| |
| Instrument Technician - Instrumentation Construction and Maintenance activities |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in Instrument Technician - Instrumentation Construction and Maintenance activities - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
84242
Last Updated:
Friday, September 19, 2008 |
Location (Residence): FAISALABAD, Pakistan
Citizenship: Pakistan
|
| |
Languages:
Native:
Hindi Other:
English United Kingdom, Hindi, Urdu |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
No Degree Years of Experience:
9 years
|
Authorized to work in:
European Union, UK (in particular), United States, Australia, Belgium, Brazil, Canada, Cyprus, Egypt, Italy, Jordan, Korea, Dem. Rep., Korea, (South), Kuwait, Libyan Arab Jama., Malaysia, Pakistan, Qatar, Saudi Arabia, Singapore, South Africa, Switzerland, Turkey, Ukraine, United Arab Emirates, United Kingdom, United States
Present Location:
PAKISTAN, FAISALABAD
Relocation:
United States, Pakistan, Qatar, Saudi Arabia, Switzerland, United Arab Emirates, United States |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Technician Level |
Instrument |
Experienced
|
14 years |
|
Plant (Refinery, Gas...) |
Refinery Plant |
Trainee
|
6 years |
|
Operations |
Field |
Trainee
|
6 years |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
n/a
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
Summary of Work Experience (From present to previous)
EXPERIENCE IN ABROAD
1: Name of Company / Country : IBN RUSHD Saudi Arabian Fibers Company
PTA/CTA PLANT (Sabic)
: Yanbu Saudi Arabia
Position : Instrument Technician
Held Period (From – To) : 16 Faburary2008 to07march 2008
Key Job Responsibilities : PTA/CTA SHUT DOWN Activities
Co-ordination with Operational Dept.
Trouble shooting, Servicing & Maintenance activities
P.M. jobs of radio active source level Transmitter.
Calibration of pressure transmitter flow transmitter. Temperature transmitter
.remove &re-Installation of vibration scope of Bentley Nevada 3000/3500/3300 series and function Test.
Maintenance, repair, calibration, loop test, function test of compressor & turbine instruments.
Lube oil & seal oil instrument loop test & function test.
Remove & installation of Instrument. Loop test & function test of Pressure, Temperature (humidity) flow transmitters. Level, Pressure, flow, temperature switches, control valves& pressure gauges.limit switches.
2: Name of Company / Country : IBN RUSHD Saudi Arabian Fibers Company LTD. (Sabic)
: Yanbu Saudi Arabia
Position : Instrument Technician
Held Period (From – To) : 11 january2008 to20 January 2008
Key Job Responsibilities SHUT DOWN Activities
Calibration of service area (Instrumentation)
Loop checking and functional testBoiler Instruments.
Dynsco pressure transmitter, wika humidity transmitter D/P Transmitter
Calibration of pressure gauges, flow and pressure switches
Calibration of all transmitter (level Vega ) rosemount pressure and flow.
Function check of all pneumatic cylinders.
Control Valves. Digital Pressure control valve
3. Name of Company / Country : IBN ZAHAR Saudi European petrochemical company (Sabic)
: Jubail Saudi Arabia
Position : Instrument Technician
Project : SHUT DOWN (Activities)
Held Period (From – To) : 23 October2007 to31 December 2007
Co-ordination with Operational Dept.
Trouble shooting, Servicing & Maintenance activities.
Maintenance, repair, calibration, loop test, function test of compressor & turbine instruments.
Lube oil & seal oil instrument loop test & function test.
Remove & installation of Instrument. Loop test & function test of Pressure, Temperature (humidity) flow transmitters. Level, Pressure, flow, temperature switches, control valves& pressure gauges.limit switches
Function test of all boiler instruments.
4. Name of Company / Country : M.S.AL-Suwaidi Industrial Services Company
Limited, : P.O.B. No. 991, Al-Jubail – 31951, K.S.A.
: www.Suwaidi-industrial.com.
Position : Instrument Technician
Project : Waste water Treatment project. AR-4529
Held Period (From – To) : 7 March 2006 to Till Date.
5. Name of Company/ Country : Saudi Aramco (Saudi Arabian Oil Company)
: Oil Refinery & North tank form (RASTANURA) K.S.A
Position : Instrument Technician
Project : Waste water Treatment project. AR-4529
Held Period (From To) :10 February 2007 to 09 October 2007.
Key Job Responsibilities Installation, Testing, Calibration, Loop checking
Troubleshooting and Functional Testing. Pre-commissioning,
Commissioning Activities
Calibration of level, Flow, Temperature, &PressureTransmittes.
Preparation of instrument material request. Installation, (As aramco standard) Testing, and Calibration, Calibration of of Control Valves Pneumatic Positioner.PCV
Safety Valves, TCV, Rexa flow control Valve, Rotork valve(Mov)
Flow control valve,
Calibration of k-Teck.Accura Trak AT100/100S Magnetostrictive
Transmitter, Enraf.Radar tank gauging Transmitter, honey well, Siemens
Pressure transmitter &D/p Transmitter
Cable laying, copper tubing’s Tubing, Cad welding, Electrical conduit
Installation.
