CV Mechanical Piping Engineer Parsons, Siemens UHDE, Mitsubishi / MHI (Japan), Toyo Engineering
|
|
|
|
|
|
|
| |
| |
| Mechanical Piping Engineer Parsons, Siemens UHDE, Mitsubishi / MHI (Japan), Toyo Engineering |
|
Resume built for oil and gas job opportunities by a jobseeker with experience in Mechanical Piping Engineer Parsons, Siemens UHDE, Mitsubishi / MHI (Japan), Toyo Engineering - would you like to offer this candidate a job/contract employment? Please contact us OR search for another relevant oil CV/Resume in our impressive oil industry database
CV/Resume ID no.:
95076
Last Updated:
Saturday, June 13, 2009 |
Location (Residence): nonthaburi, Thailand
Citizenship: Thailand
|
| |
Languages:
Native:
Thai Other:
English |
| |
| Education & Experience: |
Work Authorization & Relocation: |
|
|
Education:
Bachelors in Environmental Engineering Years of Experience:
30+ years
|
Authorized to work in:
Thailand
Present Location:
Thailand, Bangkok
Relocation:
Anywhere (International) |
|
| |
| Expertise |
| Category |
Subcategory |
Ability |
Experience |
|
Engineering |
Other |
Experienced
|
18 years |
|
Engineering |
Piping |
Experienced
|
36 years |
|
Technician Level |
Piping |
Experienced
|
36 years |
|
Operations |
Manufacturing |
Experienced
|
18 years |
|
| |
| CV/Resume Details |
| |
| 1. Summary (Cover Letter) - CV/Resume Part 1 [Mandatory] |
Application Letter
June 9, 2009
To: EPC Contractor / Recruitment
Attn.: Human Resource Manager / Recruiment Consultant
Subject: Applying for Project Coordinator / Sr. Mechanical Engineer (Ref. #)
Ref.: Power, Oil&Gas, LNG plant construction project
Due to past¤t experience in power plants, Oil&Gas, LNG Terminal projects in different roles, I am interested in applying for Project Coordinator / Sr. Mechanical Engineer.
I would describe my qualifications summarized as follows:
Bachelor Degree in Mechanical Engineering and Post-Graduate Diploma in Environmental Engineering focusing on water / wastewater / solid wastes treatment engineering from Thailand.
currently working with a PMC consultant for a LNG Terminal to perform engineering review and comment to EPC contractor for utilities, mechanical and piping documents submitted for FEED compliance verification including review on technical bid evaluation documents. I was also incharge of Project Management Team for bidding a Natural Gas Transmission Pipeline project.
All 30-year experience from current back to past are described in three major fields as follows:
* 15-year working experience in different types and small-to-large sizes of power/energy projects.
including steam pipeline.
* 7-year working experience with petrochemical plants (PE,PP, BTX) (>200,000 ton/yr),
LNG Terminal , gas pipelines projects
* 12-year working experience with utilities (BOP) e.g. fuels supply, water / wastewater treatment,
fire protection, plant / instrument air supply, cooling system etc. including water pipeline.
Construction projects experience in 8 power plants (gas,coal, biomass), 2 HV power transmission lines / substations, 6 pipelines (water,steam,gas), 7 large petroleum / petrochemical plants, >10 projects for utilities (BOP).
Overseas experience in South Korea, Saudi Arabia and Indonesia is also included.
Power experience includes a coal power plant with sea water desalination supply and pipeline project in Indonesia as Mechanical Project Engineer . Previous experience in Thailand for different power plant capacities e.g. 20, 110, 170, 700, 746, 800 and (2x746) MWe.
50 ton/day Two-stage Hazardous Wastes Incineration plant experience is also included.
Roles of EPC contractor, owners engineer in project activities have been performed e.g. engineering / construction / quality assurance supervision/coordination, contract / procurement/ subcontract administration.
