Work Authorization & Relocation: |
|
|
Education:
Vocational in Years of Experience:
16 years
|
Authorized to work in:
European Union, UK (in particular)
Present Location:
UK, Merseyside
Relocation:
Anywhere (International) |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Trades (Skilled) |
Rigger |
Experienced
|
21 years |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
Curriculum Vitae
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
FIRM DUTIES DATES
Thermal Energy Construction Ltd
Trent Lane
Castle Donnington
Derbyshire, DE74 2NP Construction of FGD Unit at Fiddler’s Ferry Power Station, Widnes.
Installation of new duct units, installation of main steel work etc. Oct 07 – Apr 08
Fabricom Contracting Ltd
Kings Road
Immingham
North East Lincolnshire Insulation of steel, columns, vessels, pipe-work and valves etc. on new ethanol alcohol plant at Manchester Cargills. Jun 06 – Aug 07
Power Eng. Services
c/o Direkt Eng Services Ltd
12 Whickham Bank
Whickham
Newcastle-Upon-Tyne Crane driver – overhead
Turbine Rigger on outage at Killingholme Power Station Mar – Apr 2006
Alstom Power Ltd
PO Box 25
Lichfield Road
Stafford
ST15 4LN Rigging work on Connah’s Quay Power Station, North Wales
And rigging duties on ICI Power Station, Runcorn Feb – Mar 2006
Short-term contract
AMEC
Houghton Road
Darlington
Tel: 01325 460 644
Rigging
Removal of 40, 60 and 80 tonne vessels and re-siting of new vessels.
At Kemira, Ellesmere Port
Jul 2005 – Dec 2005
Due to end contract 21/12/05
Pretofac
1 North Esplanade West
Aberdeen
Ab11 5QF
Total re-vamp for simplification project.
Mar 2004 – May 2005
Fabricom
Saughall Nr Chester
General rigging on shutdowns at:
BOC, Warrington
Safil, Warrington
and Shell, Stanlow
Oct 2003 – Jan 2004
AMEC
Houghton Road
Darlington
Tel: 01325 460 644 Shell Stanlow
Ellesmere Port
Linavol Plant
Re-vamp Sep 2003 – Oct 2003
Interserve Industrial Services Ltd
Claybrook House
Claybrook Drive
Redditch
Worcestershire
B98 0FH Hook-up of Calder Platform, Morecombe Bay. Aug 2003 – Sep 2003
Caxios – Fabricom
Saughall Nr Chester Shutdown on Salt End Power Station
On BP Oil Refinery Mar 2003 – April 2003
Ledwood Mechanical Engineering
Waterloo Industrial Estate
Pembroke Dock
Pembrokeshire Shutdown on Shell Stanlow
Removal of redundant pipe work valves and vessels. Renew same. Mar 2003 – Mar 2003
AMEC
Houghton Road
Darlington
Tel: 01325 460 644 ICI Runcorn
Caustic Chlorine Plant
Removal of Pipe work, valves, bundles etc. Feb 2003 – Mar 2003
Vosper Thornycroft
Shipbuilders/Repairers
Woolston Road
Southampton Heavy lifts, steelwork department
Feb 2002 – Feb 2003
Chieftan Group plc
Walker Street
Newcastle upon Tyne
NE6 3PJ
Tel: 0191 263 5544 Working on Dublin Bay Power Station May 2001 – Sep 2001
Cammell Laird
Campbell Town Road
Birkenhead
Merseyside
Tel: 0151 650 0111 Costa Classica
Worlds biggest ship enlargement
General Rigging Aug 2000
AMEC
Houghton Road
Darlington
Tel: 01325 460 644 Kemira
Shutdown 2000
General Rigging 6 May 2000 to 10 Jun 2000
UK Construction
P.O. Box No.3
Hammond Road
Liverpool
L33 7UN Mogas Project
Shell Stanlow
Ellesmere Port
General Rigging Charge-hand and Appointed Person.
