CV Planning and Scheduling Engineer
|
|
|
|
|
|
|
| |
| |
| Planning and Scheduling Engineer |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in Planning and Scheduling Engineer - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
79583
Last Updated:
Wednesday, August 20, 2008 |
Location (Residence): Lapu-lapu City, Philippines
Citizenship: Philippines
|
| |
Languages:
Native:
English Philippines Other:
English Philippines |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
Bachelors in Electrical Engineering Years of Experience:
3 years
|
Authorized to work in:
UK (in particular), United States, Australia, Austria, Bahrain, Belgium, Brunei Darussalam, Cayman Islands, Hong Kong, Indonesia, Korea, Dem. Rep., Korea, (South)
Present Location:
Philippines, Cebu
Relocation:
United States, United States |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Engineering |
Planning/Scheduling |
Experienced
|
8 years |
|
Administration |
Planning |
Experienced
|
8 years |
|
Technician Level |
Installation |
Basic
|
1 year |
|
Trades (Skilled) |
Electrician |
Trainee
|
1 year |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
Electrical Engineer with Extensive Knowledge in Planning and Scheduling
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
I.
Owner : Saudi Kayan Petrochemical Complex
Client : Flour Arabia Limited (FAL)
(RC Corridor and Port Area Pipeline Installation Project)
Location : Al Senaiyah Jubail, Saudi Arabia
Royal Commission Corridor 700-K-021A-1K
Contract Amount : SAR 277,240,214.70
The scope of the project comprises the installation of pipelines, civil infrastructural works, and structural steel erection works necessary to facilitate movement of feedstock’s, utilities and product between Saudi Kayan, King Fahd Industrial ports and existing industries.
Port Area 700-K-021B-IK
Contract Amount : SAR 85, 303,815.02
The scope of the project comprises the installation of pipelines, civil infrastructural works, and structural steel works erection from Saudi Kayan Petrochemical Complex approximately 27 km. to Port Storage Area necessary to pump the product to the Port Berths for ship transfer, installation of electrical and instrumentation works, mechanical equipments (static and rotating), insulation and cladding works.
Period : December 2007 to April 2008
Position : Planning / Scheduling Engineer
Reports to : Project Control Supervisor
Job Summary : Review project scheduling requirements and prepares, updates and maintain Critical- Path- Network Construction Schedules and Resource Schedules.
II.
Owner : Eastern Petrochemical Company (SHARQ)
Client : Foster Wheeler Utilities and Offsite Project
(Off –Site/Onsite Pipeline Installation Project)
Location : Jubail, Saudi Arabia
Contract Amount : SAR 94, 500,000.00
The scope of the project comprises the installation of pipelines (which includes fabrication and installation of pipe works, tie-in works(hot tapping), supply and application of all painting and surface protection works, insulation and cladding works, installation of electrical heat tracing system, cathodic protection, OSPAS System, installation of metering skids), civil infrastructural works and structural erection works.
Period : November 2006 to December 2007
Position : Planning / Scheduling Engineer
Reports to : Project Control Supervisor
Job Summary : Review project scheduling requirements and prepares, updates and maintain Critical- Path- Network Construction Schedules and Resource Schedules.
Duties and Responsibilities
Issues complete set of all schedules and other documentation to Controls Personnel, with appropriate instructions and procedures as to how these are to be used and maintained.
Sets –up systems and ensure full compliance with contract requirements for preparation, verification, submission, client approval and subsequent invoicing of Progress Billing.
Develops overall Master Construction Schedule from Contract and Estimate data provided
Develops schedules for Construction Equipment, Manpower (by craft) and Material Deliveries consistent with Project Master Construction Schedule.
Updates Master Construction Schedule with actual progress data as project progresses.
Analyses the potential schedule effect of Contract Variation and Change Orders.
Develops short-term schedules (usually daily shutdown or 3 month look-ahead) base on approved Master Construction Schedule and actual resources available (manpower, material, drawings, equipment).
Maintain records on Progress, Manpower, Productivity, Equipment Utilization, Contract Variations and Change Orders, and others as required.
Prepares Progress Reports for company’s Project and Executive Management and the client in accordance with company’s procedures and contract requirements. (Such reports will include, but may not be limited to, the production of Actual/Schedule Progress Curves, Manpower Histogram and Equipment Schedule).
Investigate areas where project progress deviation from the approved Master Construction Schedule and makes recommendation for recovery where possible.
Prepares, or participates in the preparation of, Client Contract Billings (Progress Payments) in accordance with Contract Terms and Conditions.
