CV QA/QC WELDING, COATING, NDT, EQUIPMENT INSTALLATION
|
|
|
|
|
|
|
| |
| |
| QA/QC WELDING, COATING, NDT, EQUIPMENT INSTALLATION |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in QA/QC WELDING, COATING, NDT, EQUIPMENT INSTALLATION - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
78616
Last Updated:
Monday, May 19, 2008 |
Location (Residence): visakhapatnam, India
Citizenship: India
|
| |
Languages:
Native:
Hindi Other:
English |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
Bachelors in Mechanical Engineering Years of Experience:
21 years
|
Authorized to work in:
Saudi Arabia
Present Location:
saudi arabia, dammam
Relocation:
Anywhere (International) |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Quality (QA/QC) |
Quality Control |
Experienced
|
26 years |
|
Inspection/Expediting |
Welding Inspection |
Experienced
|
26 years |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
I’ve 21 yrs of experience in the field of steel construction working for various industries, I started my carrier with Ship Building as production engineer & there after shifted to pressure vessel construction, Offshore platform construction & presently last 02yrs working with Saudi Aramco as inspection engineers (client Rep) for various on going projects at Saudi Arabia.
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
1. SAUDI ARAMCO : Jun 06- till to date
2. L&T (MFF) : 04 yr
3. SHIP BUILDING CENTRE (VIZAG) : 04 Years.
4. INDIAN NAVY : 12 Years
JUN 06- TILL TO DATE: SAUDI ARAMCO
HNRP (NGL)
Maintain potential (SAPID)
Khurais & Ghawar water supply pipeline
Presently working as client Rep for all Saudi Aramco projects under southern area project inspection unit, I am responsible for acceptance of welding, coating, Equipment installation, conducting hydro pressure testing, mechanical completion etc.
Review of construction related documentation, approval of QC personnel, welder, coating applicator etc.
Water Injection Pump station Installation: Worked as client rep for installation of CGT & Booster pump, Air Drier, LO tank etc, related piping system of the pumping facility, Approval & implementation approved coating scheme, on plot piping installation & welding ,Approval of the various procedure related to the plant welding, coating, preservation of equipment, bolt tightening ,hydro pressure testing procedure etc.
Cross Country pipe line (Khurais Ghawar Treated water line), covering 250kms of internally & externally coated pipeline of various Diameters 60” to 16”. I was involved with inspection & acceptance of welding (GMAW (Passo),SMAW &TIG), internal & external coating FBE coating manually & by robotic crawler technique , Valve / Pipeline hydro testing, NDT involving Radiography, Auto UT, MPI , DPI and monitoring of welding & welder repair rate.
All the special process document related to welding, coating, hydro testing, bolt torque procedure was reviewed & approval.
Hawiyah (NGL) I was initially assigned for the ongoing project of Hawiyah Natural Gas liquefied plant installation. I was overseeing of welding, PWHT & Coating activities.
Maintain potential works of SAPID: Overseeing of hot Tapping & refurbishing works of various pipelines for oil & Gas.
L&T (MFF)
L&T (Modular Fabrication Facility) is one of the leading Facilities, under taking Construction of various off shore & Pressure vessel related activities. This unit of L&T is also certified for manufacturing of pressure vessels as per ASME S, U, U2 stamps and also certified for ISO-9001, ISO 14001 (EHS), and OHSAS 18001 for Safety.
Working in Inspection & Quality Control Department, Roles and responsibilities during above period are as follows:
• Planning of Inspection activities - Forecasting and Planning of Inspection load, Distribution of load among inspectors and coordination with 3 party surveyors and customers, Preparation of Detailed Inspection Procedures, etc.
• Inspection of Received material for further processing, i.e. plates, pipes, forgings, fittings, fasteners, gaskets, etc. with respect to purchaser / client specification and approved drawings, applicable Code & Standards, and maintaining record of Materials used for construction
• Preparation of QA / QC Plan in line with specification and Code / Standard requirement and obtain customer /client approval for their Hold, Witness or Surveillance check points, Preparation of Seam wise and assembly wise Checklist for better tracking of the job progress.
• In-Process Inspection:
Review of Welding documents i.e. Welding Procedure Specification, Weld Plan and Test Plan, Welder Qualification
WEP , Setup / Fit up, and Weld Visual Examination,
Surveillance during welding to ensure the use of approved WPS
Dimensional accuracy
Identifying defects and acceptability w.r.t. Specification and end use
Post weld heat treatment
Raising Non Conformity Report and resolving the same
• Non Destructive Testing
Dye Penetrant & Magnetic particle Examination
Chemical analysis on in-situ condition by portable Alloy analyzer / Spectrometer
Hardness Testing of Base metal and welds
• Leak & Pressure test of the Vessel and part of vessels
Pneumatic test of comp vessels.
