|
Instrument Technician |
Resume built for oil and gas job opportunities by a jobseeker with experience in Instrument Technician - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
81323
|
Location (Residence): BARODA, India
Citizenship: India
|
|
Languages:
Native:
Gujarati Other:
English, Hindi |
|
Education & Experience: |
Work Authorization & Relocation: |
|
Education:
Vocational in INSTRUMENTATION & CONTROL Years of Experience:
6 years
|
Authorized to work in:
United Arab Emirates
Present Location:
UAE, DUBAI
Relocation:
Anywhere (International) |
|
|
Expertise |
Category |
Subcategory |
Ability |
Experience |
Technician Level |
Instrument |
Experienced
|
16 years |
Plant (Refinery, Gas...) |
Gas Plant |
Experienced
|
1 year |
Plant (Refinery, Gas...) |
Refinery Plant |
Experienced
|
1 year |
Plant (Refinery, Gas...) |
Chemical Plant |
Experienced
|
0 year |
|
|
CV/Resume Details |
|
1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
Dear Sir, I Want to Applied my self for the post of an instrument Technician. I have good knowledge in Instrumentation field.
|
2. Work Experience - CV/Resume Part 2 [Mandatory] |
Oct 2007 to till Date : HYUNDAI ENGINEERING & CONSTRUCTION CO. (DUBAI)
Project : Jebel Ali Power & Desalination “L” Phase II
DUBAI ELECTRICITY & WATER AUTHORITY (DEWA)
Capacity : Total Capacity of all station 1200 MW
Position : Instrument & Control Technician. (Commissioning)
► Oct 2005 to July 2007 : ALSTOM POWER INC. (KING DOM OF SAUDI ARABIA)
Project : Shoaiba Power Plant- Stage II, (Jeddah, Kingdom of Saudi Arabia)
SAUDI ELECTRICITY CO. (SICO)
Capacity : 370 X 6 MW
Position : Instrument Technician. (Commissioning)
► March 2004 to July 2005 : Jasubhai Engineering Private Limited. (Baroda, Gujarat)
Project : ● IOCL, Gujarat Refinery, FCC Unit, Vadodara, Gujarat. India
● Atul Limited, Aromatic Division, Bharuch, Gujarat. India
● Hindustan Zinc Ltd, CPP Unit, Rajasthan, India
Position : Instrument Calibration Technician.
► Dec 2003 to March 2004 : A-Z Instrument Services. (Baroda, Gujarat)
Project : Indian Petroleum Corporation Limited (IPCL)
Position : Instrument Technician
► Oct 2002 to Sep 2003 : Techno Concept. (Baroda, Gujarat)
Project : ●Oil & Natural Gas Corporation (ONGC)
●Gujarat Gas (Gas Compressor Station)
Position : Instrument Technician
Working knowledge of:
TRANSMITTERS:
Siemens (Sitran p.), Fisher Rosemount, ABB (600t-seriesN20k01), Tata Honeywell (st942-eig-000000), Rosemount smart 3051, Taylor600series, Foxboro, Yokogawa Fuji, Endress Houser, Enraf, etc
CONTROL VALVES:
Fisher, R.K. Dembla, Maadal, L &T Audco, Tata Honeywell, Forbes Marshall, Mesoneilan, Siemens, Flow serve, etc.
MOTOR OPERATED VALVE:
Auma (840 H Control valve), (SD0050 On/Off Valve), Dremo(DMC 30),Rotork.
PROGRAMMABLE LOGIC CONTROLLER:
Allen Bradley series SLC-5/2, 5/4, 5/40 along with RS 232 view, Telemechanique (TWDLMDA20DTK), Omrons Zen 10C2AR, messung (XMP8/20) Simens S5 & S7-400 H
ANALYZERS:
Siemens Ultramet-23 for (Co, No, Co2)
Siemens Ultramet-06 for (O2, So2)
Siemens Maxum Edition II for (Gas Chromatograph VOC)
Yokogawa -1000 MarkII for (Process Gas Chromatograph)
FLOW METERS:
Mechanical type of spirax (spiraflo-spring loaded variable area type,) ABB (orifice type), Forbes marshall (vortex shadding type) Sick Mahiack (Ultrasonic Type) etc.
