3845, Cisco 3845 integrated services router with two Gigabit Ethernet fixed LAN ports, one SFP slot, four NMEs, four HWICs, two AIM slots, 4 PVDM slots Cisco IP Base software, and AC power

Cisco 3800 Series ATM OC-3 Network Module
Cisco Systems® extends WAN connectivity by adding high-speed ATM access to remote branch offices with the Cisco® 3800 ATM OC-3 Network Module

1. NM-1A-OC3-POM ATM OC3 module with single POM (SFP) slot
2. SFP-OC3-MM OC3/STM1 SFP, Multi-mode fiber
3. SFP-OC3-IR1 OC3/STM1 SFP, Single-mode fiber, Intermediate Reach
4. SFP-OC3-LR1 OC3/STM1 SFP, Single-mode fiber, Long Reach (40km)

CISCO GIGABIT ETHERNET NETWORK MODULE
The Cisco Gigabit Ethernet Network Module brings Gigabit Ethernet to the Cisco 2691, Cisco 3660, Cisco 3725, Cisco 3745, Cisco 3825 and Cisco 3845.

1. NM-1GE One-port Cisco Gigabit Ethernet Network Module
2. WS-G5483, Copper GBIC (1000BASE-T, Category 5 cabling, up to 100 meters)
3. WS-G5484, Short-wavelength GBIC (1000BASE-SX, up to 550 meters)
4. WS-G5486, Long-wavelength, long-haul GBIC (1000BASE-LX/LH, up to 10 km)
5. WS-G5487, Extended-distance GBIC (1000BASE-ZX, up to 100 km)

CISCO IP COMMUNICATIONS VOICE/FAX NETWORK MODULE
Cisco IP Communications Voice/Fax Network Modules for the Cisco 2600XM Series, Cisco 2691, Cisco 2800, 3600, 3700, and 3800 Series Voice Gateway Routers
(Cisco Platform Cisco 3845 Integrated Services Router Maximum Number of Network Modules Allowed 4):

1. NM-HD-2VE, 2-slot IP communications enhanced voice/fax network module; Supports analog/BRI/T1/E1 voice and data WAN. Supports up to 48 channels of G.71 1 codec, 24 channels of medium-complexity codec, or 18 channels of any supported codec. Offers maximum investment protection with support for analog/digital voice and data WAN.

2. VWIC2-2MFT-T1/E1, 2-port RJ-48 multiflex trunk-T1/E1 (Voice and WAN) Used to connect to PBX, PSTN, or WAN using T1/E1 standard interface and provide channel drop-and-insert capability.

3. VIC-4FXS/DID, 4-port FXS voice/fax interface card. (Note: The DID feature was added to the 2600XM, 2691, 2800, 3700, 3800 starting with 12.3(14)T. This feature currently is supported on 1700 and 2801 platforms.)

4. CAB-E1-RJ45TWIN E1, cable RJ-45 to Twinax (balanced)
Cisco Digital Modem Modules for the Cisco 2800 and 3800 Series Integrated Services Routers
1. Digital Modem Port Densities Supported Through Onboard PVDM Slots
2. Cisco 3825 and 3845 Integrated Services Routers, 144 channels
3. Cisco Integrated Services Router Platforms Cisco 3825 and 3845 Maximum Number of Cisco Digital Modem PVDMs Supported 4

PVDM2-36DM, Cisco 36-Port Digital Modem Module (system)

HIGH-DENSITY PACKET VOICE DIGITAL SIGNAL PROCESSOR MODULE FOR CISCO IP COMMUNICATIONS SOLUTION

* 64-Channel Packet Fax/Voice DSP Module, or spare PVDM2-64 or PVDM2-64=

Platform Support Cisco3825, Cisco3845:
1. PVDM2-64; NM-HDV2, NM-HDV2 1T1/E1, NM-HDV2-2T1/E1, IP VOICE or IP PLUS below images

2. PVDM2-64; EVM-HD-8FXS/DID, EM HDA-8FXS; EM-4BRI-NT/TE, IP VOICE

Cisco 3800 Series Integrated Services Routers and Cisco High-Density Analog And Digital Extension Module for Voice and Fax (2 unit every Central Telecom)

CISCO3845, Cisco 3845 integrated services router with two Gigabit Ethernet fixed LAN ports, one SFP slot, four NMEs, four HWICs, two AIM slots, 4 PVDM slots Cisco IP Base software, and AC power
Cisco 3800 Series ATM OC-3 Network Module
Cisco Systems® extends WAN connectivity by adding high-speed ATM access to remote branch offices with the Cisco® 3800 ATM OC-3 Network Module

1. NM-1A-OC3-POM ATM OC3 module with single POM (SFP) slot
2. SFP-OC3-MM OC3/STM1 SFP, Multi-mode fiber
3. SFP-OC3-IR1 OC3/STM1 SFP, Single-mode fiber, Intermediate Reach
4. SFP-OC3-LR1 OC3/STM1 SFP, Single-mode fiber, Long Reach (40km)

CISCO GIGABIT ETHERNET NETWORK MODULE
The Cisco Gigabit Ethernet Network Module brings Gigabit Ethernet to the Cisco 2691, Cisco 3660, Cisco 3725, Cisco 3745, Cisco 3825 and Cisco 3845.
1. NM-1GE One-port Cisco Gigabit Ethernet Network Module
2. WS-G5483, Copper GBIC (1000BASE-T, Category 5 cabling, up to 100 meters)
3. WS-G5484, Short-wavelength GBIC (1000BASE-SX, up to 550 meters)
4. WS-G5486, Long-wavelength, long-haul GBIC (1000BASE-LX/LH, up to 10 km)
5. WS-G5487, Extended-distance GBIC (1000BASE-ZX, up to 100 km)

Cisco High-Density Analog And Digital Extension Module for Voice and Fax
1. EM-HDA-8FXS, This 8-port FXS voice and fax expansion module provides on-premises FXS signaling to connect directly to a standard telephone, fax machine, or similar device and supplies ring, voltage, and dial tone. Signaling support available in FXS mode includes loop-start and ground start. Only FXS signaling is supported-there is no DID support. This expansion module also works with the Cisco High-Density Analog Voice and Fax Network Module (part number NM HDA-4FXS).

2. EM-HDA-3FXS/4FXO, This 3-port FXS and 4-port FXO voice and fax expansion module provides on-premises FXS signaling to connect directly to a standard telephone, fax machine, or similar device and supplies ring, voltage, and dial tone. In addition, the FXO ports provide off-premises connection to the central office. FXS signaling support available includes loop-start and ground-start. There is no DID support. In addition, there is no FXO power failover support on the FXO ports. It also supports analog Centralized Automated Message Accounting (CAMA) on any port.

