|
|
CV Welding Inspector, HYUNDAI Engineering & Construction JO FOSTER WHEELER
|
|
|
|
|
|
|
| |
| |
| Welding Inspector, HYUNDAI Engineering & Construction JO FOSTER WHEELER |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in Welding Inspector, HYUNDAI Engineering & Construction JO FOSTER WHEELER - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
92269
Last Updated:
Monday, April 6, 2009 |
Location (Residence): sidoarjo, Indonesia
Citizenship: Indonesia
|
| |
Languages:
Native:
Malay Malaysia Other:
Thai |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
Bachelors in mechanical engineering Years of Experience:
10 years
|
Authorized to work in:
Algeria, Bahrain, Brunei Darussalam, Indonesia, Kazakhstan, Kuwait, Libyan Arab Jama., Malaysia, Morocco, Oman, Qatar, Saudi Arabia, Singapore, Thailand, United Arab Emirates, Uzbekistan, Vietnam
Present Location:
Indonesia, Sidoarjo
Relocation:
Anywhere (International) |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Quality (QA/QC) |
Quality Control |
Trainee
|
7 years |
|
Inspection/Expediting |
Welding Inspection |
Trainee
|
14 years |
|
Engineering |
Metallurgy |
Trainee
|
5 years |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
Having 5 years in Engineering Design and Manufacturing Process for Aircraft and also familiar with certification of Aircraft for Metallic Material and Testing, and 7 years in Spiral Pipe Manufacturing for Piling m pipeline and water pipe, also fabricate of bridge, tower, tube cylinder, etc. Project Leader of PGN Project for pipeline manufacture at PT. SPINDO, and one year in Hyundai Engineering and Construction as Welding Inspector, Scope of work as Project Leader likes Review Manufacturing Procedure Specification (MPS) from customer and socialization MPS to many department to get same perception, Make MPS for manufacture spiral pipe, Review ITP, inspection line check of piping system, prepare test package for pre qualification test, facilities acceptance line check inspection. Inspection for mechanical equipment and static equipment fabrication. Other scope as supervision develops and reviewed procedure for quality management system (QMS), Fabrication Procedure, NDE procedure, painting-coating procedure, materials inspection and review mill certificate, WPS/PQR. Familiar with QA/QC document system and traceability record, ability with computer literate, familiar with standard related with oil & gas and Petrochemical regulation. Familiar with government MIGAS and DEPNAKER regulations as certification authorizes (CA).
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
FAMILIARITY:
• Worked with B 31.1 & B 31.3 Piping (Boiler, Furnaces, Steam Drum)
• Knowledge of GTAW, SMAW welding process for CS, CS NACE, SS as per WPS.
• Familiar with P&ID and Test pack designing
• Familiar with ASME codes and standards.
• Familiar with Stress Relieving Test.
• Familiar with site modifications, Designings
PRESENT EXPERIENCE
February 08 – March 09 : HYUNDAI Engineering & Construction JO FOSTER WHEELER, “KHURAIS GAS CONTRACT (KGC) for SAUDI ARAMCO Project as Welding Inspector
Responsibilities :
To monitor effective welding quality performance and fabrication shops by evaluating and challenging inspection findings on basis of own inspections and know-how.
To be active in implementation of the quality management system.
Review all welding procedures (WPS) and procedure qualification records (PQR’s) for acceptance.
Review all welders qualifications for compliance with project requirements.
Review all welding materials control, material segregation, and NDT procedures for compliance with project requirements.
Inspection of piping beginning from receiving material until inspection on pipe rack.
Verify compliance with quality control procedures and systems for welding, and materials traceability control, including compliance with safety requirements.
Witness welders qualification tests (WQT), WPS and PQR testing, production test plates testing.
Verify welding consumables control, welding control records, certificates, and such.
Conduct trend analysis on welder repair rates, collect welding statistical information for quality and progress management, and advise on measures for improvements. This on basis of the welding database information.
Maintain records of all welding related documentation such as WPS-PQR, welding tables, welders info, repair rates, etc.
