CV SIEMENS Automation Engineer in Various International Projects
|
|
|
|
|
|
|
| |
| |
| SIEMENS Automation Engineer in Various International Projects |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in SIEMENS Automation Engineer in Various International Projects - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
80329
Last Updated:
Friday, May 23, 2008 |
Location (Residence): Puchong, Malaysia
Citizenship: Malaysia
|
| |
Languages:
Native:
Tamil Other:
English |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
Bachelors in Mechatronic (Mechanical & Electronic) Years of Experience:
6 years
|
Authorized to work in:
European Union, UK (in particular), United States, Malaysia, Singapore
Present Location:
Malaysia, Puchong
Relocation:
Anywhere (International) |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Engineering |
Controls |
Experienced
|
11 years |
|
Engineering |
Commissioning (+ Pre-) |
Experienced
|
11 years |
|
Engineering |
Instrumentation |
Experienced
|
11 years |
|
Design/Software |
Electrical/Instrument |
Experienced
|
10 years |
|
IT/Communications |
Networking |
Experienced
|
10 years |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
Dear Sir,
I am currently working with Siemens Malaysia as Senior Project Engineer II for Industrial Solutions & Services (I&S) Division. In last 7 years, I have been involved in various projects and have been dealing with various customers in tendering, negotiations, proposals, project execution, handover and warranty related engagements.
I started with Siemens after my studies as Design Engineer, then promoted as Senior Engineer and currently as Senior Engineer II. I have given various responsibilities in each project that I have been involved. From sales, designing, site installation, commissioning, lead engineer and as project manager also. Please refer to my resume for further details.
Throughout my job experience, I have been traveled to around Malaysia, Germany, Singapore, China, India and currently in Middle East (Dubai) and have been working with various level of peoples from different countries.
I would like to venture into a new area and it will be a great honor if I could be part of your team.
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
Work Experience’s and Achievements (latest on top)
1) Job Name BHS – Dubai Airport
Customer Siemens AL, Dubai, LLC
Duration 07/07 – 04/08
Team size 40
Project Value ~2B
Job Detail Commissioning Engineer
• Plan, manage and execute Baggage Handling System (BHS) from engineering design stage until commissioning to ensure project meet the intended purposes, complete as per schedule and expenditure within approved budget cost.
• Manage and execute all assigned task to ensure safety and HSE requirements are met all time
• Manage distribution and filling of project as built engineering and vendor document to ensure the end user get their references for use timely and meet contract mile stones on time.
• Commissioning scope include SIEMENS belt conveyor, Tray system, FRAD, Lift, Vertical Sorter, Hinge, X-Ray and SCADA system.
2) Job Name Conduct ‘Cemat’ Specialized Training for Siemens China
Customer Siemens A&D Shanghai , China
Duration 3weeks
Team size 1
Project Value
Job Detail • Conduct specialized training called “Cemat Lafarge Blocks” for Siemens Engineer at Siemens Shanghai, China.
3) Job Name Tanjung Bin – Fly Ash Transport Facility to Jetty
Customer Lafarge Asia Technical Centre (ATC)
Duration 11/06 – 5/07
Team size 4
Project Value 2.2 M
Job Detail Project Manager .
• Green project. Complete development of electrical and automation including Switchgears, MCC’s, DCS and PCS by implementing Lafarge Standards and Siemens e-PMP standards.
• Source and liaise with vendors/original equipment manufacturer (OEM) to obtain detail engineering solution to meet contract requirements and to ensure plant equipment reliability target is achieved.
• Develop detail project cost estimate for management budget approval and prevent cost overrun.
• Plan, implement and monitor project Turnaround work to achieve targeted schedule, budget and safety standard.
• Pilot project of implementing wireless communication and solar solutions.
4) Job Name KK3 – Lafarge Kanthan: Electrical and Automation revamp project
Customer Lafarge Malayan Cement
Duration 11/2004 – 10/2006
Team size 10
Project Value 23 M
Job Detail
• Design, plan and implement of Process Automation upgrade for CEMENT manufacturer plant.
