| |
| Sr HVAC Engineer - CHVAC, RHVAC, Refrig Box Loads, PsyChart, HVAC Solutions, Duct Size, HSYM |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in Sr HVAC Engineer - CHVAC, RHVAC, Refrig Box Loads, PsyChart, HVAC Solutions, Duct Size, HSYM - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
85697
Last Updated:
Tuesday, January 11, 2011 |
Location (Residence): Mexico City, Mexico
Citizenship: Mexico
|
| |
Languages:
Native:
Spanish Mexican Other:
English United States |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
PhD/MD in mechanical engineering No Degree Years of Experience:
12 years
|
Authorized to work in:
Mexico
Present Location:
Mexico, Mexico City
Relocation:
Anywhere (International) |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Engineering |
HVAC |
Experienced
|
17 years |
|
Design/Software |
PDMS/PDS |
Experienced
|
13 years |
|
Design/Software |
Other |
Experienced
|
17 years |
|
Engineering |
CAD/CAM |
Experienced
|
17 years |
|
Engineering |
Piping |
Basic
|
14 years |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
More than 11 years of experience in R-HVAC Systems Projects (Heating, Ventilating, Air Conditioning and Refrigerating), Industrial Exhaust, Adiabatic Cooling Systems, Hydronic systems, Automation, Optimization and Interfacing of HVAC Systems with Building management Systems in several industries: Petrochemical, Offshore Petrochemical Platforms, Chemical, Pharmaceutical, Hospital and Manufacturing, as well as residential and commercial, with the following scopes: mass and Thermal fluid balances (airside and waterside), Refrigerant lines calculation and Ductwork system design, Air Conditioning flow and control diagrams, Piping and Instrumentation Diagrams for Cooling Tower Water and Chilled Water Systems, calculation and hydraulic piping design, Pump Head Calculation, Air Conditioning equipment specification, Cooling Tower Water and Chilled water equipment selection, Advanced Air Conditioning analysis, such as: Humidity Reheat control and performance humidity, Air Conditioning and hydronic Energy consumption analysis (comparison), materials take-off for all mentioned systems, as well as, technical and economical proposals, vendor drawing review; wide experience using calculation, design and simulation software related with the specialty, besides Mexican and International Norms knowledge and application
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
ICA Fluor S. de R. L. de C.V.
•AHMSA Steel Production Plant. Eng. Senior III. Detail Engineering, include: Specifications Elaboration, Airflow & Control Diagrams, thermal balance, Airflow balance, ductwork layout, equipment arrangement, ductwork pressure drop calculation, July 2008 – September 2008.
•PEMEX Exploración y Producción, Offshore Petrochemical Platform (Living Quarters), Cayo Arcas, Sonda de Campeche. Eng. Senior III. Basic and Detail Engineering, include: Specifications Elaboration, P&ID Elaboration, Airflow & Control Diagrams, energy balance (airside and waterside), Airflow balance, Freezing and Cooler Chamber Calculation, ductwork layout, equipment arrangement, static-regain method pressure drop calculation, Head Pump Calculation and Specification; Intelligent 3D Model Elaboration & drawing extract, using PDS software (PEHVAC, Modeling Equipment, PD Draw, Interference Manager). March 2007 – July 2008.
•LNG Manzanillo Terminal, Manzanillo Colima, México, Ing. Senior III. Cost Estimated, includes materials take-off, requisition package, technical evaluation. January – March 2007
•PEMEX Exploración y Producción, Offshore Petrochemical Platform (Rebombeo Living Quarters), Technical proposal, Sonda de Campeche. Eng. Senior III. Chilled Water Central System Hydraulic Calculation, VAV Air Conditioning Systems Calculation and materials take-off. February 2007.
•PEMEX Exploración y Producción, Offshore Petrochemical Platform (Living Quarters), Cayo Arcas (Technical proposal), Sonda de Campeche. Eng. Senior II. Chilled Water Central System Hydraulic Calculation, VAV Air Conditioning Systems Calculation and materials take-off. May 2006.
