Home  Register  Jobs  CVs  Job Search  Worldwide  Process  Help  Search  Scams  JA  B  C
Oil Offshore Marine Careers in Onshore and Offshore Drilling Energy Industry Oil Offshore Marine: Oil & Gas Jobs & CVs Online recruitment services (job vacancies, resume/cv database search) for Oil Industry, Energy, Offshore, Petroleum, Engineering, Construction, Drilling, Subsea, Marine, Shipbuilding, Shipping, Petrochemical. Have your own FREE account! free cv upload registration on Oil-Offshore-Marine.com recruiter benefits: free job postings and cv search on Oil-Offshore-Marine.com
  Need to find something?
 
 Username:  
 Password:  
Oil Offshore Marine Register
 
  Remember my password?  
 Recruiters - Employers & Agencies
  Advertise / Contact Us
free cv upload for all job seekers, free access to oil and gas jobs
subscribe to oil careers alerts, oil jobs postings, drilling rig jobs, engineering jobs

 

CV Sr Electrical and Instrument Engineer

 
Sr Electrical and Instrument Engineer

Resume built for oil and gas job opportunities by a jobseeker with experience in Sr Electrical and Instrument Engineer - would you like to offer this candidate a job/contract employment?

Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database

CV/Resume ID no.: 84818

Location (Residence): Alexandria, Egypt
Citizenship: Egypt
 
Languages:
  Native: Arabic Egypt
  Other: English
 
Education & Experience: Work Authorization & Relocation:
Education:
  Bachelors in communication department

Years of Experience: 22 years
Authorized to work in:
   Kuwait
Present Location:
   egypt, alexandria
Relocation:
   United Arab Emirates
 
Expertise
Category Subcategory Ability Experience
Engineering Instrumentation Experienced 30 years
Engineering Electrical Experienced 22 years
Engineering Instrumentation Experienced 17 years
 
CV/Resume Details
 
1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory]

Dear Sir,
Please find attached my C.V. for your kind consideration i would be an excellent condidate for your above vacancy as it closely matches my skills and experience. I look forward to hearing from you.

2. Work Experience - CV/Resume Part 2 [Mandatory]

EXPERIENCE
01/5/2000 TO Now
As an Electrical & Instrumentation General Manager at Alexandria Petroleum
Maintenance Co. “Petomaint"
1- Review the Invitation to Bid documents submitted in the proposals stage, issue inquiry requisitions, review techno-commercial vendor offers, prepare equipment, material and man-hour estimates.
2- Review contract requirements for project execution, organize the preparation of the Technical Document Register, identify requirements and scope of work; review specifications Process Data Sheets, Piping Material Specifications,Piping & Instrumentation Diagrams (P&ID’s), Plot plans, General Arrangement (GA) drawings, Review Philosophies, Area Classification Drawings, Fire and Gas Detector Layout Drawings and other relevant documents. Establish contract review criteria, identify and resolve discrepancies and divergences from original proposal through the instigation of technical queries to projects/client.
3- Direct and monitor Material Take off (MTO) activities, identify irregularities and shortfalls, take corrective action as required.
Participate in HAZOP meeting and undertake SIL studies with client and representatives of other engineering disciplines.
Interact with Quality Assurance for quality issues; strictly ensure compliance with Company’s ISO Quality procedures. Coordinate Internal and Client audit requests; facilitate audit procedures of engineering systems within the department.
Interface and provide clarification and guidance and technical support to construction sites and commissioning engineers, provide startup assistance as required.
4- Participate in employee performance evaluations, establish performance criteria, identify employee strengths and weaknesses, and recommend training and development requirements.
5- Perform related duties as and when directed by Direct Supervisor
Organize the preparation of equipment and material specifications and data sheets, administer the development of detailed engineering calculations and drawings including the preparation of the design basis document, Bill of Quantities, Block Diagrams, Equipment system specifications, cable routing, control room layouts, Cause and Effect Diagrams, Loop Diagrams, Functional Logic Diagrams, Terminations Diagrams, Installation Hook-up Drawings, Instrument Plot Plans, Control Panel Drawings, Control/Equipment Room Lay-outs, Cable Tray/Trench Lay-outs, Cable/Tubing Schedules and Cable Drum Schedules, JB schedules, Interconnection Schedules, Fire/Smoke Detection Lay-out and Alarm Lists.
6- Develop the implementation work packs in sufficient detail to allow construction activities to be planned and executed in a safe and efficient manner.
Work with the design and procurement teams to ensure timely release of design information and secure suitable material delivery periods.
Ensure any fabrication activities are planned and executed to meet the requirements of the installation programmer.
7-Work with the planning team to develop and update accurate and realistic implementation schedules. In conjunction with the Senior Off shore & on shore Construction Supervisor establish the supervision, manpower and equipment requirements for each work package and ensure these are notified in good time to the contractors and suppliers.
8- Identify and resource any specialist personnel, equipment or techniques required in the execution of the offshore construction works. Work closely with the logistics teams to facilitate the mobilization /de-mobilization of the necessary manpower, materials and equipment. Monitor all offshore & on shore implementation activities providing the necessary, direction, guidance and support. If required, take the necessary corrective action. Ensure the compilation of all construction related documentation and its timely presentation in the form of closeout packages.
Continually review all aspects of all onshore support and offshore construction activities with a view to improvement in performance.
9- Coordinate with projects and planning on project time schedules, establish target completion dates, ensure target dates are achieved
10- Direct the preparation of technical inquiry requests (Inquiry Requisitions) to vendors; participate in the technical evaluation of vendor bid offers. Direct and provide guidance in the Technical Bid Evaluations (TBE), review vendor drawings and documents. Supervise the review of design calculations, ensure vendor equipment specifications meet with client equipment specifications and are within budgeted costs.
11- Provide clarification and guidance and technical support to construction sites and commissioning engineers, provide startup assistance as required.

