Home  Register  Jobs  CVs  Job Search  Worldwide  Process  Help  Search  Scams  JA  B  C
Oil Offshore Marine Careers in Onshore and Offshore Drilling Energy Industry Oil Offshore Marine: Oil & Gas Jobs & CVs Online recruitment services (job vacancies, resume/cv database search) for Oil Industry, Energy, Offshore, Petroleum, Engineering, Construction, Drilling, Subsea, Marine, Shipbuilding, Shipping, Petrochemical. Have your own FREE account! free cv upload registration on Oil-Offshore-Marine.com recruiter benefits: free job postings and cv search on Oil-Offshore-Marine.com
  Need to find something?
 
 Username:  
 Password:  
Oil Offshore Marine Register
 
  Remember my password?  
 Recruiters - Employers & Agencies
  Advertise / Contact Us
free cv upload for all job seekers, free access to oil and gas jobs
subscribe to oil careers alerts, oil jobs postings, drilling rig jobs, engineering jobs

 

CV E & I Oil & Gas Senior Engineer, Consolidated Contractors Company at KGP Khursaniyah Gas Plant

 
E & I Oil & Gas Senior Engineer, Consolidated Contractors Company at KGP Khursaniyah Gas Plant

Resume built for oil and gas job opportunities by a jobseeker with experience in E & I Oil & Gas Senior Engineer, Consolidated Contractors Company at KGP Khursaniyah Gas Plant - would you like to offer this candidate a job/contract employment?

Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database

CV/Resume ID no.: 94233

Location (Residence): Zefta, Egypt
Citizenship: Egypt
 
Languages:
  Native: Arabic Egypt
  Other: English
 
Education & Experience: Work Authorization & Relocation:
Education:
  Bachelors in Electronic and Computer Sys.

Years of Experience: 12 years
Authorized to work in:
   Algeria, Bahrain, Egypt, Kuwait, Libyan Arab Jama., Oman, Qatar, Saudi Arabia, Tunisia
Present Location:
   Saudi Arabia, El Gobeil
Relocation:
   Algeria, Bahrain, Egypt, Kuwait, Libyan Arab Jama., Oman, Qatar, Saudi Arabia, Tunisia, United Arab Emirates
 
Expertise
Category Subcategory Ability Experience
Engineering Electrical Experienced 20 years
Engineering Instrumentation Experienced 2 years
 
CV/Resume Details
 
1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory]

10 years on the E&I QA/QC for construction and follow all the procedures of the installation for (Main transformer, GIS, Switch gear, MCC, Distribution panels, UPS, Valves, All type of transmitter, Guages, ...etc)

2. Work Experience - CV/Resume Part 2 [Mandatory]

From March 2008 until now: Working for CCC (Consolidated Contractors Company) at KGP (Khursaniyah Gas Plant Project) (Saudi Arabia) as an Instrument Field Engineer Responsible for calibration and installation for all the instrument and valves and impulse line for instrument, air line header for valves and follow up the termination and test for the cables and preparing all loop check files for all the instruments and valves to hand over the system to the BTJV and ARAMCO.

From Jan. 2007 to March 2008: Working for NERA (New and Renewable Authority) at Zafarana Wind Farm [100 Χ 850 KW CAMESA Wind Turbine + 50 Χ 600 KW NORDEX Wind Turbine + 55 Χ 600 KW NORDEX Wind Turbine + 46 Χ 650 KW VESTAS Wind Turbine + 71 Χ 650 KW VESTAS Wind Turbine] Projects (EGYPT) as an Maintenance Electrical Field Engineer Responsible for following the maintenance preventive and trouble shooting like change the generator, gear box…etc.

From Aug. 2006 to Jan. 2007 : Working for PGESCo (Power Generation Engineering And Services Company) at El Kuriemat 1 Χ 750 MW (Nominal) Combined Cycle Project (EGYPT) as an Instrument Field Engineer Responsible for calibration and installation for all the instrument and valves for all the contractors according to the standard. Follow up for all testing at site, check for all signals which come from field to DCS, Arrangement for all the contractors and follow our schedules. Received all MRR (material request report) and make all inspection and check if it according to the contract or not.