Attends meetings with other members of the Project Team and/or the Client, as required, in order to report on project status, discuss problem areas and contribute toward the resolution of such problems.
III.
Owner : Linear Alpha Olefins Complex (UNITED)
Client : Linde Arabian Company (LINARCO) under Flour Arabia Ltd.
Location : Jubail, Saudi Arabia
Contract Amount : SAR 371,000,000
The scope of the project comprises the installation of pipelines (which includes fabrication and installation of pipe works, tie-in works (hot tapping), supply and application of all painting and surface protection works, insulation and cladding works, installation of electrical and instrumentation system, cathodic protection, installation of metering skids), installation of mechanical equipments (rotating and static), civil infrastructural works and structural erection works
Period : December 2005 to October 2006
Position : Quantity Surveyor/Project Control Engineer
Reports to : Planning Engineer/Cost Engineer
Job Summary : To assist Planning and Cost Engineer in tracking progress, monitoring accomplishments and generate reports.
Duties and Responsibilities
Generates, updates & maintains quantity-databases
Tracks, verifies and documents work quantity accomplishments
Computes activity / discipline progress per approved Construction Schedule / Cost Weight
Prepares overall progress computations as an aid to the Planning
Mark-up completed works onto AFC drawings and maintains an organized filing system
Collates information from other departments
Perform ad-hoc duties assigned by superiors.
Assists in the preparation of a Daily work schedule & Look-ahead for Operations group
Attend progress meeting or any other meetings as required
As built Electrical and Instrument conduit, cable trays routing, etc…
Routinely conduct daily site survey and prepare daily production report to be submitted to Planning Supervisor.
Does Materials Take Off (MTO) to any discipline (Piping, Civil, Structural, Mechanical and E&I) .
Analyze actual progress, cost, resources and revenue against plan / budget.
Update daily Manpower /Manhours and Equipments and report it to the client
Prepares daily, weekly and monthly progress report.
Perform periodic reconciliation of IFC quantities with Project Engineering Department so that the total revenue and costing can be calculated with progressive accuracy.
Jointly review and prepare balance of work schedules and its corresponding manpower requirements with Construction management.
Analyze actual progress and expenditure against plan / budget and highlight any deviations.
Recommend alternative plans or solutions to planning, progress & cost control problems as maybe required.
Update installed quantities into respective discipline tracking database to support progress reporting and measurement for invoicing.
Maintaining and archiving controls record for the duration of the project.
IV.
Company : Visayan Electric Company (VECO)
Position : Cadet Engineer
Location : Cebu City, Philippines
Period : January 2005 to July 2005
Duties and Responsibilities:
Design and Estimates electrical layouts for residential and commercial buildings
Assigned to assist in termination of 13.8KV primary cables
Undergoes training in planning and designing
Responsible in calibration of kilowatt-hour meter either analog or digital
Knowledgeable in designing of transmission lines thru Synergy program
Responsible in the construction of 69/23/13.8 KV lines as part of line maintenance
Attend weekly safety tool pouch meeting
Responsible in testing of pin and suspension insulator prior for installation
Undergoes training as a lineman and a meter reader
Responsible in monitoring of system voltage, line current and system power factor thru Supervisory Control and Data Acquisition (SCADA)
Responsible in the inspection of residential loads as requirements for energization
Responsible in the installation of potential, current and power transformer
Assigned in maintenance services of 50 and 25MVA power transformer
Assist to control engineers in load switching of 69/23/13.8KV lines thru SCADA (during line maintenance services)
Assigned in the installation of grounding system at substation
V.
Company : East Asia Utilities Corporation (EAUC)
Position : On the-Job Training (OJT)
Location : MEPZ 1, Lapu-lapu City, Cebu Philippines
Department : Electrical and Instrumentation Maintenance
Period : November 2003 to May 2004
Job Summary : Maintains, check out,commission,services,installs,tests,calibrate,repairs and/or replaces systems and system components of electronic digital equipment as well as pneumatic,electrical instruments and electronic
Analog systems in various industrial
Duties and Responsibilities:
Maintains machine with programmable logic control, electronic control and pneumatic system.
Assigned in monitoring of 3-250HP vertical sea water periodically
Simulate oil mist detector prior for installation
Assigned in termination of motor control switches, motor and generator terminal
Assigned in meggering of motor and generator winding prior for installation and energization
Assigned in the installation of different kinds of instruments such as flow, temperature, level, pressure, PT100 sensor, etc…
Assigned in installation and termination of different types of lighting fixtures
Assigned in maintenance services on transformer and generator
Assist to Maintenance Engineer in troubleshooting of overhead crane, motor controls and various types of instruments
Assigned in installation of cable tray, cable pulling for instrument.
