|
|
CV Welding Process for Piping Process and Structural / GTAW – SMAW – FCAW – SAW - GMAW
|
|
|
|
|
|
|
| |
| |
| Welding Process for Piping Process and Structural / GTAW – SMAW – FCAW – SAW - GMAW |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in Welding Process for Piping Process and Structural / GTAW – SMAW – FCAW – SAW - GMAW - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
86758
Last Updated:
Tuesday, January 6, 2009 |
Location (Residence): Tangerang, Indonesia
Citizenship: Indonesia
|
| |
Languages:
Native:
Indonesian Other:
English |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
High School in SMA Baitul Arqom Jember, Indonesia Years of Experience:
27 years
|
Authorized to work in:
Algeria, United Arab Emirates
Present Location:
Indonesia, TAngerang
Relocation:
United Arab Emirates |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Engineering |
Welding |
Experienced
|
31 years |
|
Engineering |
NDE/NDT |
Experienced
|
31 years |
|
Inspection/Expediting |
Welding Inspection |
Experienced
|
31 years |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
I read your job posting with interest.
I have more than twenty five years experience in Welding Process for Piping process and Structural, and Heavy duties Industrial Equipment.
I look forward to hearing from you. Thank you for your consideration.
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
March 20, 2008 to September 4, 2008. Sejong Emirate Electro-Mechanical Contracting LLC, join at Jebel Ali Power and Desalination “M” Package responsible for arrange more than 25 welders as A Welder Foreman, and responsible for making a daily report and welding visual from the number of that welders.
October 28 2004 to June 26, 2007. Pt . Mc Dermott Indonesia, Join at DLB 01 Project Thailand Cuel Oil Company. Responsible for Pipeline and jacket offshore project, Responsible for Fabrication Pipe Structural for Stenger, and Air Line, Sea Water line for Stenger.
30 May to 06 august 2004, at PT. OCS (Offshore Crew Service) Supply to offcon working at juscon 5, Responsible for welding and Fit up Electrical structural for modification barge and pipeline for barge sea tried.
February 24, 2002 to October 2003 at PT. Mc Dermott Indonesia. Responsible for welding steel Structure for jacket and Platform, Pipeline for Project of Conoco Ltd. North Natuna, Pipeline and Jacket, Platform for Project JVPC Rang Dong, Pipeline and Platform Project for Student join operation Cu Long Ltd. Vietnam
March 10. 2001 to May 08, 2001 at PT. Mc Dermott Indonesia. Responsible for welding Lube Line for Hydraulic Line Steel Structural for Barge Repair at Derek BARGE ‘30’ and Derek Lay BARGE (DLB 01) offshore Project.
June 1, 2000 to September 15, 2000 at PT. Petrosea /PT. Trantek Project, PT. Gulf at North Natuna Island. Responsible for Welding Gas Line – Sea Water Line – Chemical Line Steel Structural.
April 24, 1999 to September 15, 2000 at PT. Flour Daniel Indonesia Batu Hijau Project Responsible for Welding, Steel Construction and welding Pipe for Air Line Lube Line Et. Mining Area.
December 15, 1998 to April 15, 1999 at PT. Tiga Ikan Engineering Project Pindo Delli Pulp and Paper, Karawang –West Java. Responsible for Welding pipe for Hot Water Line Gas Line- Steam Line and Steel Construction.
October 19, 1998 at PT. Tiga Ikan Engineering. Project PT. Erna Julianawati West Kalimantan Responsible for Welding repair Boiler retubing free purnice (front wall left/right wall – down Comer pipe.
August 23, 1988 to October 12, 1988 PT. Catur Insan Pertiwi at Project Geothermal Power Plant Wayang Windhu, Pengalengan West Java. Responsible for Welding Pipe Stainless Steel for hot water line and Pipe Carbon Steel for Steam Line.
January 7, 1998 to March 21, 1998 PT. Mc Dermott Inc., Project Total Yadana at ( Myanmar Offshore Project). Responsible for Welding Pipe from wall head to gas terminal line with stainless steel and air line at the Platform.
