Home  Register  Jobs  CVs  Job Search  Worldwide  Process  Help  Search  Scams  JA  B  C
Oil Offshore Marine Careers in Onshore and Offshore Drilling Energy Industry Oil Offshore Marine: Oil & Gas Jobs & CVs Online recruitment services (job vacancies, resume/cv database search) for Oil Industry, Energy, Offshore, Petroleum, Engineering, Construction, Drilling, Subsea, Marine, Shipbuilding, Shipping, Petrochemical. Have your own FREE account! free cv upload registration on Oil-Offshore-Marine.com recruiter benefits: free job postings and cv search on Oil-Offshore-Marine.com
  Need to find something?
 
 Username:  
 Password:  
Oil Offshore Marine Register
 
  Remember my password?  
 Recruiters - Employers & Agencies
  Advertise / Contact Us
free cv upload for all job seekers, free access to oil and gas jobs
subscribe to oil careers alerts, oil jobs postings, drilling rig jobs, engineering jobs

 

CV Project & O&M management in water & waste water industry

 
Project & O&M management in water & waste water industry

Resume built for oil and gas job opportunities by a jobseeker with experience in Project & O&M management in water & waste water industry - would you like to offer this candidate a job/contract employment?

Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database

CV/Resume ID no.: 86803

Location (Residence): KUALA LUMPUR, Malaysia
Citizenship: Malaysia
 
Languages:
  Native: Malay Malaysia
  Other: Chinese PRC, English
 
Education & Experience: Work Authorization & Relocation:
Education:
  Bachelors in ELECTRONIC AND ELECTRICAL ENGINEERING

Years of Experience: 9 years
Authorized to work in:
   Malaysia
Present Location:
   MALAYSIA, PENANG
Relocation:
   Anywhere (International)
 
Expertise
Category Subcategory Ability Experience
Engineering Electrical Experienced 17 years
Management Engineering Experienced 3 years
Plant (Refinery, Gas...) Water Plant Experienced 17 years
Environment Waste Trainee 8 years
Environment Water Experienced 9 years
Management Production Experienced 17 years
 
CV/Resume Details
 
1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory]

Recruitment Manager

Dear Sir
Application for the vacancy position of Engineering/ Project Manager
I am looking for a similar role in a growing organization to enhance my experience.
I feel I have much to offer, and hope that after considering my enclosed CV, you will agree that my experience is both relevant and adequate. In particular, my current role of Methods and Planning manager at HCVWK, Hohhot-Inner Mongolia have provided an excellent background and experience; but leaves me keen to progress to a larger team and organization.
I have a great deal of experience in surface water and underground water treatment plants and so would be excited at the prospect of joining your team.
I look forward to hearing from you, and do hope you find my CV to be of interest.

2. Work Experience - CV/Resume Part 2 [Mandatory]

Work Experience

Work Duration: October 1999 – September 2005
Employer: Cipta Wawasan Maju Engineering Sdn Bhd
(a subsidiary of Kuok group)
Designation: Project Engineer

Work Duration: September 2005 – September 2008
Employer: Beijing CQ (secondment under Veolia Water in China)
Designation: Methods and Planning Manager

Work Duration: September 2008 - Present
Employer: Chemical Waste Management Sdn Bhd
(a subsidiary of Kuok group)
Designation: Senior Engineer


Projects Management:

Sg Selangor Water Supply Scheme Phase 2 Stage 2
Capacity: 950MLD
Duration: Oct 1999 – Oct 2000
Industry: Domestic Water Supply
Responsibility: Handling site testing, pre-commission, commissioning and trouble-shooting on low voltage system in Intake Plant; Pumping Plant; Electrical Plant; Chemical Plant (including Lime Plant, Poly Plant, Alum Plant, Fluoride Plant & Chlorine Plant); Sludge Plant and Filtration Plant. Liaise with consultant and sub-contractors.