DSP Resources for the Cisco High-Density Extension Module
PVDM2-64 PVDM2, modules provide central Digital Signal Processor (DSP) resources for the Cisco High Density Extension Module (EVM-HD) baseboard and its expansion modules. PVDM2 modules are purchased separately and installed in the DSP module slots located inside the Cisco 2821, Cisco 2851, Cisco 3825, and Cisco 3845 integrated services routers


Call Complexity and Codecs Supported with PVDM2 DSP Modules
1. High Complexity, G.71 1 a-law and mu-law; G.726 @ 32k, 24k, and 16k; G.729, A, B and AB; G.723.1 @ 5.3k and 6.3k; G.728, GSMFR, GSMEFR, clear channel codec, and fax relay

2. Medium Complexity, G.71 1 a-law and mu-law; G.726 @ 32k, 24k, and 16k; G.729A and AB; clear channel codec, and fax relay

3. Flexible or Low Complexity, G.71 1 a-law and mu-law

Cisco AS5350XM Universal Gateway (for every Central, 6 unit)
Cisco AS5350XM Universal Gateway 2-, 4-, and 8-Port CE1/CT1/PRI Termination Feature Cards
High-Density Packet Voice/Fax Digital Signal Processor Module for Cisco AS5400XM and AS5350XM Voice Gateways

1. 64-Channel Packet Voice/Fax DSP Module, or Spare AS5X-PVDM2-64 or AS5X-PVDM2-64=
2. AMR License for Cisco AS5350XM, or Spare FR535XM-AMR-LIC or FR535XM-AMR-LIC=
3. AMR License for Cisco AS5400XM, or Spare FR54XM-AMR-LIC or FR54XM-AMR-LIC=

Data Room Server for billing Central Telecom:
Cisco Catalyst Switch 4948
1. WS-C4948-S, Cisco Catalyst 4948, IP Base software image (RIP, static routes), one AC power supply, fan tray

2. WS-C4948-E, Cisco Catalyst 4948, Enterprise Services software image (IPX, Appletalk, OSPF, EIGRP, IS-IS, BGP), one AC power supply, fan tray

3. WS-C4948, Cisco Catalyst 4948, optional software image, optional power supplies, fan tray

4. S49IPB-12231SG, Cisco IOS Software for the Cisco Catalyst 4900 Series (IP Base image with EIGRP-stub support)

5. S49IPBK9-12231SG, Cisco IOS Software for the Cisco Catalyst 4900 Series (IP Base image with Triple Data Encryption Standard [3DES] and EIGRP stub support)

6. S49ES-12231SG, Cisco IOS Software for the Cisco Catalyst 4900 Series (Enterprise Services image)

Cisco SFS 7024 InfiniBand Server Switch
1. SFS-7024P, Cisco SFS 7024P InfiniBand Server Switch, 288-port switch, non-blocking fabric

2. SFS-7024P-X, Cisco SFS 7024P InfiniBand Server Switch, 288-port upgradeable chassis, ships with 156 ports, 67% blocking fabric

3. SFSX7012/24-4X12, Cisco SFS 7012P/7024P InfiniBand 4X 12-Port Line Card

4. SFS-7012/24-FM, Cisco SFS 7012P/7024P Switch Fabric Module—no management

5. SFS-7012/24-MM-K9, Cisco SFS 7012P/7024P Switch Fabric Module—with management

6. PWR-SFS7012/24, Cisco SFS 7012P/7024P Power Supply

Cisco SFS 7024D InfiniBand Server Switches
7024D InfiniBand Server Switches set the standard for high-density, low-latency, 4X DDR and SDR InfiniBand switching for building high-performance clusters.

1. SFS-7024D, Cisco SFS 7024D InfiniBand Server Switch, 288-port chassis

2. SFSX7012/24D-4X12, Cisco SFS 7012D/7024D InfiniBand 4X 12-Port Line Card

3. SFS-7012/24D-FM, Cisco SFS 7012D/7024D Switch Fabric Module – no management

4. SFS-7012/24D-MM-K9, Cisco SFS 7012D/7024D Switch Fabric Module – with management

5. PWR-SFS7012/24P, Cisco SFS 7012D/7024D Power Supply
Support Billing Server Central Telecm for critical server
Cisco MDS 9509 Multilayer Director
1. DS-C9509, Cisco MDS 9509 Chassis

2. DS-X9530-SF2-K9, Cisco MDS 9500 Series Supervisor/Fabric-2

3. DS-X9032, Cisco MDS 9000 Family 32-Port 1/2-Gbps Fibre Channel Switching Module

4. DS-X9032-SSM, Cisco MDS 9000 Family 32-Port Storage Services Module

5. DS-X9302-14K9, Cisco MDS 9000 Family 14/2-Port Multiprotocol Services Module

6. DS-X9308-SMIP, Cisco MDS 9000 Family 8-Port 1-GE IP Storage Services Module

7. DS-X9148, Cisco MDS 9000 Family 1/2/4-Gbps 48-Port Fibre Channel Switching Module

8. DS-X9704, Cisco MDS 9000 Family 10-Gbps 4-port Fibre Channel switching module

9. DS-SFP-FC4G-SW, 1/2/4-Gbps Fibre Channel—Shortwave, Small Form-Factor Pluggable (SFP), LC

10. DS-SFP-FC4G-LW, 1/2/4-Gbps Fibre Channel—Longwave, SFP, LC (10-km reach)

11. DS-X2-FC10G-SW, 10-Gbps Fibre Channel—Shortwave X2, SC

12. DS-X2-FC10G-LW, 10-Gbps Fibre Channel—Longwave X2, SC

13. DS-SFP-FCGE-SW, 1-Gbps Ethernet and 1/2-Gbps Fibre Channel—Shortwave SFP, LC

14. DS-SFP-FCGE-LW

15. DS-SFP-GE-T, 1-Gbps Ethernet and 1/2-Gbps Fibre Channel—Longwave SFP, LC

16. Gigabit Ethernet Copper SFP, RJ-45
Advanced Software Packages
1. M9500EXT12K9, Cisco MDS 9500 Series SAN Extension over IP Package for Cisco MDS 9000 Family 14/2-Port

2. Multiprotocol Services Module

3. M9500EXT1 K9, Cisco MDS 9500 Series SAN Extension over IP Package for Cisco MDS 9000 Family 8-Port 1-GE

4. IP Storage Services Module

5. M9500SSE1 K9, Cisco MDS 9500 Series Storage Services Enabler Package for the Cisco MDS 9000 Family Advanced

6. Services Module or the Cisco MDS 9000 Family Storage Services Module

7. M9500ENT1K9, Cisco MDS 9500 Series Enterprise Package

8. M9500FMS1K9, Cisco MDS 9500 Series Fabric Manager Server Package

9. M9500FIC1K9, Cisco MDS 9500 Series Mainframe Package

Cisco MDS 9506 Multilayer Director
1. DS-C9506, Cisco MDS 9506 Chassis

2. DS-X9530-SF2-K9, Cisco MDS 9500 Series Supervisor/Fabric-2

3. DS-X9032, Cisco MDS 9000 Family 32-Port 1/2-Gbps Fibre Channel Module

4. DS-X9032-SSM, Cisco MDS 9000 Family 32-Port Storage Services Module

5. DS-X9124, Cisco MDS 9000 Family 1/2/4-Gbps 24-Port Fibre Channel Switching Module

6. DS-X9302-14K9, Cisco MDS 9000 Family 14/2-Port Multiprotocol Services Module

7. DS-X9308-SMIP, Cisco MDS 9000 Family 8-Port 1-GE IP Storage Services Module

8. DS-X9704, Cisco MDS 9000 Family 10-Gbps 4-port Fibre Channel switching module

9. DS-SFP-FC4G-SW, 1/2/4-Gbps Fibre Channel—Shortwave SFP, LC

10. DS-SFP-FC4G-LW, 1/2/4-Gbps Fibre Channel—Longwave, SFP, LC (10-km reach)

11. DS-X2-FC10G-SW, 10-Gbps Fibre Channel—Shortwave X2, SC

12. DS-X2-FC10G-LW, 10-Gbps Fibre Channel—Longwave X2, SC

13. DS-SFP-FCGE-SW, 1-Gbps Ethernet and 1/2-Gbps Fibre Channel—Shortwave SFP, LC DS-SFP-FCGE-LW

14. DS-SFP-GE-T, 1-Gbps Ethernet and 1/2-Gbps Fibre Channel—Shortwave SFP, LC Gigabit Ethernet Copper SFP, RJ-45

Advanced Software Packages
1. M9500ENT1K9, Cisco MDS 9500 Series Enterprise Package

2. M9500FMS1K9, Cisco MDS 9500 Series Fabric Manager Server Package
3. M9500FIC1K9, Cisco MDS 9500 Series Mainframe Package

