|
|
CV Electrical Commissioning Supervisor, CTJV Chiyoda Technip Joint Venture, Train 6,7 Ras Laffan, Qatar
|
|
|
|
|
|
|
| |
| |
| Electrical Commissioning Supervisor, CTJV Chiyoda Technip Joint Venture, Train 6,7 Ras Laffan, Qatar |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in Electrical Commissioning Supervisor, CTJV Chiyoda Technip Joint Venture, Train 6,7 Ras Laffan, Qatar - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
93338
Last Updated:
Wednesday, May 6, 2009 |
Location (Residence): Doha, Qatar
Citizenship: India
|
| |
Languages:
Native:
Arabic Saudi Arabia, English United Kingdom, Hindi Other:
None |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
Vocational in Electrical Years of Experience:
16 years
|
Authorized to work in:
European Union, Australia, Azerbaijan, China, Congo, Hong Kong, Indonesia, Italy, Jordan, Kazakhstan, Kenya, Qatar, Russian Federation, Saudi Arabia, South Africa, Sudan, United Arab Emirates
Present Location:
Qatar, Ras Laffan, Doha
Relocation:
Anywhere (International) |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Technician Level |
Electrical |
Experienced
|
20 years |
|
Technician Level |
DCS |
Experienced
|
11 years |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
15 + years cumulative experience in commissioning construction ,trouble shooting and maintenance of various mega projects such as Offshore Drilling plat forms, Liquefied Natural Gas ( LNG ) , Petrochemical Plants and Refineries. Technical back ground includes
Commissioning of jack-up drilling platforms (BP- TPG 500 Shah Deniz Gas export project)
Main responsibility includes pre commission and commissioning of 6.6 kV power station, Drilling units, Hydraulics system, ABB variable speed drive (VSD) switch board, distribution and process system. And BP- PCWU (process, compression, water injection & utility) integrated offshore duck. I was responsible for commissioning of gas & water injection facility, consisted main 10 Rolls Roys turbines driving 3 gas injection compressors, 3 water injection compressors and 4 power generators worked in offshore.Pressently I am working with Technip, France (Chiyoda Technip Joint Venture ) for their mega LNG Train 6&7 expansion project for Qatar Gas as Electrical Supervisor in Qatar.
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
SUMMARY OF WORK AND EXPERIENCE
Construction, commissioning, trouble shooting and maintenance work. With more than 16 years of experienced from various mega projects such as Offshore
Drilling plat form, Liquefied Natural Gas (LNG) Oil & Gas Refinery can work
efficiently and competent. A consider determination, harmony and safe working are some key factor for good achieve.
DETAILS OF EXPERIENCE
• Familiar with Switching HV Electrical Power up to 66 KV.
• Familiar with international industry codes and standards, BV, DNV, IEE, API. ISO, IEC, UL, ABS, etc
• Familiar with Diesel power generation, Switchboard Room HV – LV and Feeder distribution.
• Experimented with ABB Variable Speed Drive (VSD): LV - HV technology voltage.
• Experimented with electrical equipment and classification in hazardous areas.
• Familiar with administration of permits to work and electrical insulation equipments.
• Familiar with EXCEL, WORD, and MS Office standard computer applications.
• Parameter setting for VSD controller, motor controller/starter and operation. Preparing of electrical commissioning report.
• Responsible for the pre-commission and commissioning of all 33/66 KV transformers, Merlin Gerin and siemens switchgears, gas turbine, air compressors, emergency fire pumps, oil export pumps motors, emulsion pumps motors, motor control center, well head power supply, instrumentation equipment (Pressure Transmitter, Flow transmitter, MOV adjustment, Pressure switches and etc.)
• Commissioning of drilling units includes Mud pumps, cementing units, BOP, and Hydraulic system and familiar in all controls wirings of drilling units and PLCs
•Prepare and execute the request for modification, contract strategy, technical working procedures, scope of work, provide detailed construction and as-built drawing, material take off and develop cost estimates
•Plan, supervise and coordinate all maintenance activities for Plant Electrical equipment to ensure availability and reliability. Troubleshoot electrical problem
• Checked, inspect and assist plant start-up, identify defect, trouble shoot and repair defective circuit if their any. Provide technical support to electrical technician, established program for preventive and corrective maintenance.
• Monitor daily work accomplishment, collect, distribute work order and suspend after work completion.
•Simulation of motor starter feeder from DCS and Local Control Station. Operation of relay
• Perform solo run test on LV and MV motors.
