CV Process Simulation Engineer, Hysys, Pipesim - Foster Wheeler Energy Limited
|
|
|
|
|
|
|
| |
| |
| Process Simulation Engineer, Hysys, Pipesim - Foster Wheeler Energy Limited |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in Process Simulation Engineer, Hysys, Pipesim - Foster Wheeler Energy Limited - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
80746
Last Updated:
Monday, June 23, 2008 |
Location (Residence): Wimbledon, United Kingdom
Citizenship: Australia
|
| |
Languages:
Native:
English Australian Other:
None |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
Bachelors in Chemical Engineering Years of Experience:
5 years
|
Authorized to work in:
UK (in particular), Australia
Present Location:
United Kingdom, London
Relocation:
Anywhere (International) |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Engineering |
Process |
Experienced
|
10 years |
|
Operations |
Process |
Basic
|
1 year |
|
Engineering |
Hysys/Pro II |
Experienced
|
10 years |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
I am a Process Engineer with a variety of experience, approximately 6 years in total. Have widespread experience in oil and gas and in mining and minerals processing. Seeking to further experience levels and to advance career wise. Available from 13th June 2008 upon completion of current assignment.
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
Key Experience
Approximately 6 years experience in a variety of roles including operations, FEED, Detailed Engineering, and operations support, acquired in a variety of oil and gas, minerals processing, and petrochemical roles. Seek to extend experience on major Oil and Gas projects with view to move into Senior to Lead Engineer positions and move towards project management.
Areas of Particular Expertise
• Experience in selection of shutdown procedure and philosophy.
• Strong experience in fluid mechanics and pump selection.
• Exposure to project engineering and management of small scale projects.
• Process simulation and Heat and Mass Balance generation.
• PSV calculation and valve specification.
• Operations experience.
• Process modelling and thermodynamics studies.
Professional Experience
Foster Wheeler Energy Limited
February 2008 to present.
Process Engineer
Project: Pluto LNG Detailed Design
• P&ID Review
• PSV Specification
• Pump Characterisation
• Pump Calculation and sizing
• Fire Water System characterisation.
Project: QPCC Feed
• Datasheet review (HX, Pumps, compressors, columns, reactors, fired heaters, packages, control valves, instruments).
• Steam Budget and mass balance evaluation.
• System performance checks.
• Flash Drum Sizing.
• PDP Review.
• P&ID review and modification.
• Valve review and specification.
• Tank sizing.
• N2 blanket specification.
• Vessel Sizing.
• Pump specification.
SNC Lavalin UK
June 2007 – February 2008
Process Engineer
Project: Vankor Detailed Design
• P&ID Review
• IRCD Specification.
• Cause and Effects Charts.
• Pump Calculation and specification.
• Client and Vendor liaison
• Design Evaluation
• Conceptual study.
• Logistics Study.
• Chemical Dosing Calculations.
• P&ID Creation.
• Line Sizing.
• System Management.
• Line List consolidation.
• HAZOP.
• Alarm setting.
• Closeout.
WorleyParsons, WA
March 2006 – May 2007
Process Engineer
Projects:
Coogee Montara - FEED and Detailed Engineering
• Built Process Simulations for the topsides and subsea sections.
• Produced Heat and Mass Balance s for the system including gaslift, based upon the field production models.
• Designed the pressurisation and venting system, including Dynamic depressurisation calculations, line sizing and low temperature studies.
• Multiphase fluid dynamics calculations and line sizing of multiphase production pipe lines.
• Separator Design.
• Line List construction.
• Significantly expanded experience in generation of Heat and Mass Balances and in dynamic depressurisation studies, refined HYSYS knowledge.
Dampier to Bunbury Gas Pipeline:
• Detailed fluid mechanics calculation and report.
• Design of gas regulation skids for GEA operation, including valve and filter specification, low temperature studies and defining operational limits for system.
• Added significantly to experience on piping and treatment of natural gas.
Bayu Undan Engineering Support:
• General operations support and upgrades.
• P&ID As Building; debottlenecking of FSO fluid systems; safety upgrade (PSV thermal relief additions) of fire foam system.
• P&ID redlining and redrafting, line list maintenance.
• Gained extensive experience on P&ID redrafting, instrumentation and redlining procedures. Major experience on characterisation of PSV requirements and CDTP requirements. Gained good working knowledge of API standards relevant to offshore facilities.
Talisman Project:
• Equipment Specification, line sizing analysis, fluid mechanics, and P&ID production.
Minproc
Ravensthorpe Joint Venture
April 2004 to March 2006
Engineer
• Detailed fluid mechanics calculations (including non-Newtonian fluids) and pump specification and selection.
• Project Engineering of fire hydrant and cabinet supply.
• Specification of Potable water system.
• Line Sizing.
• Detailed report writing.
Bronzewing and Lawlers Gold Mines, WA
2003 to 2004
Process Engineer/Metallurgist
• Mass balance determination.
• Sample collection and analysis.
• Process optimization.
Murrin Murrin Nickel Plant
2003
Process Engineer - Refinery
• Process support and debottlenecking.