October 1997 to November 1997 at PT. Tiga Ikan Engineering Jakarta. Responsible for welding pipe at Modification Boiler for Water line Steam Line Project PT. Nestle Confectionery.
August 1, 1997 to September 30, 1997 at PT. Mc Connell Dowell. Responsible for welding pipe stainless steel for water line Pipe Carbon Steel for Steam.
May 1, 1997 to August 1, 1997 at PT. RMI – Mc Connell Dowell. Responsible for Welding Pipe lIne Stainless Steel for Water Line and Pipe Carbon for Steam Line.
February 14, 1993 to April 25, 1997 at PT. ALL BORG SUNROD JAKARTA –INDONESIA. Responsible for fabrication Boiler – Fire Cup – Water Cup –Economizer – Super Heater – Water Drum / Steam Drum – Condenser – Heater – Heat Exenger - Pipe Fabrication – Spool For Steam Line – Steel Construction.
October 13, 1992 to July 1993 at PT. Kaltim Nusa Etika Supply PT. Adi Guna Ship Building Engineering for ARCO Project. Responsible for Welding Pipe Fabrication Erection Gas Line, Water Line and Steel Construstion.
June 9, 1993 PT. ALL BORG CISER V JAKARTA Project PT. HASTA NUSA RAYA PRIMA –Banyuwangi – East Java, Responsible for pipe fabrication / erection for steam line, water line and contrustion.
May 25, 1991 to August 1991 Hyundai Engineering and Construction Co. Ltd ( Project Cement Cibinong Phase III ). Responsible for Arrange Welder for erction welding kilen for Expansion Cibinong Phase III.
March 3, 1990 to April 1991 PT. Mc Dermott Int. Inc – Batam Island . Responsible for Welding Pipe Structural for Jacket and Dek job for Maxus – Amaco - Acti – Enterprise Oil Bawean.
June 23, 1989 to October 27, 1989 PT. Wira Matra Guna Supply to PT. GUna Nusa Utama Fabrication – Cilegon. Responsible For welding Pipe Structural For Jacket and Dek Job Amoses Oil Company.
May 17, 1988 to August 1988 at PT. Raka Daya Sarana E.F.I.E Batan – Serpomg, Responsible for welding Pipe Fabrication / Erection for Water Line, and Steam Line.
August 5, 1988 to 15 1989 at PT. Elnusa Subsidiary of Pertamina, Project RWI – Phase IIII Batam – Serpong West Java. Responsible For Welding for steam line, Water Line and Steel Construction.
November 16, 1987 to May 16, 1988 PT. Sanggar Sarana Baja Fabricator. Responsible for Welding pipe spools –Reactor Tank – Condensor – Storage Tank – Expansion Tank and Steel Construction Fabrication.
June 18, 1987 to October 11, 1987. PT. Makindo Perkasa / MAK (Project PTD – Dumai ). Responsible for Welding pipe Fabrication / Erection for Fuel Line – Water Line – Air Line – Lube Line.
July 5, !986 to October 11, 1986. PT . Jood Kappa Agung Supply to MAK ( Project PLTD Palangkaraya – Central Kalimantan ). Responsible for Welding Pipe Fabrication / Erection for Fuel Line – Water – Water Line, Air Line, Lube Line and Steel Construction.
December 15, 1982 to March 2, 1984 Bethel Int. Project Refinery Expansion For Steam Line, Air Line, Diesel Line, Cruch Line and Steel Construction.