•PEMEX Refinación, Minatitlán II, Minatitlán, Veracruz. Eng. Senior II. HVAC Calculation Log, including thermal, humidity and mass balance, technical specifications, data sheets, materials take-off, ductwork systems design, control and flow diagrams, calculation and design hydronic systems (Cooling Tower and Chilled water) including: System Hydraulic Analysis, Piping, Expansion Tank, Air separator tank and elimination system calculation, calculation and pump selection, piping arrangement, Cooling tower and Chiller water P&ID, as well as, Change order Elaboration, Engineering Hours Estimated and Interdisciplinary meetings. February 2005 – December 2006.
•Thor GMBH Speyer, Biocide Industrial Plant, Acticide 14 Plant, San Pedro Escobedo, Qro. Eng. Group Leader, Cost estimated Elaboration, HVAC Systems preliminary calculations, subcontract packaged & technical bidders evaluation and Program Engineering Activities. November 2004 / January 2005.
Grupo Profesional Planeación y Proyectos (GRI)
•PEMEX Exploración y Producción, Offshore Petroleum Platforms PB-ZAAP-C, SINAN A/B/C/D, POL-CHUC, Plataforma de Inyección de agua, Separation Batery SAMARIA-LUNA, Zonda de Campeche y Litoral Tabasco. Eng. A, Air conditioning System Calculation and Design, equipment selection, data sheets elaboration, Technical questionnaires, Pressure Vessel Calculation and Design, Squad Check, Engineering Hour Estimated, Project Progress Report, HVAC Project multidisciplinary Coordination, finish and delivery HVAC project. May 2003 / November 2004.
Grupo Profesional Planeación y Proyectos, S.A. de C.V. (PYPSA)
•PEMEX Exploración y Producción, Proyectos: 407-09, 407-20, 407-22, 407-39, 407-44, Sonda de Campeche. Eng. A, Air conditioning System Calculation and Design, equipment selection, data sheets elaboration, Technical questionnaires, drawings Squad Check, Engineering Hour Estimated, Project Progress Report, HVAC Project multidisciplinary Coordination, finish and delivery HVAC project. July 2002 / February 2003.
KRUPP Uhde Jacobs, S.A. de C.V.
•CIBA, Specialties Chemical Plant, Puebla, Pue, Eng. A, Industrial Exhaust System Calculation and Design (Vapor and dust), including mass balance and pressure drop calculation; equipment and accessories Selection, requisitions elaboration, data sheets and technical and economical equipment evaluation. August 2001 / Febraury 2002.
•L’Oreal Mexico, Xochimilco, México D. F, Eng. A, Air conditioning System Calculation and Design as well as industrial exhaust (vapor and dust) including, energy balance, mass balance, pressurization and ductwork, pressure drop calculation; equipment and accessories selection, data sheets and requisitions elaboration, technical and economical evaluation, Project Progress Report, personnel requirements, meetings with client and bidders. November 2001 / March 2002.
•Pharmacia, Mexico D.F. Eng. A. Air conditioning System Calculation and Design, including: thermal balance, pressure drop calculation, equipment specification, ductwork layout and design. January 2002
•Delta Hudson, Combined Energy Pant, Chihuahua, Eng. A, Air conditioning System Calculation and Design including energy balance, mass balance and ductwork pressure drop calculation; equipment and accessories selection, data sheets and requisitions elaboration. January 2002 / April 2002.
ICA Fluor Daniel
•Thomsom Consumer Electronics, Electronic Manufacturing Plant, Mexicali, Baja California Norte, Eng. Senior, Air conditioning System Calculation and Design as well as industrial exhaust, including energy balance (cooling and heating), mass balance, ductwork pressure drop calculation, pressurization control; equipment and accessories selection as well as technical assistance in site for HVAC Installations, such as: offices, Manufacturing areas & Clean Rooms. March 2000 / July 2001.
