|
|
CV Senior Instrumentation and Process Control Engineer (Commissionning)
|
|
|
|
|
|
|
| |
| |
| Senior Instrumentation and Process Control Engineer (Commissionning) |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in Senior Instrumentation and Process Control Engineer (Commissionning) - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
84819
Last Updated:
Sunday, October 5, 2008 |
Location (Residence): cairo, United States
Citizenship: Egypt
|
| |
Languages:
Native:
Arabic Egypt Other:
None |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
Bachelors in System Engineering Years of Experience:
12 years
|
Authorized to work in:
UK (in particular), Italy
Present Location:
Egypt, Cairo
Relocation:
United States, United States |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Engineering |
Controls |
Experienced
|
17 years |
|
Engineering |
Instrumentation |
Experienced
|
17 years |
|
Engineering |
Commissioning (+ Pre-) |
Experienced
|
17 years |
|
IT/Communications |
Networking |
Experienced
|
15 years |
|
Design/Software |
Electrical/Instrument |
Experienced
|
16 years |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
More than 12 Years in the Instrumentation and Process Control (Engineering ,Installation ,commissioning and Maintenance) for Distributed Control System (DCS)
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
 BP UK (BP Wytch Farm Oil Feild DCS/ESD Replacement Project, Wareham, Dorset, UK) October 2007 – July 2008:
• Provide System Control Engineering Support For Installation, Commissioning Phase Of The New Plant DCS/ESD System.
• Hot Swap/Live Migration For The Existing Fisher Control System To The New Yokogawa Control System.
• Well Sites Remote Control System Installation, Commissioning And Startup.
• Control Logic Testing And Modifications.
• Finishing On Site Documentations.
• Carry Out Punsh Listing Clearance.
• Project Database Maintenance.
 Yokogawa South Korea (Sahara Project FAT, Yokogawa Staging Facility, Seoul, South Korea) August 2007 – October 2007:
• Carry Out Project Pre-FAT Testing (Logic, Complex Loops, Graphics Testing).
• Modify Logic To Match Project DDS’s.
• Modify Complex Loops To Match Project DDS’s.
• Modify Graphics To Match Project DDS’s.
• Modify System Interlocks Testing/Modifications.
• Carry Out FAT Tests With Client.
 Yokogawa Italy (Sahara Project, Milan, Italy) July 2007 – August 2007:
• Carry Out Project Pre-FAT Testing (Logic, Complex Loops, Graphics Testing).
• Modify Logic To Match Project DDS’s.
• Modify Complex Loops To Match Project DDS’s.
• Modify Graphics To Match Project DDS’s.
• Modify System Interlocks Testing/Modifications.
• Carry Out FAT Tests With Client.
 AMEC UK Ltd./Shell Petroleum UK (BBL GAS Reception Project , Bacton, UK) June 2007 – March 2007:
• Provide System Control Engineering Support For Post-Commissioning Phase Of The Plant.
• Carry Out On Site Mod-Packs Implementations/Testing.
• Control Logic Testing And Modifications.
• Batch Control System Checking And Modification.
• Control Group System Checking And Modification, Including Sybol Functions And Batch Control.
• Finishing On Site Documentations.
• Carry Out Punsh Listing Clearance.
 Yokogawa UK Ltd. (TPSMAP Project FAT, Yokogawa Staging Facility, Runcorn, UK) March 2007 – April 2007:
• Export Old Project From Old FCS (Centum CS).
• Import Project To New FCS (Centum CS3000).
• Modify Graphics On CS3000 To Match CS System.
• Modify Logic On CS3000 To Match CS System.
• Modify Sybol Function On CS3000 To Match CS System.
• Modify System Interlocks On CS3000 To Match CS System.
• Modify Function Groups On CS3000 To Match CS System.
• Modify Recipe Groups On CS3000 To Match CS System.
• Revise Modified Project With The Old Project.
• Carry Out FAT Tests With Client.
 Lurgi Lentjes UK Ltd./Fortum UK Ltd. (Kent Enviropower, Energy From Waste Facility) February 2007 – June 2007:
• Provide System Control Engineering Support For The Final Commissioning Phase Of The Plant For Both Yokogawa DCS Control System And Yokogawa Safety System.
• Carry Out System Side Activities For Loop Checking.
• Logic Testing And Modifications.
• Batch Control System Checking And Modification.
• Control Group System Checking And Modification, Including Sybol Functions And Batch Control.
• Safety System Management, Loop Checking And Program Modifications.
• Carry Out Take Over Certification Tests (TOC Tests).