• Manage 66KV GIS gas filling and testing, Mechanical and electrical operation of GIS, Hi-pot test with vendor’s engineer.
• Oil filling, IR and PI value test, CT and VT test, Ratio test, Vector group test and function test of power and distribution transformer.
•Mechanical torque test, Ductor test, IR test, Hi-pot (MV) of bus duct.
•Mechanical torque test , Ductor test, IR test , Hi-pot (MV) and Mechanical/ Electrical operation checks of MV and LV panel
•Manage CT and VT test, relay test and configuration and Auto transfer scheme test with testing engineer for panels.
•Attend management and safety walk through to comply their comments / concern.
•Supervision, guidance and overview of Subcontractor(s) to implement the requirements of the subcontract including the drawings and specifications. Inform the Subcontractor to prepare detail work procedure and review and approve this procedure including any coordination with the Discipline Manager/Leader.
•Confirm that work complies with Quality, Safety/Health and Environment requirements and work with the Subcontractor(s) to take corrective action in case of problems. Coordinate any problems and corrective actions with the Construction Manager, the Area Engineer, the Safety/Health/Environmental Group, the QA/QC Group and the Manager/Leader.
•Review the progress data and possible change re-quests from Subcontractors and submits them to the Control Group and/or the Subcontract Administrator.
•Prepare daily and weekly Construction Report, as applicable.
•Inform Manager/Leader about problem and/or items of concern regarding engineering information and/or material.
•Co-operate with and advice Subcontractor(s) to correct work plans in case of engineering drawing or material availability problems or change work required.
•Preparation of Quality Assurance Plan according to project requirement, QA/QC documents, Inspection of material and installation activity as per QAP, review of Test Reports, Material inspection report. Handling of NCR and CAR (corrective action request). Preparation of OSD (Overage, shortage and Damage) report.
•Co-ordinate with Sub-contractor to raise RFI. Witness and close inspection test record in order to close system and turn it over to client in time.
•Coordinate with sub contractor to clear DPL in time.
Review and approve system turn over package submitted by sub contractor and hand over the system package to client.
•Co-ordination with client and consultant
•Electrical Planned Preventive Maintenance program in line with production and ensure maintenance task undertaken to prevent equipment breakdown.
PROFESSIONAL EXPERIENCE
Company : CTJV (Chiyoda Technip Joint Venture)
Inclusive Date : Jan. 30, 2008 till date.
Project : Qatar Gas 3 & 4 Train 6, 7 Ras Laffan, State of Qatar
Client : Qatar Gas Conoco Philips Shell (QCS)
Discipline : Electrical Commissioning Supervisor.
Scope of Responsibility
•Plan, organize, supervise and inspect electrical projects.
• Installation of indoor equipments such as 66 KV SF6 Gas insulated switch gears, transformer units from 200KVA to 130 MVA, distribution panels, UPS, Battery and chargers.
•Supervision and inspection of MV & HV cable splicing and installation of cable termination kit
•Supervision and inspection of installation switch gear panels, control panels, push button stations, cable tray/ ladders, lighting fitting, power and control cable laying etc.
•Monitoring/ scheduling the work with the sub-con in order to achieve the early completion
•Review drawings and specifications and co ordinate with field engineering for the field design change and modifications as per the site condition.
•Provide work direction to technical staff and liaise with field engineer for all work related activities.
• Cathodic Protection system for onshore pipe lines and tanks.
•Aware of the Health Safety and Environment (HSE) aspects and Permit to work.
Company : British Petroleum (BP) Azerbaijan
Inclusive Date : Sept 2006 – oct. 2007
Project : PCWU (process, compression, water injection and utility) offshore plat form
Client : BP
Discipline : Sr. Electrical Commissioning Technician
Scope of Responsibility:
• I was responsible for commissioning of gas & water injection facility, consisted main 10 Rolls Roys turbines driving 3 gas injection compressors, 3 water injection compressors and 4 power generators worked in offshore
• Responsible for the pre commission and commissioning of all 3.3/6.6/11 KV transformers, , Gas turbine, air compressors, emergency fire pumps and assist vendors.
•Testing and commissioning of 30MW ABB generators, 11/ 6.6/ 3.3KV and 400V switch gears (SF6, ACB, VCB, and VC) and all protection systems.
• Monitor daily work accomplishment, collect, distribute work order and suspend after work complete.