Installation of Steelwork, pipework, valves, vessels, Columns and rip out of HT2 for tie-ins to new Mogas Project. 1 Mar 99 to 31 Mar 2000
UK Construction
Upgrade of DVU unit, removal and installation of pipes, valves, steelwork and vessels for upgrade. Sep 98 to Oct 98
O'Hare Limited
Weston House
West Road
Runcorn
Cheshire
WA7 4HR Installation of Pipework, Vessels and Valves. Jul 98 to Sep 98
Amec Process and Energy
Haughton Road
Darlington
Co Durham
DL1 2ED
Tel 01325 460 644 Exxon Shutdown
Fife Ethylene Plant
Mossmorron
Cowdenbeath.
Removal of 48” Refleir valves
Pipe work, steelwork expansion joints. May 98 to Jul 98
Caxios Ltd
Saughall
Near Chester
Shell UK.
Ellesmere Port Stanlow
CAT Cracker Shutdown 98
Removal of bundles and pipe work. Renew same
Feb 98 to Apr 98
Amec Process and Energy
Haughton Road
Darlington
Co Durham
DL1 2ED
Tel 01325 460 644
ICI Runcorn
Caustic Chlorine Plant
Removal of Pipe work, valves, bundles etc.
Dec 97 to Feb 98
Amec Process and Energy
Haughton Road
Darlington
Co Durham
DLl 2ED
Tel 01325 460 644
Removal of 54 inch lines and replace same at JV06 plant, on ICI, Wilton
Apr 97 to May 97
Amec Process and Energy
Haughton Road
Darlington
Co Durham
DL1 2ED
Tel 01325 460 644
Complete revamp of Shell Sola site, Norway
Feb 97 to Apr 97
Amec Process and Energy
Haughton Road
Darlington
Co Durham
DL1 2ED
Tel 01325 460 644
Heat exchanges, pipe work valves, steelwork etc on BP site at Grangemouth, Scotland
Jun 96 to Oct 96
UK Construction
P.O. Box No.3
Hammond Road
Liverpool
L33 7UN
Erection of main steel, pipe work, boilers etc, on Connah’s Quay Power Station, Clwyd, North Wales
Nov 95 to May 96
AOC International Ltd
Alba Gate
Stoneywood Park
Dyce
Aberdeen
AB2 OHN
Erection of steelwork, pipe work, vessels, valves and general rigging. Point of Ayr gas terminal, North Wales
Oct 94 to Nov 95
Sub Sea Offshore
Greenwell Road
East Tullos
Aberdeen
ABI 4AX
Tel 0224 292 053
Rigging foreman
Anode riser removal Subsea on Claymore A
Jun 94 to Aug 94
Dunn International Ltd
Derby Street East
Burton-on-Trent
DE14 2NX
Tel 0283 36441
General rigging/charge hand (Deeside Power Station
Clwyd North Wales)
Nov 93 to May 94
Costain Oil & Gas
Port Causeway
Bromborough
Wirral
Tel 0151 801 4444
Pipe Pulling Barge
(Conico Oil Refinery
Theddle Thorpe)
Jan 93 to Oct 93
Dill Maggs & Co Ltd
Swn-Y-Gwynt
8 Railway TerraceTonmawr
Port Talbot
South Wales
Tel 0639 638496
Flare Stacks
(Sullom Voe, Shetlands)
Apr 92 o Nov 92
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
QUALIFICATIONS
5 Day Combined Offshore Survival and fire Fighting Course, expiry date 13/12/2008.
Ace card Ref No: 023710 Issue Date: 09/02/07 Certificate No: 1000003985.