KIPC - Dungun Water Treatment Plant
Capacity: 230MLD
Duration: Oct 2000 - Oct 2001
Industry: Petrochemical Complex Water Supply
Responsibility: Project management on site installation, testing, commissioning and trouble-shooting of high voltage (11kV system), low voltage (415V system) and low-low voltage systems (such as small power and lighting; fire fighting system including CO2 system & fire hose; ventilation system – centralized air conditioning and telephone system). Liaise with client, consultant and sub-contractors.

New Gadek Water Treatment Works and Bulk Transfer
Capacity: 55MLD
Duration: Oct 2001 - Nov 2003
Industry: Domestic Water Supply
Responsibility: Project management on design, site installation, on site testing, commissioning and trouble-shooting on high, low & low-low voltage systems (similar to above) and instrumentation. Liaise with client, consultant and sub-contractors.

Wangsa Maju Booster Pumping Station
Capacity: 230MLD
Duration: Nov 2003 – April 2004
Industry: Domestic Water Supply
Responsibility: Project management design, installation, on site testing, commissioning and trouble-shooting on high, low & low-low voltage systems (similar to above), instrumentation and SCADA system. Liaise with client, consultant and sub-contractors.

Bukit Jelutong & Bukit Tadun Booster Pumping Stations
Capacity: 178MLD (Tadun) & 158MLD (Jelutong) respectively
Duration: April 2004 – September 2005
Industry: Domestic Water Supply
Responsibility: Project management design, installation, on site testing, commissioning and trouble-shooting on high, low & low-low voltage systems (similar to above), instrumentation and SCADA system. Liaise with client, consultant and sub-contractors.

Juru & Sg Nyior Sewage Treatment Plant Project Phase 2 Package 2
Capacity: 180kPE or 40500 cu. m/day each
Duration: Sept 2008 – Present
Industry: Domestic Wastewater Treatment Plant
Responsibility: To oversee the entire electrical system of the two sites.

Operation & Maintenance Works Management:

Project Introduction

In this project, Veolia Water has signed a 30 years contract with the municipality of Hohhot, capital city of Inner Mongolia for the drinking water services of the city. The partners of the project are: KCQ (Kerry Group), Chunhua Water Development Group, and Hohhot Water Co. forming Operation (HCVWK) and Asset (HCKVW) companies. I was representing Kerry Group working under the O&M management of Veolia Water.

Key Points
Location: Hohhot, Capital of the Inner Mongolia Autonomous region
Total Population of Hohhot: 2.4 M (urban area: 1.4 M)
Activity: Drinking Water
Project Type: Investment in the Assets of Hohhot Chunhua Water Development Co. and Hohhot Water Co. with a concession period of 30 years
Project Partners: Hohhot Chunhua/ Veolia Water and Kerry shall acquire and operate the assets under Asset and O&M JVs
Investment (RMB): 516 M of which 450 M for the purchase of the assets

Production (m3/day): 400,000
Staff around 360
Water Treatment plants: 10 Drinking Water plants (9 underground plants & 1 surface plant)


Introduction of Methods and Planning Department

Organization of the department: -
As one of the pioneer to kick start this project, I was the one whom created Methods and Planning department which is in charge of the following:
- Refurbishment projects or investment plan;
- Renewals plan;
- Preventive maintenance plan;
- Technical documents management;
- Working order delivery;
- Maintenance reporting;
- Outsourcing contracts management;
- Technical support to O&M team.

My duties and responsibilities as a Methods and Planning Manager are described as follow: -

 To daily manage the method and planning team;
 To update the asset inventory database;
 To list the maintenance history and to update frequently the maintenance database
 To coordinate between different departments and water plants in order to define and to implement the preventive & corrective maintenance program.
 To define the spare equipments and tools planning to ensure the water production and quality;
 To provide technical assistance and training to the maintenance teams;
 To define yearly training plans for the Methods and Planning team;
 To prepare the investment plan. To carry out the refurbishment and the renewal program as de fined in the investment plan;
 To perform budget controlling;
 To manage all outsourcing works including site supervision;
 To assist Purchase Department to set up contracts;
 To store and organize the technical documentation;
 To participate the operation and maintenance meeting when necessary;
 To implement Health and Safety Policies.