•C.F.E. Combined Cycle Energy Plant, Tula, Hidalgo, Eng. Senior, Air conditioning System Calculation, Design and Ventilation for thermal control, including energy balance, mass balance and ductwork pressure drop calculation; equipment and accessories selection. June 2001 / August 2001.
Bufete Industrial Diseños y Proyectos S.A. de C.V.
•Development of Several Projects and Technical Proposals, such as: CFE Rosarito, B. California, PEMEX Cadereyta, Nvo. León, CFE Hermosillo, Sonora, CFE Monterrey, Nvo. Leon, Rosche México, Toluca, Edo, Mex, PEMEX 3 refinarías (Salamanca-Madero-Tula), PEMEX. PEP. AKAL-L, Zonda de Campeche, PEMEX. Plataformas Habitacionales, Zonda Campeche, BASF Herbicidas, Tamps, BASF Offices, Tamps., Refinería PETROKEMIA, en Arabia Saudita, Refinería de ZINC, Coahuila, Merck Sharp & Dohme Labs., D. F., Ing. B, technical assistance in Site. Air conditioning System Calculation and Design, including energy balance and mass balance. Humidification, dehumidification and ductwork pressure drop calculation, pressurization control; equipment and accessories selection, requisitions and datasheets elaboration, Technical and economical equipment evaluation. September 1996 / February 2000.
EPN Ingeniería – Chiyoda Corp. – ICONSA
•PEMEX Refinación, Refinerías de Tula, Hidalgo - Minatitán, Ver. - Salina Cruz, Oax. Drawer. Plans and Piping arrangement (plans and Elevations), Equipment and Isometric Arrangements and 3D Piping Models, using AutoCAD & propipe. February 1996 / September de 1996.
SUBCONTRACT DEVELOPED PROJECTS:
•2007
Executive HVAC Project for Revamp for Plaza Pabellón Cuauhtemoc. México D.F. Bar Area Air Conditioning System, Direct Expansion, About 20 t.r. with rooftop Units. As well as Air Conditioning and Exhaust System for Taco In Fast Food Area. Fast Food General Exhaust System with Canopy Hoods.
Executive HVAC Project for Procter & Gamble. México D.F. Air Conditioning System, Direct Expansion, About 50 t.r. with rooftop Units and Mini Split Units.
Preliminar Project for Poder Judicial de la Federación (Judicatura), Mazatlán, Sinaloa. Pre engineering, Thermal Analysis, airside and Waterside, Material take-off, Include cost estimated, equipment arrangement, piping and ductwork lay out. About 320 t.r. with fan & coil Units and Chilled Water System, as well as roof top units.
Executive HVAC Project for Innova Sport Shop. Ivonne Guadalajara. About 10.0 t.r. with Chilled Water Air handling Unit.
•2006
Executive HVAC Project for MINA Trico Gral. Lazaro Cardenas Refinery, located in Minatitlán, Mexico. Direct Expansion Split Systems. Air Conditioning, Pressurization and Gas control Systems for Satellite Control Rooms, battery rooms, Electrical Boards and cable rooms of the Sulphur, Diesel oil and Hydrogen Plant. About 250 total T.R.
Executive HVAC Project for Sport City, located in Cd. Carmen, Campeche, México. About 150 t.r. with rooftop Units.
Executive HVAC Project for Sistema de Administración Tributaria, located in Matamoros, Tamaulipas & Tijuana Baja California Norte, México. About 80 total t.r. with Direct expansion heat pumps.
Executive HVAC Project for Several Bimbo Production and Executive Offices (Offices, laboratories, Dinning Rooms, Warehouses, Computer and Telecom Rooms), located in Mazatlán, Sinaloa; Mexico City; Chile, Costa Rica, etc.
