|
|
CV Project Controls Manager EPC Cost Schedule Control, Project Management and Materials Management
|
|
|
|
|
|
|
| |
| |
| Project Controls Manager EPC Cost Schedule Control, Project Management and Materials Management |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in Project Controls Manager EPC Cost Schedule Control, Project Management and Materials Management - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
91967
Last Updated:
Monday, March 30, 2009 |
Location (Residence): Saucier,, United States
Citizenship: United States
|
| |
Languages:
Native:
English United States Other:
None |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
Vocational in Mechanical Drafting Years of Experience:
20 years
|
Authorized to work in:
United Arab Emirates
Present Location:
U.S.A., Houston, Tx.
Relocation:
Anywhere (International) |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Administration |
Project Control |
Experienced
|
24 years |
|
Management |
Knowledge |
Experienced
|
15 years |
|
Management |
Support Services |
Experienced
|
9 years |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
Career Summary/Objective
To continue to utilize my skills and abilities successfully in the Project Controls/Management, Cost Schedule Control, Project Management and Materials Management entities on major EPC projects in the Oil and Gas, Marine Construction and Petrochemical Sectors Internationally.
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
Work Experience
Thirty plus years of Hands-On Technical and Managerial experience in EPC Projects both in a Construction and Manufacturing environment with regard to Project Management, Project Controls, Planning/Scheduling, Cost Schedule Control, Purchasing/Inventory Control, Cost Accounting, Estimating, Commissioning and Customer Liaison.
June 2004 – Present
Project Controls Manager – The Oil Field Connection, Inc. Houston, Tx.
Develop, Monitor and Maintain Master Schedules on all Projects from Specifications, Engineering Drawings and Contractual Documents. Schedules include Engineering Drawing Releases, Procurement of all Materials including Long Lead Items, Construction, Milestones, Cash Flow and Resource Histograms. Develop Bills of Materials, Purchase Materials and Maintain Inventory Control. Develop Manpower Loading requirements and Staff Craft levels accordingly. Develop detailed Workorders for each craft with Budget Hour Allowances. Track Performance at Craft level. Track Actual Cost versus Estimated Cost for both Materials and Labor. Chair Weekly Management Meetings for Schedule and Budget Adherence. Maintain Variance Reporting System. Projects include Construction of Landbased Oil and Gas Drilling Rigs and various other Oil and Gas related Construction Projects both Domestically and Internationally.
March 2001-June 2004
Project Controls Manager – Wilson’s Welding Inc. Perkinston, Ms.
Responsible for Project Management, Planning and Scheduling, Cost Schedule Control, Purchasing and Materials Management and Sub-Contracting. Develop and Maintain Master Schedules on all Projects from Specifications, Engineering Drawings and Contractual Documents, Develop Bills of Materials, Purchase Materials and Maintain Inventory Control System, Develop Detailed Workorders for each Craft with Budget Hours. Measure Productivity at Craft and Project Levels. Chair Weekly Management Meetings for Schedule and Budget Adherence. Issue Purchase Orders for Sub-Contractors and Monitor Sub-Contractor Performance. Projects included Offshore Drilling Rig Component Systems, Other Oil and Gas Related Projects, Refinery and Chemical Plant Shutdowns and Expansions and Pipeline Fabrication and Construction and Various other Oil and Gas and Petrochemical Projects..
July 1989-May 2004
Corporate Project Controls Manager Trinity Marine Group, Halter Marine, Friede Goldman Pascagoula, Ms.
Initially started out at Moss Point Marine as Project Controls Manager. Introduced Computer Scheduling i.e. Primavera P3. Developed Master Schedules for 35 Landing Craft Utility Vessels along with various other Projects including Tugboats, Barges, Ferrys, Logistic Support Vessels, etc.. Defined Departmental Crafts and Operations for Shipyard. Distributed Estimate Budget Manhours to Crafts and Operations through detailed Work Order System. Updated Master Schedules on a weekly basis. Measured Performance at Job and Craft levels on a weekly basis by statusing work accomplished on each workorder through releasing percent complete Budget Hours measured against Actual Hours accumulated through timekeeping system.
Promoted to Corporate Project Controls Manager for Seven Shipyards located in Texas, Louisiana and Mississippi. Successfully Introduced and implemented same systems used at Moss Point Marine to all Seven Shipyards.
Halter Marine bought up five of the seven Shipyards. I remained in the same capacity with Halter Marine. Additional Projects included New Construction of Semi-Submersible Drilling Rigs along with the continued building of a numerous array of Marine vessels.
Friede Goldman bought up Halter Marine. I remained in the same capacity with Friede Goldman. Additional Projects included New Construction, Retrofits and Upgrades of Semi-Submersible, Jack-up and other Offshore Drilling Rigs.
April 1971-June 1989
Materials/Planning and Scheduling Manager Paceco (Fruehauf) Gulfport, Ms.