Methods and Planning Department is the largest department in the head quarter, it had been designed to become the mastermind of the company. We plan for optimization, effectiveness, cost saving, implement the planning, investment plans to lead the company towards a bright future. In the company, we are connecting to all departments including O&M departments, Purchase, Administration, IT, Health & Safety and Laboratory. During these 3 years secondment, my position had been acting in multi-task covering different roles such as:
1. Project Management and Consultation in execution of project works;
2. Engineering in Designing & Methodology researches;
3. Maintenance in sustaining the good status of assets;
4. Investment Planning in future development;

Technical Challenges

Throughout the 3 years secondment, I have had handled over 80 refurbishment and upgrading projects worth of over 22 million rmb. Methods & Planning department had taken the roles from planning, design, consult, supervision up to the very end of each work in technical aspects. On commercial, we have to source for supplier, execute bidding and negotiate on contractual issue before the execution of each project.

Work Achievement On Refurbishment Project
Location Description Budget kRMB Overall Progress (%) Year Schedule Remarks
Heating System & Heating Network
Plant 2 Boiler replacement 30 100 2007 Sept - Oct comply to national standard
Plant 2 heating pipe refurbishment 13 20 2008 Aug - Oct repair damaged pipe network
Plant 3 heating network refurbishment 350 10 2008 2 months Design done, pending on financial situation
Plant 5 boiler refurbishment 60 100 2007 Sept - Oct install a new boiler
Plant 5 New heating network 50  100 2007 Sept - Oct  
Plant 7 boiler yearly maintenance 100 100 2007 Sept - Oct comply to national standard
Plant 7 boiler yearly maintenance 60 20 2008 July - Oct comply to national standard
Plant 8 Boiler Renewal 120 100 2006 Sept - Oct comply to national standard
Plant 8 Increase the number of heaters in Ruyi office lobby 9 100 2007 Mar - June to improve heating effect
Plant 10 boiler yearly maintenance 200 100 2007 Sept - Oct comply to national standard
Plant 10 boiler yearly maintenance 200 50 2008 July - Oct comply to national standard
Plant 10 heating network upgrade 300 40 2008 July - Oct reduce heat & water loss. Project pending on financial situation
             
