|
|
CV Instrument Engineer UTAC Singapore
|
|
|
|
|
|
|
| |
| |
| Instrument Engineer UTAC Singapore |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in Instrument Engineer UTAC Singapore - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
84350
Last Updated:
Friday, November 6, 2009 |
Location (Residence): ang mo kio, Singapore
Citizenship: Indonesia
|
| |
Languages:
Native:
Malay Malaysia Other:
English |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
Bachelors in Electrical Engineering Years of Experience:
15 years
|
Authorized to work in:
Singapore
Present Location:
Singapore, ang mo kio
Relocation:
Anywhere (International) |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Engineering |
Instrumentation |
Experienced
|
20 years |
|
Engineering |
Electronics |
Experienced
|
11 years |
|
Engineering |
Maintenance |
Experienced
|
2 years |
|
Engineering |
Electrical |
Experienced
|
1 year |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
Instrument Engineer
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
Work experience Year 2007 ~ Present UTAC Singapore
Engineer
Responsible on the weekly pretest data monitoring and improve First pretest Yield, and fine root cause and take action to improve device problem due to contact and others Issues.
Responsible on the set up time target on the JTS-7000 machine to meet with production target
Analysis device failure on the LUL handler caused by ESD and reported to the weekly CIP meeting.
Responsible on the daily jam rate monitoring at JTS-7000 machine and improve some method and modified H/W to meet the target.
Responsible on the daily Advantest jam rate to meet with production target.
To come out an Idea on the improvement project to reduce set up down time any newly product by fabricate some JIG in term to reduce system down time machine, time and man.
Perform lot on hold verification, investigation and disposition
Ensure processes and procedures comply with company quality system.
Perform Qual buy off to all product include the machine buy off
Carry out relevant “On the Job” training as required
Liase with relevant company department, supplier and customer to communicate problems found and proposed improvement action.
Implementation of continuous improvements to reduce rejects and improve production / quality system efficiency.
2003 – 2007
Test Engineering
Responsible for the A360 Teradyne Tester, Loadboard and DUT boards Equipment
Responsible for the LTX-CX and LTX –DX Tester in term to maintaining and trouble shooting
Responsible for Synchro Fusion and PVI Tester.
Responsible for set up and diagnostic of tester problem
Establish preventive maintenance
Responsible for improving the Yield and optimize tester machine
Perform process uptime and down time Tester machine.
Responsible on the LTX tester, diagnostic problem, verify device problem and all issues regarding LTX tester.
Responsible on the Synchro QSS and Synchro PVI tester, trouble shooting and improving program to achieved OEE target
Carry out job training program to Line tech
Perform lot on hold at 9200 point, verification, investigation and disposition.
1996 – 2003 PT. Infineon Technologies formerly Siemens Components
Batam-Indonesia
Burn-In Equipment Engineer
Optimizing and improving Burn-in Process.
Set-up and establish new machine and product transfer.
Establish preventive maintenance
Fully understand the necessary controls, equipment, precaution, set-up parameter to meet the product specification
Responsible for improving and maintain AEHR Burn-in Oven system.
Responsible for improving and maintain DESPACH bake-In Oven system.
Responsible for improving and maintain Hora Oven system.
Responsible for improving and maintain BTH and SIP machine.
Responsible for improving and maintain of Super Dry machine.
To perform process uptime / downtime machine for each machine.
To reduce monthly and quarterly part consumption each machine.
Define and implement On The Job Training Instruction system.
Member of :
ESD Maintenance and Equipment Calibration team for Infineon ( Co-leader )
PMS team member.
TPM ( Total production maintenance ) driver
EMS team
OJT resources group team
Strength Point
Able and familiar to debug and diagnostic problem of A360 Teradyne Tester
To increase OEE and reduce down time.
Able and familiar to debug and diagnostic problem of LTX CX and DX Tester
To increase OEE and reduce down time.
Able and familiar to debug and diagnostic problem of Synchro QSS and Fusion / PVI tester
Able and familiar to debug and diagnostic problem of Synchro fusion or PVI tester.
