|
CV QA/QC Painting & Coating Inspector, Saudi Aramco Client
|
|
|
|
|
|
QA/QC Painting & Coating Inspector, Saudi Aramco Client |
Resume built for oil and gas job opportunities by a jobseeker with experience in QA/QC Painting & Coating Inspector, Saudi Aramco Client - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
90862
|
Location (Residence): Chittagong, Bangladesh
Citizenship: Bangladesh
|
|
Languages:
Native:
Hindi Other:
English |
|
Education & Experience: |
Work Authorization & Relocation: |
|
Education:
Bachelors in Mechanical Engineering Years of Experience:
4 years
|
Authorized to work in:
Saudi Arabia
Present Location:
SAUDU ARABIA, DAMMAM
Relocation:
Anywhere (International) |
|
|
Expertise |
Category |
Subcategory |
Ability |
Experience |
Quality (QA/QC) |
Quality Control |
Trainee
|
12 years |
Engineering |
Manufacturing |
Trainee
|
1 year |
Quality (QA/QC) |
Quality Control |
Trainee
|
14 years |
|
|
CV/Resume Details |
|
1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
I am interested to work in any where in the world. I am a Bangladeshi citizen, male working in Saudi Aramco, KSA. I'm a BGAS certified Coating Inspector level II. I have Saudi Aramco SAP NO. I have 4 years experience. I have Coating/Painting inspection experience in the Oil and Gas industry for onshore refinery, tank farm, construction yard, gas line, water injection line, & cross country pipe line work.
|
2. Work Experience - CV/Resume Part 2 [Mandatory] |
BGAS/CSWIP-Certified Painting Inspector.
Painting Inspector Grade 2
CSWIP CERT
Faysal M. Qahtani Sons Co.
Al-Rakah, FMQ Building
P.O. Box 31712, Al-Khobar 31952
Kingdom of Saudi Arabia
May 2007
POSITION : QC Coating/Painting Inspector.
WORK RECORD : MAY 2007 TO PRESENT.
CLIENT NAME : SAUDI ARAMCO.
SAP NO. :
DUTIES AND RESPONSIBILITIES:
• Assure the complete and correct execution of the approved Project Quality Plan
• Monitor the coating activities by the contractor/sub-contractor on a daily basis
• Ensure all reports that are required, are completed in a timely manner and file accordingly with project specifications.
• Monitor the coating activities by the on a daily basis.
• Ensure that the painting/coating inspection and testing activities on pipelines are performed and completed as per the project specifications
• Responsible for all required inspection hold points that have been established by the project specifications are witnessed
• Supervision of company existing projects with particular attention to Quality Control/Assurance, responsible for the execution and monitoring of approved Quality Control/Assurance Manual in the field of Coating and Painting. Preparation and submittal of quality documents to QC Supervisor and/or QA-QC Manager.
• Perform in-process and final inspection of coating and painting activities that includes verification of blasting materials to be used. Inspection and testing of coating/ painting equipment, visual inspection and verify surface profile of metal surface prior to metal surface prior to coating/ painting after blasting/cleaning.
• Conduct visual inspection on coated/painted surface and verify the wet and dry film thickness. Pressure record and sub-contractors represent & Holiday testing.
• Conduct visual inspection of all painting/coating materials to ensure its compliance with the required project standard and specification by the contractor and/or sub-contractor. Conduct visual inspection of all equipments to use to ensure equipments are calibrated and in good operating condition.
• Conduct in-process and final inspection of painted/coated pipe surface including platforms prior to delivery and installation at site.
• Preparation and compilation of quality reports/records and other quality related documents for activity acceptance and final project handover.
• Assist and perform function as maybe directed by QC Supervisor.
• Inspect the internal coating at water injection line, holiday testing & demonstration.
• Painting coating activity at Positive seal coupling and gas line.
• Color coding at inside the gas plant. STOPAQ , Patch Repair.
Faysal M. Qahtani Sons Co.
Al-Rakah, FMQ Building
P.O. Box 31712, Al-Khobar 31952
Kingdom of Saudi Arabia
May 2007
POSITION : MECHANICAL ENGINEER
WORK RECORD : MAY 2007 TO PRESENT.