4. M9500EXT12K9, Cisco MDS 9500 Series SAN Extension over IP Package for Cisco

5. MDS 9000 Family 14/2-Port Multiprotocol Services Module

6. M9500EXT1K9, Cisco MDS 9500 Series SAN Extension over IP Package for Cisco

7. MDS 9000 Family 8-Port 1-GE IP Storage Services Module

8. M9500SSE1 K9, Cisco MDS 9500 Series Storage Services Enabler Package for the Cisco MDS 9000 Family Advanced Services Module or the Cisco MDS 9000 Family Storage Services Module

Server Billing System:
IBM System x3650 (60 unit)
1. 2U Rack with Intel Xeon Quad Core E5310/E5320/E5335/X5355 or Dual Core 5110/5120/5130/5140/5150

2. 8MB (Quad Core) or (4MB (Dual Core) L2 Cache)

3. 2DGB (a2A/C1A/C3A) or 1 GB (other model) PC2-5300 FBD SDRAM DIMM (up to 48GB Max)

4. 2 x 73GB 15,000 rpm Hot-swap SAS HDD (up to 1,8TB) internal storage and server RAID 8K-I

5. Dual Gigabit Ethernet Controller - Optional internal DDS5/Go Vault tape - IBM serverGuide & IBM Director

IBM System Storage DS3200 (60 unit):
1. DS3200 Controller, IBM SAS HBA Controller
2. IBM 3m SAS Cable, 3 x 73GB 15.000 rpm
3. Hot-swap SAS HDD


Connection among/between Central Telecom for Room Transmision Central Telecom:

Cisco ONS 15454 ANSI/SONET System:

Cisco ONS 15454 SDH 12-Port STM-1 Electrical Interface Card (Slot 1 - 4 & Slot 14 -17)

1. STM-1E electrical interface card, 12 ports, SDH systems, 15454E-STM1E-12

2. STM-1 E FMEC, 12 ports for 1:1 protection or 24 ports for unprotected, 75-ohm 1.0 or 2.3 connectors, 2 slots, SDH systems, 15454E-STM11-FMEC

Cisco ONS 15454 OC-192/STM-64 XFP-Based Optics Card (slot 5, 6 & slot 12, 13)

1. OC-192 XFP-based multiple-reach optics card, 1 ckt., SONET systems, 15454-10G-XR

2. STM-64 XFP-based multiple-reach optics card, 1 ckt., SDH systems, 15454E-10G-XR

3. OC-192 XFP-based optics card, supports short-reach only, XFP included, SONET systems, 15454-10G-S1

4. STM-64 XFP-based optics card, supports intra-office reach only, XFP included, SDH systems 15454E-10G-I1


XFP Modules
1. XFP, OC-192/STM-64, short-reach/intra-office, 1310 nm, SMF,ONS-XC-10G-S1

2. XFP, OC-192/STM-64, intermediate-reach/short-haul, 1550 nm, SMF, ONS-XC-10G-I2

3. XFP, OC-192/STM-64, long-reach/long-haul, 1550 nm, SMF, ONS-XC-10G-L2

Cisco ONS 15454 Timing, Communications, and Control Version Two Cards (Slot 7 & Slot 11)

1. Timing, Communications, and Control Card, Version 2 Plus, enhanced security, industrial temperature 15454-TCC2P-K9 rated, SONET platform

2. Timing, Communications, and Control Card, Version 2 Plus, enhanced security, industrial temperature 15454E-TCC2P-K9 rated, SDH platform

3. Timing, Communications, and Control Card, Version 2, industrial temperature rated, SONET platform, 15454-TCC2

4. Timing, Communications, and Control Card, Version 2, industrial temperature rated, SDH platform, 15454E-TCC2

Cisco ONS 15454 60G/5G High-Order/Low-Order XC-VXC Cross-Connect Card (slot 8 & Slot 10)

1. 60G/5G high-order/low-order cross-connect card, XC-VXC-series, I-Temp, SONET system; 15454-XC-VXC-10G

2. 60G/5G high-order/low-order cross-connect card, XC-VXC-series, I-Temp, SDH system; 15454E-XC-VXC-10G

Cisco ONS 15454 ETSI/SDH System

Cisco ONS 15454 12-Port and 4-Port Small Form-Factor Pluggable-Based Multirate Optics Card (slot 1 - 4 & slot 14 - 17)

Ordering Information: MRC-12 Card
1. 12-port SFP-based multirate optics card, intra-office, SONET systems, 15454-MRC-I-12

2. 12-port SFP-based multirate optics card, intra-office, SDH systems, 10G capacity, 15454E-MRC-I-12

3. 12-port SFP-based multirate optics card, intra-office, SDH systems, 2.5G capacity, 15454E-MRC-2.5G12

4. 4-port SFP-based multirate optics card, intra-office, SONET systems, 15454-MRC-2.5G4



Ordering Information: SFP Modules
1. OC-3/STM-1 IR1/S-1.1, 1310 nm single-mode fiber (SMF), SFP, ITEMP, ONS-SI-155-I1

2. OC-3/STM-1 LR1/L-1.1, 1310 nm SMF, SFP, ITEMP, ONS-SI-155-L1

3. OC-3/STM-1 LR/L-1.2, 1550 nm SMF, SFP, ITEMP, ONS-SI-155-L2

4. OC-3/STM-1 CWDM, 14xx nm SMF, SFP*, ONS-SE-155-xxxx

5. OC3/STM1, IR1/S1.1.,1310 nm, Multi Mode , Small Form Pluggable (SFP), I Temp, ONS-SE-155-I1-MM=

6. Dual-rate OC-12/STM-4 and OC-3/STM-1 SR/I-1/I-4, IR1/S-1.1/S-4.1, 1310 nm SMF, SFP ITEMP, ONS-SI-622-I1

7. OC-12/STM-4 LR1/L-4.1, 1310 nm SMF, SFP, ITEMP, ONS-SI-622-L1

8. OC-12/STM-4 LR/L-4.2, 1550 nm SMF, SFP, ITEMP, ONS-SI-622-L2

9. OC-12/STM-4, CWDM, 1470 nm SMF, SFP*, ONS-SE-622-xxxx

10. OC12/STM4, IR1/S4.1.,1310 nm, Multi Mode , Small Form Pluggable (SFP), I Temp, ONS-SE-622-I1-MM=

11. OC-48/STM-16 SR/I-16, 1310 nm SMF, SFP, ITEMP, ONS-SI-2G-S1

12. OC-48/STM-16 IR/S-16.1, 1310 nm SMF, SFP, ITEMP, ONS-SI-2G-I1

13. OC-48/STM-16 LR/L-16.1, 1310 nm SMF, SFP, ITEMP, ONS-SI-2G-L1

14. OC-48/STM-16 LR/L-16.2, 1550 nm SMF, SFP, ITEMP, ONS-SI-2G-L2

15. OC-48/STM-1 6 LR DWDM, 1 5xx.xx nm SMF, 100 GHz, SFP*, ONS-SC-2G-xx.x

16. OC48/STM16/GE, CWDM, 1610 nm, Small Form Pluggable (SFP), C Temp, ONS-SC-Z3-xxxx=

17. Tri-rate OC48IR1,12/3SR1,GE LX STM S-16.1,I-4,I-1 EXT SFP, ONS-SE-Z1=

18. STM1 Electrical SFP C-TEMP for SDH mode, ONS-SC-155-EL=

Cisco ONS 15454 OC-192/STM-64 XFP-Based Optics Card (slot 5, 6 & slot 12, 13)