01/04/2007 ~ 01/04/2008
As an Instrument superintendent at Petrofac International Ltd
Client: KHALDA PETROLEUM CO.
Main Contractor: Petrofac CO
Project No. : 128 GAS TRAIN (3 & 4)
Activity: my responsibilities concerns the following
Provides management and leadership of all aspects of Electrical & instrumentation at the project site Supervises Electrical & instrument trial and calibration activities, devise the testing methods, resources, to receive best results. Analyze results and feedback information and maintains contacts with calibration regulatory bodies.
1- Plans and strategize for work plan for the Electrical & instrumentation department based on the overall project execution plan and strategy.
2- Plan for the deployment and redeployment of resources for timely completion of work as has been planned for the Electrical & Instrument department.
3- Represent the discipline for frequent review and update meetings with the client to attend to any concerns and also to give an update on the development of work as scheduled.
4- Coordinate with other engineering discipline heads at the project site to review the overall progress in work and coordinate with them to assess any hold points that originate from a particular engineering discipline.
5- Frequently assess the subcontractors for their work and quality standards for them meeting the project specifications.
6- Supervise the team for timely and accurate work execution. Ensure that all the work activities get completed as per the quality norms and as per project specifications.
7- Responsible for determining appropriate supplies and stock levels are maintained to meet functional targets, both within cost restraints and consistent with suppliers' lead times.
8- Responsible for investigating, collating and analyzing information to assist in the audits facilitated by the clients.
9- Responsible for establishing, promoting and maintaining a safe and hazard free working environment. Formulates and develops safety policies and procedures with the help of the HSE Manager.
10- Responsible for ensuring smooth day-to-day operations, scheduling and technical support. Consults with other functions' employees on the proper integration and requirements for timely completion of work as planned.
11- Carry out any other duties as and when required by the supervisor.
Responsible for the detailed design and work strategy of the Instrumentation department at the project site Responsible for the feasibility of technical solutions are considered within the context of the functional business objectives. Responsible for overall system design, development and implementation and involves liaison with users and the provision of technical expertise.
12- Instrumentation & Automation and Telecommunication standard & specification
13-Develops and maintain company standards and specification engineer &design
14- Review and updated the design specification as suitable varies project
15- Technical support and provides technical to site
16- Participations in technical evaluation for selection engineering contractors
17- Coordinate and execute and modification requirement during
Construction
18- Pre-commissioning &commissioning and start-up
Safety Regulation and Standard:
1-Ensure adherence to Company (HSE) Safety regulation by subordinates
2-Work Permit system and Risk assessment procedures
3-Conducting Monthly Safety Group meeting and Daily Tool Box Meeting
Project Content:-
Separation Skid
Condensate Stabilization & Rundown
Condensate handling & Export
Recycle Compression
Gas Treatment
Glycol dehydration
Dew pointing
Export Compression & Metering
Chemical Storage & Injection
Mercury Removal System
Flare
Oily Water Treatment
Fire Water/ Fresh Water/ Portable Water
Fuel Gas
Solvent Storage & Handling
Dematerialized Water
Compressed Air
Hot Oil / Hot Water
Diesel / Inert gas
Power generation / Diesel Generator
DCS, MC, ESD, F&G, RCP, & LCP
Switch Gear/ Medium Voltage Panels/ Low Voltage panel