Hatch Engineering
BHP HBI Project
2000 to 2001
Process Engineer
• Gas Plant Process Support.
• Materials Handling optimization.
• Project to analyse the source of the problems causing dusting problems in the solids materials handling section. Identified the major sources of the problem, and identified methodologies for engineering the issues out, and recommended remedial action to diminish problem in the interim.
• Major project to redesign major points of isolation following potentially dangerous incidents. Incorporated improvements in isolation level, provision of positive proof of depressurisation and improved isolation procedures. Performed risk analysis to prioritise highest risk locations. Gained a great deal of knowledge of isolation requirements and dangers.
Urban Energy
December 1997 to August 1998
Student Engineer
• Built dynamic computer model from scratch of high pressure (30MPaa) natural gas fuelling system. This was a study for a tender for a fast fill system for Perth’s natural gas bus fleet. Company required a dynamic model to optimise the design of the fuelling system (a combination cascade/compressor system) and to make accurate tender bid. Gained extensive knowledge of building simulation from first principles.
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
B.Eng Chemical Engineering, Curtin University, 2000.
B.Sc (Hon) Chemistry, University of Western Australia, 1995.
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
Hysys, Excel, PIPESIM, Piping System Fluid Flow, FFDS, LabView, Access, Word
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
Laboratories analysis.
Report writing.
First Aid.
Computer Modelling.
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
N/A
|
| |
|
|
|
|
|
Process Simulation Engineer, Hysys, Pipesim - Foster Wheeler Energy Limited
CV/Resume ID no.: 80746 |
|
|
|
|
|
|
| Relevant CVs; view more oil and gas CVs |
| 1. MATERIAL LOGISTIC ENGINEER |
| 2. Process Engineer |
| 3. Process Engineer, Project Management |
| 4. Process Engineer Oil Gas Offshore Upstream Onshore Hysys Pipesim |
| 5. chemical engineer looking for a new challenge |
| 6. PROCESS ENGINEER |
| 7. Chemical Engineer / Project Engineer |
| 8. Plant Operator |
| 9. Process Engineer |
| 10. Process Operator |
| 11. Experienced Electrical Instrument Technician (offshore, FPSO , production platforms) |
| 12. experience in petrochemical and refinery plant |
| 13. Business Development Manager looking for similar profile |
| 14. PROCESS ENGINEER, EXPERIENCED IN OIL AND GAS PLANT DESIGN ENGINEERING FIRMS. |
| 15. Gas plant operations |
| 16. Process Engineer |
| 17. Process Engineer |
| 18. Production / Project Planning Engineer |
| 19. Chemical Engineer, Process, Production & Operations |
| 20. engineer, engeneering, chemical, metallurgical, piping, projects. |
| |
| |
| Other CVs; view more oil and gas CVs |
| 1. DPO / SDPO looking for full or part time work |
| 2. Marine engineer officer with excellent career onall types of tankers. |
| 3. Electrical Technician (Offshore) |
| 4. Widely experienced (10 years) in business management and accounting |
| 5. Electrical Foreman, Instrument Technician |
| 6. Pipefitter / Welder |
| 7. Widely experienced (16 years +) in administration |
| 8. cook with over 10 years of cooking |
| 9. Rotating / Mechanical Technician - offshore |
| 10. Rig Medic / Timekeeper |
| 11. Executive Chef in oil and gas company in catering business |
| 12. Automation technician electric power plant with 60MW marine |
| 13. Chief Engineer - hands on experience in marine engines |
| 14. Widely experienced (13 + years) in Construction and Industrial Layouts |
| 15. Sr. Project Manager / Reliability Engineer, Mechanical Engineer |
| 16. Mechanical engineer & Junior SAP PP consultant |
| 17. Technical Support Engineer, Baker Oil Tools Dubai, WDS, Wellbore Completion Design System |
| 18. Part 1, 3, 4, Diver/Mechanic, Commercial Diver from Iceland |
| 19. Senior Plant Operator in LNG Gas Plant Process working in Libya for the Sirte Oil Company LNG Plant |
| 20. Trainee fire and safety officer working in a construction company in India |
| 21. Oil & Gas Instrument Engineer, Honeywell DCS SCADA ESD PLCs by Siemens, Allen Bradley, ABB, MODICON |
| 22. Instrument and controls technician, experience in Black Cat Enginering & Construction Qatar, KSA |
| 23. Instrument technician Kremenco + Kuwait Oil Company, Kuwait National Petroleum Company |
| 24. Young Process Design Engineer working for System Engineers Pvt Ltd India Hysys ProPipe CFD Matlab |
| 25. Trainee marine crew worked in research vessel for seven months |
| 26. Mechanical cum piping engineer trainee with STCW, ASME, ANSI, ASTM, API standards & codes |
| 27. Construction Manager National Marine Dredging Company United Arab Emirates |
| 28. Over 22 years experience various fields in Oil & Gas Piping and Hydro Electric Construction |
| 29. Safety Coordinator |
| 30. Unit Catering Manager, Supreme Food Service, Production Non Commissioned Officer, British Forces |
| |
| |
|
|
|