Mechanical components experience cover e.g. SCR (DeNOx), Bag House, ESP, Dust Collector, Scrubber, HRSG / Boiler, Gas / Steam turbine, Static and Rotating equipment, for plants
Steel shop fabrication management and quality control coordination experience for HRSG Pressure & non-pressure parts (boilers, vessels, piping), IP & LP, low-energy piping of 170 and 700 MW CCGT power plant projects with NEM BV. (The Netherlands) and Vogt U.S.A.
Coordination in CCGT plant commissioning, operation, and scheduled plant outage using Gas Turbines GTs 6561B and GTs F701 FC had been performed before C.O.D. As power plant owners Supervisor had controlled the plant operation & maintenance awarded to the contractor.
Experience in working / coordinating with international EPC / BOP contractors e.g. Bechtel, Siemens-Westinghouse, Parsons Power, Siemens, Fortum Engineering (Finland), Vogt U.S.A., NEM BV. UHDE, Mitsubishi /MHI (Japan), Toyo Engineering, Mc-Burney
|
| 2. Work Experience - CV/Resume Part 2 [Mandatory] |
Experience Summary In Petrochemical, Oil Refinery, Gas Plant and Pipelines Projects
Years Projects Descriptions Duties and Responsibilities
August 2008 - present LNG Terminal project
consisting process and utilities system e.g. mechanical equipment & piping e.g. heat exchanger, vessels, tanks, loading arms, gangway tower, LNG tanks etc. instrument air supply, fire protection, nitrogen supply, wastewater treatment, seawater and water supply systems,
(PMC) Mechanical / Piping Engineer:
- Review mechanical / piping / utilities detail
engineering design / documents proposed by
EPC Constractor
- Verify the submitted designs whether comply
with Project Specifications and /or contractual
engineering design (FEED)
- review on requision and technical bid evaluation, vendor prints documents
2002-2003 PTT Gas Pipeline Project for Power Plant in Rojana Industrial Estate
(Consultants of Technology) Project Coordinator:
Engineering support to proposal for bidding gas pipeline engineering details.
1991- 1992 Thai Olefins plant (TOC)
(BTX-Butadiene, Toluene and Xylene production)
(Petroleum Engineering Consultant) Senior Design Mechanical Engineer:
Interconnecting Process and Utilities Piping Detail Design under Bechtels supervision.
1991- 1992 Interconnecting Gas Pipelines and Electric Cables for Petrochemical Plants i.e.
BPE- Bangkok Polyethylene
NPC- National Petrochemical
TPE- Thai Polyethylene`
( Design 90) Project Coordinator
Engineering & construction coordination
1989 -1990 Tuntex Polyester Plant (Polymerization Unit)
(Mechanical & Utilities Contractor) Project Engr./ Construction Manager:
Construction Management for Process equipment, piping, tanks, vessels, steel structure, pipe supports fabrication and installation
1988 -1989 TPI Petrochemical plant expansion
Propylene plant >200,000 t/y
8x 30 km.Ethylene Gas Pipeline
Utilities Expansion e.g.
Nitrogen Generation (Air Seperation), Central Wastewater Treatment Plants, Demineralized Water Treatment Plant, Steam MP Boilers Package.
(Thai Petrochemical Industries) Project Coordinator:
project coordination
construction coordination
vendors sourcing, proposal reviews and evaluations for procurement, contract administration coordination, plant users coordination
1988 ESSO / Exxon Oil refinery plant:
Crude oil distillation unit (CDU) renovation (8.0 dia. x 60.m high)
Replacement in Trays and Bubble Caps, piping &insulation, tower attachments
Mechanical Engineer:
Annual shutdown coordination and procurement for the CDU renovation.
1987- 1988 NPC Petrochemical / Olefins Plant, Phase GIII (Polyethylene >200000 ton/yr) Process & Utilities Piping and Pipeline Detail Design
(Act Consultant) Project Engineer:
Piping and Pipeline Detail Design development supervision together with Toyo Engineering Corp. (TEC) s Supervisor
1979 Thai Meylon Polyester Plant
(Thai Meylon Polyester) Mechanical Engineer
coordination during annual plant maintenance
Experience Summary In Energy / Power Plants Projects
(Feasibilitiy Studies, Pre-Construction, Construction)
Years Projects Descriptions Duties and Responsibilities
August 2007 - July 2008 1 x 800 MW CCGT Power Plant
w / natural gas receiving station
(IPP Phase 2 - Thailand)
Senior Engineering Consultant
.