DCS:
YOKOGAWA CENTIUM CS-3000R3
SIEMENS TELEPERM XP SPPA - T 2000
ALSTOM ADVENT ALSPA - 800, P 320.
TATA HONEY WELL – TDC 3000
BANTLY NEVADA SYSTEM (3300):
1) MACHINE Monitoring and machine data management system.
2) Proximity transducer system.
3) Transient data interface (TDXnet).
OTHERS:
I/P & P/I converters, Safety berries, Proximity & Limit switches, Recorders, Scanners, Temperature Sensors RTD, T/C , Temperature switches, Pressure Switches, Gas Measuring Skied, HART Communicator(375,275)
DUTIES AND RESPONSIBILTIES
● I have knowledge of Calibration (Services for: Pressure, Vacuum, Flow, Level & Temperature) Transmitters, Converters, Controllers, Switches, Gauges, Valves (Control valves, Diverter Valves, (knife Valves, Globe Valves, ON/OFF valve, Motor Operated Valve, Solenoid Valves), Maintenance and calibration of Analyzers.
● Different types of instruments according range bench calibration & field calibration done by using Druck (DPI-610), Unomat (Trx-2), Yokogawa, Emerson source & Measuring Calibrators. I have hand operation experience of operate Hart communicator model 275,375, HHT, SFC, Ametek press, Temp Calibrators.
● I have a knowledge of P& ID drawings, Instrument HOOK-UP drawing, PLOT PLAN drawing, LOGIC & INTERLOCK Diagrams, ILD’SDrawings,Control SHEMATIC Diagrams, Internal Wiring Diagrams for construction & Commissioning Work.
● My Responsibilities includes commissioning, Loop checking, Function checking, troubleshooting of Interlock System, and also maintain all the calibration records of master instruments.
● My Responsibilities including supervise installation of Instruments and inspection of work quality and maintain conformity to project standard & Specification.
● Coordinate with main contractor regarding construction problems and improve project schedule as per targets, and prepare documents and submit to main contractor.
|
3. Education & Training - CV/Resume Part 3 [Mandatory] |
QUALIFICATION
► I Passed Diploma in Instrumentation & Control Exam from, Gujarat, India in the year of 2002.
► I have Completed Course of PROCESS CONTROL INSTRUMENTATION (Advance Vocational Training Institute), from Govt of Gujarat.
► I have Completed Course of INDUSTRIAL CONTROL AUTOMATION from Hi-Tech Training center, from Govt of Gujarat.
|
4. Computer Skills - CV/Resume Part 4 [Mandatory] |
► Computer literate MS Office MS Word, Excel, Internet
|
5. Other Skills - CV/Resume Part 5 [Optional] |
► Electrical Testing & Commissioning Works
|
6. Additional Information - CV/Resume Part 6 [Optional] |
● During my work experience in Power plants I worked in different Systems like Gas turbine(Siemens), Steam turbine(Alstom), Heat recover and steam generation system (HRSG), Chemical Dosing system, Auxilary Boiler, West water treatment Plant, Water desalination plant, Fuel Gas & Oil Station, Emergency Diesel Generates, Gas Copressor,ext.
● During my work experience in Refinery& Petrochemical I worked in FCC unit in Indian Oil Corporation Ltd. Baroda. In Petrochemical I worked in Gas cracker Plant, Poly Ethylene, Poly Propylene & PVC Plant in I P C L Baroda.
● During my work experience As an Instrument Maintenance Technician in ONGC I worked in SRU Unit (Sulphur Recovery Unit) GSP (Gas Sweeting Plant) LPG Unit & Gas & Oil Separation Plant.
During my work experience in Gujarat Gas Co. I Worked In Dresser Rand Gas Compressor Station. (O&M Work) in Hazira Surat.
|
|
|