CV QC Material Inspector, MISC Integrated Logistic Sdn Bhd
|
|
|
|
|
|
|
| |
| |
| QC Material Inspector, MISC Integrated Logistic Sdn Bhd |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in QC Material Inspector, MISC Integrated Logistic Sdn Bhd - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
93165
Last Updated:
Monday, April 27, 2009 |
Location (Residence): SEREMBAN, Malaysia
Citizenship: Malaysia
|
| |
Languages:
Native:
Malay Malaysia Other:
English United States |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
No Degree Years of Experience:
11 years
|
Authorized to work in:
Malaysia
Present Location:
MALAYSIA, SEREMBAN
Relocation:
Malaysia |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Quality (QA/QC) |
Quality Control |
Experienced
|
15 years |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
-
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
1. July 2008 Present (Contract)
QC Material Inspector, MISC Integrated Logistic Sdn Bhd.
Work Description:
1. To inspect all materials incoming and prepare inspection report.
2. To ensure NDT requirement has been comply with the procedure and requirement..
2. To verify materials as per mill certificate and specification.
3. To ensure quality and ITP has been follow accordingly.
4. Liaise with NDT and client representative in matter related to inspection and product
acceptance.
5. Compiling report for material record and documentation.
6. To do in house PMI to confirm materials content under specification.
Project Involved:
1. PSR-2 REVAMP Project. Petronas Penapisan Melaka.
2. February 2008 July 2008 (Contract)
QC Inspector , Syarikat Steelcon Sdn Bhd.
Work Description:
1. To inspect all fabricated pipe and prepare daily report.
2. To ensure NDT requirement has been comply with the procedure.
2. Material verification as per mill certificate and specification.
3. To ensure quality and ITP has been follow accordingly.
4. Liaise with NDT and client representative in matter related to inspection and product
acceptance.
5. Compiling report for material release for erection.
6. To ensure all work has been done according to WPS , PTS and ASME B31.3
7. Supervise and monitor production work to ensure quality in every aspect of work.
8. Punchlist clearance for final documentation.
9. To do final inspection for hydrotest and compiling test packages.
10.Line checking.
Project Involved:
1. Air Separation Unit for PML Mega Methanol Project Labuan, Wilayah Persekutuan Labuan.
3. May 2007 - January 2008 (Contract )
QC Inspector (Mechanical), Muhibbah Petrochemical Engineering Sdn Bhd.
Work Description:
1. Inspection of received materials that has been purchase.
2. Supervise and monitor erection work according to drawing. Starting from handover of foundation,
annular and bottom plate laying, shell erection, assemble of structure , roof plate laying,
fabrication of heating coil and until hydro test.
3. Control and ensure that the production works are carried out in accordance to WPS ,JMS ,
PTS and API 650.
4 Developing and implementation of inspection and test procedures as per ITP.
5. Liaise with the client representative in matters relating to inspection and product acceptance.
6. Conduct WQT to ensure welders are qualified to perform intended work as required.
7. Conduct NDT as per requirement such as Vacuum Test, Pneumatic Test, Hydro test and MPI.
8. Monitor and ensure that the production using correct WPS .
9. Ensure that the quality plan has been follow accordingly.
10. Record and compiling quality records and prepares Manufacturer Data Reports as per
requirement.
Project Involved:
1. 11 Units Intermediate Storage Tank for Melaka Group 3 Lube Base Oil Project
For Petronas Penapisan Melaka.
4. October 2006 March 2007 (Contract )
QC Inspector, Nam Fatt Fabricator Sdn Bhd.
Work Description:
1. Inspection of received materials that has been sent from factory to ensure that is no shortage of
material during erection work.
2. Prepare WPS and conduct WQT before any work commence to ensure that the work are in
schedule.
3. Supervise and monitor erection work to ensure works are in schedule.
4. Implement quality control in every stage of work to ensure that the ITP, and JMS has been follow
and compiling of Manufacturer Data Reports.
5. Liaise with the Third Party Inspector, NDE companies, or client representative in matters relating
To joint inspection and product acceptance.
7. Ensuring that the correct WPS are being applied by Production Department and welders are
qualified to perform the intended work.