From Mar. 2006 to July 2006: Working for EGYPTIAN OPERATION AND MAINTENANCE COMPANY at El Kuriemat Thermal Power Plant (2 Χ 600 MW) (EGYPT) as an Instrument Field Engineer Responsible for Turbine area follow up for all systems of it (steam seal – lube oil – seal oil –hydraulic oil – bypass system – drain system)Calibration of all Instrument – Valves - …etc

From Oct. 2005 to Mar. 2006: Working for TECHNIT CIMIMONTUBI COMPANY at North Cairo 1 Χ 750 MW (Nominal) Combined Cycle Project (EGYPT) as an E&I Engineer (QA/QC) Responsible for preparing all Electrical and Instrument Procedures, quality project plan and follow all Electrical and Instrument Installation (Cable Tray – Conduit – Earthing Sys. – Cable Pulling & Termination – Lighting Sys. – Switch Gear – Motor Control Station Panels – Main transformer – Aux. transformer – Fire Sys. - Test of M.V. Cables – Test of L.V. Cables…etc) - Instrument Calibration - Instrument Installation (PI – TI – LT – PT – I/P Converter – TT) All Stainless steel Tubing for Instrument – Steam tracing – All tubing for hydra which connected to valves.

From Feb. 2005 to Aug. 2005: Working for CARLO GAVAZZI EGYPT at MELLITTAH PLANT (Gas Project at West of Tripoli – Libya) as an E&I Engineer (QA/QC) Responsible for preparing all Electrical and Instrument Procedures, quality project plan and follow all Electrical and Instrument Installation (Cable Tray – Conduit – Earthing Sys. – Cable Pulling & Termination – Lighting Sys. – Switch Gear – Motor Control Station Panels – Main transformer – Aux. transformer – Fire Sys. - Test of M.V. Cables – Test of L.V. Cables – Instrument Calibration & Instrument Installation (PI – TI – LT – PT – I/P Converter – TT – Valves) All Stainless steel Tubing for Instrument – Steam tracing – All tubing for hydra which connected to valves.

From Sep 2004 to Feb. 2005: Working for CARLO GAVAZZI EGYPT at Nubaria Power Station І Χ П [2 Χ 750 MW] (Nominal) Combined Cycle Project (EGYPT) as an E&I Engineer (QA/QC) Responsible for preparing all Electrical and Instrument Procedures, quality project plan and follow all Electrical and Instrument Installation (Cable Tray – Conduit – Earthing Sys. – Cable Pulling & Termination – Lighting Sys. – Switch Gear – Motor Control Station Panels – Main transformer – Aux. transformer – Fire Sys. - Test of M.V. Cables – Test of L.V. Cables…etc) - Instrument Calibration - Instrument Installation (PI – TI – LT – PT – I/P Converter – TT) All Stainless steel Tubing for Instrument – Steam tracing – All tubing for hydra which connected to valves.

From Jan 2003 to Aug. 2004: Working for DAMIETTA LIQUID GAS COMPANY (D.L.C) at Liquid Natural Gas (LNG) Project (EGYPT) as an E&I Engineer Responsible for (Cable Tray – Conduit – Earthing Sys. – Cable Pulling & Termination – Lighting Sys. – Switch Gear – Motor Control Station Panels – Main transformer – Aux. transformer – Fire Sys. - Test of M.V. Cables – Test of L.V. Cables – All Loop Check…etc) and E&I installation for (5 Χ 25 MW Gas turbine HITACHI Co.) and follow all installation to Flare Area and Follow all installation for the emergency diesel generator (3 Χ 2 MW CAT) and follow all installation for the cathode protection at site.

From April 2003 to Dec. 2003: Working for CARLO GAVAZZI EGYPT at ROSEITA (GAS COMPRESSION) (EGYPT) as an E&I Engineer (QA/QC) Responsible for All Electrical and Instrument Installation (Cable Tray – Conduit – Earthing Sys. – Cable Pulling & Termination – Lighting Sys. – Switch Gear – Motor Control Station Panels – Main transformer – Aux. transformer – Fire Sys. - Test of M.V. Cables – Test of L.V. Cables…etc) - Instrument Calibration - Instrument Installation (PI – TI – LT – PT – I/P Converter – TT) All Stainless steel Tubing for Instrument – Steam tracing – All tubing for hydra which connected to valves.

From June 2002 to March 2003: Working for HONEYWELL COMPANY at Steam Power Plant 4 Χ 150 MW ABU SULTAN Controls Upgrade Project (EGYPT) as an E&I Engineer (QA/QC) Responsible for preparing all procedures, preparing all forms and follow all Electrical and Instrument installation at site (Cable tray – Conduit – Panels – Cable pulling & Termination – Grounding – Instrument installation – Instrument calibration – Battery room – Analyzer – All loop check – All tests of L.V. Cables …etc).