Hydrostatic Test
• Final Inspection (Visual & Dimensional)
• Surface Preparation & Painting Inspection
Pre blasting Inspection including chloride on surface and grit/garnet
Inspection of equipment used for blasting & painting
Profile checking with gauge / tape
Dust level & Surface comparison with ISO 8501
Wet Film & Dry film thickness measurement
Holiday test of coating & lining (Wet sponge & Spark test method)
Adhesion test (cross cut & Pull off test)
Visual & Aesthetic
SHIP BUILDING CENTRE (VIZAG) SENIOR PRODUCTION ENGINEER.
Shipbuilding Centre is the prime building organization of India involved in construction of Advance technological vessel. The following Building code are referred, ASME IX for welder qualification. ASME Sec VIII Div-I & Ghost for dimensional requirement, ASME Sec V for NDT and Swedish/BS 5493 & 729 Standard for Surface preparation and Painting.
Working in Execution Department, Roles and responsibilities during above period are as follows:
Supervision of Quality checks in Production Floor activities.
Study of Structural Drawing.
Data up keeping of all production activities.
Calcination & Hydrogen evaluation of Low hydrogen electrode.
Supervision of Fabrication / Erection of Sections and Blocks.
Monitoring of RT/ UT repairs of welding.
Hydro pressure testing of various Pressure vessels.
Hydro pressure testing of all system piping during fabrication and after installation.
Monitoring surface preparation to Swedish Standard and painting of the structure &
System of the Vessel to the international standard.
Installation of electrical cable rooting & foundation of electrical equipment’s in
Compartments as per the Drawing.
2. INDIAN NAVY: CLIENT REPRESENTATIVE & PRODUCTION ENGINEER for various Repair Yards. NSRY (K) and FTSU (V), Floating dock, HSL (V).
Under taking of Ship construction / Ship Repair related activities.
The following Building code was used for construction, Naval Construction Documents, BS 5493 / 729, BS 5950 Part-II and NSSS. Construction drawings of British, Russian, polish and Korean were used for construction of new built ships and following works was performed.
Roles and responsibilities during this period are as follows:
Inward Material Identification and clearance.
Review of WPS, PQR and WPQ
Stage wise inspection of Ship Assembly / Sub assembly for Witness, Hold, Review points as per approved QCP.
Inspection of Blasted and painted items.
Review / Witness of NDT activities
Destructive testing of test coupons
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
EDUCATIONAL QUALIFICATION
International Qualification : CSWIP 3.1
: BGAS Grade-2
QUALIFICATION INSTITUTION
Degree in Mechanical Engineering Indian Navy
Diploma in Mechanical Engineering/ Naval Arch. Navy Ship Wright School (V)
Radiography Testing Level –II (BARC. Mumbai ) Hindustan shipyard Limited Vizag.
Ultra Sonic Testing Level –II (ISNT.VIZAG ) Bharat heavy Plate & Vessels Vizag.
Magnetic Particle Testing Level –II (ISNT.VIZAG ) Bharat heavy Plate & Vessels Vizag.
Certificate in fire Fighting & Damage Control NBCD School, INS Shivaji Lonavala.
Method course Naval Institute of Education & Training Tech. Kochi.
Management Course INS Agarani. Coimbatore
AUTO CADD & MS OFFICE Net World Vizag
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
AUTO CADD & MS OFFICE Net World Vizag
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
JUN 06- TILL TO DATE: SAUDI ARAMCO
HNRP (NGL)
Maintain potential (SAPID)
Khurais & Ghawar water supply pipeline
Presently working as client Rep for all Saudi Aramco projects under southern area project inspection unit, I am responsible for acceptance of welding, coating, Equipment installation, conducting hydro pressure testing, mechanical completion etc.
Review of construction related documentation, approval of QC personnel, welder, coating applicator etc.
Water Injection Pump station Installation: Worked as client rep for installation of CGT & Booster pump, Air Drier, LO tank etc, related piping system of the pumping facility, Approval & implementation approved coating scheme, on plot piping installation & welding ,Approval of the various procedure related to the plant welding, coating, preservation of equipment, bolt tightening ,hydro pressure testing procedure etc.