01/1/2000 TO 31/03/2007:
As an Instrumentation Assistance General Manager at Alexandria Petroleum
Maintenance Co.
“Petomaint”, my responsibilities concerns the following:
• Plans. Follow-up & supervises execution of different E & I Projects.
• Sets & prepares the budget of E & I projects which include the elements of performance & their costs including manpower, equipment, spare parts & materials, addition to daily follow up.
• Requests all the needed spare parts & materials through the materials general department to ensure the availability of these materials & spare parts in order to guarantee the performance of works efficiency clue time without any delay.
• Ensure that there is no deviation from the prepared budget of the E & I project for various clients & activities of the company.
• Daily coordination with different sectors affiliated to E & I general department as well as the other concerned departments to ensure the integration of performance & availability of all the elements of successful performance.
• Participates in selecting the human resources needed for the sector.
• Ensures that the sector staff abides by instructions of HSE.
• Project Manager for different Oil & Gas Petroleum, Petrochemicals Co.’s such as
Wepco: supply, installation of instruments on sales gas pipe line
Alexandria P. Co: supply & installation of instruments on tanks (wax & asphalt).
P.P.C: Upgrade of DCS (Allen Bradley).
Khalda Petroleum Co.: supply & installation of instruments on tank Farm area.

Gupco: Installation, commissioning & startup for rental compressor.

Portages: Supply & installation of radar gauge (SAAB) on spherical tank.

Petrobel: Installation of instruments on high-pressure compressors.
Sumed: Supply & installation of instruments on tank farm area

Rashpetco Co. Supply, installation, Pre- commissioning & commissioning of
Condition Monitor system
ELWASTANY CO. Installation electrical & Instrument work for early Production

(Vacation from petomaint CO.)

1/06/2005 to 1/10//2006 (Kharafi National)

Client: K.O.C.
Main Contractor: Petrofac CO
Project No. : 1227 (Development of Oil Plant at KOPC)
Contractor: Kharafi national CO.
Position: Senior Project for Instrument
Activity: Review of engineering drawing of Construction work.
Planning & execution schedule for the (E & I) & other activity( piping & civil) for construction works, Follow up for construction works & attends client kick off meetings Witness for Pre-commissioning and commissioning & start up. Monthly invoices according to the progress sheet reports review of marked-up / as-built.

01/01/1999 ~ 15/12/1999

Client: KHALDA petroleum CO.
Project: TAREK, El-Slam & Aum mobarka GAS PLANT
Position: Site Manager (Electrical & Instrument)
Activity:
Issue, reviewing and approving Electrical & Instruments specifications Basic design detailed engineering. Planning & execution schedule for the
E & I construction works Follow up for construction works & attends client kick off meetings Witness for Pre-commissioning and commissioning & start up. Monthly invoices according to the progress sheet reports.
1/07/1998 ~ 30/12/98