8. Inspection at all stages of fabrication such as packer plate leveling, anchor bolt alignment,
erection of structure, bolt tightening inspection, punch list and painting work.
Project Involved:
1. Tuanku Jaafar Power Station, Port Dickson Rehabilitation Project Phase 2,
750 MW Combined Cycle Power Plant. N.Sembilan.
5. July 2005 - September 2006 (Contract )
Assistant QC Inspector, Misi Setia Oil and Gas Sdn. Bhd.
Work Description:
1. Inspection of received materials to ensure there is no shortage of material during erection.
2. Survey and cable locating to prevent any accident or cable damage.
3. Inspect every stage of work such as trenching ,cable locating, laying pipe , tie in work,
concreting and hydro test.
4.Record and compiling quality records for final documentation.
4. Ensuring that the production works are carried out in accordance to WPS, ITP and procedures
acceptable to the codes. ASME and API 1104.
5. Liaise with the Third Party Inspector, NDE companies, and government Inspector or client
representative in matters relating to inspection ,product acceptance and arrangement permit of
work.
6. Developing and implementation of inspection and test procedures.
Project Involved:
1. EPCC of NGDS to Uniqema, Bukit Raja, Klang Selangor.
2. EPCC of NGDS to Sitiawan, Perak FL Stage 2/05.
3. EPCC of Ayer Tawar City Gate Station for Petronas Gas Berhad. Perak
4. EPCC of Spangar Bay Power Corporation (SPBC) Gas Metering Station, KKIP Kota
Kinabalu Sabah.
6. September 2004 - July 2005 (Permanent)
QC Inspector, PICN Engineering Sdn Bhd.
Work Description:
1. Inspection at all stages of fabrication of products for accuracy and standard of workmanship.
2. Inspection of purchased materials for pressure vessels.
3. Record and compiling quality records and Manufacturer Data Reports.
4. Ensuring that the production works are carried out in accordance to procedures acceptable to the
codes. ASME and API 1104.
5. Ensuring that the correct WPS are being applied by Production Department and welders are
qualified to perform the intended work.
6. Liaise with the Third Party Inspector, NDE companies, and government Inspector or client
representative in matters relating to inspection and product acceptance.
7. Developing and implementation of inspection and test procedures.
Project Involved:
1. Ranhill International (Melut Basin Oil Development Project (Upstream)
a. Closed Drain Vessel
2. SIME SEMBCORP ENGINEERING Sdn Bhd.
a. Nitrogen Receiver
b. Utility Air Receiver
c. Instrument Air Receiver
d. Closed Drain Vessel
e. Portable Water Pressure Vessel.
f. Sprinkler Vessel.
g. Hot Oil Expansion Vessel
h. Hot Oil Drain Down Tank.
3. PERRY Filtration Sdn Bhd
a. Hot Oil Surge Drum.
b. Feed Surge Drum.
c. Sump Drum.
d. Interstage Separator.
e. Stabilizer Reflux Drum.
f. Instrument Air Receiver.
7. Jul 1999 Nov 1999 (Contract)
Semi Skill, NF Energy Sdn Bhd
Work Description:
1. To joint and fit-up according to the fabrication drawing.
2. Handling severely tests for piping such as Hydrostatic Test.
3. Liaise with client or main contractor representative relating to product acceptance.
Project Involved:
1. Kerteh Vinyl Chloride Monomer Aboveground/Underground Piping. Paka Terengganu.
8. Jun 1998 Jun 1999 (Contract )
Pipe Fitter, Dealim Malaysia Sdn Bhd.
Work Description:
1. To manage small group in conduct work task such as punch list, preparation for testing.
2. Responsible for pipe fitting work as per fabrication drawing.
3. Liaise with client or main contractor representative relating to product acceptance.
Project Involved:
1. GPP 5&6 (Package III) . Paka Terengganu.
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
Additional Certification and Course Attended
Attend CSWIP 3.1 Welding Inspector Course (2007)
CSWIP 3.0 Visual Welding Inspector (2003)
ISO 9001 (2006)
NIOSH Petronas Safety Passport
In house training in Destructive Test and NonDestructive Test from UNIKL - Malaysia France Institute- Welding Technology Department.