Civil Refurbishment & Plant Upgrade
Plant 1 roof water proofing 22 100 2008 Jun-July For pumping station and guard house
Plant 1 Repair & upgrade clear water tank wells entrance 13.6 100 2008 May-July  
Plant 1 plant refurbishment/ renovation 280 20 2008 July-Nov For maintenance workshop and store house
Plant 2 roof water proofing 5.8 100 2008 Jun-July For guard house
Plant 3 plant refurbishment/ renovation 1000 10 2008 Jan-Dec Design done, pending on financial situation
Plant 3 Well no.1 civil upgrade 35 100 2008 May-Jun  
Plant 3 Repair & upgrade clear water tank wells entrance 20.4 100 2008 May-July  
Plant 3 Well no.6 fencing work 8.5 100 2008 Jun-July enhance safety
Plant 3 roof water proofing 4.1 100 2008 July-Aug endanger asset
Plant 3 Concrete floor repair 6 20 2008 Aug-Sept 喷漆well landslide causing a big hole in well
Plant 4 piping works 20 20 2008 July-Sept re-design the pipeline to run through flowmeter
Plant 4 Reservoir well cover upgrade 13.6 100 2008 Jun-July enhance plant safety
Plant 5 roof water proofing 19.8 100 2008 Jun-July For well no.4 & office
Plant 5 pumping station roof repair 24 20 2008 July-Sept damaged by strong wind
Plant 6 Repair and upgrade well entrance 12.9 100 2008 May-Jun Well ChangLeGong
Plant 6 roof water proofing 7.2 100 2008 Jun-July For guard house & storehouse
Plant 7 Setup safety system in laboratory 70  100 2008 April - June comply bureau comment
Plant 7 Office building wall refurbishment 28 100 2008 May - June repair work due to wall crack
Plant 7 roof water proofing 169.6 100 2008 Jun-July For well no.2-12, pumping station & electrical room
Plant 8 Head office renovation 400 100 2005 Oct - Dec
Plant 8 Install air conditioner in office 63.9 100 2006 July - Aug  
Plant 8 Upgrade east side canteen 67.3 100 2006 July - Aug  
Plant 8 Upgrade west side canteen 67.3 100 2006 Aug-Sept  
Plant 8 Upgrade guard house 56.2 100 2006 Aug-Sept  
Plant 8 concrete road at main entrance 136 100 2006 Sept - Oct  
Plant 8 Install fencing & repair wall 86.7 100 2007 Mar - May To increase safety of the plant
Plant 8 Replace new tiles at lobby entrance 35 100 2007 June - July to celebrate the opening ceremony of HCVWK
Plant 8 Gas tank store room refurbishment 1.2 100 2008 Jan-Feb to comply Veolia safety regulation
Plant 8 Install glass at lobby roof 70 100 2007 April - Oct to improve heat loss problem
Plant 8 Gas tank store room install gas detector alarm 4.5 100 2008 Jun-July to comply Veolia safety regulation
Plant 8 Main gate repair 7 100 2008 May-Jun  
Plant 8 Repair landslide at pumping station 13 20 2008 July-Sept enhance plant safety
Plant 8 Main office entrance water leakage and re-painting works 10 5 2008 Aug-Sept  
Plant 9 roof water proofing 61.3 100 2008 Jun-July For pumping station & electrical room
Plant 9 Land slide causing water leaking in pumping station 3 100 2008 July-Aug  
Plant 10 Upgrade safety ladder 100 100 2007 Sept - Nov  
Plant 10 Install fencing guard rail around flocculators tank 50 100 2007 Sept - Nov to comply Veolia safety regulation
Plant 10 Install canteen gas detector alarm system 5 100 2008 May-June to increase safety
Plant 10 Platform construction 74.6 100 2008 May-July To reach sample water at filter plant
Plant 10 roof water proofing 127.5 100 2008 Jun-July Chemical building
Plant 10 toe plant refurbishment 9 10 2008 July-Sept comply Veolia safety regulation
Plant 10 sun shade for external flowmeter analyser 24 20 2008 July-Sept system requirement
Plant 10 Miain gate refurbishment 41.7 20 2008 May - Oct to increase safety, reliability & avoid flooding
Plant 10 Canteen refurbishment 130 100 2008 Jun-August  
Plant 10 Chlorine Building - civil upgrade 225 99 2008 Jun-August to increase safety
Plant 10 Pumping station - VSD room ventilation system civil works 16 100 2008 Jun-August to comply VSD system requirement
Plant 10 Pumping station - VSD room ventilation system air conditioner upgrade 47.3 100 2008 Jun-July to comply VSD system requirement
Plant 10 Upgrade crane 10.3 20 2008 July-Oct  
             
Chemical Dosing System
Plant 1-9 NaOCl injection kit design 180 100 2006 Aug - Dec  
Plant 1-9 NaOCl injection kit 2200 60 2007-2008 Jan-Oct  
Plant 10 Cl2 system process upgrade 120 100 2008 May-Jun to suit current water production quantity and increase safety
Plant 10 Cl2 system civil upgrade 235 100 2007 sept 2008 Sept to comply Veolia standard
             
Electrical Refurbishment
General Portable electric switchboard 150  100 2006  Oct - Dec   
General MP4 study 200 100 2006 Jun - Dec Energy efficiency study
Plant 2-7 Energy efficiency audit 50 100 2007 Mar - Jun Mainly on VSD
All Plant Daily maintenance contract 350 70 2007-2008 Jan-Dec Having Schneider to supervise and setup the maintenance system
Plant 3,5,6 HV and LV distribution 9300 50 2007-2009 Jan-Dec completed plant 3, plant 5 pending on financial situation
Plant 3,5,6 HV and LV distribution 340 100 2007 July - Dec VO for the equipment
Plant 5 Cable replacement work 85 100 2006 Oct - Nov  
Plant 5 VCB replacement 13.8 100 2008 Feb-Mar  
Plant 5 VCB replacement 17 100 2008 July-Aug  
Plant 8 Cable replacement work 14 100 2008 Jun-Aug from LV room to canteen & boiler room
Plant 10 Area Lighting refurbishment 11.5 90 2008 July-Sept  
             