6. Name of Company/ Country : Saudi ARAMCO (Saudi Arabian Oil Company)
: Juaymah Tank form (Rastanura) K.S.A
Position : Instrument Techniocian
Project : Waste water Treatment Project.AR- 4529
Held Period (From To) : 01 April 2006 to 09 February 2007
EXPERIENCE IN Pakistan
1. Name of Company / Country : ICI CHEMICAL INDUSTRIES LIMITED (Poyelster Plant)
32km-LahoreRoad,(Pakistan)
Position : Instrument Technician
Project : SHUT DOWN (Activities)
Held Period (From – To) : 15November 2005 to 14 December 2005
Key Job Responsibilities
Calibration of service area (Instrumentation)
Loop checking and functional testBoiler Instruments.
Dynsco pressure transmitter, wika humidity transmitter D/P Transmitter
Calibration of pressure gauges, flow and pressure switches
Control Valves. Digital Pressure control valve
2. Name of Company / Country : IBRAHIM FIBRES LIMITED (Polyester plant)
38km-Sheikhupura Road Faisalabad (Pakistan)
Position : Instrument Technician
Project : SHUT DOWN (Activities)
Held Period (From – To) : 19 May 2004 to 18 June 2004
Key Job Responsibilities Co-ordination with Operational Dept.
Trouble shooting, Servicing & Maintenance activities.
Maintenance, repair, calibration, loop test, function test of compressor & turbine instruments.
Lube oil & seal oil instrument loop test & function test. Remove & installation of Spinning and Fiber Line All Instrument Loop test & function test of Pressure, Temperature (humidity) flow transmitters. Level, Pressure, flow, temperature switches, control valves& pressure gauges.
3. Name of Company / County : Ibrahim Fibres Limited 38 km Sheikhupura Road
Faisalabad
Position : Instrument Technician
Project : Ibrahim Fibres Limited. Held Period (From – To) : 05January 2002 to 20 July 2005
Key Job Responsibilities
ERECTION&COMMISSIONING
.
Attending the Preventive Maintenance. Erection and Commissioning Polyester plant bye ZIMMER having Capacity 450Tons/day During Erection of IFL#2.
Calibration of various instruments.
Cable laying, copper and SS tubing, Instrument Installation. loop checking of all Instrument.
Service and Maintenance of Control valves.
Service and Maintenance of instruments.
Documentation and planning of instrumentation works.
Installation, Testing, Calibration, Loop checking.
Troubleshooting and Functional Testing.
Pre-commissioning, Commissioning Activities
4. Name of Company / County : Khazana Sugar Industries Charsaddah Road Peshawar.
Position : Junior Instrument Technician
Plant : khazana Sugar Industry Distillery. Held Period (From – To) : 04January 1999to 10 July 2000.
Key Job Responsibilities
Calibrated pressure, temperature Gauge. Repair pneumatic Cylinders, Switches, pressure level calibrated. Maintenance control valves
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
Matriculation Board of Intermediate &Secondary 1995
(Science) Education Faisalabad
PROFESSIONAL QUALIFICATION
Diploma Board 1995to1998
Diploma of Associate Engineer in Punjab Board of Technical Education Instrument Technology Lahore. Punjab (Pakistan)
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
Computer Literate-Microsoft Excel, Microsoft Word.
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
Others : Computer Literate-Microsoft Excel, Microsoft Word.
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
I have hand on experience including Pakistan and overseas working in petrochemical, oil refinery, Distilleries Chemical.
Experience in installation, maintenance, trouble shooting, loop checking, erection and commissioning, hot cut over upgrading, on electronic / pneumatic and hydraulic instrument made by Honeywell, Foxboro, Allen Bradley, Rosemount, Masoneilane, Taylor, Bentley Nevada, for control and measuring process parameter like pressure, level, flow, temperature, speed and vibration system.
Worked on TDC-3000 Honeywell DCS system, Foxboro IA series 6.4 version DCS system, Triconex PLC 3.1 version,Modicon, Siemens’SIMATIC S5(95U,100U,115U,135U) &S7(400,412,414,416,417)PLC, Scada system, Bentley Nevada 3300, 3500 & 3000 vibration and temperature measuring system and fire and gas system.
Able to read and follow P &ID and different types of loop diagrams
Worked on electronic/pneumatic transmitter’s: Rosemount-3051 smart and 1151 analog, Honeywell ST-3000 smart,Foxboro,K tek level TX, Endrss+Houser Level Tx. Control valve with positioner: masonilean, Fisher, Valtek, Fisher Gulde,jourdon hydraulic valve, Instrumentation ltd, : Masonilean,,Tailor, Rosemount, Pressure switch’s: United Electric(UE),Vibration: Bentley Nevada 3300& 3500 axils and radial speed and key pheser monoriting. Bentley Nevada – 3000 temperature monitoring. Displacer type level transmitter and switches, solenoid valve’s, Pneumatic cylinder’s, RTD and Thermocouple’s, all types of indicator’s and recorders.
|
| |
|