Executive Process HVAC Project for Productos de la Granja, located in Puebla, Mexico. About 80 T.R. with Direct Expansion Split equipment for the following areas: Pasteurization area, CIP clean area, CIP dirty Areas, Broken Shell Areas and general services areas.
•2005
Executive HVAC Project for IMPI Instituto Mexicano de la Propiedad Intelectual, Located in Mexico City. About 200 t.r. Chilled Water System. One tube chilled water system with mini-split chilled water equipment.
Executive HVAC Project for Yucatan Government Specialty Hospital, located in Mérida, Yucatan. About 1800 T.R. Chilled and Cooling water system. HVAC System for Hospitalization, Government and Treatment Modules.
Executive HVAC Project for IMSS Hospital, located in Cd Carmen, México. DX Rooftops units.
Executive HVAC Project for several Innova Sport Sotores. Located in Monterrey, Chihuahua, Mexico City, Guadalajara, etc. Direct expansion split and packages equipment.
•2004
Executive underground Parking Ventilation Project for Centro Comercial Paseo San Francisco, located in Puebla City, Pue.
Executive HVAC Project for Centro Comercial Paseo Sn. Francisco, located in Puebla City, Puebla. About 400 t.r. Chilled Water System, including diabatic Cooling for common areas.
Executive HVAC Project for IMPI Instituto Mexicano de la Propiedad Intelectual, Located in Mexico City. About 100 t.r. Chilled Water System. One tube chilled water system with mini-split chilled water equipment.
• 2003
Executive HVAC Project for Solids y Oral Líquids for the Production Plant property of Carnot, Located in México City. Dust Collection systems included. About 250 T.R. Direct expansion.
•2000 – 2001
Executive HVAC Project for San Francisco del Rincón penitentiary, Gto. y Durango. Water Heat pump (Hor and Chilled water) with fan and coil systems, including Air Handling Units.
Executive HVAC Project for ARTECHE Ofices and Electrical Equipment Warehouse, Located in Tepeji del río, Qro. About 50 T.R. Direct expansion.
•1999 - 2000
Executive HVAC Project for Centro Comercial Pabellón Cuauhtémoc, Located in México City, D.F., about 300 Chilled Water T.R. and 300 cfm adiabatic Cooling for common areas.
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
- Mechanical Engineering by Universidad Autonoma CHapingo, from 1990 to 1994
- Graduate in HVAC Sytems by Carrier, 1996.
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
•Microsoft Office (Word, Excel, Power Point, MSProject)
•Microsoft Works
•HVAC Elite Calculation Software: CHVAC, RHVAC, Refrig Box Loads, PsyChart, HVAC Solutions, Duct Size, HSYM, Shadow & GasVent, Htools.
•Trane Software: Trace 700, Engineering ToolBox, Duct Designer, Pipe Designer,TAP and Equipment Selection Software.
•Carrier: E20-II (HAP), Refrigerant Piping Design Program, HDPsyChart (Psychrometric Analysis), Separate Sale Coils and Several Equipment Selection Software.
•Hydraulic Analysis Software: HSS Taco Hydronic System Solutions, Trane Pipe Designer.
•Other Softwarwe: J-Square DSB2 (Industrial Exhaust Software), Elite Heavent, Ventilation Design Software, Opus AEC & Neodata.
•AVEVA Plant (PDMS), Modules: Equipment, Piping & HVAC
•Design Review: SmartPlant Review, Navisworks.
•Design Software: Autocad MEP 2009, AuctoCad 2009, Micro Station 8.1, Draft.
•Mechanical Software: Codeware Compress Build 6198 and PV Elite.
•Several Electronic Catalogues: Equipment and accessories.
•Plant Design System (PDS), Modules: Equipment Modeling, PEHVAC, PD Draw, Interference Checker and Design Review.
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
- Piping desig (basic), include equipment arrangement, piping arrangements, isometrics and modeling
- Mechanical Vessels calculation
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
- Nowaday working as subcontract
|
| |
|