|
|
CV DCS Instrumentation Engineer, Siemes Step7, Rockwell RS Logix 5000, Emerson DeltaV
|
|
|
|
|
|
|
| |
| |
| DCS Instrumentation Engineer, Siemes Step7, Rockwell RS Logix 5000, Emerson DeltaV |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in DCS Instrumentation Engineer, Siemes Step7, Rockwell RS Logix 5000, Emerson DeltaV - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
93968
Last Updated:
Saturday, May 16, 2009 |
Location (Residence): Lima, Peru
Citizenship: Peru
|
| |
Languages:
Native:
Spanish Peru, Spanish Argentina Other:
English United States |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
Bachelors in Mechanical and Electrical Engineering Years of Experience:
10 years
|
Authorized to work in:
Argentina, Peru
Present Location:
Argentina, Salta
Relocation:
Anywhere (International) |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Technician Level |
Controls |
Experienced
|
2 years |
|
Technician Level |
Instrument |
Experienced
|
0 year |
|
Engineering |
Instrumentation |
Experienced
|
14 years |
|
Engineering |
Controls |
Experienced
|
14 years |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
Dear Sir:
Please, allow me to use this letter to introduce myself briefly; I am Leonel Espinoza, a mechanical and electrical engineer with experience in DCS, PLC, instrumentation and startup of process and energy plants.
I write you because I know Oil & Gas always has projects and these may have some available positions and I would like to be considered for them. For that purpose i am enclosing my resume for your review. As you will see in my resume I have experience and hands on skills in DCS and PLC and instrumentation programming applied in mineral processing and especially in energy (gas) systems. Besides I have good experience in Power Generation, I have started and operated Gas Turbines and Combined Cycle Power Plants and also I have participated during the engineering, construction and commissioning stage. During my stage in mining industry I have participated during all phases of a Gold-Copper project and I have been deeply involved in the engineering, development, startup and operation of Control System.
Also I have worked in multicultural teams, where I increased my communication, coordination and empathy skills. Furthermore, these experiences have given me abilities for being a good team player and the capacity to lead and encourage people to reach and accomplish tasks and projects. Finally I am very motivated about working in Oil and Gas. I know Oil & Gas industry is the place where big challenges and projects are accomplished and I want to be part of them
I look forward to telling you how committed I am to support the growing and expansion of your company,. Please give me a chance to be interviewed.
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
KALLPA GENERACION S.A. (December 2008 – April 2009)
Power Generation Company
Position: Mechanical and Instrumentation Supervisor
Mechanical Supervision of Gas Yard station construction for two Gas Turbines (190MW).
Factory Acceptance Test for Gas Yard Station PLC
Gas Yard Pre-Commissioning, Commissioning and Startup.
Participation in Mechanical and Instrumentation Pre-commissioning of Gas Turbine and BOP.
Participation in Commissioning and Startup of a 190MW Gas Turbine (Siemens SGT6-5000FD03).
GOLDFIELDS LA CIMA (October 2007– October 2008)
Gold Mining Company
Position: Process Control Head
Configuration of Dynamical protection strategies for a 20 000 ton/day SAG Mill.
Configuration and tuning of control loops (level, pressure, density, tonnage, flow) in overall concentrator areas (Crushing, Grinding, Flotation, Regrinding, Thickening).
Configuration of DCS (DeltaV) logic for continuous operation of Concentrator plant.
Commissioning of a wide range of instrumentation equipment ( from Level, Pressure, Flow, Density, Weight Transmitters to X-Ray Analyzers)
Commissioning of Control System (Emerson DeltaV, Rockwell Control Logix 5000 – 500). Site Acceptance Test.
Configuration of protection settings (mechanical and electrical) in Sag Mill, Ball Mill and crushers.
Pre-commissioning of Control System and Instrumentation (Foundation Fieldbus Instruments, Devicenet Motor Control Centers and AC Drives, Profibus AC Drives and Remote I/O, Modbus Protection Relays).
Development of Instrumentation and Electrical Field Engineering (Loop Diagram, Instruments Specification for Purchase, Request for quotations, etc).
Loop Checks of all type of signals in Concentrator Plant.
Preparation and uphold of Instrumentation and Process Control Budget.
Trainer of Trainers for OTS (Emerson DeltaV) system and Plant Operation.
Development of basic equations, Tuning and Startup of Concentrator Plant Operator Training Simulator (OTS).
GOLDFIELDS LA CIMA (September 2006 – September 2007)
Gold Mining Company
Position: Process Control Engineer
Development of instrumentation Field Engineering.
Development of Instrumentation Maintenance Procedures for Plant Operation.
Development of Control Systems Maintenance Procedures for Plant Operation.
Technical Support to Maintenance Area in Electrical and Instrumentation Issues.
Commissioning and Factory Acceptance Test (FAT) of Control System (Emerson DeltaV). Modifications to engineering design.
Design of motors and valves standards for DCS implementation.
Selection and recruiting of maintenance and operation personnel based on HAY Method.
COMPAÑIA DE MINAS BUENAVENTURA (May 2006 – September. 2006)
Gold Mining Company
Position: Electrical and Mechanical Maintenance Supervisor
Design of preventive maintenance program for concentrator plant.
Application of CAD (Computer Aided Design) and FEM (Finite Element Method) to redesign Agitators Shafts in Cyanide destruction area.
Supervision of mechanical tasks, such as Secondary Crusher overhauls, replacement of cyanide destruction mechanical agitators, Ball Mills maintenance, etc.
Direct participation in electrical and Instrumentation tasks, such as instruments calibration, control loops tuning, AC drives startup, etc.