Instrumentation Refurbishment
Plant 1-9 Instrumentation - Flowmeter calibration in KaiFeng 46.2 100 2007 May - June install electroflowmeter at all plant
Plant 1-9 Flowmeters calibration in KaiFeng (2nd batch) 25.2 100 2007 June - July install electroflowmeter at all plant
Plant 1-9 All flowmeter transportation to Hohhot 2.2 100 2007 June - July install electroflowmeter at all plant
Plant 1-9 Flowmeter chamber construction 117.1 100 2007 Sept - Nov  
DSW flowmeters purchase at DSW 83.1 100 2007 July - Oct Brand : Actaris
DSW Instrumentation - Flowmeter calibration in KaiFeng 80.4 100 2008 Jan-Dec Flowmeter Renewal for DSW
DSW Purchase of butterfly valve and non return valve (1st batch) 22.8 100 2008 May-Dec Together with the DSW flowmeter renewal
DSW Purchase of butterfly valve and non return valve (2nd batch) 46.7 50 2008 July-Dec Together with the DSW flowmeter renewal
DSW flowmeters refurbishment at DSW 100 30 2008 July-Dec  
Plant 10 Renewal of instruments parts & sensors 640 100 2007 July - Aug  
Plant 10 Replacing instruments in the chlorine system 47.5 100 2007 July - Aug to ensure safety operation
Plant 10 Replacing instruments' spare parts 77.7 100 2007 Sept - Oct With E&H on site training
Plant 10 Replacement of broken level meter 100  50 2008 July-Nov  
             
Laboratory
Plant 7 Laboratory equipments 200 20 2008 Jan-Dec purchase of microscope
Plant 10 Laboratory construction 1000 10 2008 Jan-Dec  
             
             
Renewal Planning
Plant 1 Submersible Pump 31.4 100 2008 May-Jun Well Shen 2 & Miao 5
Plant 3 Submersible Pump 33 100 2007 July-Aug Well no.2
Plant 3 Submersible Pump 16.6 100 2008 Feb-Mar Well no.2
Plant 3 Submersible Pump 17.3 100 2008 April-May Well XiChu
Plant 3 Submersible Pump 17.7 100 2008 May-Jun Wel Jiao Xu
Plant 6 Submersible Pump 17.7 100 2008 May-Jun Well no.2
Plant 7 Pump Renewal 23 100 2007 Oct-Nov  
Plant 10 Chemical dosing pump spare part replacement 76.4 100 2007 July-Dec  
Plant 10 VSD driver replacement 25.3 100 2008 Feb-July  
Plant 10 Level meter Replacement 7 50 2008 July-Oct  
Plant 10 PVC slab for flocculator 20 10 2008 Aug-Oct  
General Transformer Renewal 579 100 2007 Sept 2008 April  
General Transformer Renewal 125 80 2008 July-Oct 四水厂南5井, 二水厂6井和五水厂西4井,四水厂主变
             
Spare Part/ Equipment Planning
General Pipe 130 100 2007 May - Oct for emergency use
General Submersible Pump 26 100 2007 June - Aug for emergency use
General Submersible Pump 96.5 100 2007 July - Aug for emergency use
General Non return valve for NaOCl chemical dosing pump 5.7 50 2008 July-Oct  
General Submersible Pump 235 100 2008 April-Aug Grundfoss
General Submersible Pump 11.4 100 2008 Jun-July for well performance testing
Plant 10 Auma Actuator 708 50 2008 July-Nov  
Plant 10 Robicon spare part 100 30 2008 Sept - Dec  
   Total investment 22912.5        