Familiar with OS system
Familiar with advantes Handler
Familiar with Advantest Handler
Familiar with JTS-7000 pick and place machine
Able and familiar to trouble shoot of Load boards problem.
Able and familiar to trouble shoot ATS system, Despatch system and BIBs
Able and familiar on using BTS-2000 boards checker in term to diagnostic of bibs socket continuity.
Outstanding Project Achievement
Upgrade AEHR system from static to dynamic system to enable running S1065 device ( Cost reduction program )
Modification of normal driver boards ( 7V ) to enable running L2301 device ( 34V ) to fill up customer requirement.
Install and implement ESD mat to avoid IC damaged caused by ESD.
A360 Test head improvement program by come out idea of new design to reduce
Down time and increase OEE.
Frog ring project ( re-design ) in term to achieved OEE target and set up problem due to contact issues.
Improvement performance of synchro tester due to duracol relay mercury ( restoration project )
A360 Test head modifying to reduce cable resistance issue for several devices ( application fail )
1994 - 1996
PT. Pamenang Pancadhatu Surabaya-East Java
Head of Maintenance
Optimizing/improving process and quality output of Rossacommeta and Vortex Hydra machine.
To support production operations are carried out efficiency.
To introduce new operation / manufacturing methods.
Responsible for the maintenance of Vortex Hydra and Rossacommeta machine.
1993 - 1994 CV. Sakti Utama Surabaya-East Java
Supervisor
Material order and control.
Control activity and report the current status to Manager.
Weekly report related with activity of firm.
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
09th & 10 th July ‘97, Statistical Process Control LV3., PT. Siemens Components Batam
20th May ’97, Statistical Process Control LV2, PT. Siemens Components Batam.
20th June ‘97, AEHR TEST SYSTEM 12100 Series., 166 kallang way Siemens Components Singapore.
15th Agustus ‘97, AEHR TEST SYSTEM 12000 Series, 166 kallang way Siemens Components Singapore.
1997, Electrostatic Discharge Prevention, PT Siemens Components Batam.
28th & 29th Sep ‘96, SIP-200 Flexiwatt Scanner and Straightener system, 166 kallang way Siemens Components Singapore.
May ‘97, DESPATCH OVEN Model VCR2-19-15 System, 166 kallang way Siemens Components Singapore.
23th March – 03rd April 1998, AEHR TEST SYSTEM ALS-1000 Auto Loading/Unloading Machine.
19th May,1999, 8D Training, Infineon Technologies Batam.
11th May 1999, 5S Seminar for Excecutive, Infineon Technologies Batam.
30 th June 2000, ESD Awareness Training, Infineon Technologies Batam.
26th July 2001, FAILURE Mode and Effect Analysis Infineon Batam.
27th July 1999, Single Minute Exchange of Dies, Infineon Technologies Batam.
06th Nov 1999, COACHING SKILL TRAINING, Infineon Technologies Batam.
29th Nov 2000, INTRODUCTION TO INDUSTRIAL ENGINEERING COURSE, Infineon Technologies Batam.
18th April 2001 TPM Improvement Course, Infineon Batam.
18 Oct 2001, SAFETY AWARENESS COURSE , Infineon Technologies Batam.
15th Feb 2002 POKA YOKE COURSE, Infineon Technologies Batam.
19th – 20th Feb 2002 Leading A Team course, Infineon Technologies Batam.
19th – 28th March 2002 power point course, Infineon Technologies Batam.
23th – 24th April 2002 Work as A Team course, Infineon Technologies Batam.
20th Aug 2002 eFMEA course, Infineon Technologies Batam.
ESD seminar 2002, Globaltronic conference hall, CHANGI – SINGAPORE
5th – 6th March 2003, The 7 Habits of Highly Effective People , Infineon Batam.
8th – 9th May 2003, IC product failure analysis, Infineon Singapore.