Coal-fired Power Plant with Seawater Desalination Supply & Water Pipelines
Indonesia.
Mechanical Project Engineer /
Senior Mechanical Engineer
Sinclair Knight Merz
joined bid proposal preparation team
local vendor sourcing for costs of construction /budget allocation
studied and compared EPC technical proposals from Siemens, Mitsubishi
Study EPC contractor document
for mechanical construction supervision
site supervision on mechanical systems erection executed by EPC Contractor
review mechanical designs/engineering
inspect/monitor boiler and structure erection works and quality at site
review quality control documents e.g.
procedures, ITP etc.
review jobs safety analysis
July 2006 August 2007 2 x 746 MW CCGT Power Plant
w / natural gas receiving station
(Ratchaburi RPCL- Thailand)
1 x 746 MW CCGT Power Plant
w / natural gas receiving station
(EGAT SBCC Thailand)
(Assistant Project Manager)
Mitsubishi Corporation
Studied the requirements specified in the contract documents and drawings/documents to understand the technical, commercial and general requirements
Studied the emissions requirements and coordinated in CEMS installation to comply with statutory & project requirements
Joined in monthly project meeting for work progress monitoring, responding in technical aspects.
Reviewed and evaluated in technical proposals for CEMS stack emissions and fuels analysis
Coordinated in quality assurance and control for piping and tanks fabrication works.
Joined in engineering reviews for mechanical work of Balance of plants
performed vendors sourcing for fuel oil suction assembly, demineralized water supplies.
Coordinated / clarified to owners engineers and owners in technical aspects
Coordinated in field installation works and site meetings
Coordinated with Electricity Authorities for communicaion system of HV substation and power energization
Oct 2003 July 2006 22.5 MW Biomass Power Plant
(450 ton/day Ground Rice Husk suspension & oil firing) including
115 / 6.6 kV Terminal Substation
(Construction & Operation Manager)
AT Biopower
Joined project management in engineering, construction, contract
Supervised plant operation and maintenance management.
Supervised/monitored the boiler & steel structure fabrication & construction
performed vendors sourcing and evaluated proposals
Coordinated with Electricity Authorities for technical clarifications and power purchasing agreement (PPA) aspects
site EHS control coordination
Implementation the requirements specified in EIA report for environmental prevention, Pollution Mitigation Measures monitoring
2002 -2003 8 MWe Palm Residues Fired Power Plant (Demonstration Project)
(Project Coordinator)
Consultants of Technology (COT). prepared tender documents
joined engineering review,
project coordination
site visit and survey for engineering design
2002 -2003 70 MW Cogeneration CCGT power plant firing biomass and gas
Power Plant
(Project Coordinator) detail engineering development and cost estimation to support feasibility study
develop RFP/vendors sourcing for power equipment components
Jan 2000 Sep 2001 110 MW Laemchabang Cogeneration (CCGT)Power Plant & Off-Site Facilities (LP / MP
Steam Pipelines & 22 / 115 KV Power Transmission Lines)
Project Engineer- Power Plant
Site Project Manager- Off-Site Facilities
ST. Fortum Engineering (Finland) engineering, procurement (vendors sourcing / reviews), construction, contract and project management including quality/ EHS control
monitor/control structural steel and piping fabrication, quality and progress
coordination in power plant commissioning / operation for steam pipeline and power transmission
Jul
1997 --
Jan 2000 700 MW Independent Power (Thailand) CCGT Power Plant
Boiler Engineer Pressure Parts
Shop Fabrication
Project Manager for NPP Shop Fabrication (Shop).
