| |
| Plant Operation and Maintenance Technician |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in Plant Operation and Maintenance Technician - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
88648
Last Updated:
Tuesday, March 24, 2009 |
Location (Residence): Dist. Muzaffargarh, Pakistan
Citizenship: Pakistan
|
| |
Languages:
Native:
Urdu Other:
English, Malay Malaysia, Punjabi, Urdu |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
Vocational in Mechanical Years of Experience:
7 years
|
Authorized to work in:
Kuwait, Libyan Arab Jama., Oman, Pakistan, Qatar, Saudi Arabia, United Arab Emirates
Present Location:
Pakistan, Multan
Relocation:
Kuwait, Oman, Pakistan, Qatar, Saudi Arabia, United Arab Emirates |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Operations |
Process |
Experienced
|
11 years |
|
Technician Level |
Maintenance |
Experienced
|
4 years |
|
Technician Level |
Process |
Experienced
|
11 years |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
Dear Sir,
Currently im working in multinational Gas company since Feb-2002, as Process Supervisor ( Operation + maintenance of Plant ) I have good command on Plant Operation and Maintenance ( Compressor, Pumps, Valves, Chiller unit, cooling tower)
I have worked in MALAYSIA as maintenance Technician in OIL MILL, for 5 years ( 1997 To 2001 )
I have good command on English ,, Computer skills, Team player.
If u give chance then we can get experience....
Looking for ur positive response.
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
BOC Gases ( The Linde ) Attached to Pak Arab Oil Reffinery
Production Technologist From 01-02-2002 to date
HSE Process Objective
Actively support Health, Environment, and Safety processes by accomplishing daily activities.
Perform duties as detailed below
Working in 800 Nm3 / hr ASU plant, Production of Nitrogen gas, supply to PARCO through 10 inch
And 3 inch dia pipe lines. The plant is operated through PLC control system. TI 545 wander wear
• Monitoring and logging all machines during shift
• Record keeping, Monitoring computer control system
• Operate, troubleshoot, repair, and maintain process and utility systems
• All machines data collection, Maintenance record, Planed Maintenance
• Compression
Main Compressor ( Kaeser- Screw type) Booster ( Ingersoll-Rand- Reciprocating)
Compressor Discharge Pressure,Tempreture, Oil pressure, Oil temperature, water in
Out pressure and Temprature,Preventive maintenance, Recently I done overhauling of
Ingersoll-rand Reciprocating Compressor with Vender.
• Refrigeration
Reciprocating compressor, Condenser, Expansion Valve, Evaporater,Heatexchanger
Preventive maintenance, Replacement of Compressor and Evaporator during major
Shut down.. Maintain air temp. below 13 C.
• Purification
Co2,Water Removing ( Purgbottles,Moisture separator,Driers,Heater. Drier Filter.)
Replacement of Purgbottles filter Elements, Inspection and replacement of Moisture
Separator filter. Annual Inspection of Alumina palates, and molecular siew
• Cryogenic Distillation Process.
High Pressure Column, Heat Exchanger, Preheater, Rich Liquid. Liquid Showering Vessel.
Use Liquid Nitrogen Temp ( -196.C ) to separate Nitrogen, Liquid Oxygen, Liquid Argon.
Collect rich Liquid ( Liquid O2+ Liquid Argon) for Acetylene Test.
• Cooling Tower
Water Pumps, Water Treatment ( Nalco ) Chemical Dosing.
Liquid Nitrogen Handling ( Temp. -196 C )
All the process to Produce Nitrogen Gas, through Cryogenic Process Use Liquid Nitrogen
Which temp. is -196 C, Collect the LN sample for Purity test, LN tanker Decanting to Storage
And Tanker to Tanker decanting. Use Proper PPE’S during the process, Collect all machine data
On hourly Log sheet, Shift end log report.
Good Knowledge of Natural Gas Process
1- Oil and Condensate Removal (Low-Temperature Separator )
2- Water Removal (Glycol Dehydration )
3- Separation of Natural Gas Liquids (The Absorption Method ) ( The Cryogenic Expansion Process )
4- Sulfur and Carbon Dioxide Removal ('sweetening ) Through ( Amine Solution )
.Soon Soon oil mill,Penang, MALAYSIA
Position: Maintenance Technician
From 01-01-1997 To 21-12-2001
Maintenance Technician
Soon Soon oil mill is a leading Group of companies in Malaysia, they have oil mill,
Feed mill, vegetable oil refinery, packing plant, boiler storage silo under one roof.
I was member of Maintenance Team to do as follows jobs,
Maintenance of oil mill plant, boiler, wheat silo ,flour mill, refinery
Maintenance of pumps (centrifugal ,rotary, multistage water pump)
Valves ( N-return, pressure reduce valve, butterfly, glob)
Steam traps, oil separator, gearboxes, screw conveyer, bucket elovaters)
Blowers , cooling tower
I work in Oil mill Annual Turnaround as Maintenance Technician with
Contractor ( it was 20 days job )
- EEHABS Engineering company LTD ( Descon Contractor )
DES 13, 1994 TO April 11, 1995
Production Expeditor- Maintenance Fitter
I work on Lucky Cement Plant during commissioning of 4000 t /d plant
At Pizzo ( NWFP).
Current job Responsibility
• Normal and emergency shutdown of Micro LN plant
• Normal Startup of Micro LN plant
• Complete command on equipments such as Compressor, Pumps, Cooling Tower
• Complete command on PLC Wonder ware
o Monitoring of the Nitrogen Distillation
o Product Quality
o Equipment performance
o Plant Specific Power
o Water treatment test and chemical dosing ( Nalco)
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
D.A.E
Diploma of Associate Engineer in Mechanical Technology from G.C.T , Multan (1994)
B.A
Graduation from Bahuddin Zakaria University, Multan ( 2006)
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
Windows XP
MS Word
MS Excel
Power Point
Microsoft Outlook
Internet Browsing
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
Training
• Work permit System ( Isolation, Planning, Lifting)
• Emergency Response Member
• First aid;
• Personal protective equipment (PPE) using training;
• Water treatment;
• IMSS ( Integrated Management System & Standard)
• Maximo training.
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
-
|
| |
|