Verify relevant ITP and quality procedures are in place before start of work.
Prepare a weekly report on QC highlights for inclusion in the weekly QM-QA-QC report.
Verify punch list before hydro test and check all aspect according to drawing requirement.
Compliance with site safety requirements.
July 06 – Oct 07 : PT. ALIM AMPUHJAYA STEEL
(Steel Fabriacator)
Alim Steel is steel fabricator (Bridge, Tower, Pipeline, Piling Pipe, Building and tube cylinder 3 kg, 12 kg & 50 kg) at Surabaya, Indonesia
Responsibilities :
- Coordinate the production line to get good production for LPG cylinder 3 kg, and to ensure that ISO 9001 : 2000 shall be carry out at the company
- Management Representative for ISO 9001:2000, prepared the procedure, work instruction and form for supporting ISO 9001:2000
- Coordinate with the other department to get good production and zero break down to reduce down time machine
- Coordinate all production employee to get good environment on plant
- Review and check specifications & procedure
- Review Inspection and Testing Plant (ITP)
- Review WPS according with standard are used
July 05 – June 06 : PT. STEEL PIPE INDUSTRY OF INDONESIA
(Spiral Pipe and ERW Pipe)
Project : South Sumatra West Java (SSWJ II) Pagardewa - Labuhan Maringgai
Client : PT. PERUSAHAAN GAS NEGARA
Position : Project Leader
Responsibilities :
Coordinate all Department to make better performance for all material, consumable and equipment.
Monitoring all process to get the product fulfill the requirement and specification.
Evaluation the result of production conform to schedule or not.
To monitor effective welding quality performance and fabrication shops by evaluating and challenging inspection findings on basis of own inspections and know-how.
To be active in implementation of the quality management system.
Review all welding procedures (WPS) and procedure qualification records (PQR’s) for acceptance.
Review all welders qualifications for compliance with project requirements.
Review all welding materials control, material segregation, and NDT procedures for compliance with project requirements.
Verify compliance with quality control procedures and systems for welding, NDT, and materials traceability control, including compliance with safety requirements.
Witness welders qualification tests (WQT), WPS and PQR testing, production test plates testing.
Verify welding consumables control, welding control records, certificates, and such.
Conduct trend analysis on welder repair rates, collect welding statistical information for quality and progress management, and advise on measures for improvements. This on basis of the welding database information.
Maintain records of all welding related documentation such as WPS-PQR, welding tables, welders info, repair rates, etc.
Review quality systems documentation, such as ITP’s and quality control procedures.
Verify relevant ITP and quality procedures are in place before start of work.
Be pro-active in ensuring effective use of ITP’s and related documents in all quality monitoring activities.
Be pro-active in ensuring effective implementation of non-conformance and deviation control systems.
Prepare a weekly report on QC highlights for inclusion in the weekly QM-QA-QC report.
Compliance with site safety requirements.
March 2004 to Feb. 2005 : PT. STEEL PIPE INDUSTRY OF INDONESIA
(Spiral Pipe and ERW Pipe)
Project : Ujung Pangkah Development Project, Gresik-Indonesia
Client : PT. INTI KARYA PERSADA TEHNIK & PT. PERTAMINA
Position : Project Leader
Responsibilities :
To monitor effective welding quality performance and fabrication shops by evaluating and challenging inspection findings on basis of own inspections and know-how.
To be active in implementation of the quality management system.
Review all welding procedures (WPS) and procedure qualification records (PQR’s) for acceptance.
Review all welders qualifications for compliance with project requirements.
Review all welding materials control, material segregation, and NDT procedures for compliance with project requirements.
Verify compliance with quality control procedures and systems for welding, NDT, and materials traceability control, including compliance with safety requirements.
Witness welders qualification tests (WQT), WPS and PQR testing, production test plates testing.
Verify welding consumables control, welding control records, certificates, and such.
Conduct trend analysis on welder repair rates, collect welding statistical information for quality and progress management, and advise on measures for improvements. This on basis of the welding database information.
