|
|
CV Sr. Piping Cad Designer / Checker - SKS Woods, Brunei
|
|
|
|
|
|
|
| |
| |
| Sr. Piping Cad Designer / Checker - SKS Woods, Brunei |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in Sr. Piping Cad Designer / Checker - SKS Woods, Brunei - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
84301
Last Updated:
Sunday, September 21, 2008 |
Location (Residence): Yamuna Nagar, Nigdi, Pune, India
Citizenship: India
|
| |
Languages:
Native:
Hindi, Marathi Other:
Hindi, Marathi |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
High School in SSC Years of Experience:
15 years
|
Authorized to work in:
Germany, India, Italy, Kuwait, New Zealand, Singapore, Switzerland, United Arab Emirates, Western Sahara
Present Location:
Brunei Darussalam, Daerah Belait
Relocation:
Anywhere (International) |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Design/Software |
Piping |
Experienced
|
20 years |
|
Design/Software |
CAD |
Experienced
|
20 years |
|
Engineering |
CAD/CAM |
Experienced
|
20 years |
|
Engineering |
Piping |
Experienced
|
1 year |
|
Engineering |
Piping |
Experienced
|
3 years |
|
Engineering |
Piping |
Experienced
|
9 years |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
Sir / Madam,
Sub: Application for the position of Sr.Piping Designer. (offshore/onshore)
Presently, employed by SKS Woods, Brunei as a Sr.Piping Designer. (offshore/onshore)
During the 15+ years of working experience, I have gained good experience in Piping design for onshore as well offshore.. I’ve been part of Design group for different projects.
I believe that my skills and personal attributes match the requirements you seek for this role and that I would be able to effectively contribute to the team and the organization. I would appreciate the opportunity to discuss my application with you.
I look forward to hearing from you soon.
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
Work Experience
• 23rd Jan 2008 to Till date - Sr. Piping Checker, SKSWOOD Sendirian Berhad, Brunei
Working on the different area: WOP-11, WOP-12, WOP-13 & EOP-11
Job Details:
• Site visits & inspects onshore & offshore BSP (Brunei Shell Petroleum) facility.
• Checking the workpack in the design team as assigned by Lead Designer & prepare the workpack for quality and accuracy prior to approval by Lead Designer.
• Developing maintenance work pack using client information and site surveys and in accordance with client & engineering standards.
• Review workpack inclusive of offshore site visit to ensure complete definition of the works.
• Produc sketches, drawings, material take off as part of the work pack development deliverables.
• Executing design tasks in accordance with SKSWood quality system and client’s quality requirements competently, efficiently with minimal supervision.
• Responsible for delivering all work assigned by Lead Designer.
• Preparing and checking the standard requisitions and drawings, carrying out field surveys, and reviewing/checking 3Rd party workpack delivery.
• Implementing safety and environmental considerations in the work.
• Sr. Piping Designer, Tebodin Consultant & Engineers, Muscat, Oman,
15th Dec 2006 to 22nd Jan 2008
DD for Galfar Engineering Services for High Pressure Gas Flow line – 80854.
DD for PDO (Petroleum Development of Oman) Flow lines for SAIH RAWL SOUTH, SAIH NIHAYADA, BARIK & SAIH RAWL – 83023.
Lekhwair Gas Sweetening Unit Upgrade – Project No. 80388.
Engineering Services for Qarn Al Alam Off plot Steam Injection Plant – Project No. 83039.
Job Details:
• Development of drawings e.g., plots plan, piping key plan, piping plan, isometric, piping support & tie in schedule.
• Preparations of Material take of (MTO) as per SHELL standard.
• Prepare material requisitions for piping commodities and piping mechanical specialty items.
• Preparation of all associated lists, i.e., specialty items, piping tie – ins etc.
• Develops / maintains standard specification sheets for engineered items.
• Consolidated MTO of piping bulk items, valves, special items during preliminary GFO and final stages.
• Data sheets & specification for piping items.
• Sr. Piping Designer - Electro watt Engineering, Muscat, Oman,
10th Jun 2006 to 13th Nov 2006.
Mukhainzana Power Station Gas Treatment Plant 1 & 2 – Project No. 3698.