Responsible for Purchasing, Warehousing, Planning/Scheduling and Cost Schedule Control. Purchase Material from Engineering generated Bill of Materials and Maintain Inventory Control Program. Develop and Maintain Master Schedules for all Projects. Develop Detailed Workorders for Each Craft including Operations required and Budget Hours Allotted, Status Workorders on a Weekly basis to Determine Performance (Budget vs. Actual), Develop Manpower Requirements. Maintain Variance Reporting System. Chair Weekly Production Meeting to Review Projects Status and Action Items Required.
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
Education and Training
Graduate Harrison Central High School 1969
Associate’s Degree Mechanical Drafting Mississippi Gulfcoast Community College 1971
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
Skills
Skilled in the use of Primavera Project Planner, Open Plan, Microsoft Project, Excel and Word.
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
General Management
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
Overseas Experience
Brazil, Venezuela, Columbia, Mexico, Germany, Netherlands, U.A.E..
|
| |
|
|
|
|
|
Project Controls Manager EPC Cost Schedule Control, Project Management and Materials Management
CV/Resume ID no.: 91967 |
|
|
|
|
|
|
| Relevant CVs; view more oil and gas CVs |
| 1. Sr. Planning/Scheduling Engineer |
| 2. Planner / Project Controller Belleli Energy Oman Tecnimont Chile Turner Townsend India |
| 3. PROCUREMENT, BUYER, SALES MANAGER |
| 4. Administrative Manager |
| 5. Experienced (30 years) technical manager with piping/plumbing/HVAC/mechanical |
| 6. business analyst, senior cost controller; interest to evaluate opportunities in challenging projects |
| 7. Contract Administrator/ Management, Logistics Superintendent, Administrator |
| 8. Operations & Maintenance in offshore / oilfield / maritime |
| 9. HYDRO POWER SPECIALIST, 29+ EXPERIENCE, CIVIL CONSTRUCTION. |
| 10. Material Manager with 30+ years of experience |
| 11. Project planning/scheduling, coordination, administration |
| 12. Electrical Engineer / supervisor/ qc inspector/offshore technician |
| 13. Cost Controller, Material Controller and warehouse supervisor |
| 14. Senior Planning/Project Control/Contracts Engineer |
| 15. HSE Fire Protection, Firefighting, Emergency Response, Fire Safety Trainer |
| 16. Document Controller/Technical /Secretarial/Administration |
| 17. Project Planner & Scheduler / Project Control and Cost Control |
| 18. Document Management and Control |
| 19. Structural Engineer, Project Management, Project Engineering, Construction Manager |
| 20. International Human Resources Generalist |
| |
| |
| Other CVs; view more oil and gas CVs |
| 1. Ship Management |
| 2. QA QC Engineer in fabrication & construction of piping & steel structural |
| 3. Operator experience (14 years +) in Oil & Gas production |
| 4. Electronics, Electrician |
| 5. Pipefitter, on and offshore. |
| 6. Medic, Doctor india and afghanistan |
| 7. Crew Marine |
| 8. INSTRUMENT TECHNICIAN |
| 9. Environmental Senior Engineer, HSE Engineer |
| 10. Rig Mechanic |
| 11. Seasoned Chef, InterContinental Hotel, Chicago, IL |
| 12. Finance & Administration Officer, Accountant, Ventures Middle East LLC |
| 13. DR Operator / DCS Control Room |
| 14. Account Officer - Mis, Taxation, Audit, Accounts, Sales and Marketing |
| 15. Office Assistant, NSB School of Business, New Delhi India |
| 16. Marine Surveyor Indian Register of Shipping National Ship Classification Society |
| 17. Instrumentation engineer powerplant, Covanta Madurai Operating Pvt. Ltd. Madurai India |
| 18. Electrican / Welder KBR (Kellogg, Brown & Root), Zachry Construction US |
| 19. Fork lift driver experience in various roles using all kinds of lifting techniques safely |
| 20. Casualty Nurse / Emergency Nurse, Saad Hospital, K.S.A Kingdom of Saudi Arabia |
| 21. Project Manager/Cad Detailer Specialty Systems, Inc., Steel Detailer/Coordinator Marshall Erdman |
| 22. Chief Rig Mechanic Schlumberger Dalma Energy on deep drilling land rigs having 23 years experience |
| 23. ERO / ETO for DP-II Vessel, Shipping Corporation of India, ELO EMAS Offshore Singapore |
| 24. Trainee graduate from Bangladesh wants to immigrate in Pakistan |
| 25. Sr Design Engineer National Drilling Company UAE Abu Dhabi Drake & Skull International, Philippines |
| 26. Procurement Engineer Rotary Logistics Singapore, ETA Star International Doha Qatar, AlMassood Group |
| 27. Process Engineer Edison SPA, ENI E&P S.p.A. Italy, Chemical Engineering Degree Rome State University |
| 28. Rigger, pipe laying, cable laying, oil and gas subsea construction on the Subsea Viking ROV subsea |
| 29. HSE Officer NEBOSH-Certified Oil and Gas Field Saita Pakistan ENI Pakistan on BHP Billiton Site |
| 30. Derrickman with Burgan Well Drilling Company Kuwait, Gerat Wall Drilling Co Pakistan |
| |
| |
|
|
|