o NonDestructive Test
Dye Penetrant Test
Magnetic Particle Test
o Destructive Test
Nick Break Test
Macro Examination
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
MICROSOFT OFFICE - 6 YEARS
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
-
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
-
|
| |
|
|
|
|
|
QC Material Inspector, MISC Integrated Logistic Sdn Bhd
CV/Resume ID no.: 93165 |
|
|
|
|
|
|
| Relevant CVs; view more oil and gas CVs |
| 1. Piping Superintendent/supervisor/engineer |
| 2. Qa/Qc, NDT, Welding Inspection, Integrity |
| 3. CSWIP-AUT Phased Array/SENIOR WELDING/ASNT NDT LEVEL III/LEAD QA/QC INSPECTOR |
| 4. QA/QC, WELDING INSPECTOR |
| 5. Offshore, Pipeline, Topside, Coating |
| 6. QA/QC, welding inspector, NDE engineer, NDE, pipeline |
| 7. QC Inspector (Welding) |
| 8. Electrical Engineer |
| 9. SENIOR WELDING INSPECTOR |
| 10. Lead - Inspection & QC / QA Metallurgy Engineer |
| 11. Pipe, Piping, Lead Piping, Coating, Insulation |
| 12. QA QC |
| 13. Electrical and instrumentation, Project Engineering, maintenance |
| 14. Civil Engineer - Projects |
| 15. Instrument Supervisor |
| 16. Laboratory Technician / Chemist |
| 17. QA/QC Engineer |
| 18. Manager / Sr. Engineering - Projects [electrical] |
| 19. QC Welding Inspector, 17 years, cswip 3.1 |
| 20. Pipeline, Piping, Vessels,Tanks & structural field, have over 9 year experiance |
| |
| |
| Other CVs; view more oil and gas CVs |
| 1. AB seaman, crane operator, tug experience B.O.S.I.E.T / H.U.E.T certificates OOW certificate, GMDSS |
| 2. Piping Engineer - With almos 4 years of experience in layout section. |
| 3. Marine manager, Offshore construction vessel supervisor |
| 4. O/S, Wiper/Oiler eager to advance career |
| 5. Welding, Piping and Quality Assurance |
| 6. Experienced in chemical operations |
| 7. Rig Medic, Health & Safety, Emergency Response |
| 8. Graduate well site geologist |
| 9. 9 years in marine jobs captain of tug, chief officer and pilot |
| 10. Young technician looking for a job in london |
| 11. Sr Materials Specialist Sirte Oil Company |
| 12. Crane Operator - drilling semis jack ups |
| 13. Electrical Technician, Rope Access Technician, compex certification |
| 14. Experienced paramedic with 7 years of Houston, TX training |
| 15. Safety Officer 5 years experience |
| 16. Warehouse Operator / Sakhalin-2 project in Sakhalin Energy |
| 17. Welder 30 years experience, TIG, MMA, MIG, FCAW, and automatic welding processes |
| 18. Spray painter for dragger safety uk, experienced welder |
| 19. Logistics, supply chain executive, shipping, freight forwarder, 3PL, Transmarine Logistics Limited |
| 20. Mechanical Enginee Graduate Raja College Of Engineering and Technology, Madurai India |
| 21. Civil PhD Geotechnical Engineer, Swayin Associates, Bhubaneswar, Orissa, India |
| 22. Inspection Engineer Welding QC Larsen & Toubro Ltd. India Welding Department for Offshore Projects |
| 23. Process operator offshore/onshore Ras Gas North Field Qatar with Proserv Middle East India Hindustan |
| 24. Trainee worker two years experience in R&D section related to corrosion property |
| 25. Senior HSSE Manager, HSSE Management Consultant British Gas Tunisia Agip KCO Kashagan |
| 26. Junior DPO / Chief officer for 11 years on oil tanker ships interested in a career in DP field |
| 27. Techno Commercial Engineer working for Emirates Techno Casting FZE Sharjah United Arab Emirates Gulf |
| 28. CNC Supervisor worked in Metallurgical Fabricators Philippines |
| 29. 25 years in the oil drilling industry Assistant Driller National Drilling Co UAE SEDCO FOREX Forasol |
| 30. Pre-Mechanical Commissioning Supervisor LNG Project Ras Laffan Industrial City Doha Qatar |
| |
| |
|
|
|