V) M/S GERMANSCIHER LLOY

Position: Senior Instrument Engineer

Client: Qatar General Petroleum Corporation

Contractor: National Petroleum Construction Company,

Project: QGPC - Welled Jacket and Pipeline ENG. “Onshore &”Offshore”
PS-2, PS-3, HALUL-WDP, BH-DO7”Platform
Activity:
Review of engineering drawing Inspection of Construction work Installation jab's & instrument slaying mullet core cable & secondary cables Installation of Hydraulic system Installation (F&G, RTU, WHCP) DC panel Calibration all instruments (transmitters, pressure, level, control valves, safety valve Hook-up for cables, instrument & termination Continuity test & loops check system. Pre-commissioning, commissioning & start-up for (RTD, MTU, Solar panels and PLC
System) Final review of marked-up / as-built




1/11 /97 ~ 30/06/98
M/S GERMANISCHER LLOYD (Abu Dhabi)
Position held: Senior Instrument Engineer
Client: ADMA - OPCO
Contractor: National Petroleum Construction Company, Abu Dhabi.
Project: Arab “D” projects for Ummshaif gas development t field
Activity: Review of engineering drawing.
Inspection of construction work like.
Installation cable trays
Installation J.B’s & Instruments.
Laying multi-core cables & secondary cables
Calibration all instruments (transmitters, levels, pressures, control
Valves, safety valves).
Hook-up for cables & instruments & Termination.
Installation of Hydraulic system
Installation panels (F&G, HPU, RTU, MTU, and WHCP)
Continuity test & loops check.
Pre -commissioning & commissioning and startup onshore / off shore.
Witness and inspection of commissioning, by vendor for (F&G, HPU,
RTU, MTU, panels and DCS system)
Final review of marked -up / as-built.
Quality control as well as third party service


15/09 /96 ~ 15/09/97
M/S YADCO (158, Median El- hegaz St. Maser Al-Gideda, Egypt)
Position held: Senior Instrument Engineer
Contractor: QARUN Oil Company
Project: Oil Train & Gas Train and Storage Tank.
Design: ENPPI
Activity: Review of engineering drawing
1- Supervision of construction work like.
2- Installation cable trays
3- Installation J.B’s & instruments
4- Laying multi-core cables & secondary cables Installation of hydraulic &
5- Pneumatic system
6- Installation panels (in control room (DCS fisher & resmount, PLC Bailey,
7- F&G Dolly) UPS
8- Calibration all instruments (Transmitters, levels, pressures, control valves,
9- Safety valves)
10- Hook-up for cables & instruments & termination.
11- Continuity test & loops check
12- Pre-commissioning &commissioning and start-up.
13- Witness and supervision of commissioning system
14- Coordinate and execute and modification requirement during construction
15- Final Review of marked-up / as-built
Project content Oil Train & Storage Area
- Heater treated skid
- Production & separator skid
- Skimmer skids
- Stabilizer
- (2) Storage tanks 5000 cum No. 3, 55,000 cum
- Gas turbines
- Gas cooler, oil cooler & pump skid
- R.O.V (Remote Operated Valve)
- Air Compressor
- Storage Tank
- Gas Train
- Four gas compressor (NOVA Pinecone)
- Four scrubber skid
- Air & Gas cooler
- Mole save package
- Fuel gas skid
- Ignition transformer panel
- Control room (PLC, DCS fisher & resmount)
- PLC (Bailey) for compressor
- F & G system
08 / 05 / 94 ~ 10 / 09 / 96
M/s First Engineering Co. (Cairo – Egypt)
Position Held: Senior Instrument Engineer
Client: M/s BAPETCO Co.
Activity: Supervision of construction, pre-commissioning, activities related to instrumentation works of the plant. The work included review of engineering drawing, supervision of fabrication and installation of equipment / instrument supports, installation of cable trays, laying, glanding, termination of cables, testing of panels, UPS System, ESD, DCS, PCS Panels etc. routing and installation of tubing, pressure testing and finally preparation of mark up/ as built drawing.