CLIENT NAME : SAUDI ARAMCO.
DUTIES AND RESPONSIBILITIES:
• Assure the complete and correct execution of the approved Project Quality Plan
• Making as-built for Saudi Aramco projects
• Making Hydrostatic test package for the Saudi Aramco projects
• Inspect the cold cutting and preparing related document
• Inspect the Hot tapping and preparing related document
BAIZID NEWS PRINT & BOARD MILLS LTD.
60/61 Baizid Bostami Road, Nasirabad I/A
Chittagong-4209, Bangladesh.
November 2006 to May 2007
Position : Maintenance Engineer.
Responsibility:
• Maintenance of paper processing machines, including motor pump, compressor, generator, Boiler etc. Preparation and submittal of reports and quality documents to QC Supervisor and QA/QC Manager.
• Perform in-process and final inspection of erect process machines such as Plastic separator machine, Turbo separator, Pulper, and Moulder ; verify machine performance status ; recording of machines performance status.
• Coordinate with machine supplier representative on daily basis to resolve any quality problems or issues.
• Assist and perform other function as maybe directed by immediate Supervisor.
MAX AUTOBILE PRODUCTS LTD.
BASIC Industrial Estate, Chowmuhany,
Noakhali, Bangladesh.
June 2005 to October 2006
Position : Assistant Engineer.
Summary of Responsibilities:
• Schedule, supervise and control the execution of work and updates the work progress to ensure the quality of work performed will comply with the standards imposed by the Company.
• Supervise and Quality Control of Design & Drawing of all steel structure, metal economy design, Die design and making.
• Coordinate project activities with the responsible engineers in the function support teams of contract management, quality control, time control and cost control.
• Attend regular project meetings and weekly meetings with owner/client.
• Conduct quality inspection based on the approve drawings and required standards and recommend appropriate corrective and preventive action plane
|
3. Education & Training - CV/Resume Part 3 [Mandatory] |
EDUCATION : BACHELOR OF SCIENCE IN
MECHANICAL ENGINEERING.
DHAKA UNIVERSITY OF ENGINEERING & TECHNOLOGY GAZIPUR, BANGLADESH.
3.18 IN A SCALE OF 4.00
|
4. Computer Skills - CV/Resume Part 4 [Mandatory] |
COMPUTER LITERACY:
Office Files : MS Words, MS Excel, MS Power Point.
Design Software : AutoCAD (2D, 3D)
Programming Language : C, C++
Operating System : Windows 98, 2000, XP, Vista premium.
|
5. Other Skills - CV/Resume Part 5 [Optional] |
LANGUAGE SKILL:
Good Writing, Reading, & Speaking in English. Bangla
Speaking in Hindi, Speaking in Arabic (Formal),
PROJECT INVOLBMENT:
1. TANAJIB PLANT SWEET GAS FUEL LINE PROJECT.
Tanajib, Al-Khafji,
Dammam, K.S.A.
2. TIE-IN IN SAFANIYAH ONSHOR WATER INJECTION PROJECT.
Safaniyah, Al-Khafji,
Dammam, K.S.A.
3. FADHILI WELL OIL WELL FIELD & WATER INJECTION PROJECT.
Khursaniyah,
Dammam, K.S.A.
4. MAINTAIN POTENTIAL PROJECTS
Hawiyah, Haradh, QMP Oil Well head Projects
Hofuf, K.S.A.
5. JUAYMAH FABRICATION SHOP
Juaymah, Rastanura, K.S.A.
6. SJG-JGP PIPELINE PROJECT
Satgum plant to juaymah plant pipeline project
K.S.A.
7. KHURAIS UPSTREAM FACILITIES PROJECT
Khurais, K.S.A.
|
6. Additional Information - CV/Resume Part 6 [Optional] |
TRAINING / SEMINARS ATTENDED:
1. BGAS / CSWIP
Coating and Painting Inspector Course.
Manama, Bhahrain
June 2-8, 2007
2. SAFETY ORIENTATION SEMINAR
Emergency Procedure, Personal Protective Equipment (P.P.E) and Fire Extinguishers.