•Duties of interpreting project and vendor schematic/wiring diagrams, completing inspection and function test, records and updating as-built drawings.
•Study and propose modifications when required for production for safety improvement.
•Setting and testing parameters of protection relays such as generator management, feeder management, motor management relays and GE multilin.
• I was also responsible for the commissioning of the black start emergency generator set operation.
Company : British Petroleum (BP) Azerbaijan
Inclusive Date : Feb. 2005 – Aug 2006
Project : TPG 500 Shah Deniz Gas export Project (offshore Jack-up plat form)
Client : BP
Discipline : Sr. Electrical Technician
Scope of Responsibility:
•Supervision of pre-commissioning and commissioning 6.6 KV 2.5MW ABB generators, transformers, switch gears, low voltage breakers up to 5000 amps, and UPS (Gutor)
•Experimented with ABB variable speed drive (VSD) LV-HV technology voltage.
•Checked, inspect and assist plant start-up, identify defect, trouble shoot and repair defective circuit of their any. Provide technical support to electrical technician, established program for preventive and corrective maintenance.
•Commissioning of drilling units includes Mud pumps, cementing units, BOP, and Hydraulic system and familiar in all controls wirings of drilling units and PLCs.
•Commissioning Power Management System (PMS) distribution panels, motor with S&I motor manager and witness all testing like Hipot, primary and secondary injection, CT, VT, polarization index, ductor, megger etc.
•Review vendor package equipment to include inspection, witness testing and approval.
•Co -ordinate to perform operational and functional acceptation test on electrical systems.
Company : Costain Abu Dhabi Co. Abu Dhabi
Inclusive Date : Aug – 2002 to Sept 2004
Project : LNG Train 1, 2 & 3
Client : Adgas, DasIsland
Discipline : Senior Elect. Technician
Scope of Responsibility:
• Utility, Train and Loading sections, all kinds of electrical equipment related works in HV switch gear, UPS, Battery charger, VFD, GTG and Emergency generator.
• Trouble shooting of control circuits, Isolation and De-isolation, Earthing, rack in rack out of breakers and change load transfer through bus coupler.
• Preventive maintenance, trouble shooting of MV and LV motors, different types of relays which has over current, under current, over and under voltage protection, reading and setting by manually and laptop.
Company : Kuwait National Petroleum Co. (Employed by Finesco International)
Inclusive Date : Feb 1997 - Feb 2001
Project : Shoiba Refinery
Client : KNPC
Discipline : Electrical Foreman.
Scope of Responsibility:
• Plan, supervise and co ordinate all maintenance activities for plant electrical equipments to ensure availability and reliability
•Testing, commissioning, and maintenance activities of Power generation, emergency generator, UPS, battery Charger, transformer, switch gears, HV & LV distribution system and all associated static and rotating equipments.
•Preventive maintenance activities and scheduling.
•Testing of relays, CT and VT
•Testing of HT cables, HV/MV transformers, circuit breakers, cable splicing and terminations.
Company : Arabian Oil Co. LTD, Saudi Arabia.
Inclusive Date : March 1992 – Apr. 1996
Project : Offshore & Onshore Facility Maint. Dept.
Discipline : Electrical Technician.
Scope of Responsibility:
• Electrical testing, commissioning and maintenance with the system voltage up to 13.8 KV
• Testing, repairing and maint. of Power transformers, MV/LV switch boards, circuit breakers, contactor starters (DOL, Star delta, Hi speed- slow speed, soft starter, reverse forward etc.)
• Checking and repairing Diesel generator with PLC and micro processor based control for power auto transfer system.
• Normal and explosion proof lighting and small power distribution system.
• Navigational Aids system.
• Trouble shoots electrical problems and outdoor & indoor lighting system.
• Electrical planned preventive maintenance (PPM) program in line with production and ensure that the maintenance task under taken to prevent equipment break down.
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
National trade certificate (Electrical) NCVT Govt. of India.
Supervisor license from State Electricity Licensing Board.
• HUET and Sea Survival course By OPITO (UK) Azerbaijan. Expiry- 02-2010
• International Offshore medical. Expiry-2010
• Safe System of Work (SSOW) by British Petroleum.
• Authorized Electrical Person for Shah Deniz off shore plat form
• Isolating Authority under the site – Technip and BP
• Best safety supervisor award from Qatar Gas operating Co.
.Task Specific Assessment Course and RTC – Supervisory level.
• Electrical competency certificate LV/MV- British Petroleum.