Maintenance Works Achievement

A part of methods and planning department is in charge of maintenance activities. We had established the following: -

a) Asset Management: -
• Equipment list
• Equipment criticality
• Serviceable Index
• Well’s Identity Card

b) Maintenance Operation: -
• Daily maintenance work flow
• Emergency management
• Preventive/ corrective maintenance schedule and procedure.

c) Tools Management: -
• Identify individual/ truck/ workshop tools
• Tools replacement management

d) Spare Parts Planning: -
• Critical level
• Propose number to be stored

e) Achieve System: -
• Hard version achieve room (including technical information and maintenance history)
• Electronic version of documentation on server (a provision on the next move)


3. Education & Training - CV/Resume Part 3 [Mandatory]

Education

Bachelor of Engineering
With Honours Class II (Division II)
(Electronic and Electrical Engineering with Language)
University of Birmingham

Training Opportunities through Veolia Water
Throughout these years Veolia had provided various training to improve our working skills. The following are some of the trainings I have attended.

Management Development Program I
Location: Shanghai
Schedule: 2007 September 12th – 14th
Objective: The program is design for newly promoted managers to understand the fundamental of management principles. In this program, what we are able to learn are described as follows: -
 The impact of effective people management on achieving their business objectives.
 Recognize the core outputs expected from all managers and understand the means by which they achieve their business objectives
 The role of a manager, coach and mentor for employees
 Develop effectiveness in collaboration, team leadership and team participation

Understand Veolia Water Business In France
Location: Lyon, France
Schedule: 2008 March 17th - 21st
Objective: The program is design for managers who need to have a throughout understanding of the operation and management practice in Lyon, France. Here, we are able to obtain a general knowledge of the entire Veolia Water Business and techniques and improve networking by building contacts with Lyon management people. We visited their Commercial & Contractual Department, The Regional Technical Department, Network Efficiency & Modeling Department, Customer Management Department, Marketing & Public relation Department, Waste Water Department and Croix Luizet Water Treatment Plant.

Pumping System In Water Industry
Location: ShenZhen
Schedule: 2007 June 20th – 22nd
Objective: The program is design for maintenance department, technical managers and department heads for choosing pumping sets. In this program, we learned the following: -
 Analyze the performance of the existing pumping installation.
 Understand on site measurement of the characteristics of a Pumping set
 Choose the right pumping set for a pumping installation
 Carry out effective maintenance and replacement of pumping stations

Maintenance Management Concepts and Tools
Location: Shanghai
Schedule: 2006 Sept 13th-15th
Objective: We learned the importance to manage maintenance in water plant. Understand the maintenance concepts, evaluate the estimate labors and to know how to build maintenance plan according to process constraints and existing organization. Analyze maintenance activities and optimize them with computerized Tools design by Veolia (GAMA software, MAXO, BDI…etc) and implement it as a part of Maintenance Project.

Chinese Culture
Location: Beijing
Schedule: 2006 September 7th – 8th
Objective: For the foreigners in the company to have a better understanding of Chinese culture. We learned the relationship in China, social aspects, political aspects and also managing negotiation in China.

Microsoft Project
Location: Beijing
Schedule: 2007 July 24th -25th
Objective: a general software training to improve the project management skills through software tool.


4. Computer Skills - CV/Resume Part 4 [Mandatory]
Computer Skills

Operating System:
I am proficient in a wide range of modern operation systems and application including Windows (3.11, 98, 2000, XP and Vista) and MS-DOS.

Application Software:
I am familiar with the common office based software applications (Word processors, Excel, Power Point, etc) specifically the Microsoft Office Suite.