Assigned in the installation of different types of lighting such as aviation, floodlights, fluorescent, etc
Complies with, at all times, all company safety procedures.
Performs calibration of process instrumentation such as flow analyzer, temperature indicating controllers, temperature indicator, and pressure indicator.
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
Bachelor of Science in Electrical Engineering, 05 February, 2006
Confined Space Seminar
Flour Arabia Ltd.
United Olefins Complex Project
Jubail, KSA
29 March, 2006
Hot Work Seminar
Flour Arabia Ltd.
United Olefins Complex Project
Jubail, KSA
8 April 2006
Lock Out Tag Out (LOTO) Seminar
Flour Daniel Arabia Ltd.
United Olefins Complex Project
Jubail, KSA
10 April 2006
Commissioning and Pre Commissioning Seminar
Flour Daniel Arabia Ltd.
United Olefins Complex Project
Jubail, KSA
05 February, 2006
Working at Heights Seminar
Flour Arabia Ltd.
United Olefins Complex Project
Jubail, KSA
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
Proficient Microsoft Excel
Proficient Microsoft Word
Proficient Microsoft Power Point and PDF
Proficient in Primavera Project Planner (3.1 version)
Knowledgeable in AutoCAD 2D (2006)
Knowledgeable in Microsoft Project Planner
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
Able to read and interpret P&ID, Instrument, Electrical and Isometric drawing.
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
Previously Working in Saudi Arabia as a Project Planner and Scheduler in the Construction of Petrochemical Company
|
| |
|
|
|
|
|
Planning and Scheduling Engineer
CV/Resume ID no.: 79583 |
|
|
|
|
|
|
| Other CVs; view more oil and gas CVs |
| 1. NDT Professioanl |
| 2. DPO, Second Mate, Cargo, RORO, AHTS, PSV, Multipurpose, Drilling, Diving |
| 3. HVAC, engineering, designing & supervising |
| 4. Document Controller (Engineering/Oil & Gas sectors) |
| 5. Marine Engineer, willing to learn more challenging roles |
| 6. Senior Supervisor Electrician |
| 7. Safety Engineer |
| 8. CWI Pipewelder, AWS Welding Inspector |
| 9. Former Military, Operation Co-ordination Expert |
| 10. Radio Operator Offshore / IT |
| 11. Officer / 2nd mate with Wagenborg |
| 12. Radio Operator, GMDSS, FOET, UKOOA Medical, CAA Radio license |
| 13. Senior Manager, Marine Support, Master, Superintendent |
| 14. Painting / coating inspector, YEMEN LNG PIPE LINE PROJECT |
| 15. Executive Head Chef / Manager |
| 16. Experienced installation electrician |
| 17. Structural Engineer STAAD.Pro 2007, McGuffy Energy Services, Houston, TX |
| 18. Document Controller - Technical Support to Administration within Engineering Technical Field |
| 19. Rigger in pipe/valve removal & installation, structural steel erection, Ireland, Uk, Australia |
| 20. Crane operator, rigging in charge, Arabian Logistics Co, Oman Muscat Offshore Gulf UAE Abu Dhabi |
| 21. Shift Supervisor / Team leader / Mechanical Fitter V.B.G, Fontaine International Enterprise Way |
| 22. Oil & Gas Sales Engineer / Manager, Jeddah, Riyadh, Dammam, Dubai, Kuwait, Qatar, Bahrain & Sudan |
| 23. Post Graduate in Emergency Medicine with ACLS, BLS, ITLS Certification - stupid Indian worker |
| 24. Static Equipment Design Engineer - Mechanical design software knowledge PV-Elite, B-Jac, HTRI |
| 25. Experiened Mechanical Fitter in MI Swaco Offshore, Petrosa South Africa |
| 26. Junior electrical / instrumentation technician air conditioning and refrigeration |
| 27. Air construction diver subsea spoolpiece installations riser installation sbm installations offshore |
| 28. Security Specialist PSD Baghdad Iraq Dallas TX USA East Timor United Nations Haiti Bosnia MidEast |
| 29. Safety Officer from National Institute Occupational Safety and Health Malaysia |
| 30. Experienced Welding Inspector Level 2, Qualified Welder from South Africa |
| |
| |
|
|
|