1. OC-192 XFP-based multiple-reach optics card, 1 ckt., SONET systems, 15454-10G-XR

2. STM-64 XFP-based multiple-reach optics card, 1 ckt., SDH systems, 15454E-10G-XR

3. OC-192 XFP-based optics card, supports short-reach only, XFP included, SONET systems, 15454-10G-S1

4. STM-64 XFP-based optics card, supports intra-office reach only, XFP included, SDH systems 15454E-10G-I1


XFP Modules
1. XFP, OC-192/STM-64, short-reach/intra-office, 1310 nm, SMF,ONS-XC-10G-S1

2. XFP, OC-192/STM-64, intermediate-reach/short-haul, 1550 nm, SMF, ONS-XC-10G-I2

3. XFP, OC-192/STM-64, long-reach/long-haul, 1550 nm, SMF, ONS-XC-10G-L2

Cisco ONS 15454 Timing, Communications, and Control Version Two Cards (Slot 7 & Slot 11)

1. Timing, Communications, and Control Card, Version 2 Plus, enhanced security, industrial temperature 15454-TCC2P-K9 rated, SONET platform

2. Timing, Communications, and Control Card, Version 2 Plus, enhanced security, industrial temperature 15454E-TCC2P-K9 rated, SDH platform

3. Timing, Communications, and Control Card, Version 2, industrial temperature rated, SONET platform, 15454-TCC2

4. Timing, Communications, and Control Card, Version 2, industrial temperature rated, SDH platform, 15454E-TCC2

Cisco ONS 15454 60G/5G High-Order/Low-Order XC-VXC Cross-Connect Card (slot 8 & Slot 10)

1. 60G/5G high-order/low-order cross-connect card, XC-VXC-series, I-Temp, SONET system; 15454-XC-VXC-10G

2. 60G/5G high-order/low-order cross-connect card, XC-VXC-series, I-Temp, SDH system; 15454E-XC-VXC-10G

Cisco ONS 15454 Multiservice Transport Platform
The First Combination, Cisco ONS 15454 MSTP:

10-Gbps Multirate Enhanced Transponder Card for the Cisco ONS 15454 Multiservice Transport Platform (Slot-1 dan Slot-17)

* 15454-10E-L1-xx.x=10-Gbps EFEC multirate transponder card, XFP-based client interface, 4-channel tunable on 100-GHz ITU
* 15454-10E-L1-xx.x=10-Gbps EFEC multirate transponder card, XFP-based client interface, 8-channel tunable on 50-GHz ITU
* ONS-XC-10G-S1=10-Gigabit SFP OC-192/STM-64/10 GE/10-Gbps Fibre Channel, 1310 SR-SM LC connectors
ONS-XC-1 0G-L2=10-Gigabit SFP OC-192/STM-64, 1550 LR-SM LC connectors (supported on ETSI platform only)


Multiservice Aggregation SONET/Ethernet MSPP-on-a-Blade Card for the Cisco ONS 15454 Multiservice Transport Platform (Slot-2 dan Slot 16)

* 15454-ADM-10G =, MSPP-on-a-Blade OC192 3/12/48/GE 16-Client,
* ONS-XC-1 0G-xx.x=, OC-1 92/STM64/1 0GE, XFP, 1 5xx.xx (see Table 6), 100 GHz, LC,
* ONS-XC-10G-S1=, 10 Gigabit SFP OC-192/STM-64/10 GE/10-Gbps Fibre Channel ,, 1310 SR-SM LC connectors
* ONS-SE-G2F-SX=, GE/1G-FC/2G-FC – 850nm - MM – LC - EXT TEMP,
* ONS-SE-G2F-LX=, GE/1 G-FC/2G-FC/HDTV – 131 0nm - SM – LC - EXT TEMP,
* ONS-SI-GE-ZX=, SFP – 1 000BASE-ZX Gigabit Ethernet, 1550, SM, I-Temp,
* ONS-SE-Z1=, OC48IR1, 12/3SR1, GE LX STM S-16.1, I-4, I-1 EXT,
* ONS-SI-155-L2=, OC3/STM1 LR, 1550 nm, Small Form Pluggable (SFP), ITEMP,
* ONS-SI-622-I1=, OC12/STM4 and OC3/STM1 IR, 1310 nm, SFP ITEMP,
* ONS-SI-2G-S1=, OC48/STM16, SR1, 1310nm, Small Form Pluggable (SFP), I-Temp
* ONS-SI-2G-L2=, OC48/STM16, LR2, 1550nm, Small Form Pluggable (SFP), I-Temp

4-Port 2.5-Gbps Enhanced Muxponder Card for the Cisco ONS 15454 Multiservice Transport Platform (Slot-3 dan Slot -15)

* 15454-10ME-xx.x 4-Port OC-48/STM-16 EFEC muxponder card, 4 SFP-based client interfaces, 4-channel tunable on 100-GHz ITU wavelengths (50-GHz stability) DWDM line with LC connectors – C band

* 15454-SF P-OC48-IR= OC-48/STM-1 6 SFP, intermediate-reach, 1550-nm, single-mode, LC connectors

* 15454E-SFP-L.16.1= ONS-SE-2G-S1 = OC-48/STM-16 SFP optics module, short-reach/intra-office, 1310-nm, single-mode, EXT temperature range, LC connectors

* 15454E-SFP-L.16.1=ONS-SE-2G-L2= OC-48/STM-16 SFP optics module, long-reach/long-haul, 1550-nm, single-mode, EXT temperature range, LC connectors

Cisco ONS 15454 SL-Series 4-Port Fibre Channel Multiservice over SONET/SDH Card (Slot-4 dan Slot-14)

* 15454-FC-MR-4, 1- or 2-Gbps Fibre Channel/FICON card, 4 ports, SONET/ANSI system

* 15454E-FC-MR-4 ONS-GX-2FC-MM 1- or 2-Gbps Fibre Channel/FICON card, 4 ports, SDH/ETSI system Dual-rate 1.0625 or 2.125 Gbps Fibre Channel (FC-PI 10.0 compliant), 850 nm, multimode, GBIC, SC connectors

* 15454E-FC-MR-4 ONS-GX-2FC-SML 1- or 2-Gbps Fibre Channel/FICON card, 4 ports, SDH/ETSI system Dual-rate 1.0625 or 2.125 Gbps Fibre Channel (FC-PI 10.0 compliant), 1310 nm, single-mode, GBIC, SC connectors

* 15454-GBIC-SX 1000BASE-SX, short-reach, multimode, GBIC, SC connectors (GE/1 Gb FC only)

* 15454-GBIC-LX 1000BASE-LX, long-reach, single-mode, GBIC, SC connectors (GE/1 Gb FC only)

L-Band Optical Amplifier Portfolio for the Cisco ONS 15454 Multiservice Transport Platform (Slot-5, 6 dan Slot- 12, 13)

* 15454-OPT-AMP-L= Optical amplifier; can be configured as preamplifier or booster; L-band, 64 channels, 50-GHz compatible, LC connectors, midstage access; includes one 4-dB LC/LC attenuated loopback (to be used if Dispersion Compensation Units [DCU] are not required) and two 2-meter LC/LC fiber-optic cables

* 15454-OPT-BST-L= Optical booster amplifier, L-band, 64 channels, 50-GHz compatible, LC connectors; includes two 2-meter LC/LC fiber-optic cables

10-GBPS MULTIRATE TRANSPONDER CARD FOR THE CISCO ONS 15454 MULTISERVICE TRANSPORT PLATFORM (slot-7, 8 dan Slot 10, 11)


1. 15454-10T-L1-xx.x; 10-Gbps transponder optics card; short-reach client interface with LC connectors; long-reach, two-wavelength¬tunable, 100-GHz ITU-compliant DWDM line optics with LC connectors, SONET platform

2. 15454E-10T-xx.x; 10-Gbps transponder optics card; intraoffice client interface with LC connectors; long-haul, two-wavelength¬tunable, 100-GHz ITU-compliant DWDM line optics with LC connectors, SDH platform