Networking Level:
I am familiar with the concepts and workings of the Internet. Including using the web pages, e-mail and Usenet.
5. Other Skills - CV/Resume Part 5 [Optional]
Language Capabilities:

Spoken: Chinese (mandarin and Cantonese), English, Bahasa Malaysia
Written: Mandarin, English, Bahasa Malaysia
Interest & Activities

Sport (Badminton) represented University of Birmingham in the University League and Birmingham League. Captain of the badminton team at college, lead the team to play many friendly matches between colleges.
I also play basketball, tennis, volleyball and squash.
Personal Attribute:

- Tri linguist
- Dependable
- Ability to adapt to new working environment
- Ability to work under pressure
- Strong intellectual skills
- Leadership
- Strong observant
6. Additional Information - CV/Resume Part 6 [Optional]
Contributions to Offer

General Management Skills
With the opportunity given in HCVWK, I have had a chance to create, lead and developed a department of 7 engineers on top of 400 plus employees; manage to involve in the top management decision making and strategic planning meetings. Throughout these years combining the management of French and the Chinese, I have manage to develop myself with the management qualities such as resources analysis, managing people, team work & building, perspective, key focusing, communication & information sharing.

Project Management
During the services in China and CWM, I have been managing many key projects involving design, supplier sourcing, bidding, supplier negotiation, contracting, site work supervision, trouble shooting, testing & commissioning dealing with local government to get certificates and etc. I have managed over 20millions of projects recently under the 3 years of services in China. I believe the skills developed through these years such as investment planning, budget control, optimization, efficiency studies will be beneficial to your company. On technical knowledge, I am familiar with the surface and underground water treatment process such as intake, pumping stations, aeration, flocculation, coagulation, sedimentation, filtration, clarification, chemical dosing & chlorination system, laboratory up to sludge disposing systems.

In addition to project experiences, I am now working on 2 sewage treatment plants which is another added value in terms of knowledge and experiences to my project career life. I am doing management to oversee the overall progress of these two projects in electrical system.

O&M Management
Operation and Maintenance is the main business of HCVWK. Working 3 years in the company had developed myself with O&M management and skills. On operation, I have picked up Veolia’s operation organization style, the “shift” system, emergency treatment & procedure…etc. On maintenance side, I am familiar with maintenance activities & methods, equipment management (timing, cost analysis, budgetary control, safety, economical repair cycle & decision making), scheduling & planning, stock control, purchasing & procurement, equipment criticality index, technical documentation, information circulation, maintenance work flow, outsourcing maintenance contract, reports & maintenance cycle analysis.

Contractual and Commercial Knowledge
During the secondment in Hohhot, China I had been handling various assignments particularly investment planning and implementation where involved heavily in the purchase department including supplier sourcing, bidding, contracting, contractual and commercial negotiation and the knowledge of SOX requirements.

International Exposure
I am willing to travel, relocate in order to adapt and grow of your company. With my international exposure, I believe I will be your best candidate to be your front line in many new areas of developments.


 

Questions about this candidate? Contact us for an immediate answer. To find similar people [or more experienced] - active jobseekers, please login OR create, FREE of charge, your own company account.

In order to view this candidate's contact information, you must a) be registered with Oil Offshore Marine - Worldwide Oil & Gas Jobs, and b) have already purchased a subscription.

Login Register Pricing Information
Project & O&M management in water & waste water industry
CV/Resume ID no.: 86803

Relevant CVs; view more oil and gas CVs
1. Electrical engineer experienced (15years +) in maintenance and fault finding
2. Electrical Technician Oil & Gas
3. Civil geotechnical engineer, young I aim to be involved in new challenging projects.
4. ELECTRCAL TECHNICIAN experienced in Offshore
5. Electrical Supervisor/Technician
6. 5 years experience in pharma industry
7. electrician and mechanic oil and gas experience
8. technical management
9. Electrical Engineer
10. Electrical Engineer
11. Electrical Staff
12. 30 year Experienced Major project Manager
13. Industrial automation engineer, senior industrial automation engineer
14. Electrical Designer
15. AutoCAD, Microstation, PDMS
16. Electrical Engineering
17. Rig Electrician
18. Project Coordinator
19. Quality Assurance / Quality Control
20. Senior Electrical Engineer
 