 PPS/Saipem Contracting Nigeria Ltd/ Shell Petroleum Development Company (SPDC) (Soku LGSP De-Bottle-Necking Project) December 2006 – February 2007:
• Yokogawa CS3000 DCS System:
ï‚§ Complete Remaining Commissioning Tasks For The Newly Added Train-3 Devices.
ï‚§ Adding New Fieldbus Devices To Fieldbus Network.
ï‚§ Creating New Control Drawings For The Newly Installed Devices.
ï‚§ Creating New Graphics For The Newly Installed Devices, Added To The Existing Plant Graphics As Per Project FDS.
ï‚§ Configure New Metering Skid OPC Communication Gateway.
ï‚§ Creating Trends For Some Devices As Per Client Request.
• Yokogawa SLS ESD System
ï‚§ Configure SLS Input Cards For The New Added ESD Devices.
ï‚§ Configure SLS Output Cards For The New Added ESD Devices.
• F&G System
ï‚§ Configure New Added F&G Input Cards For Newly Installed Devices.
• Train 3 (Expansion Train)
ï‚§ Monitor Performance For 90-Days Reliability Test For The Newly Added Train-3.
ï‚§ Monitor Glycol Unit Train-3 Performance During 90-Days Test.
ï‚§ Calibrate/Configure Field Devices For The Glycol Unit (Field Side).
• ExaOPC Servers
ï‚§ Install/Maintain ExaOPC Servers Used For Exaquantum Servers Data Access.
• Exaquantum Servers
ï‚§ Install/Maintain Exaquantum Server/Web Servers Used For Remote Plant Data Monitor.
ï‚§ Provide Assistance For Data Reporting/Archiving.
ï‚§ Regular Servers Maintenance And Database Backups.
 Bechtel Intec Consortium/Burullus Gas Company (Scarab Saffron Development Project) February 2003 – November 2006:
• YOKOGAWA CENTUM 3000 Distributed Control System Configuration And Operation.
• Yokogawa Plant Resource Manager (PRM) Operation/System Parameters Tuning.
• Follow Up The Implementation , Pre Commissioning & Commissioning, Loop Test (Cold And Hot Loop Test), And Calibration For The Following Devices:
• Flow Indication Transmitters (FIT).
• Level Indication Transmitters (LIT).
• Temperature Indication Transmitters (TIT).
• Pressure Indication Transmitters (PIT).
• Ultrasonic Flow Indication Transmitters (US FIT).
• Tank Gagging (SAAB/Enraff).
• Control Valves (CV).
• Using Hand Held Tools (Druk, Fluke, Hand Pump, Hart Communicator) To Check/Teats/Calibrate Field Instruments (Foxporo Smart Transmitters, Foxporo Spec 200 (ELEC.) Transmitters, YOKOGAWA Transmitters, Masonielan, Fisher, Taylor, Honeywell, Fuji, Hartman & Brown, Rosemount, Neelis, Magnetrol, Eckardt
• Fire & Gas Instruments Installation/Calibration.
• Fire Fighting Systems (FM200).
• ABB Notifire Fire Control System.
• Emergency Shutdown System (ESD) Installation & Calibration.
• Electrical Distributed Supervisory System (EDSS) Commissioning.
• Implementation, Pre Commissioning & Commissioning, Loop Testing And Calibration Filing & Documentation.
 Citro Misr Citric Acid Plant 10th Of Ramadan City:
• Follow Up The Implementation Of Programming Of DCS With The DCS Contractor (Giza Systems Engineering (YOKOGAWA)) Regarding The Process Graphics, User Interface And Batch Sequence And Attending The FAT In Order To Test The Programming Of DCS In Accordance With The Know How Partner.
• Follow Up The Erection Of The DCS In The Plant.
• Attending And Pass DCS Training Course For YOKOGAWA System (CENTUM CS 3000) By One Of YOKOGAWA Middle East Expert At Citro Site Including Fundamentals, Maintenance, And Engineering Items.
• Follow Up The Site Eriction Done By Giza Systems Engineering, Of Instrumentation Cable Trays, Signal Cables Conduits Junction Boxes, Instruments And Control Valves.
 ABB Petroleum Technology, 1996 – January 1998:
• Western Desert Gas Development Project (Khalda Petroleum Company).
• Instrumentation & Control Engineer, Shared In Installation, Testing, Commissioning, And Start Up Activities For Variety Of Field Instruments, Package Control And Shared In Control Loop Checks With Honeywell DCS System.
