| |
| PDS Piping Designer |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in PDS Piping Designer - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
79877
Last Updated:
Monday, April 28, 2008 |
Location (Residence): Mumbai, India
Citizenship: India
|
| |
Languages:
Native:
English United Kingdom, Hindi, Marathi Other:
English |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
Vocational in Diploma in Mechnical Engg Years of Experience:
12 years
|
Authorized to work in:
European Union
Present Location:
Spain, Madrid
Relocation:
Anywhere (International) |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Design/Software |
Piping |
Experienced
|
17 years |
|
Design/Software |
PDMS/PDS |
Experienced
|
13 years |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
Over 12.5 years experience in process piping design. Experience includes, equipment arrangements, piping layouts, isometric and GAD drawings, material take-offs, checking, verification and design and supervision of piping personnel. in oil and gas offshore and onshore, petrochemical, refineries etc. Field site experience in design, operations, inspection and maintenance Currently assigned as a ‘Senior PDS Piping Designer’ for Tecnicas Reunidas, S. A. Madrid, Spain ’ . Also has extensive computer related experience. Proficient in the use of: Microstation, PDS, Autocad.Overseas Assignment- Tecnicas Reunidas, S. A. Spain,
Petrofac International Ltd, UAE.
Technip Italy S.P.A., Roma.
Onsite Assignment Stone & Webster, BASF – YPEC Ethylene Unit Basic Chemicals Complex (BCC) project at Nanjing, China.
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
WORK EXPERIENCE
Tecnicas Reunidas, S. A. Spain, Deuted by Quality Engineering & Software Technologies Pvt. Ltd Nov’ 06 – Till date
Currently working as a ‘Senior Piping Designer’.
Project: - Hellenic Petroleum S. A. ,
Elefsis Refinery Upgrade Project.
Scope of work involved Prepare Interconnecting Pipe Rack Piping Layout, Pipe Rack Estimation. Pipe spacing,, Flare Line Header & typical connection, Battery limit valve, Platform & ladder arrangement.
Petrofac International Ltd. Sharjah U.A.E. July’ 06 – Oct’ 07
Worked as a ‘Senior Piping Designer’.
Project: - Karachaganak 4th Stabilization & Sweetening Train Project,
Responsibility of Condensate Splitter & Condensate Reflux Unit Area.
Scope of work involved piping layout design & PDS modeling for several Equipments, Nozzle Orientation, Issued Isometrics & GAD for IFC, Support Placement as per stress requirement, Resolved Interference detection, RDB error correction & Rectification of models on the basis of analysis reports. Preparation of PDS cad index file. Prepare civil details drawing.
Project: - KNPC Proposal Project
Sulfur Recovery Unit and Scot, New Refinery Project
• Piping MTO & Drawing estimation.
• Estimation of Pipe Rack piping study layout.
Technip India Ltd. Chennai, India. Feb’ 06 - July’ 06
Worked as a ‘PDS Piping Designer’ on contract basis deputed by R.K. Engineering Consultant.
Project: - YEMEN LNG Project, Technip Paris
• Equipment arrangment & Nozzle Orientation, Platforms & Ladder Arrangement, Details about Cut-out releted piping & required stucture for pipe support to civil.
• Conversion of P&IDS to piping Sketches, Routing, Support placement and Extract isometrics.
Technip Italy S.P.A. Roma Deputed by Technip India Ltd. Nov’ 05 - Jan’ 06
Worked as a “PDS Piping Designer” for Underground Piping Distribution Network on deputation.
Project: - Khursaniyah NGL Recovery Plant (Saudi Arabia)
• Oily Water Sewer Typical connection Piping layout, Vent Pipes Supports with Guard Rail for vent protection, Catch Basin & Manholes Inlet-Outlet Calculation,
• Development of Grading, Underground & Foundation Plant Layout, and Modeling involved.