Qarn Al Alam Power Station Gas Treatment Plant 1 – Project No. 3698
Job Details:
• Draws piping layout and isometric drawing & bill of materials.
• Prepares "as-built" drawings of existing piping.
• Prepares piping material take off for estimate and purchasing.
• Responsible for checking piping plan and isometric drawings.
• Preparation of support drawings with support standards.
• Piping Designer – Tecnimont ICB Pvt. Ltd. - India, 30th Feb 2006 to 6th June 2006.
Job Details:
• Draws piping layout and isometric drawing & bill of materials.
• Prepares "as-built" drawings of existing piping.
• Prepares piping material take off for estimate and purchasing.
• Responsible for checking piping plan and isometric drawings.
• Preparation of support drawings with support standards.
• Piping Designer – Kvaerner Power Gas India Ltd. - India, 1st Sep 2005 to 1st Feb 2006.
Job Details:
• Draws piping layout and isometric drawing & bill of materials.
• Prepares "as-built" drawings of existing piping.
• Prepares piping material take off for estimate and purchasing.
• Responsible for checking piping plan and isometric drawings.
• Preparation of support drawings with support standards.
• Preparing Nozzle orientation drawings.
• Piping Designer – Thermax Ltd. Cogen - India, 1st July 2002 to 21st Aug 2005.
Kalpa – Taru 8.0 MW IPP
Sree Metallic 8.0 MW CPP
Shristi Ispat Ltd. 8/0 MW CPP
Madras Cement Ltd 2 x 18 Coal Based CPP
Job Details:
• Draws piping layout and IBR & Non IBR isometric drawing & bill of materials.
• Prepares "as-built" drawings of existing piping.
• Prepares piping material take off for estimate and purchasing.
• Responsible for checking piping plan and isometric drawings.
• Preparation of support drawings with support standards.
• Mechanical D’man – Thermax Babcock & Wilcox Ltd. - India,
10th Oct 1993 to 26th June 2002.
Job Details:
• Draws piping layout and IBR & Non IBR isometric drawing & bill of materials.
• Drawings for pressure part assemble.
• Panels for Boiler, Eco Header, Evaporator Header, Attemperator Header, Assembly for Deaerator, Storage tank, Vapour tank, I.B.D. tank.
• Supporting arrangement for Headers, Structure, Ducting, Chimney, and Buckstay Headers.
• Tube drawings & studding arrangement, logic diagrams, economiser assembly & coil etc.
• Prepares "as-built" drawings of existing piping.
• Prepares piping material take off for estimate and purchasing.
• Responsible for checking piping plan and isometric drawings.
• Mechanical D’man Trainee Apprenticeship in Thermax Babcock & Wilcox Ltd.
- India,
10th Oct 1992 to 10th Oct 1993.
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
Education and Academic Achievements
S.S.C. board examination passed.
Passed I.T.I. (Mechanical D’man) in the year 1992 from Chinchwada – Pune, India
Passed Apprenticeship (N.C.T.V.T. Mechanical D’man) in the year 1993 from Thermax Babcock & Wilcox Ltd.
Certification
• N.C.T.V.T. Certification course done by Thermax Babcock & Wilcox Ltd. In the year 1993 – India.
• HSE course from STS – Oman, Approved from Petroleum Development of Oman (PDO).
• H2S course from STS – Oman, Approved from Petroleum Development of Oman (PDO).
• Certification course done in AUTOCAD from I.C.C. CAD centre – India.
• Tropical BOSIET including Travel Safely by Boat and Tropical EBS course from OPITO,
Megamas Training Co. SDN BHD
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
Computer skills:
AUTOCAD - 2007, Micro station, Auto Plant, Worked on BAAN Software, WINDOWS NT, MS office & Internet
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
Projects worked with:
• Oil & Gas – offshore & onshore.
• Petrochemicals.
• Chemicals
• Pharmaceuticals
• Other Plants
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
Strength
• More than 15 years experience in generating piping layout for petrochemical, oil production and transportation facilities for new projects and for plant modification jobs, front end design and detailed engineering, developing maintenance work pack using client information & site surveys, site visit & inspect onshore & offshore BSP facility.