3. 15216-CS-SM-Y= Y-; cable splitter/combiner module, single-mode, single-width module, LC connectors, installs in Cisco FlexLayer shelf assembly (1521 6-FL-SA)

4. 15216-FL-SA=; Shelf assembly, 4 module slots, 1-rack unit high, 19- or 23-inch rack mounting, Cisco FlexLayer platform

Cisco ONS 15454 Timing, Communications, and Control Version Two Cards (Slot-9)

1. Timing, Communications, and Control Card, Version 2 Plus, enhanced security, industrial temperature15454-TCC2P-K9 rated, SONET platform

2. Timing, Communications, and Control Card, Version 2 Plus, enhanced security, industrial temperature15454E-TCC2P-K9 rated, SDH platform

3. Timing, Communications, and Control Card, Version 2, industrial temperature rated, SONET platform, 15454-TCC2

4. Timing, Communications, and Control Card, Version 2, industrial temperature rated, SDH platform, 15454E-TCC2


The Second Combnation Cisco ONS 15454 MSTP:


10-GBPS MULTIRATE TRANSPONDER CARD FOR THE CISCO ONS 15454 MULTISERVICE TRANSPORT PLATFORM (slot-1 dan Slot 17)


1. 15454-10T-L1-xx.x; 10-Gbps transponder optics card; short-reach client interface with LC connectors; long-reach, two-wavelength¬tunable, 100-GHz ITU-compliant DWDM line optics with LC connectors, SONET platform

2. 15454E-10T-xx.x; 10-Gbps transponder optics card; intraoffice client interface with LC connectors; long-haul, two-wavelength¬tunable, 100-GHz ITU-compliant DWDM line optics with LC connectors, SDH platform

3. 15216-CS-SM-Y= Y-; cable splitter/combiner module, single-mode, single-width module, LC connectors, installs in Cisco FlexLayer shelf assembly (1521 6-FL-SA)

4. 15216-FL-SA=; Shelf assembly, 4 module slots, 1-rack unit high, 19- or 23-inch rack mounting, Cisco FlexLayer platform

10-Gbps Full-Band Tunable Multirate Enhanced Transponder Card for the Cisco ONS 15454 Multiservice Transport Platform (slot -2 dan slot -16)

1. 15454-1 0E-L1 -C= 10-Gbps EFEC multirate transponder card, XFP-based client interface, Full C-band tunable on 50-GHz ITU wavelengths DWDM line with LC connectors

2. 10-Gbps EFEC multirate transponder card, XFP-based client interface, Full L-band tunable on 50-GHz ITU wavelengths DWDM line with LC connectors

3. ONS-XC-10G-S1=, 10-Gigabit SFP OC-192/STM-64/10 GE/10-Gbps Fibre Channel , 1310 SR-SM LC connectors

4. ONS-XC-10G-L2=, 10-Gigabit SFP OC-192/STM-64, 1550 LR-SM LC connectors (supported on ETSI platform only)

4-Port 2.5-Gbps Full-Band Tunable Enhanced Muxponder Card for the Cisco ONS 15454 Multiservice Transport Platform (Slot - 3 dan Slot - 15)

1. 15454-10ME-L1-C= 4-Port OC-48/STM-1 6 EFEC muxponder card, 4 SFP-based client interfaces, Full C-band tunable on 50-GHz ITU wavelengths DWDM line with LC connectors

2. 15454-10ME-L1-L= 4-Port OC-48/STM-1 6 EFEC muxponder card, 4 SFP-based client interfaces, Full L-band tunable on 50-GHz ITU wavelengths DWDM line with LC connectors

3. ONS-SE-2G-S1 = OC-48/STM-16 SFP optics module, short-reach/intra-office, 131 0-nm, single-mode, EXT temperature range, LC connectors

4. 15454-SF P-OC48-IR= OC-48/STM-1 6 SFP, intermediate-reach, 1550-nm, single-mode, LC connectors

5. 15454E-SFP-L.16.1= ONS-SE-2G-L2= OC-48/STM-16 SFP optics module, long-reach/long-haul, 1550-nm, single-mode, EXT temperature range, LC connectors

8-Port Enhanced Data Muxponder Card for the Cisco ONS 15454 Multiservice Transport Platform (Slot - 4 dan Slot - 14)

1. 15454-10DME-C=
8-port EFEC data muxponder card, 8 SFP-based client interfaces, full C-band tunable on 50-GHz ITU wavelengths, DWDM line with LC connectors

2. 15454-10DME-L= 8-port EFEC data muxponder card, 8 SFP-based client interfaces, full L-band tunable on 50-GHz ITU wavelengths, DWDM line with LC connectors

3. ONS-SE-4G-MM= 4-Gbps FC SFP optics module, (0–70m 50/1 25 micron, 0–150m 62.5/1 25 micron, 850 nm, multimode, EXT temperature range, LC connectors

4. ONS-SE-4G-SM= 4-Gbps FC SFP optics module, 0–20,000m reach, 1310 nm, single-mode, EXT temperature range, LC connectors

Reconfigurable Optical Add/Drop Multiplexing Portfolio for the Cisco ONS 15454 Multiservice Transport Platform (Slot 5, 6 dan Slot 12, 13)

1. 15454-32-WSS= 32-Channel Wavelength Selective Switch, C-band, MPO connectors for add path, LC connectors for interconnection, includes two 2-m LC/LC fiber-optic cables

2. 15454-32-WSS-L= 32-Channel Wavelength Selective Switch, L-band, MPO connectors for add path, LC connectors for interconnection, includes two 2-m LC/LC fiber-optic cables

3. 15454-32-DMX= 32-Channel Demultiplexer 100 GHz (for use with 32-WSS), C-band, MPO connectors for drop path, LC connectors for interconnection, includes one 2-m LC/LC fiber-optic cables

4. 15454-32-DMX-L= 32-Channel Demultiplexer 100 GHz (for use with 32-WSS), L-band, MPO connectors for drop path, LC connectors for interconnection, includes one 2-m LC/LC fiber-optic cables

Mesh/Multiring Upgrade Card for the Cisco ONS 15454 Multiservice Transport Platform (Slot - 7 dan Slot - 11)

15454-MMU= Mesh/Multiring upgrade unit, C band and L band, for use with ONS 15454 MSTP Reconfigurable Optical Addr/Drop Multiplexer (ROADM) nodes (32-WSS/32-DMX or 32-WSS-L/32-DMX-L), LC connectors, includes one 2-meter LC/LC fiber-optic cable

2.5-Gbps Multiservice Aggregation Line Card for the Cisco ONS 15454 Multiservice Transport Platform (Slot-8 dan Slot-10)

1. 15454-DM-L1-xx.x= 2.5-Gbps data muxponder card, 8 SFP-based client interfaces, 4-channel tunable on 100-GHz ITU wavelengths (50 GHz stability), unprotected DWDM line with LC connectors – C band

2. 15454-DM P-L1-xx.x= 2.5-Gbps data muxponder card, 8 SFP-based client interfaces, 4-channel tunable on 100-GHz ITU wavelengths (50 GHz stability), protected DWDM line with LC connectors – C band

3. ONS-SE-200-MM= ESCON SFP, short-reach, 1310-nm, multimode, LC connectors

4. 15454-SF P-GE+-LX= GE, Fibre Channel (1- and 2-Gbps) and HDTV SFP, 1310-nm, single-mode, LC connectors

5. ONS-SE-G2F-LX= GE, Fibre Channel (1- and 2-Gbps) and HDTV SFP, long-reach, 1310-nm, single-mode, LC connectors

6. 15454-SFP-GEFC-SX= GE and Fibre Channel (1- and 2-Gbps) SFP, 850-nm, multimode, LC connectors