• Utility Piping (Fire Water/Drinking water) Piping Layout Preparation, Arrangement of Hydrant, Monitor, Post Indicator Valve, Fire Hose Reel, Direct Buried valve, safety Shower.
Petrofac Engineering India Limited, Mumbai, India. Deputed by Rolta India Ltd. Feb’ 05 – Oct’ 05
Worked as a ‘PDS Piping Designer’ on Deputation by Rolta India Ltd.
Project: - Agip Kazakhstan North Caspian Operating Company.
Scope of work for Sulfur, Gas & Oil Unit Area which involved Design Oily Water Sewer network, Closed Drain, Fire Water, Sea water, Non-contaminated water. Conversion of P&IDS to piping Sketches, Routing, Support placement and Extract isometrics & GAD. Equipment arrangment & Nozzle Orientation. Design Standard pipe support as per stress requirement.
ROLTA India Limited, Mumbai, India. May’ 97 - Feb’ 05
On site Assignment: China Oct’ 04 - Feb’ 05
Worked as a ‘Piping Designer’ in SHAW Group Engineering Design department.
Project :- (BASF-YPEC Petrochemical plant, Stone & Webster, USA)
(BASF – YPEC Ethylene Unit Basic Chemicals Complex Project at Nanjing, China)
Involved in activity of Listing as well as solving Engineering punch list to make system ready for Hydro-testing or commissioning. Issue CVI (confirmation of verbal information) for construction. Generate the material list required as per modification. Updating of isometrics in Micro station as per design changes in suit at site as well as update masters P&ID’s. There are additional re-instatement punches generated by testing team and IMT (Integrated Management Team, a core team of officials from BASF and YPEC). We also supervised, re-verified and also attended minor punches generated by them.
Sr. Cad Tech– PDA Division.
Important PDS Projects worked in Piping Division:
Project: - Singapore Methyl Methacrylate. Jacobs H & G Ltd, India.
Support placement for piping using Isometric Drawings of different lines, provided by JH&G.
This was a project of Support modeling using Pelican Forge’s Support Modeler, Isometrics extraction and QC with P&ID. Checking of isometrics for IFC issue with respect to 3D model, piping basis of design, Vendor drawings/ mechanical datasheets, assigning support designations. Detail bill of Material.
Project: - Aquatech Asia, Pune, United Olefins complex, Saudi Arabia, Water Treatment Unit,
Nanhai petrochemicals, Shanghai, China.
Responsible for study Designing & modification of Piping & Equipments. Support Placements as per stress requirement. Resolved clash & RDB reports, Extraction of GAD & Isometrics. BOM Details.
Project: - Indian Oil Corporation Ltd, Vadodara (Gujarat), India. Hydro Cracker Unit,
On-site data collection, Markup modification and re-route pipelines as well as modeling of Equipment, Support Placements, Extraction of GAD’s and Isometrics. BOM Details.
Project: - Hindustan-Dorr Oliver, Mumbai, Yunus Emre, Turkmenistan, Paper & Pulp (100ADT/day)
Modeling of Equipment, duct layout design, Equipment arrangement, Nozzle orientation, Piping layout Plant Layout, Plot plan, extraction of GAD’s and Isometrics Standard Support Placement.
Project: - Bharat Heavy Electrical Ltd (BHEL), Trichi, India, Ramagundam Boiler Unit.
Equipment & Duct Modeling. Prepare Duct layout.
Project: - Oil & Natural Gas Corporation Ltd., India.
• Qatif, Saudi Armco, Saudi Arabia.
• Engineer’s India Ltd., India.
• Vikram Ispat, India.
AutoCAD Based Project:-Qapco, Kashima, LAN zoo, Stone and Webster, USA
Interr Tech. Pvt. Ltd. Andheri, Mumbai India. Oct ‘95 – April ’97
Worked as a ‘Cad Operator' on Micro station Based Project mentioned below:-
• De’moin Gas Project-USA
• Natural Gas Project, NGC, New Zealand.
• STC_Bldg – Saudi Arabia.