01 / 01 / 94 ~ 01 / 05 / 94
SABBOUR ASSOCIATES Electro Mechanical Dept. (Dokki – EGYPT)
Client: Shell Marketing, Egypt.
Project: Shell lubes oil-blending plant.
Position Held: Instrument Engineer
1. Activity: The activities included review of drawings, supervision of electrical and instrumentation works related to the shell tube oil blending plant located at 6th October City, Egypt. Supervision of fabrication and installation of equipment supports, instrument supports, cable tray supports etc. and installation of cable trays / cable ladder racks, cabling, & testing
Calibration and installation of instruments, loop checking, etc …
Routing, installation of tubing & pressure testing.
Assist in commissioning and start up activities of instrumentation system
06 / 12 / 86 ~ 30 / 12 / 93
Petroleum Projects & Technical Consultation Co. (Petrojet)
A) 01/05 /92 ~ 30/12/93
Client: WEPCO Co.
Project: Gas compression plant
Position: Instrument Engineer
Activity: Review of engineering drawing, shop drawings, supervision of fabrication and installation of equipment supports, instrument supports, cable tray supports etc. and installation of cable trays / cable ladder racks, cabling, & testing and termination.
• calibration and installation of instruments, loop checking, etc ...
• Routing, installation of tubing & pressure testing.
• assist in commissioning and start up activities of instrumentation system
Project Content: Gas compressors train A/B/C
Scrubbers A/ B/ Gas & Oil Coolers/ F&G System
Gas compressors train A/B/C / TCP / CCP / PCS / ESD system
B) 01/02 /92 ~ 30/04/92
Client: PETROBEL
Project: Platform SP-1
Position: Instrument Engineer
Activity:
• Review of Engineering drawings & Construction supervision of installation of cable trays, cabling Calibration of instruments, testing and pre-commissioning of Instrumentation works related to the following plants,
• Production Separators - Test Separators / Gas coolers / shutdown system
• UPS / Battery Systems / .Instrument Control Rooms / Hydraulic safety)
• 15/09/91 ~ 30/01/92
Client: BAPETCO Petroleum Co.
Project: BED-2, Gas Development Project.
Position: Instrument Engineer
• Activity: supervision of fabrication and installation of equipment supports, instrument supports, cable tray supports etc. and installation of cable trays / cable ladder racks, cabling, & testing and termination.
• calibration and installation of instruments, loop checking, etc ...
• Routing, installation of tubing & pressure testing.
Assist in commissioning and start up activities of instrumentation system
• Project Content : Production / Test Manifold Skid
Test Separators / Glycol Skid
Compressor packages / Utilities & fuel gas skids
Control Room (PLC, ESD, DCS, F&G Panels etc)


D) 01/ 08/91 ~ 10/09/91
Client: SUCO CO.
Project: Gazwarina Project
Position: Instrument Engineer.
Activity:
• Supervision of construction, Review of Engineering drawings & Construction supervision of installation of cable trays, cabling Calibration of instruments, testing and pre-commissioning of Instrumentation works related to the following plants,
Project Content: Separator Skids,
Production Skid / Metering Skid
Shutdown Skid / Control room

VI) 01/05 /91 ~ 30/07/91
Client: PETROBEL
Project: El Qara Integrated Plant.
Position: Instrument Engineer
Activity:
• Supervision of instrumentation works related to El Qara Integrated Plant. Review of Engineering drawings & Construction supervision of installation of cable trays, cabling Calibration of instruments, testing and pre-commissioning of Instrumentation works related to the following plants, maintenance instruments & trouble shooting.
Project Content: Gas Turbine (Solar)
Separators
Stabilizer, Air coolers, Gas cooler etc.
K.O. Drum
Control room (PLC, DCS, F&G, and ESD)

VII) 17/02 /91 ~ 30/04/91
Client: GUPCO
Project: Helall Field
Position: Instrument Engineer
Activity: Supervise the construction work, pre-commissioning, commissioning & star – up Activities to related instrumentation. Works Review of Engineering drawings &. Instrumentation works related to the following plants,
Project Content: Two-valve skid
Gas cooler
Three gas turbine (Solar)
Control room (PLC, DCS, F&G, and ESD)