From Oct. 2001 to May 2002: Working for TECHNIT CIMIMONTUBI COMPANY at Suez Gulf Power Plant 2 Χ 340 MW (EGYPT) as an E&I Engineer (QC) Responsible for all Electric and Instrument installation (Cable tray – Conduit – Fire Sys – Lighting Sys – Motor Control Station Panels – Dry Transformer – Main Transformer - Aux. Transformer – Cable Pulling & Termination – Elec. Heat Tracing – Grounding – Instrument Calibration – Instrument Installation – H.V. test for MV cables – Insulation Meggar test for LV cables…etc).

From March 2001 to Sep. 2001: Working for MAK for Electrical, Trading and Contracting as an Electric Engineer Responsible for Installation Dept, Offers and Design.

From Oct. 1999 to Feb. 2001: Working for Consortium (Balfour Kilpatrick – Electro Tharwat) Ayuon Moussa Power Plant 2 Χ 320 MW (EGYPT) as an Electric Engineer Responsible for checking all the control loops of the plant sys. And Commissioning field equipments (Motor Valves – Transmitters – Pumps – Electrical Panels…etc).

From Sep. 1997 to Sep. 1999: Working for TECHNIT CIMIMONTUBI COMPANY Sidi Krir Power Plant 2 Χ 320 MW (EGYPT) as an Electric Engineer Responsible For all electrical installation at site (Cable tray – Conduit – Fire Sys – Lighting Sys – Motor Control Station Panels – Dry Transformer – Main Transformer - Aux. Transformer – Cable Pulling & Termination…etc).


3. Education & Training - CV/Resume Part 3 [Mandatory]

1 Training on VESTAS wind turbine (Introduction and main components of the V47 turbine – Operating the system – Service and fault diagnostics – Hydraulic system – Troubleshooting and measurements – Safety instructions on personal protective equipment – Safety instructions on the conditions of the V47 wind turbine – Practical safety and rescuer training – Handling the Vestas service documentation valid for the V47 turbines from 08/08/2007 to 16/08/2007 at EGYPT.
2 Moving from DCS to Field Bus at Petromaint training center from 23rd Feb. 2003 to 28th Feb. 2003 at EGYPT.
3 Control Valve Calculation and sizing at Petromaint training center from 19th Jan. 2003 to 23rd Jan. 2003 at EGYPT.
4 Total International Expertise Co. (TOTALITY) from 28/05/2000 to 31/05/2000 at EGYPT.
5 Shoubra El Khama Steam Power Plant 4 Χ 320 MW from May 1997 to Aug. 1997 at EGYPT.
6 Nasr TV Co. From Jan. 1996 to Apr. 1996 at EGYPT.
7 ABB Arab 10th of Ramadan City from May 1995 to Aug 1995 at EGYPT.
8 MEMCO Co. 10th of Ramadan City from Oct 1993 to Dec 1993 at EGYPT.
9 Nile for Packing and Painting Co. 10th of Ramadan City from Jan 1993 to Apr 1993 at EGYPT.


4. Computer Skills - CV/Resume Part 4 [Mandatory]
Word & Excel & Auto CAD ….etc.
5. Other Skills - CV/Resume Part 5 [Optional]
-
6. Additional Information - CV/Resume Part 6 [Optional]
-


 

Questions about this candidate? Contact us for an immediate answer. To find similar people [or more experienced] - active jobseekers, please login OR create, FREE of charge, your own company account.

In order to view this candidate's contact information, you must a) be registered with Oil Offshore Marine - Worldwide Oil & Gas Jobs, and b) have already purchased a subscription.

Login Register Pricing Information
E & I Oil & Gas Senior Engineer, Consolidated Contractors Company at KGP Khursaniyah Gas Plant
CV/Resume ID no.: 94233

Relevant CVs; view more oil and gas CVs
1. Instrument and Control Engineer
2. Electrical engineer experienced (15years +) in maintenance and fault finding
3. ELECTRONICS AND INSTRUMENTATION ENGINEER
4. CONTROL, AUTOMATION AND INSTRUMENTATION ENGINEER
5. INSTRUMENT TECHNICIAN
6. Electrical Technician Oil & Gas
7. Senior Instrumentation Engineer
8. ELECTRCAL TECHNICIAN experienced in Offshore
9. Electrical Supervisor/Technician
10. Instrumentation & DCS Enginner
11. Marine Instrumentation Engineer
12. INSTRUMENTATION DESIGN AND DETAIL ENGINEER
13. electronic and instrument engineer
14. Instrument Engineerer - Oil & Gas
15. Electrical Engineer
16. Project Manager, Planning Specialist
17. Fire & Gas Detection System engg.
18. Electrical Engineer
19. Electrical Staff
20. Lead Engineer / Project Engineer
 