Maintain records of all welding related documentation such as WPS-PQR, welding tables, welders info, repair rates, etc.
Review quality systems documentation, such as ITP’s and quality control procedures.
Verify relevant ITP and quality procedures are in place before start of work.
Be pro-active in ensuring effective use of ITP’s and related documents in all quality monitoring activities.
Be pro-active in ensuring effective implementation of non-conformance and deviation control systems.
Prepare a daily, weekly report on QC highlights for inclusion in the weekly QM-QA-QC report.
Compliance with site safety requirements.
Dec. 1999 to Jan. 2001 : PT. STEEL PIPE INDUSTRY OF INDONESIA
(Spiral Pipe and ERW Pipe)
Project : SPINDO Project
Client : All Customer
Position : QC Supervisor
Responsibilities :
Review and selection QC procedure
Prepare QC procedure, Inspection test plan, standard or code, etc
Prepare and review inspection test plan from related engineering discipline.
Monitoring, controlling and responsible for general quality control activity and system at all vendor work. Coordination and clarification with related internal disciplines (Engineering, procurement, project control, etc) and vendor on quality control matter such as: inspection progress and status, notification of inspection schedule, pre-inspection meeting.
Review fabrication procedure, WPS/PQR, inspection test plan, material certificate and inspection record.
Review and selection for Inspection Agency
Coordination and clarification with engineering discipline on inspection matter.
Perform Quality Control activity by mean check of testing, Inspection and Documentation in accordance with Construction specification and drawing.
Perform inspection bulk material.
Review mill certificates of material.
Review calibration equipment certificates.
Prepare document and Compiling Quality Control Report for turn over document to Client.
Nov. 1994 to Nov. 1999 : PT. DIRGANTARA INDONESIA
(Aircraft Manufacture)
Project : CN 235, N 250, N 2130
Position : Head of Section Metallic Material & Manufacturing Process
(Engineering Design)
Responsibilities :
Coordinator of all material and manufacturing process which will be used on Aircraft CN 235, N 250 & N 2130, Certification for N 250 specialist for Metallic Material & Manufacturing Process
Selection of metallic material for aircraft and non aircraft material
Selection of Manufacturing process for metallic material for aircraft and non aircraft
Mechanical test of raw material (tensile test, bending test, fatigue life, crack growth rate, fracture toughness, etc)
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
Training/Course
16 -28 March 2009 PT. Multi Spec Sinergindo, “ASNT Ultrasonic TestLevel II“, Surabaya
29 Oct – 02 Nov 2007 The Welding Institute, “Welding Inspection”, CSWIP3.1, Jakarta
25 March 2006 PT. Steel Pipe Industry of Indonesia, “Project Management”,
PPM Institute of Management, Pasuruan
15 Oct – 21 Oct 2003 PT. Steel Pipe Industry of Indonesia, “Shop Floor Leadership”, Pasuruan
8 – 9 April 2003 PT. Steel Pipe Industry of Indonesia, “ISO 9001 - 2000”, Surabaya
29 Oct – 29 Nov 2002 Petra University “Production Planning & Inventory Control”, Surabaya
29 May 2002 IMPAC “Communication Strategies”, Surabaya
21 Oct 2001 PT. Steel Pipe Industry of Indonesia, “Submerged Arc Welding Training”, Pasuruan
8 – 9 May 2001 Sekolah Tinggi Teknik Surabaya “Penerapan Sistem Informasi Dalam Perencanaan dan Pengendalian Produksi”, Surabaya
18 Oct – 5 Nov 1999 PT. Dirgantara Indonesia “Magnetic Particle ”, ASNT-TC-1A, Bandung