VIII) 1/03/ 90 ~ 31/01/ 91
Client: SUMED
Project: 4 Tank 100,000 cum
Position: Instrument Engineer
Activity:
• Supervision of construction, Review of Engineering drawings & Construction supervision of installation of cable trays, cabling Calibration of instruments, testing and pre-commissioning of
• Maintenance instruments & trouble shooting.
• Testing and commissioning activities of instrument systems.
Project Content 4 storage tanks - Capacity 100,000 cu/m.
M.O.V.'S& Switch gear.
Control room (DCS, F&G, ESD, and PCS)
Pump skid etc


H) 01/08 /89 ~ 15/2/90
Client: BAPETCO Petroleum Co.
Project: BED-3
Position: Instrument Engineer
Activity: Supervision of construction Review of Engineering drawings & Construction supervision of installation of cable trays, cabling Calibration of instruments, testing and pre-commissioning of Instrumentation works related to the following plants,
Project Content: Production Separator
Test Separators &Glycol Skid
Air & Gas Coolers
Slug Catcher &Heater
Gas Turbines
Control Room (DCS, ESD, F&G)

I) June, 88 ~ July, 89
Client: PETROBEL
Project: L.T.S. Gas Plant
Position: Instrument Engineer
Activity: Supervision of construction, Review of Engineering drawings & Construction supervision of installation of cable trays, cabling Calibration of instruments, testing and pre-commissioning of Instrumentation works related to the following plants, maintenance instruments & trouble shooting. Testing and commissioning activities of instrumentation system related to the L.T.S. Gas Plant.
Project Content: Air & Gas Cooler, Ignition panels, Separators, Glycol skid
Air Compressor, Glycol Skid
Control Room (DCS, ESD, F&G)


j) Dec., 1986 to MAY 1988
Project : Assuit Oil Refinery
Position : Instrument Engineer
Activity :
• Review of engineering drawing.
• Installation of work likes.
• Installation cable trays
• Installation J.B’s & Instruments.
• Laying multi-core cables & secondary cables
• Calibration all instruments (transmitters, levels, pressures, control valves, safety valves).Hook-up for cables & instruments
• Termination of cables, testing of panels, UPS System, ESD, DCS, PCs,
• F & G Panels etc ...
• Installation of tubing, pressure testing of tubing and finally preparation of mark uas built drawing termination.


3. Education & Training - CV/Resume Part 3 [Mandatory]

B. Sc In Communication Engineering Monouf University May 1986. With Grade “Good” Graduate Project “Very Good”

1- course for PLC
2- Instrumentation
3- DCS
4- Inspection
5- Management


4. Computer Skills - CV/Resume Part 4 [Mandatory]
1- Word
2- Excel
3- power point
5. Other Skills - CV/Resume Part 5 [Optional]
-
6. Additional Information - CV/Resume Part 6 [Optional]
-


 

Questions about this candidate? Contact us for an immediate answer. To find similar people [or more experienced] - active jobseekers, please login OR create, FREE of charge, your own company account.

In order to view this candidate's contact information, you must a) be registered with Oil Offshore Marine - Worldwide Oil & Gas Jobs, and b) have already purchased a subscription.

Login Register Pricing Information
Sr Electrical and Instrument Engineer
CV/Resume ID no.: 84818

Relevant CVs; view more oil and gas CVs
1. Instrument and Control Engineer
2. Electrical engineer experienced (15years +) in maintenance and fault finding
3. ELECTRONICS AND INSTRUMENTATION ENGINEER
4. CONTROL, AUTOMATION AND INSTRUMENTATION ENGINEER
5. INSTRUMENT TECHNICIAN
6. Electrical Technician Oil & Gas
7. Senior Instrumentation Engineer
8. ELECTRCAL TECHNICIAN experienced in Offshore
9. Electrical Supervisor/Technician
10. Instrumentation & DCS Enginner
11. Marine Instrumentation Engineer
12. INSTRUMENTATION DESIGN AND DETAIL ENGINEER
13. electronic and instrument engineer
14. Instrument Engineerer - Oil & Gas
15. Electrical Engineer
16. Project Manager, Planning Specialist
17. Fire & Gas Detection System engg.
18. Electrical Engineer
19. Electrical Staff
20. Lead Engineer / Project Engineer
 