 
Other CVs; view more oil and gas CVs
1. INSTRUMENT & CONTROL TECHNICIAN
2. Planning engineer (4.5 years Exp) in Oil and gas Industry
3. SDPO Chief Officer, Master Mariner, Specialist in ROV and DSV DPO operations
4. Mud engineer
5. Roustabout, Rigger, Pipefitter
6. Officer offshore vessels/DP vessels
7. CODED WELDER / BOILER MAKER / WELDING ENGINEER
8. Mechanical & logistics, have little or no oil field exp.
9. Doctor, Medical Doctor
10. Radio Operator HM Forces
11. Knowledge in accounting - account officer
12. Maritime Superintendent, Commissioning & Pre Commissioning
13. Logistics Specialist – Hup Seng Huat Land Pte Ltd
14. Crane Operator / Heavy Equipment Operator, Saipem Angola, Africa
15. Welder / Fitter, Lear Siegler Services. Inc/ EG&G, IRAQ
16. EMBA Professional, Human Resource Management and Administration
17. Fresher intersted in all electrical based works
18. PIPING PDS DESIGNER, CAESARII, AUTOCAD, MICROSTATION WITH 10 YEARS EXPERIENCE
19. Electrical Maintenance Skilled Technician / Commissioning of Electrical Equipments Abu Dhabi UAE
20. Welding Inspector Quality Control Galfar Engineering & Contracting Client Petroleum Development OMAN
21. Instrument Technician upstream Oil & Gas industry Petroleum Refinery Fertilizer plants
22. Health and Safety Advisor Petrofac Offshore Engineering & Operations through Atlantic Resourcing Ltd
23. Trainee Instrumentation Engineer working in Paris Glass, Dabhasa India
24. Sales Officer working in Godrej Hersheys Limited India
25. Graduate Geoscientist Oilmax Energy India, proficient in Kingdom SMT seismic software
26. Experienced Member of Administration having +4 years of experience in construction companies
27. Cost Analyst work for DA Desk FZE Sharjah Hamriyah Freezone United Arab Emirates plus India
28. Sr Environmental Advisor NCOC North Caspian Operating Company JV Shell ExxonMobil Total Agip Conoco
29. Mechanical Piping Designer for EPC Projects, sofware skills in Autocad, Pro/E, Caesar II
30. Process Engineer Shaw Rolta India Ltd EPC Company in Ethylene and FCC Technology
 
 

Press Ctrl+D to Bookmark - Tell a Friend - Job Archives - Jobs - Oil and Gas CVs Resumes - Subscribe to Job Alerts - Site Map - Events - Legal - Privacy - Contact

oil offshore marine's website design

Official Blog - International Maritime Signal Flags - Glossary of Oil & Gas Jobs Definitions - Abbreviations & Acronyms from the Oil, Offshore, Marine, and Shipping Industries - Engineering Oil Jobs - Top 100 Energy Sites - Marine Jobs - Offshore Jobs - Oil Careers - Maritime Jobs - PDS/PDMS Oil & Gas Jobs - Oil Industry Jobs - Oil Field Jobs - Oil and Gas Careers - Petroleum Jobs - Oil Rig Jobs - Offshore Oil Rig Jobs - Drilling Jobs - Oil Industry - Official Sitemap - Jobs Feed - Login to your Oil-Offshore-Marine.com account

www.Oil-Offshore-Marine.com - Your Oil & Gas, Offshore, Construction, Shipping, Petrochemical, and Marine Engineering Recruitment Center.

© Oil Offshore Marine - Oil & Gas Jobs - All Rights Reserved.
This website is designed for international users, and its use is governed by Oil Offshore Marine - Oil & Gas Jobs Legal provisions. By browsing on any page of this website, you are deemed to have accepted all Oil Offshore Marine - Worldwide Center of Oil & Gas Jobs legal terms. If you do not agree with Oil Offshore Marine's legal provisions, you must stop using this website and its services.


find oil and gas jobs

  Looking for something?