Cross Country pipe line (Khurais Ghawar Treated water line), covering 250kms of internally & externally coated pipeline of various Diameters 60” to 16”. I was involved with inspection & acceptance of welding (GMAW (Passo),SMAW &TIG), internal & external coating FBE coating manually & by robotic crawler technique , Valve / Pipeline hydro testing, NDT involving Radiography, Auto UT, MPI , DPI and monitoring of welding & welder repair rate.
All the special process document related to welding, coating, hydro testing, bolt torque procedure was reviewed & approval.
Hawiyah (NGL) I was initially assigned for the ongoing project of Hawiyah Natural Gas liquefied plant installation. I was overseeing of welding, PWHT & Coating activities.
Maintain potential works of SAPID: Overseeing of hot Tapping & refurbishing works of various pipelines for oil & Gas.
L&T (MFF)
L&T (Modular Fabrication Facility) is one of the leading Facilities, under taking Construction of various off shore & Pressure vessel related activities. This unit of L&T is also certified for manufacturing of pressure vessels as per ASME S, U, U2 stamps and also certified for ISO-9001, ISO 14001 (EHS), and OHSAS 18001 for Safety.
Working in Inspection & Quality Control Department, Roles and responsibilities during above period are as follows:
• Planning of Inspection activities - Forecasting and Planning of Inspection load, Distribution of load among inspectors and coordination with 3 party surveyors and customers, Preparation of Detailed Inspection Procedures, etc.
• Inspection of Received material for further processing, i.e. plates, pipes, forgings, fittings, fasteners, gaskets, etc. with respect to purchaser / client specification and approved drawings, applicable Code & Standards, and maintaining record of Materials used for construction
• Preparation of QA / QC Plan in line with specification and Code / Standard requirement and obtain customer /client approval for their Hold, Witness or Surveillance check points, Preparation of Seam wise and assembly wise Checklist for better tracking of the job progress.
• In-Process Inspection:
Review of Welding documents i.e. Welding Procedure Specification, Weld Plan and Test Plan, Welder Qualification
WEP , Setup / Fit up, and Weld Visual Examination,
Surveillance during welding to ensure the use of approved WPS
Dimensional accuracy
Identifying defects and acceptability w.r.t. Specification and end use
Post weld heat treatment
Raising Non Conformity Report and resolving the same
• Non Destructive Testing
Dye Penetrant & Magnetic particle Examination
Chemical analysis on in-situ condition by portable Alloy analyzer / Spectrometer
Hardness Testing of Base metal and welds
• Leak & Pressure test of the Vessel and part of vessels
Pneumatic test of comp vessels.
Hydrostatic Test
• Final Inspection (Visual & Dimensional)
• Surface Preparation & Painting Inspection
Pre blasting Inspection including chloride on surface and grit/garnet
Inspection of equipment used for blasting & painting
Profile checking with gauge / tape
Dust level & Surface comparison with ISO 8501
Wet Film & Dry film thickness measurement
Holiday test of coating & lining (Wet sponge & Spark test method)
Adhesion test (cross cut & Pull off test)
Visual & Aesthetic
SHIP BUILDING CENTRE (VIZAG) SENIOR PRODUCTION ENGINEER.
Shipbuilding Centre is the prime building organization of India involved in construction of Advance technological vessel. The following Building code are referred, ASME IX for welder qualification. ASME Sec VIII Div-I & Ghost for dimensional requirement, ASME Sec V for NDT and Swedish/BS 5493 & 729 Standard for Surface preparation and Painting.
Working in Execution Department, Roles and responsibilities during above period are as follows:
Supervision of Quality checks in Production Floor activities.
Study of Structural Drawing.
Data up keeping of all production activities.
Calcination & Hydrogen evaluation of Low hydrogen electrode.
Supervision of Fabrication / Erection of Sections and Blocks.
Monitoring of RT/ UT repairs of welding.
Hydro pressure testing of various Pressure vessels.
Hydro pressure testing of all system piping during fabrication and after installation.
Monitoring surface preparation to Swedish Standard and painting of the structure &
System of the Vessel to the international standard.
Installation of electrical cable rooting & foundation of electrical equipment’s in
Compartments as per the Drawing.
2. INDIAN NAVY: CLIENT REPRESENTATIVE & PRODUCTION ENGINEER for various Repair Yards. NSRY (K) and FTSU (V), Floating dock, HSL (V).
Under taking of Ship construction / Ship Repair related activities.
The following Building code was used for construction, Naval Construction Documents, BS 5493 / 729, BS 5950 Part-II and NSSS. Construction drawings of British, Russian, polish and Korean were used for construction of new built ships and following works was performed.
Roles and responsibilities during this period are as follows:
Inward Material Identification and clearance.