Basic Offshore Safety Induction and Emergency Training, OPITO approved Certificate No 20990
SCATS Training and Safety Course, Certificate No 302092 Expires 04/08/08
SSI Crane Assessment Ref No ACH/SHELL 03/022 Instructor Stan Clarke
Loler Lifting Regulations 1998 British Standard 7121
Appointed Person British Standard 7121
Shell Authorised Competent Person
ECITB Skills Database Grade 6 Category B
BEH Air Trailer Trained, Airline Trained, Self Contained Breathing Air Trained
CITB accredited Slinger/Slinger Operator No 00564860/1 Feb 2007
Pegasus RIG 9942
Southampton Eng. Training Ass. Ltd – Pendant, Satellite and Over-head Crane Operation
RTITB Rough Terrain Telescopic Handler – Up to 5000 kg, expiry date 18/08/08, Reg. No. 085012261
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
yes
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
no
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
no
|
| |
|
|
|
|
|
Experienced Rigger
CV/Resume ID no.: 81684 |
|
|
|
|
|
|
| Relevant CVs; view more oil and gas CVs |
| 1. rig operator, crane operator, slickline operator |
| 2. RIGGER/ROUSTABOUT (OFFSHORE) |
| 3. Crane Operator |
| 4. Crew - Marine offshore or onshore, expirience and hardworking guy |
| 5. QHSE officer, Casing crew leader, Marketing, Advertising, Management |
| 6. 2 yr Well Tester |
| 7. Rigging superintendent |
| 8. CODED WELDER PIPEFITTERER, BOILERMAKER AND RIGGING |
| 9. Able-Bodied Deckhand, Bosun, or Marine Rigger |
| 10. Able Seaman Rigger |
| 11. Rigger/Roustabout/Pipefitter/Plumber/Deckhand - Multi Talented |
| 12. AB COXWAIN RIGGER |
| 13. Safety Manager, QA/QC Manager |
| 14. Commercial diver; marine construction industry |
| 15. Mechanical rotating technician, (including pumps and turbines, and basic compressors) |
| 16. Rigger offshore |
| 17. Pipefitter |
| 18. Offshore/Onshore crane operator, Rigger |
| 19. NCCO certified crane operator Crosby rigging NCCER heavy equipment operator |
| 20. Rigger |
| |
| |
| Other CVs; view more oil and gas CVs |
| 1. Junior Geologist (PhD), sedimentologist |
| 2. Master, Marine Superintendent |
| 3. Electrical, Instrumentation, Oil and Gas |
| 4. Engineering Professional Infrared Thermograph |
| 5. Offshore Medic, Rig Medic |
| 6. Able bodied seaman with Vroon Offshore Services |
| 7. Mechanical Engineer, Operations Supervisor |
| 8. M.Sc. Geology with two year exp. in ground water investigation and making log |
| 9. Hospitality experience - food and beverage service department |
| 10. Composite Pipe Design Engineer |
| 11. Telecommunications Engineer / Supervisor |
| 12. Certified marine mechanic |
| 13. Graduate mettalurgy engineer |
| 14. GRADUATE GEOLOGIST |
| 15. Time served heating engineer, 16 yrs + experience |
| 16. Trainee accountant, auditor, finance officer |
| 17. Design Engineer, Supplier Manager |
| 18. HVAC technician/engineer, last job was for British gas out in Tunisia |
| 19. 6 years on the railroad been layed off looking for a new job work hard and is a company man |
| 20. Recent graduate with very limited work experience |
| 21. Trainee B.E Mechanical Engineer Graduate from India |
| 22. Trainee Design Engineer GRP Pipe Designing & Marketing EPP Composites Private Limited Rajkot |
| 23. Onshore / offshore Production Engineer Suez Oil Company (SUCO) Egypt |
| 24. Graduate petroleum engineer Mehran University of Engineering and Technology Jamshoro Sindh Pakistan |
| 25. Telecom/network technician would like to work in the Middle East or in Africa |
| 26. Marine mechanical engineer working at Orascom HD El Gouna Red Sea Egypt |
| 27. Project Coordinator working for FMC Technologies Subsea Systems BP Block 18 Greater Plutonio Angola |
| 28. Marine Mechanic Heavy Diesel Engines working in Greater Nile Petroleum Operating Company Sudan |
| 29. Senior Project Engineer Technip Engineering Thailand in process operation, precommissioning |
| 30. Off. Electrical Technician/Electrican Aker Solutions Agip KCO Kashagan Project Kazakhstan Offshore |
| |
| |
|
|
|