Ain Nahkel, Abqaiq, FMQ Site office, K.S.A. July 17, 2007.
3. BASIC ISO 9000 COURSE
Ain Nahkel, Abqaiq, FMQ Site office, K.S.A.
K.S.A July 17, 2007.
4. LEADERSHIP COURSE
Value of work, Inspirational quotes, Winner attitude, Paradigm shift/ proactivity, And Institutional Key Attitude.
Ain Nahkel, Abqaiq, FMQ Site office, K.S.A.
K.S.A. July 17, 2007.
5. RIGGER CERTIFICATION COURSE.
Jaymah, Ras Tanurah.
K.S.A.
|
|
|
|
|
|
QA/QC Painting & Coating Inspector, Saudi Aramco Client
CV/Resume ID no.: 90862 |
|
|
|
|
|
Relevant CVs; view more oil and gas CVs |
1. Piping Superintendent/supervisor/engineer |
2. Qa/Qc, NDT, Welding Inspection, Integrity |
3. CSWIP-AUT Phased Array/SENIOR WELDING/ASNT NDT LEVEL III/LEAD QA/QC INSPECTOR |
4. QA/QC, WELDING INSPECTOR |
5. Project Engineer |
6. Offshore, Pipeline, Topside, Coating |
7. PDMS Design Engineer |
8. QA/QC, welding inspector, NDE engineer, NDE, pipeline |
9. QC Inspector (Welding) |
10. Electrical Engineer |
11. SENIOR WELDING INSPECTOR |
12. Lead - Inspection & QC / QA Metallurgy Engineer |
13. Pipe, Piping, Lead Piping, Coating, Insulation |
14. QA QC |
15. Electrical and instrumentation, Project Engineering, maintenance |
16. CAD Experience - oil & gas industry |
17. AutoCAD, Microstation, PDMS |
18. Civil Engineer - Projects |
19. Instrument Supervisor |
20. Chemical Engineer with 5 languages knowledge |
|
|
Other CVs; view more oil and gas CVs |
1. CV HSE |
2. business analyst, senior cost controller; interest to evaluate opportunities in challenging projects |
3. FEA/7-years experience/ ANSYS-Nastran-ABAQUS-Patran |
4. Production Supervisor / Production Foreman, Sr. Production Operator, responsible wellhead monitoring |
5. CFD (Computational Fluid Dynamics) Technical Specialist |
6. PDS Piping Draftsman |
7. Control Room Operator, power station operator (O & M ) |
8. Maintenance Supervisor |
9. Environment Manager, Director Advisory Group |
10. HSE Manager / Trainer / Engineer / Supervisor |
11. Experience in marine operations, port operatios |
12. BTech chemical engineer |
13. Chief Officer holder ( Master Unlimited Certificate) |
14. Sheet Metal Worker, Plater, Fabricator, HVAC Installer |
15. Restaurant Assistant Manager |
16. QC COATING / PAINTING INSPECTOR |
17. 30 years offshore building and fabrication of drilling rigs |
18. Trainee safety engineer |
19. Customer Service Rep, Supply Technician |
20. Chemical Operator / Firefighter |
21. TRAINEE INSPECTOR NDT LEVEL II |
22. Process Simulation Engineer MAT, FAT, SAT projects, software PRO-II, DYNSIM, HYSYS & DSPICE |
23. Oil & Gas Auditor, Half Year, Quarters & Final Audit, Shell, RWE Dea, BNP, Britis gas, GlobalSantaFe |
24. Basic experience in mechanical side, seeking a new challenging job |
25. Portfolio Manager / Lead Project Manager - IBM Global Technology Services, US, EMEA, AP, LA |
26. Graduate B.Sc. of Geophysics, Geology Department Faculty of Science, Zagazig University Egypt |
27. Instrument and Electrical Technician 12 years experience, JGC Philippines TSTC Corporation |
28. Instrument & Control Technician working for Karachi Electric Supply Corporation (K.E.S.C) Pakistan |
29. Professional oil and gas manager upstream and downstream industry companies in Malaysia, Singapore |
30. TRAINEE PIPING DESIGN ENGINEER OF OIL AND GAS PROCESS PLANTS |
|
|
|
|
|