 
Other CVs; view more oil and gas CVs
1. PDMS & PDS Designer - Structural
2. Young competent chef - offshore duties
3. Senior Project Instrument Engineer, EDG Consulting Engineers, Luanda Angola EPIC
4. Deck Officer with 2.5 years in Merchant Marine experience seeking JDPO position
5. EMT, Medic
6. Senior Plant Supervisor Duke Energy - process opertions supervisor, LNG, NGL
7. Administration person
8. Planning 8 year experience in Oil & Petroleum industry
9. Sales Engineer
10. PDS Administrator, Intergraph (Vienna, Austria)
11. Technical Support Engineer (offshore exploration)
12. Chief Engineer - marine engineering, surveyor new buldings, superintendent
13. Field Engineer / Mud Engineer
14. Logistics Warehouse Operator (Oracle ERP/Autostore WMS)
15. Scaffolder - Roustabout Rigging, Scaffolding, Painting, Buffering
16. Expert Welder heavy industry, oil and gas
17. GRADUATE MECHANICAL ENGINEER
18. HS & E Safety Specialist, Construction Safety Supervisor
19. ETO - Electro Technical Engineer, Marine Electrical Engineer
20. Piping Engineer, Software PIMS, MCS & Lotus Note, Bulk MTO, Final MTO
21. Crane operator offshore, roustabout
22. Wireline Field Engineer Schlumberger, Multi-industry experienced Geologist
23. Logistics, supply chain executive, shipping, freight forwarder, 3PL, Transmarine Logistics Limited
24. Electrical Engineer Electrical Technician in Ginanjar Electrical Indonesia
25. Junior Trainee Electrical Technician worked in Allen Bradley & ABB, Omran, Siemens, PLC
26. Trainee UNexperienced chemical engineer Bachelor of Technology Chemical Engineering Mumbai India
27. Asst. Crew Purser, Asst. Executive Housekeeper in NYK Cruises Japan, Regent Seven Seas Navigator
28. Graduate master of mechanical engineering degree from Stevens Institute of Technology, Hoboken
29. Trainee piping designer working in MAN Diesel India Ltd. Aurangabad Maharashtra India
30. Mining & Metallurgy Engineer Alba, Aluminium Bahrain Industrial Trainee in Metallurgy Department
 
 

Press Ctrl+D to Bookmark - Tell a Friend - Job Archives - Jobs - Oil and Gas CVs Resumes - Subscribe to Job Alerts - Site Map - Events - Legal - Privacy - Contact

oil offshore marine's website design

Official Blog - International Maritime Signal Flags - Glossary of Oil & Gas Jobs Definitions - Abbreviations & Acronyms from the Oil, Offshore, Marine, and Shipping Industries - Engineering Oil Jobs - Top 100 Energy Sites - Marine Jobs - Offshore Jobs - Oil Careers - Maritime Jobs - PDS/PDMS Oil & Gas Jobs - Oil Industry Jobs - Oil Field Jobs - Oil and Gas Careers - Petroleum Jobs - Oil Rig Jobs - Offshore Oil Rig Jobs - Drilling Jobs - Oil Industry - Official Sitemap - Jobs Feed - Login to your Oil-Offshore-Marine.com account

www.Oil-Offshore-Marine.com - Your Oil & Gas, Offshore, Construction, Shipping, Petrochemical, and Marine Engineering Recruitment Center.

© Oil Offshore Marine - Oil & Gas Jobs - All Rights Reserved.
This website is designed for international users, and its use is governed by Oil Offshore Marine - Oil & Gas Jobs Legal provisions. By browsing on any page of this website, you are deemed to have accepted all Oil Offshore Marine - Worldwide Center of Oil & Gas Jobs legal terms. If you do not agree with Oil Offshore Marine's legal provisions, you must stop using this website and its services.


find oil and gas jobs

  Looking for something?