7. ONS-SE-G2F-SX= GE and Fibre Channel (1- and 2-Gbps) SFP, short-reach, 850-nm, multimode, LC connectors

Cisco ONS 15454 Timing, Communications, and Control Version Two Cards (Slot-9)

1. Timing, Communications, and Control Card, Version 2 Plus, enhanced security, industrial temperature15454-TCC2P-K9 rated, SONET platform

2. Timing, Communications, and Control Card, Version 2 Plus, enhanced security, industrial temperature15454E-TCC2P-K9 rated, SDH platform

3. Timing, Communications, and Control Card, Version 2, industrial temperature rated, SONET platform, 15454-TCC2

4. Timing, Communications, and Control Card, Version 2, industrial temperature rated, SDH platform, 15454E-TCC2

The Third Combination Cisco ONS 15454 MSTP:

Cisco ONS 15454 SL-Series 4-Port Fibre Channel Multiservice over SONET/SDH Card (Slot-1, 2 dan Slot-16, 17)

* 15454-FC-MR-4, 1- or 2-Gbps Fibre Channel/FICON card, 4 ports, SONET/ANSI system

* 15454E-FC-MR-4 ONS-GX-2FC-MM 1- or 2-Gbps Fibre Channel/FICON card, 4 ports, SDH/ETSI system Dual-rate 1.0625 or 2.125 Gbps Fibre Channel (FC-PI 10.0 compliant), 850 nm, multimode, GBIC, SC connectors

* 15454E-FC-MR-4 ONS-GX-2FC-SML 1- or 2-Gbps Fibre Channel/FICON card, 4 ports, SDH/ETSI system Dual-rate 1.0625 or 2.125 Gbps Fibre Channel (FC-PI 10.0 compliant), 1310 nm, single-mode, GBIC, SC connectors

* 15454-GBIC-SX 1000BASE-SX, short-reach, multimode, GBIC, SC connectors (GE/1 Gb FC only)

* 15454-GBIC-LX 1000BASE-LX, long-reach, single-mode, GBIC, SC connectors (GE/1 Gb FC only)

10-GBPS MULTIRATE TRANSPONDER CARD FOR THE CISCO ONS 15454 MULTISERVICE TRANSPORT PLATFORM (slot-3, 4 dan Slot 14, 15)


1. 15454-10T-L1-xx.x; 10-Gbps transponder optics card; short-reach client interface with LC connectors; long-reach, two-wavelength¬tunable, 100-GHz ITU-compliant DWDM line optics with LC connectors, SONET platform

2. 15454E-10T-xx.x; 10-Gbps transponder optics card; intraoffice client interface with LC connectors; long-haul, two-wavelength¬tunable, 100-GHz ITU-compliant DWDM line optics with LC connectors, SDH platform

3. 15216-CS-SM-Y= Y-; cable splitter/combiner module, single-mode, single-width module, LC connectors, installs in Cisco FlexLayer shelf assembly (1521 6-FL-SA)

4. 15216-FL-SA=; Shelf assembly, 4 module slots, 1-rack unit high, 19- or 23-inch rack mounting, Cisco FlexLayer platform


L-Band Optical Amplifier Portfolio for the Cisco ONS 15454 Multiservice Transport Platform (slot-5, 6 dan Slot-12, 13)

1. 15454-OPT-AMP-L= Optical amplifier; can be configured as preamplifier or booster; L-band, 64 channels, 50-GHz compatible, LC connectors, midstage access; includes one 4-dB LC/LC attenuated loopback (to be used if Dispersion Compensation Units [DCU] are not required) and two 2-meter LC/LC fiber-optic cables

2. 15454-OPT-BST-L= Optical booster amplifier, L-band, 64 channels, 50-GHz compatible, LC connectors; includes two 2-meter LC/LC fiber-optic cables

Reconfigurable Optical Add/Drop Multiplexing Portfolio for the Cisco ONS 15454 Multiservice Transport Platform (slot 7 dan slot 8)

1. 15454-32-WSS= 32-Channel Wavelength Selective Switch, C-band, MPO connectors for add path, LC connectors for interconnection, includes two 2-m LC/LC fiber-optic cables

2. 15454-32-WSS-L= 32-Channel Wavelength Selective Switch, L-band, MPO connectors for add path, LC connectors for interconnection, includes two 2-m LC/LC fiber-optic cables

3. 15454-32-DMX= 32-Channel Demultiplexer 100 GHz (for use with 32-WSS), C-band, MPO connectors for drop path, LC connectors for interconnection, includes one 2-m LC/LC fiber-optic cables

4. 15454-32-DMX-L= 32-Channel Demultiplexer 100 GHz (for use with 32-WSS), L-band, MPO connectors for drop path, LC connectors for interconnection, includes one 2-m LC/LC fiber-optic cables

Multiservice Aggregation SONET/Ethernet MSPP-on-a-Blade Card for the Cisco ONS 15454 Multiservice Transport Platform (slot-10)

1. 15454-ADM-10G =, MSPP-on-a-Blade OC192 3/12/48/GE 16-Client,

2. ONS-XC-1 0G-xx.x=, OC-1 92/STM64/1 0GE, XFP, 1 5xx.xx , 100 GHz, LC

3. ONS-XC-10G-S1=, 10 Gigabit SFP OC-192/STM-64/10 GE/10-Gbps Fibre Channel ,, 1310 SR-SM LC connectors

4. ONS-SE-G2F-SX=, GE/1G-FC/2G-FC – 850nm - MM – LC - EXT TEMP

5. ONS-SE-G2F-LX=, GE/1 G-FC/2G-FC/HDTV – 131 0nm - SM – LC - EXT TEMP

6. ONS-SI-GE-ZX=, SFP – 1 000BASE-ZX Gigabit Ethernet, 1550, SM, I-Temp

7. ONS-SE-Z1=, OC48IR1, 12/3SR1, GE LX STM S-16.1, I-4, I-1 EXT

8. ONS-SI-155-L2=, OC3/STM1 LR, 1550 nm, Small Form Pluggable (SFP), ITEMP

9. ONS-SI-622-I1=, OC12/STM4 and OC3/STM1 IR, 1310 nm, SFP ITEMP

10. ONS-SI-2G-S1=, OC48/STM16, SR1, 1310nm, Small Form Pluggable (SFP), I-Temp

11. ONS-SI-2G-L2=, OC48/STM16, LR2, 1550nm, Small Form Pluggable (SFP), I-Temp

Cisco ONS 15454 Timing, Communications, and Control Version Two Cards (Slot-9 dan Slot 11)

1. Timing, Communications, and Control Card, Version 2 Plus, enhanced security, industrial temperature15454-TCC2P-K9 rated, SONET platform

2. Timing, Communications, and Control Card, Version 2 Plus, enhanced security, industrial temperature15454E-TCC2P-K9 rated, SDH platform

3. Timing, Communications, and Control Card, Version 2, industrial temperature rated, SONET platform, 15454-TCC2

4. Timing, Communications, and Control Card, Version 2, industrial temperature rated, SDH platform, 15454E-TCC2

DVR Server - Cisco Video Surveilance Convergence Chasis:
1. Four (4) unit, Cisco Video Surveilance Convergence Chasis; 16-slot, Fast Ethernet, 230 VAC (CIVS-CVG16-FE-230) or

2. Four (4) unit, Cisco Video Surveilance Convergence Chasis; 16-slot, Gigabit Ethernet, 230 VAC (CIVS-CVG16-GE-230)

3. Four (4) unit Cisco Video Surveilance Convergence Chassis; with 4x4 channel IP Gateway modules (16 channels), 4 USB, no power supply - starter configuration (CIVS-16ECCVG16-USB)