• Strong teamwork skills.
• Able to ensure the proper execution of time-sensitive projects.
• Able to check the drawings and communicate effectively with superiors / technicals.
|
| |
|
|
|
|
|
Sr. Piping Cad Designer / Checker - SKS Woods, Brunei
CV/Resume ID no.: 84301 |
|
|
|
|
|
|
| Relevant CVs; view more oil and gas CVs |
| 1. widely experienced(10 years)in Marine field,Marine piping(Offshore),Having excellent technical skill |
| 2. Structural PDMS Designer (17) |
| 3. Piping Design Engineer |
| 4. Piping Designer |
| 5. Piping Designer working with Compelmada International, s.a. Portugal |
| 6. PDMS Piping for Oil & Gas Engineering (Offshore, Onshore, EPC Power etc) |
| 7. Piping Superintendent/supervisor/engineer |
| 8. Structural Designer |
| 9. PDS, PlantSpace, PSDS-Bentley, Piping Designer |
| 10. Hydraulic Technician |
| 11. Senior Piping Designer, I aim to be involved in new challenging projects. |
| 12. PDS Piping Designer / Piping Senior Draughtsman |
| 13. PDMS Piping Designer |
| 14. Civil geotechnical engineer, young I aim to be involved in new challenging projects. |
| 15. PDS Piping Designer |
| 16. PDS/PDMS Piping / Electrical designer |
| 17. Mechanical Engineer with expertise in Piping & Pressure vessel Design |
| 18. Naval Architect - Shipyard Experience in Design of Ships |
| 19. Piping/Mechanical Draughtsman With 7 years experiance |
| 20. PDMS Design Engineer |
| |
| |
| Other CVs; view more oil and gas CVs |
| 1. Graduate in Politecnico di Danzica (Management) |
| 2. oil and gas and construction field installation testing and commmissioning |
| 3. Process Supervisor / Panel / Field / Operator |
| 4. QA/QC Welding Inspector |
| 5. Electrician, Safety training |
| 6. Experienced Chef, Food Production Manager |
| 7. Petroleum Engineer Production Engineer Construction roadway Inspector |
| 8. Electrical/Electronic Maintenance Engineer |
| 9. Service electronic engineer |
| 10. M.SC. GEOLOGY (FRESHER) FROM PRESIDENCY COLLEGE IN CHENNAI |
| 11. MBA Graduate in Shipping and Logistics |
| 12. Site Manager / Service Engineer cum Technician |
| 13. Claims Administrator, Contracts Controller |
| 14. Pipe Fabricator, Pipefitter |
| 15. Steel structural design and detailing engineer, Staad-Pro, X-steel, Autocad, Strucad |
| 16. Electrical foreman, commercial, industrial, petroleum |
| 17. Sr Quantity Surveyor / Cost Engineer / Contract Administration / Claims Consultant |
| 18. E & I cad designer, SNC lavalin consultant for TABREED-DISTRICT COOLING PLANTS |
| 19. Director Finance, Accounts & Company Secretary |
| 20. Trainee sales experience |
| 21. Project Manager, Finance Director, African Steamship Angola, Luanda, have a Ph.D. in economics |
| 22. Senior Piping Designer / Supervisor / Coordinator/CAD Intergraph PDS SmartPlant & I-Sketch products |
| 23. Safety professional - nebosh iosh diploma in safety management and fire and safety |
| 24. Experienced MT, PT, UT technician willing to relocate & travel Valero Refinery, Exxon Mobil LA |
| 25. International Recruiter, International Human Resources Management, Mobility Management, Intercultu |
| 26. Expert British Pipefitter, thirty years experience in oil and gas industry in UK & overseas projects |
| 27. Mud engineer onshore land and offshore rigs, obm water base mud emulsion invert emulsion |
| 28. Controls/Instrument Engineer, vastly experienced in commissiong GE gas turbines 12 years experience |
| 29. Quality Manager / Customer & Supplier activities, Supplier Quality Engineer Wisconsin USA |
| 30. I & C Engineer Siemens Malaysia Sdn Bhd Siemens DCS and sub-systems Siemens Simatic Step 7 Step 5 |
| |
| |
|
|
|