 
Other CVs; view more oil and gas CVs
1. Sr. Instrument Technician
2. Petrophysicist, Geosteering Coordinator, LWD Expert, Schlumberger, UAE
3. 9 years of un-certified crane operation, responsible, safe, reliable, willing to relocate.
4. Oil & Gas Production Technician / Operator Offshore & Onshore
5. Off-Shore AB
6. Intermediate Project Engineer, Facilities Engineer, Calgary AB
7. Assistant Legal Advisor, Assistant Manager-Administration
8. Health and Safety Officer
9. Human Resource and Training Lead in Oil and Gas Industry
10. Mate / DPO / SDPO on ROV and DSV vessels
11. Junior HSE officer
12. CCTV & Access Control System Installation Technician
13. Offshore roughneck Seawell formerly Seadrill Smedvig
14. Drilling Supervisor / Superintendent, Conpany Man, Drilling Engineer
15. Senior Project Engineer, Petrofac International Ltd
16. Chartered Accountant, Exxon, Schlumberger and First Data, Finance Professional
17. Geotechnical/Civil Engineer - Offshore and Coastal, TRITON Consulting Engineers Ltd Athens Greece
18. Experienced accountant in Luminiaire trading co LLC
19. Instrument Control technician Chevron-Production offshore in Angola
20. Young Instrument Engineer Stainless Steel, Alloys Steel & Mild Steel Plates, Sheets & Coils
21. Systems Analyst, IT Analyst VALIC Retirement Services Houston, TX Schlumberger Oil & Gas
22. Electrican / Welder KBR (Kellogg, Brown & Root), Zachry Construction US
23. 3O years experienced in Heavy Equipment Operations (off-shore, land, in the field)
24. Jr Instrumentation Engineer Cairn Energy India Pty Ltd Offshore Oil and Gas industry
25. Piping Technician and Machinist Sharda Shipping Pvt. Ltd. as Oil-Man, Meridian Marine Workshop
26. Technical Service Incharge for 32 MW windfarm (40 x 800 KW) wind power project at Hiriyur, KA India
27. Instrument Supervisor/Technician PLC, DCS and SCADA Based control and monitoring system
28. INTools Instrumentation Designer working in Angola as Construction Manager electrical installations
29. Security Manager Ex military & maritime, experience with UK HM Forces and international Cruise Lines
30. Logging Geologist/Wellsite Geologist Orient Petroleum, Petronas Carigali, Premier, OMV, ENI, and BP
 
 

Press Ctrl+D to Bookmark - Tell a Friend - Job Archives - Jobs - Oil and Gas CVs Resumes - Subscribe to Job Alerts - Site Map - Events - Legal - Privacy - Contact

oil offshore marine's website design

Official Blog - International Maritime Signal Flags - Glossary of Oil & Gas Jobs Definitions - Abbreviations & Acronyms from the Oil, Offshore, Marine, and Shipping Industries - Engineering Oil Jobs - Top 100 Energy Sites - Marine Jobs - Offshore Jobs - Oil Careers - Maritime Jobs - PDS/PDMS Oil & Gas Jobs - Oil Industry Jobs - Oil Field Jobs - Oil and Gas Careers - Petroleum Jobs - Oil Rig Jobs - Offshore Oil Rig Jobs - Drilling Jobs - Oil Industry - Official Sitemap - Jobs Feed - Login to your Oil-Offshore-Marine.com account

www.Oil-Offshore-Marine.com - Your Oil & Gas, Offshore, Construction, Shipping, Petrochemical, and Marine Engineering Recruitment Center.

© Oil Offshore Marine - Oil & Gas Jobs - All Rights Reserved.
This website is designed for international users, and its use is governed by Oil Offshore Marine - Oil & Gas Jobs Legal provisions. By browsing on any page of this website, you are deemed to have accepted all Oil Offshore Marine - Worldwide Center of Oil & Gas Jobs legal terms. If you do not agree with Oil Offshore Marine's legal provisions, you must stop using this website and its services.


find oil and gas jobs

  Looking for something?