Review of WPS, PQR and WPQ
Stage wise inspection of Ship Assembly / Sub assembly for Witness, Hold, Review points as per approved QCP.
Inspection of Blasted and painted items.
Review / Witness of NDT activities
Destructive testing of test coupons
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
NIL
|
| |
|
|
|
|
|
QA/QC WELDING, COATING, NDT, EQUIPMENT INSTALLATION
CV/Resume ID no.: 78616 |
|
|
|
|
|
|
| Relevant CVs; view more oil and gas CVs |
| 1. Piping Superintendent/supervisor/engineer |
| 2. Qa/Qc, NDT, Welding Inspection, Integrity |
| 3. CSWIP-AUT Phased Array/SENIOR WELDING/ASNT NDT LEVEL III/LEAD QA/QC INSPECTOR |
| 4. QA/QC, WELDING INSPECTOR |
| 5. Offshore, Pipeline, Topside, Coating |
| 6. QA/QC, welding inspector, NDE engineer, NDE, pipeline |
| 7. QC Inspector (Welding) |
| 8. Electrical Engineer |
| 9. SENIOR WELDING INSPECTOR |
| 10. Lead - Inspection & QC / QA Metallurgy Engineer |
| 11. Pipe, Piping, Lead Piping, Coating, Insulation |
| 12. QA QC |
| 13. Electrical and instrumentation, Project Engineering, maintenance |
| 14. Civil Engineer - Projects |
| 15. Instrument Supervisor |
| 16. Laboratory Technician / Chemist |
| 17. QA/QC Engineer |
| 18. Manager / Sr. Engineering - Projects [electrical] |
| 19. QC Welding Inspector, 17 years, cswip 3.1 |
| 20. Pipeline, Piping, Vessels,Tanks & structural field, have over 9 year experiance |
| |
| |
| Other CVs; view more oil and gas CVs |
| 1. Sales and Marketing |
| 2. Commercial / Contracts Negotiations and Finalization |
| 3. INSTRUMENT TECHNICIAN |
| 4. Civil/Structural CAD Drafter/Designer |
| 5. Officer, Marine Engineer |
| 6. Graduate Production Engineer |
| 7. Lead Piping Designer (PDMS & PDS modeling) |
| 8. HR Specialist and Human Resources Manager |
| 9. Energy Analyst (Temporary), LCG Consulting, Los Altos, CA |
| 10. QA/QC Welding Engineer/ Inspector, Piping Inspector |
| 11. Piping / project engineer refinery fpso cross country pipelines |
| 12. TRAINEE ELECTRICAL / ELECTRONICS TECHNICIAN |
| 13. Trainee Roustabout Job Wanted |
| 14. Professional Geophysicist, SeisWorks, ZMAPPlus, GeoProbe, Post Stack PAL and TDQ |
| 15. Sr Welding Inspector Oil & Gas Industry, Reliance Engineering, Gujarat, India |
| 16. GRADUATE ENGINEER, NO WORK EXPERIENCE |
| 17. Senior Oil & Gas Production Technician Wonderware PLC and Kvaerner sub-sea D.C.S |
| 18. SAP PM - MM - PS Consultant IBM Egypt, ERP Consultant (SAP) |
| 19. Pipeline Engineer Dorsch Consult India Pvt. Ltd Dorsch Gruppe, Germany |
| 20. QA/QC Inspector, QC Welding Inspector, Piping Inspector, Submarine Pipeline Inspector NDT Supervisor |
| 21. Warehouseman Kellogs Brown & Root Baghdad Iraq, Slavonski Brod, Croatia |
| 22. Human Resources Specialist, Jakarta Indonesian Administration Foundation |
| 23. Trainee Safety Officer China Petroleum Pipeline Bureau in India |
| 24. Medic Offshore / Marine Nurse, Maersk Ventura Vessel, Sacor Maritima S.A, Promarine, Saipem |
| 25. Boatmaster on 50 passenger ferry service, Tier 2 Inland Waterways/Day Skippers European Ticket |
| 26. Graduate with Degree in Energy Storage In Fuel Cell Using Aqueous Hydrogen Peroxide India |
| 27. MARINE SECOND ENGINEER WORKED FOR DANNEBROG REDERI DENMARK |
| 28. 2nd Mate Great Offshore Ltd Doehle Danautic Univan Ship Management Shipping Corporation Saudi Arabia |
| 29. IT & Quality Assurance Officer in Porcelain International Alexandria Egypt |
| 30. Intern Engineer Trainee in Ghana Railways Company Limited Takoradi West Africa coast |
| |
| |
|
|
|