August 16 – 09 Sept 1999 PT. Dirgantara Indonesia “Penetrant Test”, ASNT-TC-1A, Bandung
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
Microsoft office, Windows, AUTOCAD
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
Easy going, Good communication skills, Site modification Capabilities, Engineering Stuffs
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
-
|
| |
|
|
|
|
|
Welding Inspector, HYUNDAI Engineering & Construction JO FOSTER WHEELER
CV/Resume ID no.: 92269 |
|
|
|
|
|
|
| Relevant CVs; view more oil and gas CVs |
| 1. Piping Superintendent/supervisor/engineer |
| 2. Qa/Qc, NDT, Welding Inspection, Integrity |
| 3. CSWIP-AUT Phased Array/SENIOR WELDING/ASNT NDT LEVEL III/LEAD QA/QC INSPECTOR |
| 4. QA/QC, WELDING INSPECTOR |
| 5. Offshore, Pipeline, Topside, Coating |
| 6. QA/QC, welding inspector, NDE engineer, NDE, pipeline |
| 7. QC Inspector (Welding) |
| 8. Electrical Engineer |
| 9. SENIOR WELDING INSPECTOR |
| 10. Lead - Inspection & QC / QA Metallurgy Engineer |
| 11. Pipe, Piping, Lead Piping, Coating, Insulation |
| 12. QA QC |
| 13. Electrical and instrumentation, Project Engineering, maintenance |
| 14. Civil Engineer - Projects |
| 15. Instrument Supervisor |
| 16. Laboratory Technician / Chemist |
| 17. QA/QC Engineer |
| 18. SPECIALIST INSPECTION & Q.C. |
| 19. Manager / Sr. Engineering - Projects [electrical] |
| 20. Pipeline, Piping, Vessels,Tanks & structural field, have over 9 year experiance |
| |
| |
| Other CVs; view more oil and gas CVs |
| 1. Graduate civil engineer |
| 2. DPO/2Off. DOF Management AS, Multipurpose,ROV/Survey vessels |
| 3. Graduate Electronics Engineer |
| 4. Navy deck cadet |
| 5. HSE Advisor, Engineer In Charge, HSE Officer, |
| 6. Health and Safety Engineer |
| 7. Derrick Man for the past fifteen (15) years |
| 8. Second Mate / Assistant Chief Mate - BW GAS Shipping, Norway/Singapore |
| 9. Pipe Coating Inspection, Traceability, Supervising and Instructing Inspectors |
| 10. Marine engineer, marine officer, seaman crew + offshore engineer |
| 11. Experienced GIS Analyst, GIS Department Manager |
| 12. AB seaman Roustabout/Floorman/Derrickhand/Assistant Driller with 8 years exp |
| 13. Mechanical engineer with piping construction experience |
| 14. SAP ABAP Senior Consultant |
| 15. Cad Engineer / Designer |
| 16. Gas Turbine Engineer, GE Gas Turbines, GE Technical Advisor |
| 17. Commercial Diver with offshore and drilling experience, International Rescue Diver – PADI |
| 18. Electrical Design Engineer, Tribon, PDMS with AVEVA certification |
| 19. Experienced electro-mechanical technician with 30 years experience |
| 20. INSTRUMENT TECHNICIAN, GS ENGINEERING AND CONSTRUCTION CO, SOUTH KOREA |
| 21. Administrative Assistant of Executive Director |
| 22. Rigger, Radio Operator, Roustabout Offshore Sector Eastern Canada and the Gulf of Mexico |
| 23. Radio operator, radio officer, ETO, IT/Communication on on passenger and research vessels |
| 24. NDT Inspector, Ultrasonic Testing, Radiographic Testing, Magnetic Particle Testing Samco Inspection |
| 25. Mig welder 7 years in auto industry, completed my welding training at Tata Motors India |
| 26. Petrochemical graduate engineer with work experience in multiorganics, Abhideep Chemical Ltd India |
| 27. Trainee instrument technician searching for overseas jobs |
| 28. Skipper / Master on fishing vessels, Data Collection for Marine Institute onboard fishing vessels |
| 29. MBA in shipping and port logistic management from Seacom Engineering College West Bengal University |
| 30. Maritime Second Officer - 6 years on Car and Truck Carriers and 3 years on Passenger Vessels |
| |
| |
|
|
|