26th – 27th May 2003, Training for the trainers program to deliver effective training, Infineon Batam
28th 30th June 2004, TS16949 training course, Neville-clarke Singapore
15th Jan 2005, EMS 14001 revision course, Holiday in Batam
HONTEC O/S machine Singapore
Advantest Tester and handler training Singapore
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
Microsoft office package
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
Good familiar on the maintain Electronics circuit boards ( Audio / Video, TV, VCD, Power Amp Etc )
Working knowledge of Pneumatic and Hydraulic system for Vortex Hydra and Ressacommetta machine.
Good familiar to troubleshooting on Driver board / MOS driver boards.
Good familiar to troubleshooting on Programmable Pattern Generator
( PPG / SPPG ).
Good familiar to troubleshooting on Digital Linear driver boards.
Working knowledge in Operation and trouble shooting of :
- AEHR TEST SYSTEM 12100,12200,12000 machine.
- Remote Test system with manual and Network system.
- EPPROM Programmer.
- BTS-2000 machine.
- ALS-1000 machine Loader / Unloader machine.
- BTH and SIP machine.
- DESPATCH Bake- In Oven VCR2-Series
- Heraeus Bake-in Oven.
- HORA Profet Machine.
- Super Dry M/C
- A360 Teradyne machine
- LTX CX and DX Tester
- Synchro PVI and Fusiom
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
Good experienced to operate Multimeter, DMM, DVM, osciloscope, ESD tools and other measurement equipment
|
| |
|
|
|
|
|
Instrument Engineer UTAC Singapore
CV/Resume ID no.: 84350 |
|
|
|
|
|
|
| Other CVs; view more oil and gas CVs |
| 1. sedimentology, stratigraphy, geodynamic, field geology |
| 2. Widely experienced (15 years+) in Oil& Gas production (off-shore, and on-shore) |
| 3. Senior Cost and Planning Engineer, Offshore / Onshore Planning Engineer |
| 4. Instrumentation Engineer |
| 5. Fire and Safety Engineer, Fire and Safety Officer |
| 6. Offshore- Welding Inspector QA/QC,Goal-driven achiever with strong organizational skills |
| 7. Instrumentation & automation, analytical mind |
| 8. Scaffolder/Scaffolding superintendant/co-ordinator/supervisor |
| 9. Support Admin Projects & Contracts Coordinator / Planning and Coordination |
| 10. Master Mariner, Officer, experienced in tanker cargo operations |
| 11. Hard working welder |
| 12. HSE Professional with large project experience |
| 13. HR Manager, Human Resources Coordinator |
| 14. Service Engineer, HVAC Technician |
| 15. Chief Officer - ASAP Marine Bluestar |
| 16. Directional Driller, Drilling Supervisor, Directional Drilling Supervisor and RSS Engineer |
| 17. Waste Water Engineering, Environmental Analyst, Hazardous Waste Management, EIA |
| 18. Piping Engineer, PDMS Administrator, PDMS,MS-ACESS,ACAD,MS-EXCEL proficiency |
| 19. RIGGER / ROUSTABOUT / CRANE OPPERATOR |
| 20. Geologist, sedimentologist looking for a challenging and interesting opportunity world-wide |
| 21. GIS Technician Geographical Information System (GIS) |
| 22. ROV Pilot / Tech Construction projects, Jacket installations, pipeline surveys, cable laying support |
| 23. Secretary PA, experience in the legal sector - litigation Stopforth Swanepoel & Brewis Attorneys SA |
| 24. Junior Lawyer, King & Spalding International LLP, LLM Corporate Finance University of Westminster UK |
| 25. Safety Supervisor at Larsen & Toubro India Hazira Surat, Punj Lloyd Ltd., Essar Steel Limited |
| 26. Oil & Gas Process/Operations Commissioning Operator Laffan Refinery Qatar, Sohar Refinery Oman |
| 27. Experienced for 10 years as a fitter/welder/machinist in Philippines Manila capital city |
| 28. Piping Design Engineer with 5+ years experience PDS/PDMS Microstation, interested in a job in Norway |
| 29. Petty Officer, Logistics branch 1990 to present Irish Naval Service - Ireland |
| 30. Technical Inspector of corrosion Cathodic Protection, Painting, Sandblast, Coating Iran |
| |
| |
|
|
|