ENDESA-ETEVENSA (September 2004 – April 2006)
Electrical Generation Company
Position: Multifunctional Operator
Commissioning and Startup of Combined Cycle Power Plant (CCPP).
Commissioning and Startup of Gas Turbines Power Plant (GTPP).
Failure Diagnosis and detection in DCS (Siemens Teleperm XP).
Technical knowledge of Siemens Teleperm XP and GE Mark 5.
Startup and Operation of CCPP and GTPP, including their auxiliary systems.
Modeling and Simulation of CCPP control system.
IAESTE – SINERTEC MÉXICO (December 2002 –March 2003)
Maintenance and Automation Company
Position: Projects Coordinator.
Planning and Development of Maintenance jobs in Distribution Substations.
Programming of Siemens PLCs, Westinghouse and GE energy meters and protective relays.
Installation of switchgears and measurements instruments.
Development of Automation Systems for Mexican Standard Association and for Johnson & Johnson.
CONSTRUCTORA NORBERTO ODEBRECHT (July –December 1998)
Engineering and Construction
Position: Electrical Supervisor.
Installation and Startup of Automatic Batch Scales. .
Siemens PLC programming, Startup of Allen Bradley and Siemens AC drives.
Intouch Scada installation and programming.
SHOUGANG HIERRO PERU (December 1996 – April 1997)
Iron Mining Company
Position: Electrical Technician.
Installation and maintenance of electric motors up to 5 MW.
Installation of motor control centers for synchronous motors at mill area.
Auxiliary operator of Grinding and separation area
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
UNIVERSITY OF PIURA (UDEP)
MECHANICAL ELECTRICAL ENGINEER
TECSUP TECHNICAL INSTITUTE
TECHNICIAN IN ELECTRONICS
OPC Wokshop Matrikon
Delta V System Administration
Delta V Hardware Troubleshooting and Fieldbus
Delta V Intelligent Busses (FieldbusH1,Profibus, etc)
Delta V Engineering Implementation.
Control System Simulator Training Siemens –Westinghouse
Combined Cycle Operation Siemens –Westinghouse
Model Predictive Control
DCS on Combined Cycle Power Plants
Combined Cycle Power Plants Operation
Simulation and Modeling of Electric Networks with ATP-EMTP
Business and Leadership
Vibration Analysis
PLC II Allen Bradley
Fuzzy Control Based on PLC
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
Microsoft Office
Windows XP
Visio
SolidWorks
Solidedge
Cosmosworks
Matlab
Hysys
Emerson DeltaV
Rockwell RS Logix 500
Rockwell RS Logix 5000
Siemens Step7
Siemens T3000
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
Proven ability to work under pressure.
Proven ability to work in remote locations.
Highly adaptable to Changes.
Ability to manage and supervise multidiscipline employees.
Resourceful, Team player.
Easygoing, Good Empathy.
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
-
|
| |
|
|
|
|
|
DCS Instrumentation Engineer, Siemes Step7, Rockwell RS Logix 5000, Emerson DeltaV
CV/Resume ID no.: 93968 |
|
|
|
|
|
|
| Other CVs; view more oil and gas CVs |
| 1. NEBOSH (Credit) qualified Safety Officer and a member of IOSH.U.K. (TechIOSH) having 9 years Exp. |
| 2. Experienced Motorman (20 years of which 3+ offshore), hardworking, excellent technical skills |
| 3. Experienced (8 years) Laboratory Analyst / Chemist |
| 4. Offshore Production |
| 5. Snr. Instrument Technician |
| 6. Junior technician, mechanical and facility tehnician |
| 7. Site Manager |
| 8. Miner, Marine Technician Fitter |
| 9. Production Operator / Shift Supervisor |
| 10. Ex-army chef |
| 11. PDS Administrator, Intergraph (Vienna, Austria) |
| 12. QHSE Professional / Quality Assurance / Quality Control Manager |
| 13. Rigger, Scaffolder, Crane Driver, Multi-Skilled Operator/Dogman/Scaffolder/Trades Assistant |
| 14. Radar / Communications Officer Republic Of Singapore Navy |
| 15. Junior instrument technician, electronics technician |
| 16. ROV Pilot Technician Deep Marine Tech, Houston TX |
| 17. EXPERIENCED DRAFTSMAN, NIKHIL ENGINEERING TECHNOLOGIES, VISAKHAPATNAM |
| 18. International Experienced Sr. Project and Procurement Manager (22 Years Experience) |
| 19. Pipe Foreman / Heavy Equipment Operator, QC Technician |
| 20. Tribon Designer Draughtsman working in Total Maritime Design Pvt. Ltd. India |
| 21. Junior service engineer in a marine automation company |
| 22. Health and Safety Advisor Petrofac Offshore Engineering & Operations through Atlantic Resourcing Ltd |
| 23. Quality Control Engineer, National Steel Fabrication Egypt, graduate of Suez Canal University |
| 24. Rig Electrician for KCA Deutag Drilling at Saudi Arabia, SCR Russhill Topdrive-TDS-1 from Varco GE |
| 25. Master Mariner experienced on oil/chemical/gas tankers + supercargo with DWT 10-20,000 t |
| 26. Offshore rig electrician SC Rig Service SA Constanta Port Dana 34 Romania Black Sea Gloria platform |
| 27. Male nurse - 5 years work experience in Construction Industry train in Immediate Life Support (ILS) |
| 28. Mechanical/Piping Technical Office Engineer, Control Valves Field Piping Engineer in Egypt |
| 29. Production Supervisor Total Qatar Al Khaleej Offshore field, DNO Yemen AS, Occidental Oman |
| 30. Crawler Crane And Mobile Operator Oilfields Supply Center Ltd. Free Zone Jebel Ali UAE Pakistan |
| |
| |
|
|
|