• Complete engineering for plant process development using Siemens ‘Simatic PCS7’ and Cemat System. (International Process Standard for Lafarge)
• Prepare, review, update and monitor engineering work procedures and work instructions, to ensure compliance to ISO & HSE requirement.
• Close coordination with Project and Engineering Manager to define work scope, project schedule, FAT and report requirements. Resource management of commissioning team and sub contractors to ensure execution of project on track.
Accomplishment 1) Project completed successfully on time.
5) Job Name TNB - Cameron Highland Hydro Plant revamp project
Customer Tenaga National Berhad.
Duration 8/2003 – 9/2004
Team size 5
Project Value 25 M
Job Detail
• Planning & Design of Fiber Optic network system (20km), E2 Network System, CCTV, PABX and Data transmission system for 5 hydro stations in Cameron Highland.
• Liaising with customer and supplier during design stage and handover complete system to installation team after FAT with customer.
• Accomplishment 1) Complete the FAT successfully with customers.
6) Job Name Lekir Bulk Terminal – Jetty Delivery System
(2100 MW Manjung Power Station) Sri Manjung, Perak
Customer Lekir Bulk Terminal Sdn. Bhd.
Duration 2/2003 – 7/2003
Team size 1 (Liaising with Siemens AG on material handling automation system)
Project Value 24 M
Job Detail
• Preparing complete O&M ( Operation and Maintenance) documentation for Conveyor system, Shipunloader system, Transfer tower, Substation, CCTV, PA-PABX, Fire fighting system, VHF radio system and Lighting system
• Scope of work covered Jetty delivery system and Coal Stock Yard in cooperation with Siemens Germany for PLC and DCS O&M documentation compilations.
• Accomplishment 1) Manage to handover 100% of O&M manuals within 3 months.
7) Job Name FLK Gas Analyzer system for APMC Cement Plant, Rawang
Customer LAFARG - APMC, Rawang
Duration 11/2002 – 2/2003
Team size 2 (Myself & 1 Senior engineer)
Project Value 700,000 (RM)
Job Detail
• Assist Senior engineer in designing, installation and commissioning of FLK gas analyzer (SIEMENS Gas analyzer and SIEMENS S7-300 PLC)
• Accomplishment 1) First successful ‘Siemens Gas Analyzer’ installation in Malaysia
• Complete the installation on time.
• Developed instant solution for SO2 gas leakage at condensation tank.
• Managing the warranty related service to clients.
8) Job Name Telekom HQ Indoor Parking & Counting System
Customer Multinetwork Sdn. Bhd, Meganet Sdn,Bhd and Telekom Malaysia
Duration 06/2002 – 12/2002 (6 months)
Team Size 1+1 (Myself & 1 draft man)
Project Value 1 Million (RM)
Job Detail
• Design automated parking system and car count-display system using SIEMES S7-300,WINCC, project planning & management, commissioning, documentation (ISO standard) and handover to customer.
Accomplishment
1) Managed to complete the project 4 weeks ahead of schedule.
2) First successful installation of Siemens car park and counting system in Malaysia
3) Managing the warranty related service to clients.