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
Training
Yokogawa DCS CS-3000 Engineering, maintenance course CSE 2001
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
Excellent command of computer skills
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
• Network Engineer with extensive experience in design, implementation, and support for Ethernet and AppleTalk local and wide area networks. Additional experience includes purchasing, planning, and cost control. Background includes administration of Unix, PC, and Macintosh operating systems and software. Interpersonal skills with excellent problem solving skills. Extensive troubleshooting and administration skills on IP networks, routers, and switches. In-depth knowledge of TCP/IP, IPX/SPX, and AppleTalk protocol suites and common WAN/LAN (leased line, FR, ATM) technology.
Extensive Experience In CISCO & A Wide Range Of Instrumentation And Control Systems Engineering; Covering A Range Of Job Functions In Various Industries (Chemical, Petrochemical, On-Shore/Off-Shore Oil & Gas, Pharmaceutical, Iron & Steel And Cement Industries. Involvement In All Areas Of Instrumentation Engineering: Electrical Interfaces And Control, Design, Installation Supervision And Commissioning. ICS/DCS & Safety Systems Implementation, Configuration And Operation. Intrinsically Safe And Other Hazardous Area (EXD, EXN etc). Field Bus, Hart And Analogue Instruments.
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
I am an Engineer with excellent communication, organizational and technical skills. Proven leadership coordinator. A reliable team player, skilled in project management; able to multi-task efficiently. Accomplished Senior Instrumentation & Control Engineering Professional with 12 years of combined experience spanning project engineering; supervision of EPC contractors, and instrument & DCS engineering & maintenance in the Oil & Gas industry. Successful record of achievement as Lead Project Engineer in large-scale projects. Specialist knowledge of the YokoGawa DCS & SCADA.
I would like to be considered as a serious candidate for the position of Senior Instrumentation Engineer / Commissioning Supervisor / Systems Engineer and look forward to pursuing this avenue with you further. Thank you for your time and attention.
|
| |
|
|
|
|
|
Senior Instrumentation and Process Control Engineer (Commissionning)
CV/Resume ID no.: 84819 |
|
|
|
|
|
|
| Other CVs; view more oil and gas CVs |
| 1. Radio Operator (Onshore Or Offshore, Document Controller, Storekeeper) |
| 2. PROCUREMENT, BUYER, SALES MANAGER |
| 3. Instrumentation & Controls Expert |
| 4. Quality Control, Quality Assurance, Quality Auditor, Welding Inspector |
| 5. Trained in electrical technology |
| 6. DPO Simrad Kongsberg Alstom Saudi Aramco, Shell, Maersk Oil Qatar, Occidental Qatar, QGPC, ONGC |
| 7. fresh piping designer |
| 8. Project Engineering, Production Engineering |
| 9. Mechanical Engineering/Power plant operator |
| 10. Sr. Document Controller - Coordinator |
| 11. Electrical, Reliability, Facility Engineering Construction Group |
| 12. Horizontal Directional Drilling Engineer |
| 13. Sr. Mechanical Technician (Rotating equipment), PDO (PETROLEUM DEVELOPMENT OMAN) |
| 14. Mechanical Completion and Commissioning Engineer |
| 15. Production operator, Working Experience at both Onshore & Offshore |
| 16. Experienced cook, computer tehnician |
| 17. Medical doctor |
| 18. Security Consultant 18 years military operational experience, British Army, Northern ireland |
| 19. Supply Base Manager PT Petrosea Tbk (Clough Ltd), Balikpapan, East Kalimantan, Indonesia |
| 20. Maintenance engineer Accumen's Engineering Works Pvt Lt Hyderabad India |
| 21. Trainee accountant seeking a new job |
| 22. Marine Officer Maersk Neustadt APL Oakland – Container vessel Ukrainian Danube Shipping Co |
| 23. INtools Plant Design Engineer software SmartPlant Instrumentation, training on spi, sp3d, pds, spel |
| 24. Trainee mechanical engineer worked as junior QC technician engineer |
| 25. Trainee marine engineer working in Qatar Shipping |
| 26. Carbonate Sedimentologist Stratigrapher Sedimentary Petrologist and Biostratigrapher with PhD degree |
| 27. Steel Quality Controller, test results for metallurgical and mechanical testing Dubai UAE |
| 28. FPSO / Marine Superintendent Greater Plutonio Angola West Africa on 28/28 rota - UK North Sea Fife |
| 29. Process Design Engineer DuPont Engineering Centre Hyderabad, UOP Honeywell Company Gurgaon India |
| 30. Sr Rig Mechanic 12 yearsexperience in Petrochemical industry and 7 years offshore |
| |
| |
|
|
|