Project Field engineer (Site)
Vogt (U.S.A.) - Nem BV (The Netherlands),
Siemens-Westinghouse U.S.A. boiler engineer & license administration
local HRSG, fire protection system vendors & sourcing and bids evaluation
piping, HRSG steel fabrication supervision / management and quality control coordination
HRSG Parts fabrication certification to regulartory requirements, including management coordination / supervision in main equipment and Balance of Plant construction & commissioning at site
engineering design review
Aug 1996 July 1998 170 MW Amata Egco Cogeneration(CCGT) Power Plant
Boiler Engineer HRSG Parts
Nem BV (The Netherlands) boiler engineer & license administration, vendors sourcing, procurement, parts fabrication monitoring for certification in quality & regulatory compliance
1996 -1997 Pulp & Paper Mill: Steam Generator Renovation (Project Coordinator) Supervision, contractor obligation field inspection / compliance
1988 -1989 25 / 40 MW TPI CCGT / Coal-fired Power Plant (Project Coordinator)
Thai Petrochemical Industry Proposals (MHI, Kawasaki, Standard Kessel) study / reviews, coordination,
1987- 1988 HRSG of National Petrochemical Plant (Project Engineer)
Act Consultants. Supervision on Interconnecting Detail Process&Utilities Piping / Pipeline Design
Experience Summary In Water & Wastewater Treatment, Municipal / Hazardous Wastes Incineratiion Plants Projects
Years Projects Titles (Capacities) Duties and Responsibilities
2008-present LNG Terminal
Wastewater treatment systems,
Seawater / water supply systems FEED compliance verification and review on EPC proposal and documents
2007 - 2008
Water Treatment plant (Desalination) and seawater supply station and water pipeline for power plant in Indonesia
(Sr. Mechanical Engineer) Design review and provide comments to EPC contractors for correction / clarifications
2006-2007 Ratchburi & SBCC III 746 MW CCGT Power Plants
Cycle Make-up / Demin. Plant
(Asst. Project Manager) Engineering review, fabrication coordination
2003 2006 A.T. Biopower Plant
Raw water treatment plant and Demineralized water treatment plant
(Construction & Operation Manager) Construction and commissioning supervision
2001 -2003 Demonstration 8 MWe Palm residue-fired Power Plant
Demineralized Water Treatment Plant Engineering review
Feasibility Study Report
(Waste-To- Energy Project) (MSW) Provide deatil engineering to back-up the report
DIW 50 ton/day Hazardous Wastes Incineration Plant with anti-pollution control equipment
(Project Coordinator) Engineering review, construction supervision / coordination, vendors sourcing, proposal management, contract review, codes / regulation verifications.
100 ton/day MSW Incineration Plant (with heat recovery boiler)
Ash Solidification and Stabilization Plant
Plants Visit in Taiwan Visiting plant configurations.
Enquiring design features , plant operation characteristics, equipment specifications, performance etc.
1998 2000 Raw Water Treatment Plant (solid contact clarifier with Lamella) and Demineralized water treatment plant (Ion Exchange & Reverse Osmosis) for 700 MW CCGT IPT Power Plant
(Project Field Engineer) construction & commissioning coordination
1995-1997 Water conditioning / treatment units for boiler feed water systems of HRSG for 170 MW Amata-Egco Power Plant
(Boiler Engineer) Installation coordination
1993 Demineralized water treatment plant (Ion Exchange) for Advance Agro Pulp & Paper Mill in Prachinburi Bid preparation and submission, bids clarification
Municipal wastewater treatment plant (AS) renovation in Bangkok Bid preparation, site survey for cost estimate, coordination with client
1988 - 1989 - 70000-100000 cu.m./yr x 1000 ppm C.O.D. Wastewater treatment plant (Oxidation Pond) and
- 70 ton/hr Demineralized Water Treatment Plant (Ion Exchange) for TPI Plant Utilities Expansion
(Project Coordinator) plant users coordination, vendors sourcing, proposals review, procurement and contract coordination
1987 1988 Renovation/Uprating in the existing Bangpoo WWTP (CMAL) and wastewater pumping station& pipeline Design coordination for the existing plant improvement / uprating and design review
1987 1988 Wastewater treatment Plant for hospital in Bangkok (rotating biological contactor- RBC) construction coordination
1987 1988 Wastewater Treatment Plant (activated sludge-AS) for hi-rise bldgs. Design and engineering clarifications for permit as Design Engineer
1977 1984
Saudi Arabia Wastewater Treatment Plants (DAF) for Housing Complexes populations) construction projects.