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
Senior High School Baitul Arqom Jember, Indonesia
Training (Combined Survival and Fire Fighting ) By MSTS ASIA SDN, BHD Malayasia
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
Browsing on Internet, Type in Microsoft Office
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
None
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
Welder Classification : GTAW – SMAW – FCAW – SAW - GMAW AUTO
|
| |
|
|
|
|
|
Welding Process for Piping Process and Structural / GTAW – SMAW – FCAW – SAW - GMAW
CV/Resume ID no.: 86758 |
|
|
|
|
|
|
| Relevant CVs; view more oil and gas CVs |
| 1. Qa/Qc, NDT, Welding Inspection, Integrity |
| 2. CSWIP-AUT Phased Array/SENIOR WELDING/ASNT NDT LEVEL III/LEAD QA/QC INSPECTOR |
| 3. QA/QC, WELDING INSPECTOR |
| 4. Offshore, Pipeline, Topside, Coating |
| 5. QA/QC Vendor Inspector Oil and Gas |
| 6. Mechanical, Construction, Maintenanace |
| 7. Lead - Inspection & QC / QA Metallurgy Engineer |
| 8. Sr Inspection / Welding Engineer |
| 9. Assistant Manager Welding Shop |
| 10. QA/QC Engineer |
| 11. Pipe Stress Engineer, CAESAR II |
| 12. welding, steel and pipe constuction |
| 13. QC Welding Inspector, 17 years, cswip 3.1 |
| 14. QA/QC Engineer, QC Supervisor, Inspector – Mechanical, Welding, NDT, Coating / Painting. |
| 15. QA/QC Inspector |
| 16. QA/QC, engineering inspection, NDT |
| 17. Quality Control |
| 18. Company Rep., Dive consultant, Inspector available to work anywhere outside the USA. |
| 19. QA/QC Supervisor / InspectorFor welding,painting,NDE, Mechanical |
| 20. Inspection supervisor/ coordinator with field management experience |
| |
| |
| Other CVs; view more oil and gas CVs |
| 1. Laboratory Technician / Chemist |
| 2. Master Mariner, Marine Warranty Survey (Sub Sea Construction) |
| 3. Document Controller having 11 Yrs Exp., Well versed Computer, Assai, Live Link, SAP system, ISO:9001 |
| 4. 2nd officer, 2nd mate DPO, DPO |
| 5. Reservoir engineer, surface facility engineer,Drilling engineer, production engineer |
| 6. Lead Production Operator |
| 7. Marine officer |
| 8. Mechanic, Rank Mechanic / Fitter |
| 9. CAD Draftsman |
| 10. Site Instrument Engineer |
| 11. IT Sr. Manager & Head of PMO |
| 12. SAFETY ADVISOR |
| 13. Health and Safety Professional, HSE Training, Safety officer NEBOSH Certified |
| 14. Experienced Assistant |
| 15. Executive Secretary / Administration |
| 16. Painting inspector 9 years |
| 17. Trainee customer / sales experience |
| 18. Instrument Control Engineer Siemens DCS, PLCs, Fire and Gas, ESD systems, control equipment |
| 19. Process Plant Operator Engro Chemical Pakistan Ltd Ammonia Plant participated in HAZOPs PHAs JSAs |
| 20. Trainee FEA Design Engineer knows Hypermesh and ANSA software |
| 21. Project Manager, Pegasus International Houston, Business Manager Engineering & Construction Sector |
| 22. Instrument Tech Oil & Gas processing plant, Petrochemical plant, Sulphur plant, LPG loading stations |
| 23. Drilling Fluids Mud Engineer, Baroid Fluids Services (Halliburton) Kuwait, MI Swaco Turkmenistan |
| 24. IBM Red hat certified Engineer, IT Systems Engineer Well Log Digitizing Softenger Pvt. Pune India |
| 25. Junior QC Welding Engineer in Larsen & Toubro modular fabrication Oman Sohar |
| 26. Technician Baker Pacific offshore pedestal cranes, skidding system and jacking system, gear boxes |
| 27. Experienced as Trailer Driver in Interchange Transport Services Philippines |
| 28. Trainee Structural Analyst Designer from Institut Teknologi Bandung (ITB) Indonesia |
| 29. E & I Lead Manager Engineering, Construction & Commissioning of various FPSO in Singapore |
| 30. Expert MCIPS Buyer / Principal Expeditor working in the UK Oil & Gas construction industry |
| |
| |
|
|
|