9) Job Name ERL Cisco Data Network
Customer Express Railway Link Sdn. Bhd (5 stations & 1 Depot)
Duration 10/2001 – 4/2002 (6 months)
Team Size 1 (My self only)
Project Value 1 Million (RM)
Job Detail
• Design CISCO network system up to Layer 3, installation, interfacing with OTN system, project planning & management, commissioning, documentation (ISO Standard) & handover to customer
Accomplishment
1) Managed the whole project individually and successfully completed and handed over 3 weeks ahead of schedule
2) Introduced new labeling method of data network faceplate. Accepted by ‘End Customer’ and ‘Direct customer’
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
Education Background
Level: Bachelor’s Degree Grade : 2nd Class Upper, CPA (3.18)
Field of Majoring : Mechatronic (Mechanical and Electronic)
University : University Technology Malaysia
Location : Malaysia Graduate Date : April 2001
Completed Training
1) Siemens S7 - Basic training in Singapore 2003
2) Siemens SIPARK Parking automation - Germany 2002
3) Siemens CEMAT, Cement automation - Singapore 2005
4) Industrial Wireless Application & Technology - Malaysia 2007
5) OPC foundation course - Malaysia 2007
6) Siemens S7 PLC Automation - Advance - Malaysia 2007
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
Simatic PCS7 System 5
Cemat for Simatic PCS7 5
MS Project 5
MS Visio 5
Siemens products (Automation) 5
MS Office 7
MS Access 6
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
Personal Strengths :
International team work and fast learning capability
Handled various responsibilities
Automation with IT background & Engineering background
Good Communication skills
Able to work under pressure
Keen with company and customer requirements
Target orientated
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
Currently working with SIEMENS I&S Malaysia as Senior Project Engineer and Project Manager. Now looking to venture in Oil & gas Industries
|
| |
|
|
|
|
|
SIEMENS Automation Engineer in Various International Projects
CV/Resume ID no.: 80329 |
|
|
|
|
|
|
| Other CVs; view more oil and gas CVs |
| 1. HSE PROFESSIONAL |
| 2. QC Engineer |
| 3. Chemical Engineer, Process, Production & Operations |
| 4. Rigging Assistant, Safety Supervisor,Roustabout |
| 5. 2nd mate/DP Trainee, 2nd mate, DP Trainee, Junior DPO |
| 6. Chief mate - crude/product tankers |
| 7. Steward / Galleyhand |
| 8. Ship Electrician |
| 9. Marine surveyor and maintenance |
| 10. Floorhand (Roughneck) at NIS Naftagas (Serbian Oil Company) |
| 11. Clerk on Nabors Rig 144 (KSA) |
| 12. Production Operator - Assignments in Ammonia production |
| 13. Instrumentation Engineer Consolidated Construction International Company |
| 14. Welding inspector (aws cwi) - 8 years experienced. |
| 15. Roustabout - Norwegian/UKOOA Offshore Survival Training & Medical |
| 16. Pipe Welder / Welder 10 years, Fitting, Assembling and Welding |
| 17. Asst. Manager Accounts / Finance, Chevron, USA and Al-Bakri Group Saudi Arabia |
| 18. Radio Operator / Cook |
| 19. Safety Manager, OSHA 30-hr Certified |
| 20. DOCUMENT CONTROLLER, Kentech International Limited for AGD-II Gasco (ASAB GAS DEVELOPMENT PROJECT) |
| 21. Experienced scaffolder, worked on offshore platforms clyde, tartan, brae alpha |
| 22. PIPE FABRICATOR, 19 YEARS EXPERIENCE, Willbross Company, Nigeria |
| 23. Entry Level CADWorx Plant Pro Pipe Drafter, quick learner, work horse |
| 24. Graduate Electronics Engineer, Sir Syed University of Engineering & Technology |
| 25. QC Inspector Electrical & Instrumentation Oil & Gas, Chemical and Petrochemical, Qatar Gas PDO Oman |
| 26. Trainee graduate mechanical engineer some skills in catia, labview, auto cad-2010, ansys |
| 27. QC Manager / NACE CIP 2 certified inspector, Adamac Pipe Coating Port Harcourt Nigeria |
| 28. Field Operator with 11+ years of experience in Oil & Gas, Gas Treatment, Petrochemical Industries |
| 29. Petroleum Engineering Graduate from Maharashtra Institute of Technology, Pune University, India |
| 30. Senior Structural Designer, Tekla, Xsteel, PDS, Autocad Oil & Gas (Australia Russia Middle East) |
| |
| |
|
|
|