Water pipeline including pumping & diesel power station.
Package Wastes Incinerator for hospitals construction projects.
(Office Engineer / Site Coordinator) detail design (Shop drawings),
site coordination and supervision
|
| 3. Education & Training - CV/Resume Part 3 [Mandatory] |
1975 : Bachelor Degree in Mechanical Engineering (B.Eng.)
1986 : Post-Graduate Diploma in Environmental Engineering (Post-Grad. Dip.)
(major: water & wastewater and solid waste treatment engineering)
|
| 4. Computer Skills - CV/Resume Part 4 [Mandatory] |
Microsoft Word. Excel, Project
Acrobat Professional
|
| 5. Other Skills - CV/Resume Part 5 [Optional] |
contract, procurement, subcontract administration
|
| 6. Additional Information - CV/Resume Part 6 [Optional] |
Languages: English: fluent in reading, speaking and writing
References
Previous supervisors and colleagues are available upon request later
Training & Plants Visits:
HRSG, CCGT, Cogeneration and Coal-fired Power Plants / Coal Mine:
Mitsubishi Heavy Industries (MHI), Japan (Engineering Department)
NEMs Heat Recovery Steam Generator (HRSG) Pressure Parts Fabrication Shop in
Scheemda - The Netherlands.Training on quality and engineering document systems.
EGAT Wangnoi 2000 MW CCGT Power Plant (Ayudhya-Thailand)(Mitsubishi 701F)
REGGO 1200 MW CCGT Power Plant (Rayong - Thailand)(Alstom)
130 MW CCGT PTT Utilities Phase 1- (Rayong Thailand)[ Nuovo Pignone, Frame 6 B]
EGAT Mae Moh 2400 MW Coal-Fired Power Plants and Coal Mines (Lampang - Thailand)
EGAT SPP & PPA Seminars (Bangkok, Petchburi- Thailand)
BLCP 1400 MW Coal-Fired Power Plant (Rayong - Thailand)
Tuntex Coal-Fired Power Plant (Rayong Thailand)
ISO 14000 & 18000 Seminar organized by Industrial Works Dept. (Pitsanulok- Thailand)
Mine Processing Plant / Biomass/Renewable /Solid / Hazardous Wastes Treatment Plants:
Akara Gold & Silver Mining & Processing Plant (Pichit Thailand)
Banpu Coal Stock Piles & Handling Facilities at Site and Port (Kalimantan - Indonesia)
100 tons/day Hazardous Wastes Incineration Plant w/ HRSG & steam-turbo generator, Anti-Pollution Control (Bag House) System (Taiwan)
Ash Solidification and Stabilization Plant for Municipal Solid Wastes (Taiwan)
Electrostatic Precipitator (ESP) & Boiler Accessories Manufacturer(BHEL - India)
On-Nooch Municipal Solid Wastes Treatment Plant (Bangkok- Thailand)
Mitr Pohl Phukhiew Baggasse/Rice Husk-fired 40 MW Power Plant (Chiyapum- Thailand)
Univanich 8 MWe Palm Residue-fired Power Plant (Krabi- Thailand)
Multi-Biomasses (coal/rice husk/wood chip) Fired 150 MW Power Plant (Prachinburi-Thailand)
Prathum Rice Husk- Fired 6 MW Power Plant (Prathumthani Thailand)
|
| |
|
|
|
|
|
Mechanical Piping Engineer Parsons, Siemens UHDE, Mitsubishi / MHI (Japan), Toyo Engineering
CV/Resume ID no.: 95076 |
|
|
|
|
|
|
| Relevant CVs; view more oil and gas CVs |
| 1. Piping Design Engineer |
| 2. PDMS Piping for Oil & Gas Engineering (Offshore, Onshore, EPC Power etc) |
| 3. Piping Superintendent/supervisor/engineer |
| 4. Hydraulic Technician |
| 5. Senior Piping Designer, I aim to be involved in new challenging projects. |