Guest Keen William LTD Mumbai-400 078. Oct ‘92 – Sept’95
Trade Apprenticed:-Worked for 3 yrs as a Trade Apprentice in Design & production Dept.
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
Diploma in Mechanical Engineering Dec’ 03 61 % M.H. Saboo Siddik Polytechnic, Mumbai
National Council for Vocational Training Oct’ 92 To Nov’ 95 78 % Industrial Training Institute, India
Higher Secondary Certificate Oct’ 96 Maharashtra State Board
Secondary School Certificate Mar’ 92 59 % Maharashtra State Board
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
9 years of experience in 3D modeling on Inter Graph’s Plant Design System Environment Software.
• PDS Version 7.1 / 7.2 covering Piping Designer, Pipe support Designer, Equipment Modeling, Drawing Manager, Isometric Drawing Manager, Project Creation, Archival and Retrieval.
• Bentley MicroStation 95 / SE / J 7.1 / V8
• Intergraph Smart Plant Review
• NAVIS’ Works Jet Stream V4 / V5
• Pelican Forge’s Support Modeler Version7.2
• Intergraph’s Smart Plant P&ID Version 4.0
• AutoCAD, Smart Sketch, Oracle 9.0, PL/SQL 2.1.3, SQL Plus 3.3, MS Office
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
RESPONSIBILITIES
Process Plant Layout Piping - Basic & Detail Design Engineering for interconnecting Equipments like Distillation Towers , Pumps, Heat Exchangers, Compressors, Reactors, Storage Tanks, Drums, Pipe-Racks, OVHD Condenser, Feed Pre Heater, Re boiler, Underground Piping, PSV arrangement, De-Superheater, etc.
Piping Study layout with reference of Plot-Plan, Process P&ID, Utility P&ID, Line-List, Civil Drawing, Piping Specification, Equipment Data sheet, Instrument specification, etc. to identify location for equipments and associated infrastructure for routing the piping to satisfy client specifications for operational, maintenance & safety requirement and considering the possibility of piping supports.
Design Equipment layout, Equipment arrangement & Elevation, Nozzle orientation, Platform Elevation, ladder & staircase arrangement, hand railing, lifting lugs, Tray arrangement, Manhole accessibility, instrument visualization and their operational, maintenance & safety requirement. Also required pipe lines supporting clits & structures.
Incorporate latest revised P&ID modification & clients review comments as Co-ordinate with Civil, Stress, Process and Mechanical Dept.
Development of Grading, Underground & Foundation Plant Layout. Included Oily Water Sewer, closed Drain, Trenches, Fire Water, Sea Water, Non-contaminated water etc.
Oily water Sewer typical connection piping layout, vent pipe supports with guard rail for vent protection, Catch Basin & Manhole Inlet-Outlet calculation.
Pipe Rack Piping Layout, Pipe spacing, PSV arrangement on Pipe Rack, Flare Line Header & typical connection, Battery limit valve, Platform & ladder arrangement.
Study of Piping TIE-IN Schedule.
PDS Model data verification and diagnostics, RDB error correction & Rectification of models and resolved Interference/clash detection and troubleshooting.
Design Standard pipe support as per stress requirement using Support Modeler & PDS Pipe support Designer
Material Take Off .
Checking of isometric as per Piping layout, Line List, P&ID & Piping Specification.
Creation & development of intelligent Piping & Instrumentation Diagram using Smart Plant P&ID.
Co-ordination with other piping designers & modelers as well as with other disciplines.
Preparing drawing lists, equipment lists, line lists, valve lists, instrument lists.
Single line Piping Isometric as per Piping Layout.
Checking of piping design & layouts.
Preparing Cad Drawing Index & Area Index.
As-Built Drawings i.e. modification of final designed isometrics as fabricated in shop and erected on field to suit at site conditions and requirements.
Modification of P&ID as per final designed Isometrics.
Reporting the progress report of project work.
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
-
|
| |
|