4. Four (4) unit, 19-in, 1-RU rack spacer for Cisco Video Surveilance Convergence Chasis (CIVS-1RU-SPACER)

5. Four (4) unit, 2-slot blank panel for Cisco Video Surveilance Convergence Chasis; spare (CIVS-CVG16-2BLANK=)

6. Four (4) unit, 250W power supply for Cisco Video Surveilance RPS chassis (CIVS-REDPS-350=)

7. Four (4) Redundant power supply (RPS) chassis for Cisco Video Surveilance Convergence Chassis (CIVS-EDPWR-CHS)

Cisco Video Surveilance Services Platform (Hardisk Storage):
Compatibility Product Series:
Product compatibility Cisco Video Surveillance Services Platform with Video Surveillance Stream Manager software
Analog matrix switcher manufacturers All Bosch Matrix Switcher LTC8200 – LTC 8900 Series
All American Dynamic Matrix Switcher AD1 68 – MegaPower Series
Pelco 9760 and higher

Cisco Video Surveillance IP Gateway All models


8 Unit, Cisco Video Surveillance Stream Manager Services Software, 2-RU Services Platform RAID 5 6x400 GB, CIVS-SP2RR5-2000

8 unit, Cisco Video Surveillance 400-GB SATA Hard Disk Drive 2R Services Platform/Integrated Services Platform, spare, CIVS-HDD-400GB=

8 unit ,Cisco Video Surveillance Stream Manager Services Software 1-RU Services Platform, SCSI Connection, CIVS-SP1 R-SCSI
8 unit, Cisco SCSI Cable for Video Surveillance DAS/Storage Array 2 Meter, spare, CAB-SCSI-2M=

8 unit, Cisco USB cable for CVG1 6K to Video Surveillance Recorder, 1 Meter, spare, CAB-USB-1 M=

Cisco Video Surveilance Services Platform with RAID/SCSI Channel Connections:
4 Unit, Cisco Video Surveillance Services Platform with SCSI for external storage, CIVS-SP1 R-SCSI
4 Unit, Cisco Video Surveillance SCSI Cable, 1 Meter, CAB-SCSI-1M=
4 Unit, Cisco Video Surveillance SCSI Cable, 2 Meters, CAB-SCSI-2M=


Cisco Video Surveilance Integrated Services Platform:
1. Four (4) unit Cisco Video Surveilance Pelco Keyboard Adapter, RS232 to RS422/485 (CIVIDEO SURVEILANCE-KYBD2232-P=)

2. Four (4) unit Cisco Video Surveilance Stream Manager service Software, Integrated Services Platform ISP with 8 Encoders, 6x400-GB RAID 5 Hardisk Drives and 8 Stream Manager Connection Feature Licenses (CIVIDEO SURVEILANCE-SP8ECISP-2000)

3. Four (4) unit Cisco Video Surveilance 400-GB SATA Hardisk Drive 2R services Platforms and Integrated Services Platforms (CIVIDEO SURVEILANCE-HDD-400GB=)

4. Four (4) unit Cisco Video Surveilance Stream Manager Storage Administration Software, does not include PC (CIVIDEO SURVEILANCE-SM-AS30=)

5. Four (4) unit Cisco Video Surveilance Stream Mgr Admin Storage Administration Failover Software, does not include PC (CIVIDEO SUVEILANCE-SM-ASF30=)

Cisco Video Surveilance Stream Manager Software Version 5.0:
1. Four (4) unit Cisco Video Surveilance stream Manager Configuration Module (CIVS-SM-CFG50=)

2. Four (4) unit Cisco Video Surveilance stream Manager Client Viewing Module (CIVS-SM-CL50=)

3. Four (4) unit Cisco Video Surveilance stream Manager Administration and Monitoring Module (CIVS-SM-AS50=)

4. Four (4) unit Cisco Video Surveilance stream Manager Administration and Monitoring with Failover Module (CIVS-SM-ASF50=)

TYPICAL VIRTUAL MATRIX APPLICATION FOR CISCO VIDEO SURVEILLANCE
Compatibility List
Cisco Video Surveillance IP Gateway video encoders and decoders with Cisco Video Surveillance Stream Manager software are compatible with the following CCTV products:

Keyboard
1. Pelco KB 300
2. Bosch IntuiKey (Universal)
3. Panasonic WV-CU650
4. AD -2088, CC1100, and Touch Tracker

Speed Domes
1. All Bosch AutoDomes
2. All Pelco Spectra II & III series (D protocols) AD Ultra 6 and 7 series
3. Ultrak KD6
4. Panasonic WV-CS954
5. Cohu i-Dome

PRODUCT SPECIFICATIONS
Specifications
1. Video Encoder/Decoder
2. Compression: MPEG-4 – ISO/IEC 14496-2:1999 (simple profile)
3. Number of streams: 2 (second stream is CIF resolution only)
4. Data rate: 384 Kbps to 4 Mbps (constant bit rate)
5. Resolution:
1. D1: 720 x 576 PAL or 720 x 480 NTSC 4CIF:

2. 720 x 576 PAL or 704 x 480 NTSC 2CIF:

3. 704 x 288 PAL or 704 x 240 NTSC CIF:

4. 352 x 288 PAL or 352 x 240 NTSC

5. Audio Encoder/Decoder

6. Sampling rates: 8, 16, 24, 44.1, and 48 kHz

7. Network Compliance: IEEE 802.3, 802.3u, and 802.3x

8. Data rate: UTP 10/100 Mbps

9. Protocols: IP, Unicast/Multicast, User Datagram Protocol (UDP), Transmission Control Protocol (TCP), Real-Time Transport Protocol (RTP), Dynamic Host Control Protocol (DHCP), Address Resolution Protocol (ARP), Interior Gateway Management Protocol (IGMP) 2.0, and Simple Network Management Protocol (SNMP) 2.0

Signal Interfaces
1. Video: 1V pk–pk (75 ohms)
2. Audio: Full-duplex stereo
3. Input: 3V pk–pk (unbalanced)
4. Output: 2.5V pk–pk (unbalanced)
5. Serial data: RS-232, RS-422, or RS-485 (2- or 4-wire) Data rate: DC – 38.4 Kbps (NRZ)
6. Bit error rate: < 1 x 10-9

Contact closure
1. Response time: 0.5 ms
2. Input: (3) TTL, programmable N/O or N/C
3. Output: (1) SPST relay, N/O, 150 mA, 15 VDC
4. Indicators
5. Power/video detect, speed, and duplex

Connectors:
1. Video: BNC (gold-plated center pin)
2. Network: RJ-45
3. Data/contact/audio: Spring-cage terminal block Power: Screw terminal block
4. Electrical and Mechanical
5. Power: 8 to 18 VDC or from RMC-RJ
6. Current protection: Automatic resettable polymer fuses Circuit board: Meets IPC standard
7. Size (L x W x H)
8. Standalone Cisco Video Surveillance IP Gateway: 7.0 x 4.9 x 1.0 in. (17.8 x 12.4 x 2.5 cm)
9. Cisco Video Surveillance Convergence Chassis: 7.0 x 5.1 x 1.0 in. (17.8 x 13.0 x 2.5 cm) Slot required: 1
10. Shipping weight: <2 lb/0.9 kg

Environmental
1. MTBF: >100,000 hours
2. Operating temperature: –40 to 40°C, ambient Storage temperature: –40 to 85°C, ambient Relative humidity: 0 to 95% (noncondensing) †
3. Certifications and Compliance
4. Radiated emissions: FCC Part 15, Class A and EN55022

Matrix VideoWall Multiplexers:

1. Plasma and widescreen LCD panels have a 16:9 image format, whereas standard video input sources use a 4:3 image format…

2. This creates a size mismatch between the source image and displayed image which must be compensated in the display device.