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
: MS Excel, Power point, Word, Basic MS access.Integrated Document Management System (i- DMS)
Electronic Data Management System (EDMS)
Material System (MS)
Windows project completion system (Win Pcs)
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
knowledge of testing relays and setting parameters, testing CT & VT, Hi-pot, P I test, modern PLCs systems and trouble shootings
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
Able to make decisions, act on own initiative and operate in a pro-active way
|
| |
|
|
|
|
|
Electrical Commissioning Supervisor, CTJV Chiyoda Technip Joint Venture, Train 6,7 Ras Laffan, Qatar
CV/Resume ID no.: 93338 |
|
|
|
|
|
|
| Relevant CVs; view more oil and gas CVs |
| 1. HVAC/R Journeyman with excellent technical experiance |
| 2. Radio/Navigation/Instruments system including Radar |
| 3. Electrical Technician Oil & Gas |
| 4. Electrical Supervisor/Technician |
| 5. electrician and mechanic oil and gas experience |
| 6. Electrical Engineer |
| 7. Electrical Staff |
| 8. Experienced Electrician (11 years +) |
| 9. Document Controller, E&I Technician |
| 10. Electrical and instrumentation, Project Engineering, maintenance |
| 11. Senior Electrical Technician, Oil & Gas Production (off-shore field) |
| 12. Electrical Commissioning Supervisor |
| 13. Marine Service Engineer/mechanical/Instrumentation |
| 14. Electrical, Instrumentation, Oil and Gas |
| 15. Manager / Sr. Engineering - Projects [electrical] |
| 16. 29 YEARS EXPERIENCE IN AUTOMATION |
| 17. Process operator, plant operator, field operator |
| 18. 30 years experience in the electrical commissioning, inspection, planning and engineering |
| 19. E&I Technician |
| 20. Experienced Electrical Instrument Technician (offshore, FPSO , production platforms) |
| |
| |
| Other CVs; view more oil and gas CVs |
| 1. Motorman, heavy duty mechanic offshore |
| 2. 5 yrs education, Third officer, nautical science, oil and chemical endorsements, motivated |
| 3. Captain offshore |
| 4. Maintenance electronics engineer, Maintenance technician |
| 5. Master on offshore PSVs recently employed on DP1 vessels |
| 6. GRADUATE ENGINEER |
| 7. Piping Designer, PDS, CAD |
| 8. Oilfield instrumentation off and on shore |
| 9. Maritime Superintendent, Port Operations |
| 10. Advanced Care Paramedic, working Australia and Greenland |
| 11. Greenhand Roustabout |
| 12. Technical support engineer / process engineer / and engineering trainer |
| 13. Ship electrical engineer on oil & chemical tankers |
| 14. Manufacturing engineer |
| 15. Offshore ROV Superintendant / Supervisor, ROV Pilot / Technician |
| 16. SLS Data Engineer Baker Hughes INTEQ Mud Logger |
| 17. Electrical technician - diagnosis of faults rectification of electrical equipment |
| 18. Radio Operator in Royal Australian Navy - Submarines TBOSIET |
| 19. Welding section engineer hinkley point 'b' nuclear power station |
| 20. MATERIAL COORDINATOR, PETROFAC INTERNATIONAL SUDAN, OLAYAN DESCON CO LTD KSA |
| 21. Graduate Kazakh British Technical University, faculty of oil & gas industry offshore techniques |
| 22. PRESSURE VESSELS ENGINEER PV ELITE/MS WORD/EXCEL/MS PROJECT/BAAN |
| 23. Electrical technician working in steel, power and cement industries |
| 24. ROUSTABOUT IN TRANSOCEAN OFFSHORE COMPANY & NEPTUN MARINE SINGAPORE |
| 25. Information Technology Profeesssional - one year experience in Netlogic information technologies |
| 26. A/C Technician Operating & Maintenance of Packaged Air Conditioners, Ductable Split Air Conditioners |
| 27. STCW Marine Technician Motorman on petroleum tankers, chemical tankers from Turkey |
| 28. IHO/FIG CAT 'A' Hydrographic Surveyor with 14 years of experience and excellent in communication |
| 29. Logictics Officer Gulf Drilling International Qatar, Orient Petroleum, Saif Energy Ltd, OXY, Paige |
| 30. Field experience in lots of Iranian oil & gas HP-HT fields as drilling supervisor & completion eng. |
| |
| |
|
|
|