| 6. PDS Piping Designer / Piping Senior Draughtsman |
| 7. PDS Piping Designer |
| 8. Mechanical Engineer with expertise in Piping & Pressure vessel Design |
| 9. PIPING ENGINEER |
| 10. Pipe, Piping, Caesar, Stress Piping |
| 11. Fire & Gas Detection System engg. |
| 12. Pipe, Piping, Lead Piping, Coating, Insulation |
| 13. Piping design engineer, PDS/PDMS |
| 14. PDS Piping Designer |
| 15. PDS/PDMS/AutoPlant piping designer |
| 16. PIPING ENGINEER |
| 17. Construction Supervisor / Engineer |
| 18. Field Piping Designer |
| 19. Project Coordinator |
| 20. Lead Piping Engineer, Piping Stress, Plant Layout,Caesar, Routing, Support |
| |
| |
| Other CVs; view more oil and gas CVs |
| 1. Electrical Designer |
| 2. 10 years experience in oil and gas production DCS control system |
| 3. Contract Administration, Commercial Management, Subcontract Management, Disputes |
| 4. Driller as a Trainee and Wireline Logger and Mud Logger |
| 5. Ships Officer, DP Operator, Advanced Computers & IT training, Oil Industry & Operations |
| 6. Bachelors in Business Administration/Government experience |
| 7. PLANNING ENGINEER (OIL & GAS) |
| 8. Seeking a driller position |
| 9. Sales Assistant Aberdeen, Scotland UK |
| 10. Graduate Medical Doctor, MBBS Lahore Medical And Dental College |
| 11. Rigger, Radio Operator, Roustabout Offshore Sector Eastern Canada and the Gulf of Mexico |
| 12. Principal Project Engineer with Saipem ABB Lummus, Singapore, Vincent FPSO Azurite FDPSO |
| 13. HSE officer safety audits, ptw, scaba, confine space entry, tool box talk, safety demonstration |
| 14. PDS Piping Designer, Jacobs Engineering India Pvt. Ltd. Baroda. Gujarat |
| 15. Cheif of security, security guard, manager at courier company |
| 16. Safety Manager, Risk analysis management DNV Energy Solutions Argentina Business Development Manager |
| 17. E & I Engineer in K-PAS Instronic Engineers, Chennai India |
| 18. Trainee Fire Safety Supervisor at Mangalam Drugs & Chemicals, Vapi, Gujarat India |
| 19. PROCUREMENT OFFICER IN RAS GAS EXPANSION PROJECT QATAR |
| 20. PDMS Administrator Worley Parsons Oman Jacobs India Mott Mac Donald LLC Toyo Engineering India |
| 21. Graduate seeking for a job as petroleum engineer in any oil and gas field company |
| 22. Commissioning Engineer CEGELEC Oil & Gas, Abu Dhabi UAE / Tecnie Electrical Engineering |
| 23. QA/QC Engineer experience in Pipeline Construction Jayaram Engineering Industry India |
| 24. Sr Expatriate International Maintenance Supervisor exp. UK, CIS, Russia, Middle East, Asia Pacific |
| 25. Expat Piping Engineer worked UK, Norway, USA, Spain, Finland, Singapore, China, Australia, Indonesia |
| 26. Trainee worker looking to build a career in the oil industry |
| 27. Offshore Materials Man / Storekeeper / Storeman in Constanta Romania |
| 28. Radio Officer in Ennore Port India Signal Station last one year |
| 29. I & C Engineer Siemens Malaysia Sdn Bhd Siemens DCS and sub-systems Siemens Simatic Step 7 Step 5 |
| 30. Sr. Reservoir Engineering Advisor Hunt Oil Company USA, OMV/Petrom SA Romania ENI Shell Chevron |
| |
| |
|
|
|