3. Plasma and LCD panels can be set to different display modes to cope with
4. standard 4:3 images, depending on user preferences

5. Letterbox modes expand the image vertically to maintain 4:3 aspect ratio, but the top and bottom of the video image is lost
6. Fill Screen modes expand the 4:3 image horizontally and compress the image vertically to fill the screen resulting in a foreshortened image (people will look shorter than reality)

7. The Brick-2 video wall processor has flexible capability to display a square or asymmetric magnified image to help compensate for the 16:9 panels

8. In addition to magnification flexibility, the processor can shift individual segments of the displayed image to correctly line-up with the array of panels


Two (2) unit Matrix Video Wall Matrix (Brick-2 Video Wall Processor) dengan penayangan gambar:

1. 1 x 3 Video Wall
2. 5 x 4 Video Wall
3. 5 x 5 Video Wall
4. 4 x 5 Video Wall
5. 4 x 3 Video Wall
6. 6 x 5 Video Wall
Cisco 10GBASE X2 Modules
Product Overview
The Cisco® 10GBASE X2 modules (Figure 1) offer customers a wide variety of 10 Gigabit Ethernet connectivity options for data center, enterprise wiring closet, and service provider transport applications

Main features of Cisco 10GBASE X2 modules include:
• Support 10GBASE Ethernet.
• Hot-swappable input/output device plugs into an Ethernet X2 port of a Cisco switch or router to link the port with the network.
• Provides flexibility of interface choice.
• Supports “pay-as-you-populate” model.
• Supports the Cisco quality identification (ID) feature that enables a Cisco switch or router to identify whether the module is certified and tested by Cisco.
• Has optical interoperability with respective 10GBASE Xenpak and 10GBASE XFP modules on the same link.
Cisco X2-10GB-CX4
The Cisco 10GBASE-CX4 Module supports link lengths of up to 15m on CX4 cable.
Cisco X2-10GB-LRM
The Cisco 10GBASE-LRM Module supports link lengths of 220m on standard Fiber Distributed Data Interface (FDDI) grade multimode fiber (MMF).
Cisco X2-10GB-LX4
The Cisco 10GBASE-LX4 Module supports link lengths of 300m on standard FDDI grade MMF.
Cisco X2-1 0GB-SR
The Cisco 10GBASE-SR Module supports a link l
5. Other Skills - CV/Resume Part 5 [Optional]
Management Project

Management Construction

Personnel Management and Human Resources
6. Additional Information - CV/Resume Part 6 [Optional]
NA

 

Questions about this candidate? Contact us for an immediate answer. To find similar people [or more experienced] - active jobseekers, please login OR create, FREE of charge, your own company account.

In order to view this candidate's contact information, you must a) be registered with Oil Offshore Marine - Worldwide Oil & Gas Jobs, and b) have already purchased a subscription.

Login Register Pricing Information
EPCM experienced (10 years +) in oil & Gas, IT and Telecomunication
CV/Resume ID no.: 78413

Relevant CVs; view more oil and gas CVs
1. Contracts Administrator
2. Structural Designer
3. PDS-PDMS Civil Designer
4. Civil geotechnical engineer, young I aim to be involved in new challenging projects.
5. Piping/Mechanical Draughtsman With 7 years experiance
6. Planner / Project Controller Belleli Energy Oman Tecnimont Chile Turner Townsend India
7. PROCUREMENT, BUYER, SALES MANAGER
8. Document Controller, E&I Technician
9. Administrative Manager
10. Power Plant Construction Civil Engineer
11. Field Engineer (On-Shore and Off Shore)
12. Field Operations Manager, OIM
13. Health Safetty & Enviornmental
14. Construction Supervisor / Engineer
15. Civil Engineer - Projects
16. business analyst, senior cost controller; interest to evaluate opportunities in challenging projects
17. X-steel detailer
18. Senior Document Controller with 5 years experience, excellent inetrpersonal & communication skills
19. Civil Structural Designer (x-steel)
20. CIVIL, STRUCTURAL, PIPING
 
 
Other CVs; view more oil and gas CVs
1. Material Management and Procurement Systems
2. Senior Process Operator
3. Offshore oil rig crane operator
4. Seeking Radio Operator job
5. Able Seaman- Unlimited / Crane Operator
6. Material Controller, QC Inspector, Blaster
7. Chief Mate Senior DPO with experience in DSV (Dive Support Vessels) and Drilling rigs
8. QC Engineer - Welding / Painting / NDT Level III
9. New starter as Roustabout, fully trained and ready for hard work.
10. Electrical supervisor / foreman
11. Experience in construction Line Of 1 year Commercial Bldg
12. CITB advanced scaffolder
13. Industrial Safety Manager, Fire Fighting, Rescue Professional
14. Crane Operator / Project Manager with 20+ years of experience
15. Billing Systems & Billing Operations Manager
16. Mud Logger Weatherford Graduate in Petroleum Technology at the Nowrosjee Wadia College, Pune
17. Time served Pipefitter, current BOSIET survival certificate and offshore medical certificates
18. Pipe Welder with over 18 years experience, Tig, Arc, Gas Welding, Mig, Carbon arc
19. Shutdown Engineer, Mechanical Engineer with 14 years in petrochemical & oil & gas sector
20. Certified Sr. Geophysicist with a Masters degree, Paradigm Geophysical Corporation, Houston, TX, US
21. PIPEFITTER, QATAR ENGINEERING & CONSTRUCTION COMPANY WLL (QCON)
22. Senior IT Project Manager, Lead PeopleSoft Project Manger, Project Budget Planner, MIS Manager
23. FPSO Maintenance Superintendent Prosafe Production Singapore Ivory Coast West Africa Offshore
24. Process / Production / Control Room Operator Abu Dhabi Company for Onshore Oil Operations UAE
25. Instrumentation & Control Engineer in Oil Field Equipments Nov-Sara India Limited
26. Painting Supervisor ECC Project of Shell Eastern Petroleum Company (SEPC) Singapore
27. Container Freight Section Operations Assistant Maersk Logistics Limited Sri Lanka
28. Young expatriate rigger working in Arabian Gulf Oman Muscat Bahwan Engineering Company
29. A Marketing professional with considerable experience in research, strategic planning implementation
30. Non Destructive Testing Technician Energy Workforce Sdn Bhd Malaysia
 
 

Press Ctrl+D to Bookmark - Tell a Friend - Job Archives - Jobs - Oil and Gas CVs Resumes - Subscribe to Job Alerts - Site Map - Events - Legal - Privacy - Contact

oil offshore marine's website design

Official Blog - International Maritime Signal Flags - Glossary of Oil & Gas Jobs Definitions - Abbreviations & Acronyms from the Oil, Offshore, Marine, and Shipping Industries - Engineering Oil Jobs - Top 100 Energy Sites - Marine Jobs - Offshore Jobs - Oil Careers - Maritime Jobs - PDS/PDMS Oil & Gas Jobs - Oil Industry Jobs - Oil Field Jobs - Oil and Gas Careers - Petroleum Jobs - Oil Rig Jobs - Offshore Oil Rig Jobs - Drilling Jobs - Oil Industry - Official Sitemap - Jobs Feed - Login to your Oil-Offshore-Marine.com account

www.Oil-Offshore-Marine.com - Your Oil & Gas, Offshore, Construction, Shipping, Petrochemical, and Marine Engineering Recruitment Center.

© Oil Offshore Marine - Oil & Gas Jobs - All Rights Reserved.
This website is designed for international users, and its use is governed by Oil Offshore Marine - Oil & Gas Jobs Legal provisions. By browsing on any page of this website, you are deemed to have accepted all Oil Offshore Marine - Worldwide Center of Oil & Gas Jobs legal terms. If you do not agree with Oil Offshore Marine's legal provisions, you must stop using this website and its services.


find oil and gas jobs

  Looking for something?